Let's Get on and Do It!

  1. Let’s get on and do it……….. David Forbes Pearson
  2. • Do what? Renewable Energy Energy efficiency Clean air Supply security Local jobs Smart grids Less imports
  3. Which gases causes Global Warming?
  4. Where do CO2 emissions come from?
  5. What % of heating is not 2050 Ready?
  6. What % of heating is not 2050 Ready?
  7. Where do we do heating in Scotland? (note total demand circa 78,000 GWh ~ 2bn £GBP
  8. 2km strip astride the river = 4209GWh /a
  9. How much heat is in a river? 20,000 l/s If cooled by 3K = 0.2508 GW If harvested 8760 hours per year = 2197 GWh/a
  10. What % of heating is not 2050 Ready?
  11. CASE STUDY: DISTRICT HEATING DRAMMEN (the original success in 2010) • District heating system in Drammen, Norway • 13.2MW water sourced heat pump • High temp (90oC) water generated from 8oC fjord • Proves 85% of hot water needed to heat the city • World’s largest 90oC ammonia heat pump • Average COP of 3.05 (over 8 years running) • Renewable energy source • Fully natural refrigerant • Easily repeatable technology
  12. CASE STUDY: DISTRICT HEATING-Queen Quay-2019 Commissioning • 5.2MW river water sourced heat pump • High temp (80oC) water generated from 5oC river • UK’s largest 80oC ammonia heat pump • Typical COP of 3 • CO2 circa 45% of Gas and falling • Zero Local NOx
  13. CASE STUDY: DISTRICT HEATING-Queen Quay – UK’s Largest HT River Heat Pump • Harnesses local energy • Doesn’t create NOx (clean air) • Creates local jobs • Allows more wind generation • Produces Cooling as well • Can use cheapest tariff • 3 units heat for 1 unit electricity • 2050 Ready!
  14. So- the opportunity? What makes District Energy happen?Over & Over
  15. What makes District Energy happen over & over? Low Risk Predictable Repeatable R.O.I.
  16. So- the opportunity? • Harness local energy from rivers • (low risk capital as rivers are known) • Purchase off peak electricity – use thermal stores @1/1000th cost of LI-ion batteries • Generate and distribute heating and cooling
  17. Barriers? • Customers are happy with gas • District heat is seen as tricky and a by-product of CHP which is struggling as electrical tariffs are up and down like a yo-yo
  18. Solution -> Thinking really big! An end to end energy solution – part1 • Work with cities to create a concession zone • Work with cities to educate around NOx / CO2 • Set NOx/CO2 phase down targets 3% per year • Issue improvement notice if 9% behind OR •Join DH; setup as a “fairopoly”
  19. Solution -> Thinking really big! An end to end energy solution – part2 • With improvement notices avoided in favour of DH… • Plan DH routes and demands • On a big scale bring private wire power @ <€60/MWh • Build your own -> with guaranteed consumers – you! •Build the new paradigm of energy
  20. So the three keys to clean cities Secure Customers -> FAIROPOLY Secure Costs –> Private Wire Wind Secure Technology-> RSHP + DH
  21. Things I’d do in an Emergency………..Commercial Users • Remove all taxation from clean heat – keep nonDom RHI for HP • Add all lost taxation onto dirty heat (incl gas) • Ramp up CCL (per kgCO2 per fuel) • So Commercial customers only for first 5 years • Compel commercial users to 3%/a or agree to DH-FAIROPOLY • Define FAIROPOLY- Price 5p/kWh, cleanliness <120g/kWh @2020 • Auction DH zones (p/kWh fee) – linear strips from river • Or from Key Heat emitters (but watch durability of fuel) • Start Running towards the problems- not away from them.
  22. Things I’d do in an Emergency………..Domestic • Remove all taxation from clean heat • Announce intention to add taxation onto dirty heat (incl gas) • Outline CCL (per kgCO2 per fuel) starting 2025 – gas only!! • So Commercial customers only for first 5 years • Continue domRHI – it would have worked with PAYG from 2008! • Force BIG5 to offer domestic GSHPs (pay as you go : 10% below gas) • Allow replacement gas boilers on rental only (electric only?) • Be much clearer about H2 opportunities – it isn’t really for heat.
  23. Run towards the Emergency and take action like Alex McIlveen
  24. Let’s get on and do it……….. David Forbes Pearson

Editor's Notes

  1. ISO9001: Accredited Quality Management System ISO18001: Accredited Health & Safety Management System CHAS: Contractors Health & Safety Assessment Scheme Safecontractor: Health & safety accreditation scheme Alcumus Isoqar: accreditation body for SafeContractor
  2. ISO9001: Accredited Quality Management System ISO18001: Accredited Health & Safety Management System CHAS: Contractors Health & Safety Assessment Scheme Safecontractor: Health & safety accreditation scheme Alcumus Isoqar: accreditation body for SafeContractor
  3. ISO9001: Accredited Quality Management System ISO18001: Accredited Health & Safety Management System CHAS: Contractors Health & Safety Assessment Scheme Safecontractor: Health & safety accreditation scheme Alcumus Isoqar: accreditation body for SafeContractor
  4. ISO9001: Accredited Quality Management System ISO18001: Accredited Health & Safety Management System CHAS: Contractors Health & Safety Assessment Scheme Safecontractor: Health & safety accreditation scheme Alcumus Isoqar: accreditation body for SafeContractor
  5. ISO9001: Accredited Quality Management System ISO18001: Accredited Health & Safety Management System CHAS: Contractors Health & Safety Assessment Scheme Safecontractor: Health & safety accreditation scheme Alcumus Isoqar: accreditation body for SafeContractor
  6. ISO9001: Accredited Quality Management System ISO18001: Accredited Health & Safety Management System CHAS: Contractors Health & Safety Assessment Scheme Safecontractor: Health & safety accreditation scheme Alcumus Isoqar: accreditation body for SafeContractor
  7. ISO9001: Accredited Quality Management System ISO18001: Accredited Health & Safety Management System CHAS: Contractors Health & Safety Assessment Scheme Safecontractor: Health & safety accreditation scheme Alcumus Isoqar: accreditation body for SafeContractor
  8. ISO9001: Accredited Quality Management System ISO18001: Accredited Health & Safety Management System CHAS: Contractors Health & Safety Assessment Scheme Safecontractor: Health & safety accreditation scheme Alcumus Isoqar: accreditation body for SafeContractor
  9. ISO9001: Accredited Quality Management System ISO18001: Accredited Health & Safety Management System CHAS: Contractors Health & Safety Assessment Scheme Safecontractor: Health & safety accreditation scheme Alcumus Isoqar: accreditation body for SafeContractor