Vision 2025  at work Tulsa Event Center
 
 
 
View from the west side of the arena
 
East side view
 
 
 
 
 
Installation of the hockey rink
 
Main Level – Concession
Premium Level
Typical rough-in of CAT6 and CATV cables
Overhead cable tray – installed by general contractor
Sub Contractor Crew Chief – directs cable installation
Technician installing vertical cable tray in one of 19 telecom closets
Custom fitting to allow tray to form to the conduits provided by general contractor
Custom fitting of the vertical cable tray
 
Technician operates a  scissor lift installing CAT6 cable
Technician operates boom lift to be in position to install outside camera’s.
Camera’s were installed on the west eyebrow RG6 cables were extended down both sides of the arena
 
View from the West Eyebrow
 
 
 
Technician labeling cables before installing on the east eyebrow
Security Office Cabinets Front View Rear View
 
 
Front view of equipment rack in the Security Office
Initial preparation of CATV distribution Fiber patch panel Room 1B31.04
Premium Level A Quadrant Distribution of the Cable TV System
View from the Upper Level Concourse
Typical Equipment Cabinet -  being prepped to terminate Belden Fiber Optic cable and Belden CAT 6 Media Twist cable
Trans – Tel Central Inc: Bryan Shank – Director of Engineering Bill Wright – Account Executive Carol Harper – Director of ...
Subcontractor Support DCI Communications Mike Weaver – Project Manager Fred Anderson – Crew Chief Santos Yvanez – Crew Chi...
Opening the BOK Center on 9/6/08  The Eagles
Upcoming SlideShare
Loading in …5
×

4 Ok802 Bok Center Terry B

474 views

Published on

Telecommunication wiring infrastructure at the BOK Center, Tulsa OK

Published in: Business, Technology
  • Be the first to comment

  • Be the first to like this

4 Ok802 Bok Center Terry B

  1. 1. Vision 2025 at work Tulsa Event Center
  2. 5. View from the west side of the arena
  3. 7. East side view
  4. 13. Installation of the hockey rink
  5. 15. Main Level – Concession
  6. 16. Premium Level
  7. 17. Typical rough-in of CAT6 and CATV cables
  8. 18. Overhead cable tray – installed by general contractor
  9. 19. Sub Contractor Crew Chief – directs cable installation
  10. 20. Technician installing vertical cable tray in one of 19 telecom closets
  11. 21. Custom fitting to allow tray to form to the conduits provided by general contractor
  12. 22. Custom fitting of the vertical cable tray
  13. 24. Technician operates a scissor lift installing CAT6 cable
  14. 25. Technician operates boom lift to be in position to install outside camera’s.
  15. 26. Camera’s were installed on the west eyebrow RG6 cables were extended down both sides of the arena
  16. 28. View from the West Eyebrow
  17. 32. Technician labeling cables before installing on the east eyebrow
  18. 33. Security Office Cabinets Front View Rear View
  19. 36. Front view of equipment rack in the Security Office
  20. 37. Initial preparation of CATV distribution Fiber patch panel Room 1B31.04
  21. 38. Premium Level A Quadrant Distribution of the Cable TV System
  22. 39. View from the Upper Level Concourse
  23. 40. Typical Equipment Cabinet - being prepped to terminate Belden Fiber Optic cable and Belden CAT 6 Media Twist cable
  24. 41. Trans – Tel Central Inc: Bryan Shank – Director of Engineering Bill Wright – Account Executive Carol Harper – Director of Administration David Uhles – Project Support Manager Terry Bowler – Project Manager Belden Inc Technical & Product Support Sandy Stines - Sales Representative
  25. 42. Subcontractor Support DCI Communications Mike Weaver – Project Manager Fred Anderson – Crew Chief Santos Yvanez – Crew Chief Material & Product Support Graybar Inc John Smith – Area Manager Elizabeth Smith – Customer Service Representative Les Brown – Customer Service Representative
  26. 43. Opening the BOK Center on 9/6/08 The Eagles

×