SlideShare a Scribd company logo
1 of 8
SOLAR OFF GRID INVERTER SYSTEM
www.statconenergiaa.com
Solar present, Grid available.
Battery Charged through
Solar MPPT charger Only,
Load supplied through Grid.
AC LOADS
(Priority)
P1=0
AC LOADS
(Others)
P2 P3
P gr=P2+P3
GRID
CHARGING
INTERLOCK
DG SET
(OPTIONAL)
OFF GRID SOLAR POWER SYSTEM
CONDITION # 1
P gr
P so
P dg
P ba = P so
©2015 STATCON ENERGIAA PVT LTDwww.statconenergiaa.com
AC LOADS
(Priority)
AC LOADS
(Others)
GRID
INTERLOCK
CHARGED
Solar present, Grid available.
Battery Full Charged condition, Priority
Load supplied only through Solar.
Secondary Load Through Grid
separately
CONDITION # 2
DG SET
(OPTIONAL)
P1=P so
P2=P so P3=P gr
P gr
P so
P dg
P ba = 0
P gr=P3
OFF GRID SOLAR POWER SYSTEM
©2015 STATCON ENERGIAA PVT LTDwww.statconenergiaa.com
AC LOADS
(Priority)
AC LOADS
(Others)
GRID
INTERLOCK
CHARGING
Solar NOT present, Grid Available.
Battery Charged through GRID, Load
supplied through Grid.
CONDITION # 3
DG SET
(OPTIONAL)
P1
P2 P3
P gr=Pba +P2+P3
P gr
P so = 0
P dg
P ba
OFF GRID SOLAR POWER SYSTEM
©2015 STATCON ENERGIAA PVT LTDwww.statconenergiaa.com
AC LOADS
(Priority)
AC LOADS
(Others)
GRID
INTERLOCK
DISCHARGING
Solar NOT present, Grid NOT
available.
Priority Load supplied through
Battery.
CONDITION # 4
DG SET
(OPTIONAL)
P1=P ba
P3
P gr
P so
P dg
P ba = P2
No Interruption To LOAD during
changeover!
OFF GRID SOLAR POWER SYSTEM
©2015 STATCON ENERGIAA PVT LTDwww.statconenergiaa.com
AC LOADS
(Priority)
AC LOADS
(Others)
GRID
INTERLOCK
CHARGING
©2015 STATCON ENERGIAA PVT LTDwww.statconenergiaa.com
CONDITION #5
Solar NOT present, Grid NOT
available.
Battery level lower than Pre-set then
Charged through DG Set, All Load
supplied through DG Set.
DG SET
(OPTIONAL)
P1=0
P2 P3
P dg=Pba+P2+P3
P gr
P so
P dg
P ba = P so
OFF GRID SOLAR POWER SYSTEM
ADVANTAGES
1. Most trusted and long running technology for solar inverters
2. Maintains the battery life by using solar to reduce its charging and discharging cycles
compared to a non-solar inverter battery system.
3. Provides uninterrupted supply to the primary loads of the household
4. Can run the loads from the available sources according to the priority of the sources
in the algorithm.
5. Reduces diesel consumption by not running DG all the time.
DISADVANTAGES:
1. If the battery is already charged and the loads are few, then the excess power
produced from the Solar panels is wasted.
2. Cannot export to grid
3. No power sharing between sources. Different sources supply to different loads at
the same time.
4. Battery life not as good ( as Hybrid Inverters generally ) and it dies out early.
www.statconenergiaa.com
PH: +91 120 2427310/11
EMAIL: info@statconenergiaa.com

More Related Content

Viewers also liked

Power Electronics Chapter 7
Power Electronics  Chapter 7Power Electronics  Chapter 7
Power Electronics Chapter 7guest8ae54cfb
 
Presentation on solar cell
Presentation on solar cellPresentation on solar cell
Presentation on solar cellOmar SYED
 
Hybrid inverter
Hybrid inverterHybrid inverter
Hybrid inverterAnusha k
 
Solar Biomass Hybrid System For Cold Storage & Power Generation
Solar Biomass Hybrid System For Cold Storage & Power GenerationSolar Biomass Hybrid System For Cold Storage & Power Generation
Solar Biomass Hybrid System For Cold Storage & Power GenerationAnand Upadhyay
 
Power engineering assign
Power engineering assignPower engineering assign
Power engineering assignravi shankar
 
