Project 3 state highway 130 092210

407 views

Published on

Case Study #3 for UTCM Report #08-14-03 "Making Mobility Improvements a Community Asset: Transportation Improvements Using Context-Sensitive Solutions"

Published in: Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
407
On SlideShare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Project 3 state highway 130 092210

  1. 1. Project 3State Highway 130Austin, Texas area 1
  2. 2. Project 89 miles (Georgetown – Seguin) Bypass congested I-35 section Austin-San Antonio New toll highway Almost all rural and semi-rural Source: http://www.sh130.com/ 2
  3. 3. CSS Design Collaborative design input from stakeholders  Cities  Counties  Property owners Design charrettes Areas of stakeholder interest  Aesthetics  Noise  Future road, ped/bike networks  Landscaping  Historic property mitigation  lighting 3
  4. 4. Features Regional icon (Texas star) Native wildflowers, trees Down facing luminaires Depressed toll plaza Provide for existing, future streets, paths on transportation plan  Grade separations Depressed toll plaza. Source: http://www.texastollways.com 4
  5. 5. Features 5
  6. 6. Status First 49 miles completed 2009 Last 40 miles under construction in 2009 Source: http://www.texastollways.com 6

×