IBS TRAININGPREPARED BY:Tempus Telcosys
 IBS SURVEYIBS SURVEY LINK BUDGET CALCULATIONLINK BUDGET CALCULATION IMPLEMENTATIONIMPLEMENTATION QUALITY CHECKLISTQUA...
What is IBS/DAS ?1.In-building Solution (IBS) / Distributed Antenna System (DAS)2.Small Cell Coverage within building prem...
What drives the need for IBS ?1. Demand of Continuous coverage2. Indoor Activities generating high traffic3. Poor indoor c...
IBS Project1.Site Survey (IBS and LOS)2.Design report preparation of the survey3.Implementation work4.Frequency planning a...
PLANNING PROCESSSurvey, IBS Planning
IBS Planning Process Flow ChartSITE ACQUISITIONCustomer request1. With target buildings -> Preliminary site survey2. Witho...
PRELIMINARY SITE SURVEY/PRE- PLANNING1. Building Information.2. Surrounding Network Information.3. Draft Solution Design.4...
SITE SURVEY1. Propagation Measurement.2. Final BTS & Antenna location.3. Final Cable routing.4. Photos of Antenna Location...
DETAIL DESIGN REPORT1. System Diagram (Trunking Diagram).2. Power Budget Calculation.3. Solution Description Template.4. T...
TYPES OF TYPICAL BUILDINGS COVERED INIBS1.Office Complex2.Shopping Malls.3.Hotels & Restaurants.4.Hospitals.5.VIP Guest Ho...
IBS SURVEY & PRE-PLANNING
TOOLS REQUIRED FOR IBS SURVEY1. GPS2. Digital Camera.3. Magnetic Compass.4. Binoculars.5. Measuring Tape.6. Net Monitor Ph...
STEPS IN IBS SURVEY1. Study the building architecture, with the help of floor plans & guidance fromBuilding authorities2. ...
LOS SURVEYTAKE LAT – LONG BY GPSASK FOR FAR END TO SURVEY CO ORDINATORDECIDE TOWER HEIGHT( e. g POLE,RTT, GBT )REQUIREMENT...
INDOOR PROPOGATION Indoor channels are different from traditional mobile radio channels intwo different ways• The distanc...
 However, conditions are much more variable• Doors/windows open or not The mounting place of antenna• On the wall, ceili...
PARTITION LOSSES There are two kind of partition at the same floor:• Hard partitions: the walls of the rooms• Soft partit...
ANTENNA SYSTEM USED IN IBSAntennas Distributed Via Coax Feeder NetworkThis is the most simplified method used in IBS. It ...
ULTRAMINI SITE2+0SEC 1SP25mSP15m5m15m5m10m15m10m10m15mSP3SP410m10m10m5m10m15m10m10m5m5m10mSP5SP6SP7SP8OA1OA2OA3OA4OA5OA6OA...
OA2OA3OA4OA5OA6OA7OA8OA11OA12OA1PA1PA2OA9OA10SADDLE WORKPOP CUTTINGREQUIREPOP CUTTINGREQUIRE
LINK BUDGET CALCULATIONIT IS BASICALLY FOR POWER THAT REQUIRED AT ANTENNA END.IT DEPENDS ON THE COMPONENTSTHAT HAS BEEN US...
1) SPLITTERS::2 WAY2 WAY -3.25-3.253 WAY3 WAY -5.05-5.054 WAY4 WAY -6.25-6.25TYPE LOSS (dB)Generally 3 types of splitters ...
1) SPLITTERS ( Continue )::2 WAY 3 WAY 4 WAY
2) COUPLERS::7 dB7 dB-7-7 -1.5-1.510 dB10 dB-10-10 -0.5-0.515 dB15 dB-15-15 -0.3-0.3TYPE LOSS ATCOUPLE PORT (dB)LOSS ATTHR...
2) COUPLERS ( Continue )::INPUTCOUPLED PORTTHROUGH PORT
