Michael Reifer, Frener & Reifer, Brixen (IT) “Development and implementation of façade system”

57 views

Published on

The Future Envelope 12
Interreg IT-AU FACEcamp project
------------
Conference on Building Envelopes
20-21 May 2019, NOI Techpark, Bolzano (Italy)
"It’s all about performances".

Published in: Technology
  • Be the first to comment

Michael Reifer, Frener & Reifer, Brixen (IT) “Development and implementation of façade system”

  1. 1. The Future Envelope 12 final event 20-21 May 2019, Bolzano The Future Envelope 12 It’s all about performances • Development and implementation of façade system • Michael Reifer • FRENER & REIFER GmbH/Srl FACEcamp is funded by European Regional Development Fund and Interreg V-A Italy-Austria 2014-2020. www.interreg.net
  2. 2. The Future Envelope 12 final event 20-21 May 2019, Bolzano FRENER REIFER Company development
  3. 3. The Future Envelope 12 final event 20-21 May 2019, Bolzano Euregio region TAAT SOUTH TYROL
  4. 4. The Future Envelope 12 final event 20-21 May 2019, Bolzano FRENER & REIFER history
  5. 5. The Future Envelope 12 final event 20-21 May 2019, Bolzano FRENER & REIFER history
  6. 6. The Future Envelope 12 final event 20-21 May 2019, Bolzano New York HQ Brixen Augsburg Zürich Paris London Richard Meier Kenzo Tange Tadao Ando Norman Foster SANAA Renzo Piano Herzog & de Meuron Zaha Hadid FRENER & REIFER worldwide
  7. 7. The Future Envelope 12 final event 20-21 May 2019, Bolzano FRENER & REIFER Film
  8. 8. The Future Envelope 12 final event 20-21 May 2019, Bolzano (r) & D - Projects Iconic Architecture Complex Geometry
  9. 9. The Future Envelope 12 final event 20-21 May 2019, Bolzano From Wildspitzbahn to Softbridge, a R&D transfer story
  10. 10. The Future Envelope 12 final event 20-21 May 2019, Bolzano Fabrication (classical), surface destruction
  11. 11. The Future Envelope 12 final event 20-21 May 2019, Bolzano Fabrication (classical), surface destruction
  12. 12. The Future Envelope 12 final event 20-21 May 2019, Bolzano Fabrication (classical), surface destruction
  13. 13. The Future Envelope 12 final event 20-21 May 2019, Bolzano Rendering Fabrication, how to do a double curved mirror surface?
  14. 14. The Future Envelope 12 final event 20-21 May 2019, Bolzano Alternative fabrication (result of R&D project nURBS-tEC) ― Potential forming methods selection determination ― Forming limit parameter definition ― Forming limit parameter
  15. 15. The Future Envelope 12 final event 20-21 May 2019, BolzanoREFERENCES Prototyping alternative fabrication (MockUp passed)
  16. 16. The Future Envelope 12 final event 20-21 May 2019, BolzanoREFERENCES Installation
  17. 17. The Future Envelope 12 final event 20-21 May 2019, BolzanoREFERENCES work result
  18. 18. The Future Envelope 12 final event 20-21 May 2019, BolzanoREFERENCES Developement minimo „structural glased), based on minimo_FR
  19. 19. The Future Envelope 12 final event 20-21 May 2019, Bolzano (r) & D - Projects Iconic Architecture, structural glass
  20. 20. The Future Envelope 12 final event 20-21 May 2019, Bolzano Structural glass pyramide, Hotel Adler, Val Gardena, pretensioned glas structure
  21. 21. The Future Envelope 12 final event 20-21 May 2019, Bolzano R&D: design variants, test scenario creation, supply chain development, prototyping
  22. 22. The Future Envelope 12 final event 20-21 May 2019, Bolzano (r) & D - Projects Iconic Architecture, adaptive facades
  23. 23. The Future Envelope 12 final event 20-21 May 2019, Bolzano New challenge: adaptive high end facade
  24. 24. The Future Envelope 12 final event 20-21 May 2019, Bolzano Step 1: make feasable the architectural vision
  25. 25. The Future Envelope 12 final event 20-21 May 2019, Bolzano Step 2: functionality and visual design, and supply chain logic development
  26. 26. The Future Envelope 12 final event 20-21 May 2019, Bolzano Step 3: automation control design, production of visual and functional prototype
  27. 27. The Future Envelope 12 final event 20-21 May 2019, Bolzano Step 4: testing: wind forces, wind noise, corrosion, flash
  28. 28. The Future Envelope 12 final event 20-21 May 2019, Bolzano Step 5: optimization and production „zero serie prototype“
  29. 29. The Future Envelope 12 final event 20-21 May 2019, Bolzano Step 6: supply chain implementation (Super market)
  30. 30. The Future Envelope 12 final event 20-21 May 2019, Bolzano Step 7: production & installation