Solar inverter with autosynchronization using microcontroller
Solar inverter with autosynchronization using microcontrollerSolar inverter with autosynchronization using microcontroller
Solar inverter with autosynchronization using microcontrollerDhaval Brahmbhatt
 
LDR BASED MOBILE CHARGING AND PUBLIC LIGHTNING BY USING SOLAR TREE EEE/ECE S...
LDR BASED MOBILE CHARGING AND PUBLIC LIGHTNING BY USING SOLAR TREE  EEE/ECE S...LDR BASED MOBILE CHARGING AND PUBLIC LIGHTNING BY USING SOLAR TREE  EEE/ECE S...
LDR BASED MOBILE CHARGING AND PUBLIC LIGHTNING BY USING SOLAR TREE EEE/ECE S...Vithalreddy Reddy's
 
A presentation on inverter by manoj
A presentation on inverter by manojA presentation on inverter by manoj
A presentation on inverter by manojIACM SmartLearn Ltd.
 
Solar Inverter Project Report
Solar Inverter Project ReportSolar Inverter Project Report
Solar Inverter Project ReportHitesh Gupta
 

Viewers also liked (16)

Inverter
InverterInverter
Inverter
 
Power Electronics Chapter 7
Power Electronics  Chapter 7Power Electronics  Chapter 7
Power Electronics Chapter 7
 
Presentation on solar cell
Presentation on solar cellPresentation on solar cell
Presentation on solar cell
 
Hybrid inverter
Hybrid inverterHybrid inverter
Hybrid inverter
 
Solar Biomass Hybrid System For Cold Storage & Power Generation
Solar Biomass Hybrid System For Cold Storage & Power GenerationSolar Biomass Hybrid System For Cold Storage & Power Generation
Solar Biomass Hybrid System For Cold Storage & Power Generation
 
Power engineering assign
Power engineering assignPower engineering assign
Power engineering assign
 
Solar inverter with autosynchronization using microcontroller
Solar inverter with autosynchronization using microcontrollerSolar inverter with autosynchronization using microcontroller
Solar inverter with autosynchronization using microcontroller
 
Inverter (Industrial_C_06_mid)
Inverter (Industrial_C_06_mid)Inverter (Industrial_C_06_mid)
Inverter (Industrial_C_06_mid)
 
Inverter
InverterInverter
Inverter
 
LDR BASED MOBILE CHARGING AND PUBLIC LIGHTNING BY USING SOLAR TREE EEE/ECE S...
LDR BASED MOBILE CHARGING AND PUBLIC LIGHTNING BY USING SOLAR TREE  EEE/ECE S...LDR BASED MOBILE CHARGING AND PUBLIC LIGHTNING BY USING SOLAR TREE  EEE/ECE S...
LDR BASED MOBILE CHARGING AND PUBLIC LIGHTNING BY USING SOLAR TREE EEE/ECE S...
 
microbial fuel cell
microbial fuel cellmicrobial fuel cell
microbial fuel cell
 
Inverter 2003
Inverter 2003Inverter 2003
Inverter 2003
 
A presentation on inverter by manoj
A presentation on inverter by manojA presentation on inverter by manoj
A presentation on inverter by manoj
 
Tidal energy
Tidal energyTidal energy
Tidal energy
 
LED'S
LED'SLED'S
LED'S
 
Solar Inverter Project Report
Solar Inverter Project ReportSolar Inverter Project Report
Solar Inverter Project Report
 

Recently uploaded

National Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfNational Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfRajuKanojiya4
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptMadan Karki
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgsaravananr517913
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the weldingMuhammadUzairLiaqat
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm Systemirfanmechengr
 
The SRE Report 2024 - Great Findings for the teams
The SRE Report 2024 - Great Findings for the teamsThe SRE Report 2024 - Great Findings for the teams
The SRE Report 2024 - Great Findings for the teamsDILIPKUMARMONDAL6
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - GuideGOPINATHS437943
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
Industrial Safety Unit-I SAFETY TERMINOLOGIES
Industrial Safety Unit-I SAFETY TERMINOLOGIESIndustrial Safety Unit-I SAFETY TERMINOLOGIES
Industrial Safety Unit-I SAFETY TERMINOLOGIESNarmatha D
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadaditya806802
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating SystemRashmi Bhat
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
Steel Structures - Building technology.pptx
Steel Structures - Building technology.pptxSteel Structures - Building technology.pptx
Steel Structures - Building technology.pptxNikhil Raut
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating SystemRashmi Bhat
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptJasonTagapanGulla
 