3) CABLES::½ ‘’( LDF4-50 A)½ ‘’( LDF4-50 A)-0.11-0.117/8 ‘’( LDF5-50 A )7/8 ‘’( LDF5-50 A )-0.06-0.061-5/8’’ ( LDF7-50 A )...
3) CABLES ( Continue )::
4) ANTENNAS::Generally 3 types of antenna are used in IBS, which are as follows.OMNI ANTENNAOMNI ANTENNA22PANEL ANTENNAPAN...
4) ANTENNAS ( Continue )::OMNI ANTENNA
4) ANTENNAS ( Continue )::PANEL ANTENNA
FLAT PATCH OMNI ANTENNA ( Vendor : Kaweri )4) ANTENNAS ( Continue )::12 cm12 cm
5) COMBINER::A combiner is the device that enables several transmitters to transmitter from the same antenna.HYBRID COMBIN...
6) LINK BUDGET CALCULATION :: Example with Trunking Diagram:
NOTE:BTS POWER IS MENTIONED AS 37 CONSIDERING 3dB COMBINER LOSS.
6) DIFFERENT CONNECTOR USED IN IMPLEMENTATION:( 1 ) ½ N MALE CONNECTOR( L4PNM-RC )To connect female port of other componen...
( 2 ) ½ N FEMALE CONNECTOR( L4PNF-RC )Connect with ½ cableConnect with male port like7/8 to ½ inch connectorOr Kaveri comb...
( 3 ) 7/8 to ½ inch CONNECTOR( L5PNM-RC )Connect with 7/8 cable( LDF 5-50A )Connect with female port likeOur antannas and ...
To connect female port of 7/8 cable at one side and BTS port or jumper cable( 4 ) DIN Male for LDF5-50 A 7/8 inch Cable( L...
( 5 ) EXTERNAL COMBINER(AVANTEL)Female PortFemale PortFemale Port
( 6 ) EXTERNAL COMBINER(KAVERI)Female PortFemale PortFemale Port( 6 ) EXTERNAL COMBINER(KAVERI)
( 7 ) EXTERNAL JUMPER CABLEAT BTS ENDAT COMBIER ENDTHIS PORT HAS SIZE SAME AS 7/8 CABLE
7) BTS Types:Generally 3 types of BTSAvailable.1) Ultra BTSCabinet Max. power Demand:1.8KVVAC / 1.5KVADCNominal Voltage:23...
2) METRO BTS85cm35cm25cmConfiguration: 2+2Power: 40 dBm
SECTOR’S JUMPER CABLEMW CABLE FOR CONNECTIVITY
3) ULTRA MINI BTSIt looks same as Ultra BTS.Configuration: 2+2Power: 43 dBm
DETAILED DESIGN REPORT1. Building Information: Co-ordinates, No. of Floors, Basements, Lobbies.2. BTS Information: BTS Typ...
REPEATER :Generally used where capacity required is low.It amplifies and converts weak signal into stronger signal by addi...
TYPICAL REPEATER INSTALLATION
PICK UP ANTENNA(HIGHLY DIRECTIONAL )NEARER SITE
INDOOR REPEATERCONNECTED TO PEAKUP ANTENNACONNECTED TO ANTENNAPOWER: 2W GENERALLY.( 33 dBm )BAND SELECTIVE
IBS IMPLEMENTATION
TYPICAL IBS INSTALLATION
GENERAL IMPLEMENTATION ISSUE IN IBS OPEN CONNECTIONAntenna, splitter, coupler port is open COUPLERCouple port/through po...
VENDOR HANDLING1. Handover site to vendor with all details like work permission, materialstoragespace, proper cable routin...
IMPLIMENTATION AUDITVisit site daily if possible otherwise 2-3 day in weekCheck installation is as par plan or changeDecid...
IBS IMPLEMENTATION QUALITY STANDARDS.1. No Extra Cable is left rolled near the BTS Equipment.2. Feeder Cable and component...
THANK YOU…
Upcoming SlideShare
Loading in …5
×