  31. 31. The Future Envelope 12 final event 20-21 May 2019, Bolzano Step 8: impressions
  32. 32. The Future Envelope 12 final event 20-21 May 2019, Bolzano developing concepts verifying solutions developing solutions designing concepts generating ideas producing solutions The F&R stage gate process ! Step 9: R&D process standardisation for a complex ETO building system supplier Project development as stage gate process with the right competencies on the right time Generating ideas, developing design Developing and designing concepts and variants Developing solution variants and pricing variants, testing, developing supply chain models and suppliers Producing solutions,
  33. 33. The Future Envelope 12 final event 20-21 May 2019, Bolzano New market opportunities departing from the R&D project
  34. 34. The Future Envelope 12 final event 20-21 May 2019, Bolzano Building Envelopes Context driven R&D Aproach R&D holistic context driven innovation approach
  35. 35. The Future Envelope 12 final event 20-21 May 2019, Bolzano Innovation Process Questions 2011 1. What kind of building and façade trends are to be expected? 2. Is reacting to trends enough of innovation? 3. How to close the strategic gap between the F&R innovation and the world architecture and building trends ― Look for the right networks: Universities, research institutes, parametric designers, suppliers….. ― Research in the right directions ― Enforce evolution true portfolio management and revies R&D in F&R: the beginnings
  36. 36. The Future Envelope 12 final event 20-21 May 2019, Bolzano Information Flow Cooperative problem Solving Documentation Energy Flow, Cradle 2 Cradle Life Cycle Parametrics Context induviduality System Component Logics Geometric Parametrics, Mathematical Detailing Context Green BuildingContext Urban Integration Material Flow Process Parametrics Part Logistic Parametrics Context Building Performance Innovation portfolio, context and topics
  37. 37. The Future Envelope 12 final event 20-21 May 2019, Bolzano Building Supply Chain, Research and Developement Topics
  38. 38. The Future Envelope 12 final event 20-21 May 2019, Bolzano R & (d) - projects functional design free form technology
  39. 39. The Future Envelope 12 final event 20-21 May 2019, Bolzano State of the art in 2011: System Layers, Details (primary steel-concrete Construction), RWTH
  40. 40. The Future Envelope 12 final event 20-21 May 2019, Bolzano nURBS-tEC R&D: Surface Materials & Macro Joint Analysis (I.C. TU Stuttgart)
  41. 41. The Future Envelope 12 final event 20-21 May 2019, Bolzano nURBS-tEC R&D: Forming Method Analysis, craftman based methods
  42. 42. The Future Envelope 12 final event 20-21 May 2019, Bolzano nURBS-tEC R&D: Forming Method Analysis deep drawing methods & explo forming
  43. 43. The Future Envelope 12 final event 20-21 May 2019, Bolzano nURBS-tEC R&D: Forming Method Analysis deep drawing methods & explo forming
  44. 44. The Future Envelope 12 final event 20-21 May 2019, Bolzano Institut für Baukonstruktion und Entwerfen Lehrstuhl 2, Prof. Stefan Behling nURBS-tEC R&D: Forming Method Analysis
  45. 45. The Future Envelope 12 final event 20-21 May 2019, Bolzano nURBS-tEC R&D: Forming Method Analysis
  46. 46. The Future Envelope 12 final event 20-21 May 2019, Bolzano nURBS-tEC Process, Forming Technology Evaluation Meth 1 Meth 2 Meth 3 Meth 4 Meth 5 Form 1 A 1 B 1 C 2 3 A ― technology readiness evaluation ― alinement forming methods to surface curvature regions ― forming limit parameter evaluation
  47. 47. The Future Envelope 12 final event 20-21 May 2019, BolzanoRESEARCH AND nURBS-tEC prototypes & Start of production
  48. 48. The Future Envelope 12 final event 20-21 May 2019, Bolzano nURBS-tEC Business field, Iconic Architecture, Surface types
  49. 49. The Future Envelope 12 final event 20-21 May 2019, Bolzano Intelligent Architecture Iconic Architecture Brand Architecture Exclusive Living Products and technologies Organic Construction Iconic Architecture Iconic Superyots Wide Size Prototyping Digital Chain •building envelope system supplier (design 2 build) •Other industries •architectural freeform know how •façade engineering and detailing •„mathematical“ detailing nURBS-tEC, business modelling, strategy alinement