Recently uploaded (20)

National Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfNational Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdf
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.ppt
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the welding
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm System
 
The SRE Report 2024 - Great Findings for the teams
The SRE Report 2024 - Great Findings for the teamsThe SRE Report 2024 - Great Findings for the teams
The SRE Report 2024 - Great Findings for the teams
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - Guide
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
Industrial Safety Unit-I SAFETY TERMINOLOGIES
Industrial Safety Unit-I SAFETY TERMINOLOGIESIndustrial Safety Unit-I SAFETY TERMINOLOGIES
Industrial Safety Unit-I SAFETY TERMINOLOGIES
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasad
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating System
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
Steel Structures - Building technology.pptx
Steel Structures - Building technology.pptxSteel Structures - Building technology.pptx
Steel Structures - Building technology.pptx
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating System
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.ppt
 

Solar off grid inverters

  • 1. SOLAR OFF GRID INVERTER SYSTEM www.statconenergiaa.com
  • 2. Solar present, Grid available. Battery Charged through Solar MPPT charger Only, Load supplied through Grid. AC LOADS (Priority) P1=0 AC LOADS (Others) P2 P3 P gr=P2+P3 GRID CHARGING INTERLOCK DG SET (OPTIONAL) OFF GRID SOLAR POWER SYSTEM CONDITION # 1 P gr P so P dg P ba = P so ©2015 STATCON ENERGIAA PVT LTDwww.statconenergiaa.com
  • 3. AC LOADS (Priority) AC LOADS (Others) GRID INTERLOCK CHARGED Solar present, Grid available. Battery Full Charged condition, Priority Load supplied only through Solar. Secondary Load Through Grid separately CONDITION # 2 DG SET (OPTIONAL) P1=P so P2=P so P3=P gr P gr P so P dg P ba = 0 P gr=P3 OFF GRID SOLAR POWER SYSTEM ©2015 STATCON ENERGIAA PVT LTDwww.statconenergiaa.com
  • 4. AC LOADS (Priority) AC LOADS (Others) GRID INTERLOCK CHARGING Solar NOT present, Grid Available. Battery Charged through GRID, Load supplied through Grid. CONDITION # 3 DG SET (OPTIONAL) P1 P2 P3 P gr=Pba +P2+P3 P gr P so = 0 P dg P ba OFF GRID SOLAR POWER SYSTEM ©2015 STATCON ENERGIAA PVT LTDwww.statconenergiaa.com
  • 5. AC LOADS (Priority) AC LOADS (Others) GRID INTERLOCK DISCHARGING Solar NOT present, Grid NOT available. Priority Load supplied through Battery. CONDITION # 4 DG SET (OPTIONAL) P1=P ba P3 P gr P so P dg P ba = P2 No Interruption To LOAD during changeover! OFF GRID SOLAR POWER SYSTEM ©2015 STATCON ENERGIAA PVT LTDwww.statconenergiaa.com
  • 6. AC LOADS (Priority) AC LOADS (Others) GRID INTERLOCK CHARGING ©2015 STATCON ENERGIAA PVT LTDwww.statconenergiaa.com CONDITION #5 Solar NOT present, Grid NOT available. Battery level lower than Pre-set then Charged through DG Set, All Load supplied through DG Set. DG SET (OPTIONAL) P1=0 P2 P3 P dg=Pba+P2+P3 P gr P so P dg P ba = P so OFF GRID SOLAR POWER SYSTEM
  • 7. ADVANTAGES 1. Most trusted and long running technology for solar inverters 2. Maintains the battery life by using solar to reduce its charging and discharging cycles compared to a non-solar inverter battery system. 3. Provides uninterrupted supply to the primary loads of the household 4. Can run the loads from the available sources according to the priority of the sources in the algorithm. 5. Reduces diesel consumption by not running DG all the time. DISADVANTAGES: 1. If the battery is already charged and the loads are few, then the excess power produced from the Solar panels is wasted. 2. Cannot export to grid 3. No power sharing between sources. Different sources supply to different loads at the same time. 4. Battery life not as good ( as Hybrid Inverters generally ) and it dies out early.
  • 8. www.statconenergiaa.com PH: +91 120 2427310/11 EMAIL: info@statconenergiaa.com