IBS Training

48,923 views

Published on

In-building Solution (IBS) / Distributed Antenna System (DAS)

Small Cell Coverage within building premises

Signal is restricted inside the building

Antenna installed inside the building

Low Transmit Power of Antenna

Smaller Antenna size

Published in: Education, Business, Technology

IBS Training

  1. 1. IBS TRAININGPREPARED BY:Tempus Telcosys
  2. 2.  IBS SURVEYIBS SURVEY LINK BUDGET CALCULATIONLINK BUDGET CALCULATION IMPLEMENTATIONIMPLEMENTATION QUALITY CHECKLISTQUALITY CHECKLIST VENDOR HANDLING TIPSVENDOR HANDLING TIPS REPEATERREPEATER BASIC OF LOS SURVEYBASIC OF LOS SURVEY BASIC OF RF SURVEYBASIC OF RF SURVEYCONTENTSCONTENTS
  3. 3. What is IBS/DAS ?1.In-building Solution (IBS) / Distributed Antenna System (DAS)2.Small Cell Coverage within building premises3.Signal is restricted inside the building4.Antenna installed inside the building5.Low Transmit Power of Antenna6.Smaller Antenna size
  4. 4. What drives the need for IBS ?1. Demand of Continuous coverage2. Indoor Activities generating high traffic3. Poor indoor coverage of outdoor sites4. Offloading outdoor cells with high utilization5. Improvement of Network Performance.
  5. 5. IBS Project1.Site Survey (IBS and LOS)2.Design report preparation of the survey3.Implementation work4.Frequency planning and database preparation5.Walk test6.Optimization and site handover
  6. 6. PLANNING PROCESSSurvey, IBS Planning
  7. 7. IBS Planning Process Flow ChartSITE ACQUISITIONCustomer request1. With target buildings -> Preliminary site survey2. Without target buildings -> Area survey to locate possibletarget buildings-> Approval: customer acceptstarget buildings
  8. 8. PRELIMINARY SITE SURVEY/PRE- PLANNING1. Building Information.2. Surrounding Network Information.3. Draft Solution Design.4. Budgetary Cost Estimation.
  9. 9. SITE SURVEY1. Propagation Measurement.2. Final BTS & Antenna location.3. Final Cable routing.4. Photos of Antenna Location, BTS Location, Microwave Polelocation.
  10. 10. DETAIL DESIGN REPORT1. System Diagram (Trunking Diagram).2. Power Budget Calculation.3. Solution Description Template.4. TSSR (Technical Site Survey Report) for BTS & Microwavedetails.
  11. 11. TYPES OF TYPICAL BUILDINGS COVERED INIBS1.Office Complex2.Shopping Malls.3.Hotels & Restaurants.4.Hospitals.5.VIP Guest House.6.Exhibition Centre.7.Government Buildings.8.Airports.9.Railway Stations.10.Corporate Residential Complex.11.Factories & Industries
  12. 12. IBS SURVEY & PRE-PLANNING
  13. 13. TOOLS REQUIRED FOR IBS SURVEY1. GPS2. Digital Camera.3. Magnetic Compass.4. Binoculars.5. Measuring Tape.6. Net Monitor Phone.7. Floor Plan of that Particular Site
  14. 14. STEPS IN IBS SURVEY1. Study the building architecture, with the help of floor plans & guidance fromBuilding authorities2. Understand the requirements need in terms of Coverage, Capacity, futureSubscriber growth etc.3. Identify the duct for the cable routing & component location.4. Survey on each floor using net monitor and floor plan.5. Mark the present signal level and the antenna location to be installed in thefloor plan.6. Note down all the present serving cell information like CELL ID, BCCH, Rx.Level, etc.7. Identify the BTS location, antenna locations and mark on the floor plan.8. Also not down the type of ceiling, whether pop cutting is required or notand availability of cable tray.9. Identify if any future planning is required or not in case of underconstruction buildings.