  50. 50. The Future Envelope 12 final event 20-21 May 2019, Bolzano nURBS-tEC, R&D:„Sandwich“ Core Parametrics ― research, test and parametrization of cut sheet metal core solutions ― research, test and parametrization of auxetic and folded core solutions ― research, test and parametrization of blown core solutions
  51. 51. The Future Envelope 12 final event 20-21 May 2019, Bolzano nURBS-tEC, „mathematical“ detail engineering ― starting from classical façade engineering (cartesian) ― redesign details “mathematical” reproduceable (spherical coordinates) ― solve conttradiction between tolerance behavior and „mathematical detailing
  52. 52. The Future Envelope 12 final event 20-21 May 2019, Bolzano ― surface and panel geometry scripting ― core, frames and structure geometry scripting ― geometry dependencies and logistics scripting nURBS-tEC, geometric model generation
  53. 53. The Future Envelope 12 final event 20-21 May 2019, Bolzano ― model logistics control and modification ― part drawing scripting ― production chain and NC code scripting nURBS-tEC, digital chain generation
  54. 54. The Future Envelope 12 final event 20-21 May 2019, Bolzano R & (d) - Projects sustainability integral facades
  55. 55. The Future Envelope 12 final event 20-21 May 2019, Bolzano Solpower, integrated semitransparent facade collector (I.C. TU Stuttgart, TU Munich
  56. 56. The Future Envelope 12 final event 20-21 May 2019, Bolzano Solpower, collector performance test (energetical & visual)
  57. 57. The Future Envelope 12 final event 20-21 May 2019, Bolzano Solpower, design prototyp, evaluation of global application potential
  58. 58. The Future Envelope 12 final event 20-21 May 2019, Bolzano R & (d) - projects sustainability integral envelopes
  59. 59. The Future Envelope 12 final event 20-21 May 2019, Bolzano i-Cover, modular regenerative envelope system (I.C. TUM, Eurac, TUIBK, KAB) project objectives ― more adaptability ― more integration variants ― modular system ― model building simulation ― configurator prototype ― design pilot project ― installation pilot plant & facade
  60. 60. The Future Envelope 12 final event 20-21 May 2019, Bolzano results ― modul variants 1 ― modul variants 2 ― Konfigurator
  61. 61. The Future Envelope 12 final event 20-21 May 2019, Bolzano results ― modul variants 1 ― modul variants 2 ― configurator (Java, Excell) ― simulation office building ― design pilot plant ….not yet realized
  62. 62. The Future Envelope 12 final event 20-21 May 2019, Bolzano R & (d) - projects sustainability adaptive facades
  63. 63. The Future Envelope 12 final event 20-21 May 2019, Bolzano Flex Cover, auto-reactive facade (I.C. TU Munich), based on i-Cover
  64. 64. The Future Envelope 12 final event 20-21 May 2019, Bolzano Flex Cover, auto-reactive facade, smartr materials as „regulators“
  65. 65. The Future Envelope 12 final event 20-21 May 2019, Bolzano Thermotrope Glass fins
  66. 66. The Future Envelope 12 final event 20-21 May 2019, Bolzano Autoractive thermo cylinder regulated double skin facade
  67. 67. The Future Envelope 12 final event 20-21 May 2019, Bolzano Autoractive hygroscopic regulated double skin facade (humidity regulating)
  68. 68. The Future Envelope 12 final event 20-21 May 2019, Bolzano Bio Cover, auto-reactive facade (I.C. TU Dresden, Arup a.o.), based on i-Cover
  69. 69. The Future Envelope 12 final event 20-21 May 2019, Bolzano R & (d) - projects sustainability adaptive spaces
  70. 70. The Future Envelope 12 final event 20-21 May 2019, Bolzano L.I.S.A. liviing indepentently in ST AA, inteligent wardrobe (ageing society)
  71. 71. The Future Envelope 12 final event 20-21 May 2019, BolzanoREFERENCES Flissade, the convertible space
  72. 72. The Future Envelope 12 final event 20-21 May 2019, Bolzano R & (d) - projects sustainability circular Economie
  73. 73. The Future Envelope 12 final event 20-21 May 2019, Bolzano As part of the “London Design Festival”, Arup has collaborated with FRENER & REIFER and BAM to create the Circular Building, The partners have teamed up to apply and test circular economy principles in the construction industry by asking the following question: “Can we design a building where, at the end of its life, all its components and materials can be re-used, re-manufactured, just at least re-cycled?” Circular Building ― Installation and exhibition in London
  74. 74. The Future Envelope 12 final event 20-21 May 2019, Bolzano Circular Buildings ― are leading to „BIG DATA“ in construction industry !