  15. 15. LOS SURVEYTAKE LAT – LONG BY GPSASK FOR FAR END TO SURVEY CO ORDINATORDECIDE TOWER HEIGHT( e. g POLE,RTT, GBT )REQUIREMENT( ALSO CONSIDER CUSTOMER SPECIFICATION , NOT MENDATORY )CHECK POSSIBILITY OF CABLE ROUTING UPTO BTS LOCATIONIF PCM CABLE OR A-BTS IS REQUIRED FOR TX ,THEN MAKE NOTE THAT PCM CABLE LENGTHIS NOT EXCEEDING BY THAT OF GIVEN SPECIFICATION( UPTO 250 M).( DO NOT COMPROMISE WITH BTS LOCATION IT AFFECTS POWER CALCUTAION )MAKE TERRACE LAY OUT
  16. 16. INDOOR PROPOGATION Indoor channels are different from traditional mobile radio channels intwo different ways• The distances covered are much smaller• The variability of the environment is much greater for a muchsmaller range of Tx-Rx separation distances. The propagation inside a building is influenced by• Layout of the building• Construction materials Typical building type• Sports arena, residential home, factory,... Indoor propagation is dominated by the same mechanisms as outdoor• reflection, scattering, diffraction.
  17. 17.  However, conditions are much more variable• Doors/windows open or not The mounting place of antenna• On the wall, ceiling, etc.• The level of floors In building path loss factors• Partition losses (same floor)• Partition losses between floors
  18. 18. PARTITION LOSSES There are two kind of partition at the same floor:• Hard partitions: the walls of the rooms• Soft partitions: moveable partitions that does not span to theceiling• The path loss depends on the type of the partitionsPARTITION LOSSES BETWEEN FLOORS The losses between floors of a building are determined by• External dimensions and materials of the building• Type of construction used to create floors• External surroundings• Number of windows• Presence of tinting on windows
  19. 19. ANTENNA SYSTEM USED IN IBSAntennas Distributed Via Coax Feeder NetworkThis is the most simplified method used in IBS. It has some advantage likelow cost, flexibility in theDesign when shaping the coverage area, robust and well proven techniqueLeaky CableThis type is mainly used in Train tunnels, where it is tough to install with Coaxfeeder network. It also has flexible design but it is costly
  20. 20. ULTRAMINI SITE2+0SEC 1SP25mSP15m5m15m5m10m15m10m10m15mSP3SP410m10m10m5m10m15m10m10m5m5m10mSP5SP6SP7SP8OA1OA2OA3OA4OA5OA6OA7OA8OA9OA10OA11OA12PA1PA2EXAMPLE
  21. 21. OA2OA3OA4OA5OA6OA7OA8OA11OA12OA1PA1PA2OA9OA10SADDLE WORKPOP CUTTINGREQUIREPOP CUTTINGREQUIRE
  22. 22. LINK BUDGET CALCULATIONIT IS BASICALLY FOR POWER THAT REQUIRED AT ANTENNA END.IT DEPENDS ON THE COMPONENTSTHAT HAS BEEN USED FROM BTS TO ANTENNA THAT IS ERP( EFFECTIVE RADIATED POWER ).LIST OF COMPONENTS WITH LOSSES ARE AS FOLLOWS::EIRP( Effective Isotropic Radiated Power )= ERP( Effective Radiated Power ) + Gain of that componentWe generally deal with EIRP ( Effective Isotropic Radiated Power ),which is defined below.1) SPLITTERS2) COUPLERS3) CABLES4) ANTENNAS5) COMBINER6) JUMPER CABLE
  23. 23. 1) SPLITTERS::2 WAY2 WAY -3.25-3.253 WAY3 WAY -5.05-5.054 WAY4 WAY -6.25-6.25TYPE LOSS (dB)Generally 3 types of splitters are used in IBS which are as follows.
  24. 24. 1) SPLITTERS ( Continue )::2 WAY 3 WAY 4 WAY
  25. 25. 2) COUPLERS::7 dB7 dB-7-7 -1.5-1.510 dB10 dB-10-10 -0.5-0.515 dB15 dB-15-15 -0.3-0.3TYPE LOSS ATCOUPLE PORT (dB)LOSS ATTHROUGH PORT (dB)NOTE: Ideally there should be 0 dB loss at through port. But there is always some loss, which ismentioned in table.
  26. 26. 2) COUPLERS ( Continue )::INPUTCOUPLED PORTTHROUGH PORT
  27. 27. 3) CABLES::½ ‘’( LDF4-50 A)½ ‘’( LDF4-50 A)-0.11-0.117/8 ‘’( LDF5-50 A )7/8 ‘’( LDF5-50 A )-0.06-0.061-5/8’’ ( LDF7-50 A )1-5/8’’ ( LDF7-50 A )-0.03-0.03TYPE LOSS (dB per meter)
  28. 28. 3) CABLES ( Continue )::
  29. 29. 4) ANTENNAS::Generally 3 types of antenna are used in IBS, which are as follows.OMNI ANTENNAOMNI ANTENNA22PANEL ANTENNAPANEL ANTENNA77FLAT PATCH OMNIFLAT PATCH OMNIANTENNAANTENNA 55TYPE Gain (dBi )
  30. 30. 4) ANTENNAS ( Continue )::OMNI ANTENNA
  31. 31. 4) ANTENNAS ( Continue )::PANEL ANTENNA
  32. 32. FLAT PATCH OMNI ANTENNA ( Vendor : Kaweri )4) ANTENNAS ( Continue )::12 cm12 cm
  33. 33. 5) COMBINER::A combiner is the device that enables several transmitters to transmitter from the same antenna.HYBRID COMBINER( 2 I/P,1HYBRID COMBINER( 2 I/P,1O/P )O/P ) 3 dB3 dBTYPE LOSSANTENNATX 1TX 2e. g TRX
  34. 34. 6) LINK BUDGET CALCULATION :: Example with Trunking Diagram:
  35. 35. NOTE:BTS POWER IS MENTIONED AS 37 CONSIDERING 3dB COMBINER LOSS.
  36. 36. 6) DIFFERENT CONNECTOR USED IN IMPLEMENTATION:( 1 ) ½ N MALE CONNECTOR( L4PNM-RC )To connect female port of other component like our antennas and splitter.Connect with ½ cableConnect with antenna portOr splitter port.
  37. 37. ( 2 ) ½ N FEMALE CONNECTOR( L4PNF-RC )Connect with ½ cableConnect with male port like7/8 to ½ inch connectorOr Kaveri combinerTo connect male port of other component like 7/8 to ½ connector.
  38. 38. ( 3 ) 7/8 to ½ inch CONNECTOR( L5PNM-RC )Connect with 7/8 cable( LDF 5-50A )Connect with female port likeOur antannas and splitterTo connect female port of 7/8 cable at one side and female port of ½ cable or splitter
  39. 39. To connect female port of 7/8 cable at one side and BTS port or jumper cable( 4 ) DIN Male for LDF5-50 A 7/8 inch Cable( L5PDM-RPC )Connect with 7/8 cable( LDF 5-50A )Connect with female port ofjumper cable or directly toPort of BTS which isGenerally at the top of Ultra BTS
  40. 40. ( 5 ) EXTERNAL COMBINER(AVANTEL)Female PortFemale PortFemale Port
  41. 41. ( 6 ) EXTERNAL COMBINER(KAVERI)Female PortFemale PortFemale Port( 6 ) EXTERNAL COMBINER(KAVERI)
  42. 42. ( 7 ) EXTERNAL JUMPER CABLEAT BTS ENDAT COMBIER ENDTHIS PORT HAS SIZE SAME AS 7/8 CABLE
  43. 43. 7) BTS Types:Generally 3 types of BTSAvailable.1) Ultra BTSCabinet Max. power Demand:1.8KVVAC / 1.5KVADCNominal Voltage:230AC/-48VDCConfiguration: 4+4+4Power: 43 dBm
  44. 44. 2) METRO BTS85cm35cm25cmConfiguration: 2+2Power: 40 dBm
  45. 45. SECTOR’S JUMPER CABLEMW CABLE FOR CONNECTIVITY
  46. 46. 3) ULTRA MINI BTSIt looks same as Ultra BTS.Configuration: 2+2Power: 43 dBm