  75. 75. The Future Envelope 12 final event 20-21 May 2019, Bolzano R&D process innovation construction 4.0
  76. 76. The Future Envelope 12 final event 20-21 May 2019, Bolzano Source: DFKI (2013) From industry 1.0 to industry 4.0
  77. 77. The Future Envelope 12 final event 20-21 May 2019, Bolzano Design Construction Operation Building Information Modeling (BIM) Cloud Computing Virtual Reality (VR) Augmented Reality Simulations Robotics Additive Manufacturing From industry 1.0 to industry 4.0, main building processes & digital context Lean Construction
  78. 78. The Future Envelope 12 final event 20-21 May 2019, Bolzano developing concepts verifying solutions developing solutions designing concepts generating ideas producing solutions The F&R stage gate process ! F&R-innovation Step 1: process standardisation review departing from TKHQ learnings Project development as stage gate process with the right competencies on the right time Generating ideas, developing design Developing and designing concepts and variants Developing solution variants and pricing variants, testing, developing supply chain models and suppliers Producing solutions,
  79. 79. The Future Envelope 12 final event 20-21 May 2019, Bolzano Project „Build 4 future“: front loaded installation planning (last planner system)
  80. 80. The Future Envelope 12 final event 20-21 May 2019, BolzanoInformationsfluss=Kultur Jolly Ja Ja Ja Ja Ja Ja Ja Ja Ja Ja Ja Ja 12 gt. gt. gt. gt. 0 gt. 0 0 0 gt. gt. gt. gt. gt. gt. 0 gt. 0 0 0 0 gt. 0 MF PP NM DA EC FM GP GG RH HD LM LW MH OJ PP1 RD RM SF SE SS TV VA WC 9 0 9 0 0 0 0 0 0 0 9 9 9 0 9 0 9 0 0 0 0 9 0 h 9 9 9 9 0 9 0 0 0 9 9 9 9 9 9 0 9 0 0 0 0 9 0 h/d PP PP NM DA FM HD LM LW MH OJ PP1RM VA AK h PP NM DA FM HD LM LW MH OJ PP1 RM VA 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 3 27 0 0 0 0 0 0 0 0 0 0 9 0 9 0 9 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 X X X X X X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 X X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 X X X X X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 X X X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 r Bauabschnitte Anwesenheitsliste Mittwoch KW 43 woch KW 43 Ostfassade 1-A 1-A-O-4 1-A-O-5 1-A-O-6 1-A-O-7 1-A-O-8 1-A-O-9 1-A-O-1 1-A-O-2 1-A-O-3 1-A-O-10 Bedarf 0,0 0,5 1,0 1,5 2,0 2,5 3,0 3,5 4,0 4,5 5,0 5,5 6,0 6,5 7,0 7,5 8,0 8,5 9,0 9,5 MF PP NM DA EC FM GP GG RH HD LM LW MH OJ PP1 RD RM SF SE SS TV VA WC Project „Build 4 future“: Excell prototyping, ressources, materials, NCRs Project Build 4 future: I.C, FUBZ, Fraunhofer Italia, 10 building industry companies
  81. 81. The Future Envelope 12 final event 20-21 May 2019, Bolzano Project „Build 4 future“: protoype evaluation, optimisation and digitalisation 3 Pilot projects „lean construction“ • Krankenhaus Bozen (repetitive) • Swiss Re (repetitive,complex parts • Soft Bridge (not repetitive, complex parts ) R&D Outcome: Excell-Prototypes • for innovative site orientated ERP with • agile site ressource and supply chain regulation • NCR Monitoring and contiuous improvement
  82. 82. The Future Envelope 12 final event 20-21 May 2019, Bolzano Project „Cockpit“: developing digital planning, recording and regulation tools Project „Cockpit: I.C., FUBZ, Fraunhofer Italia, 3 building industry companies „digitalisation“ of lean construction BIM integration of lean process data
  83. 83. The Future Envelope 12 final event 20-21 May 2019, Bolzano R&D process innovation construction design 4.0
  84. 84. The Future Envelope 12 final event 20-21 May 2019, Bolzano Project „open BIM“: engineer 2 order (ETO) organised building supplier: example F&R
  85. 85. The Future Envelope 12 final event 20-21 May 2019, Bolzano developing concepts verifying solutions developing solutions designing concepts generating ideas producing solutions ! Fact 1: Not well defined supplier interferences because of late involvement of suppliers Fact 2: High costs in the realisation process because of not cleared intersections between suppliers Fact 3: High competition and lowest prices seams to be much important than solution finding Fact 4: BIM is not well manageable because lack of information at the right time Project „Build 4 future“: problems and challanges for innovative project development
  86. 86. The Future Envelope 12 final event 20-21 May 2019, Bolzano How we can rethink the project development process? • How we can obtain more process transparency? • How we can obtain more process efficiency? • How we can reduce process costs? • How we can use BIM with value added at the process? The project development process Project „Build 4 future“: problems and challanges for innovative project development