  47. 47. DETAILED DESIGN REPORT1. Building Information: Co-ordinates, No. of Floors, Basements, Lobbies.2. BTS Information: BTS Type, BTS O/P power, TRX Configuration,Sectorization.3. TSSR Form – Transmission & RF details if planned with outdoor sectorsalso)4. Trunking Diagram - Schematic Presentation of Antenna to BTS connectionvia different components like, splitters, combiners & couplers.5. Link Budget Calculations – EIRP calculation at all antenna ports,considering all the losses.6. Planned Antenna Location with coverage area.7. Bill of Quantity - Material Requirement for the Implementation of DAS.
  48. 48. REPEATER :Generally used where capacity required is low.It amplifies and converts weak signal into stronger signal by adding some gain to it.There are 2 types of repeaters.1) BAND SELECTIVE:It amplifies and boost frequency of particular BAND2) FREQUENCY SELECTIVE:It amplifies and boost particular frequencies only (Generally 2 / 3 frequency.
  49. 49. TYPICAL REPEATER INSTALLATION
  50. 50. PICK UP ANTENNA(HIGHLY DIRECTIONAL )NEARER SITE
  51. 51. INDOOR REPEATERCONNECTED TO PEAKUP ANTENNACONNECTED TO ANTENNAPOWER: 2W GENERALLY.( 33 dBm )BAND SELECTIVE
  52. 52. IBS IMPLEMENTATION
  53. 53. TYPICAL IBS INSTALLATION
  54. 54. GENERAL IMPLEMENTATION ISSUE IN IBS OPEN CONNECTIONAntenna, splitter, coupler port is open COUPLERCouple port/through port is reversedInput port/through port is reversed LABELINGAll the splitters and couplers should be labeled for easy identification ANTENNA PLACEMENT OR ORIENTATIONS IS NOT AS PER PLANShift in antennas if any due to route / customer problem. THERE IS NO PROPER SADDLING, TYING OF CABLESNo Saddling/tying done on site, typical requirement is as followsi.e., every 1mtr or 1.5mtr cable is to be tied REQUIREMENT OF EXTRA MATERIALClamps FOR Antennas/cable
  55. 55. VENDOR HANDLING1. Handover site to vendor with all details like work permission, materialstoragespace, proper cable routing.2. Generate MRF for delivery of material to this site.3. Ask vendor for daily update.4. Must visit site 2-3 day in week.5. Ask all details after completion of full site.6. Get the material details from the vendor7. Get the BOM (Bill of Material) from the vendor and generate cam Formforthe site after reconciling the material
  56. 56. IMPLIMENTATION AUDITVisit site daily if possible otherwise 2-3 day in weekCheck installation is as par plan or changeDecide any changes in antenna location (if require according toaesthetic,permission, cable routing etc..)
  57. 57. IBS IMPLEMENTATION QUALITY STANDARDS.1. No Extra Cable is left rolled near the BTS Equipment.2. Feeder Cable and components have to be independently & properlyclamped(saddling) to the wall or laid over the cable tray .3. Combiner is clamped and the various cables to and from thecombiner aresecured properly on the Cable tray or Wall mount.4. Feeder Installation for all the sectors should have appropriatebending radiusfor both 1/2” & 7/8”.5. Connector have to be weather proofed6. Feeders & components should be anchored at fixed intervals bysaddling/cable tie7. Aesthetic rectification should be completed with cleanliness