  87. 87. The Future Envelope 12 final event 20-21 May 2019, Bolzano developing concepts verifying solutions developing solutions designing concepts generating ideas producing solutions The F&R stage gate process ! Project development as stage gate process with the right competencies on the right time ??? Innovation to Order (ITO) or Engineerin to Order supplier (ETO) Configuration to Order (CTO) supplier Build to Order (BTO) or Production on Demand (PoD) supplier Assembly to Order (ATO or Make to Stock supplier Project „open BIM“: supplier types: supply chain variants in project development Same Submission line for every supply chain model
  88. 88. The Future Envelope 12 final event 20-21 May 2019, Bolzano developing concepts verifying solutions developing solutions designing concepts generating ideas producing solutions The F&R stage gate process ! Project development as BIM friendly stage gate process !!! • Defining supplier technology complexities from start • Defining supplier supply chain model types from start • Defining the integrated project delivery strategy and submission stages • Defining the BIM strategy (stage orientated LOD) Project „open BIM“: BIM and supply chain type orientated project development process Same Submission line for every supply chain model
  89. 89. The Future Envelope 12 final event 20-21 May 2019, Bolzano developing concepts verifying solutions developing solutions designing concepts generating ideas producing solutions The F&R stage gate process Project „open BIM“: BIM and supply chain type orientated project development process Different involvement submission lines for every supply chain model Suppliers sorted by supply chain model
  90. 90. The Future Envelope 12 final event 20-21 May 2019, Bolzano Source: http://www.makebim.com/2016/09/17/bim-collaboration-format- with-archicad/?lang=en Source: http://www.hks-architekten.de/de/news/hks-i-architekten- planen-bim-pilotprojekt-des-bundes-berlin Project „open BIM“: BIM and supply chain type orientated project development process Open stage gate oriented BIM: • Information delivery at the right time • From the right competence • With the right knowledge • In the right LOD • With the right recompense • With the right data connectors Results: • Early clash detection • Interference solution finding • Transparence at the right time • Reduction of cost uncertainities
  91. 91. The Future Envelope 12 final event 20-21 May 2019, Bolzano R&D process digitalization robotics in construction
  92. 92. The Future Envelope 12 final event 20-21 May 2019, Bolzano Construction robotics: : additive manufacturing: installation automation Robotics in construction: Installation automation: • Scaffolding • Brick positioning • Brick installation
  93. 93. The Future Envelope 12 final event 20-21 May 2019, Bolzano Construction robotics: additive manufacturing: 3d „printing“ Robotics in construction: 3d printing: • Concrete casting • Concrete printing large scale • 3d metal welding
  94. 94. The Future Envelope 12 final event 20-21 May 2019, Bolzano R & (d) - projects facecamp knowlegde management
  95. 95. The Future Envelope 12 final event 20-21 May 2019, Bolzano Knowledge management based on fractal abstract structure, tested in flexcover
  96. 96. The Future Envelope 12 final event 20-21 May 2019, Bolzano Knowledge management based on fractal abstract structure, to be continue
  97. 97. The Future Envelope 12 final event 20-21 May 2019, Bolzano Inventing future envelopes What If ???
  98. 98. The Future Envelope 12 final event 20-21 May 2019, Bolzano Innovation portfolio, context and topics todays world future world F&R_development (r) & D ! future world from todays point of view F&R_Innovation R & (d) ! ?F&R_innoVision What if ???
  99. 99. The Future Envelope 12 final event 20-21 May 2019, Bolzano Information Flow Cooperative problem Solving Documentation Energy Flow, Cradle 2 Cradle Life Cycle Parametrics Context induviduality System Component Logics Geometric Parametrics, Mathematical Detailing Context Green BuildingContext Urban Integration Material Flow Process Parametrics Part Logistic Parametrics Context Building Performance Innovation portfolio, todays view of future world
  100. 100. The Future Envelope 12 final event 20-21 May 2019, Bolzano Innovation portfolio in the future world ????
  101. 101. The Future Envelope 12 final event 20-21 May 2019, Bolzano Thank you for your attention! • Michael Reifer • FRENER & REIFER GmbH/Srl • m.reifer@frener-reifer.com FACEcamp is funded by European Regional Development Fund and Interreg V-A Italy-Austria 2014-2020. www.interreg.net

×