Pléiades 1 & 2
Content <ul><li>Spot Image in short </li></ul><ul><li>System status </li></ul><ul><li>First outlines </li></ul>© Spot Imag...
Spot Image in a few words… <ul><li>A multisensor provider </li></ul><ul><ul><li>2 satellites in full operation: SPOT 4 & 5...
Content <ul><li>Spot Image in short </li></ul><ul><li>System status </li></ul><ul><li>First outlines </li></ul>© Spot Imag...
Courtesy of Astrium Pléiades program March 08: platform integration at Astrium    EADS Astrium / CNES
May 08: antenna and M&C room    Spot Image / CNES
July 08: flight telescopes undergoing integration    EADS Astrium / CNES
September 08: Platform and telescope at Astrium    EADS Astrium / CNES
October 08: Processing room    Spot Image / CNES
© Spot Image 2008 Avril 09: Testing at Intespace    EADS Astrium / CNES / Intespace
January 2010: ground segment installed in Kiruna    Spot Image / CNES / SSC
Countdown engaged! <ul><ul><li>Pléiades 1  delivered to the CNES  on 13 th  of November – stored in clean room  </li></ul>...
Content <ul><li>Spot Image in short </li></ul><ul><li>System status </li></ul><ul><li>First outlines </li></ul><ul><ul><li...
Precise © Spot Image 2010 Imaging sensor One camera 1 panchromatic band  4 multispectral bands 12 bit Pixel depth at acqui...
Reactive © Spot Image 2010 Constellation capabilities 1 day Revisit time 2 satellites  @ 45° incidence (Equator)  @ 30° in...
Monopass collection scenarios Typically  15 targets  over 1,000 km within a +/-30 deg corridor In a single pass 6,000 sq.k...
Conclusion <ul><li>Pléiades, an outstanding system to answer users’ needs </li></ul><ul><ul><li>Unprecedented commercial a...
Pléiades – simulated image Cannes – France – 0,50 m Colour    CNES
Pléiades – simulated image Port de Bouc – France – 0,50 m Colour    CNES
© Spot Image 2009 © CNES
© Spot Image 2009
Upcoming SlideShare
Loading in …5
×

Pleiades - satellite imagery - very high resolution

3,462 views

Published on

With the Pleiades constellation, comprising the Pleiades-1 and Pleiades-2 satellites, Spot Image is set to bring you satellite imagery at a resolution of 50 cm and with a footprint of 20 km x 20 km.

More information on http://www.spotimage.com/pleiades

Published in: Business, Technology
0 Comments
3 Likes
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total views
3,462
On SlideShare
0
From Embeds
0
Number of Embeds
15
Actions
Shares
0
Downloads
0
Comments
0
Likes
3
Embeds 0
No embeds

No notes for slide
  • Titre, lieu et date
  • Titre, lieu et date
  • Titre, lieu et date
  • Titre, lieu et date
  • Pleiades - satellite imagery - very high resolution

    1. 1. Pléiades 1 & 2
    2. 2. Content <ul><li>Spot Image in short </li></ul><ul><li>System status </li></ul><ul><li>First outlines </li></ul>© Spot Image 2010
    3. 3. Spot Image in a few words… <ul><li>A multisensor provider </li></ul><ul><ul><li>2 satellites in full operation: SPOT 4 & 5 </li></ul></ul><ul><ul><li>Strong commitment in partnerships: Formosat 2, Kompsat 2, TerraSAR X, ERS, Envisat… </li></ul></ul><ul><ul><li>Continuity on track! </li></ul></ul><ul><ul><ul><li>SPOT 6 & 7 (2012 - 2013) </li></ul></ul></ul><ul><ul><ul><li>Pléiades 1 & 2 (2010 - 2011) </li></ul></ul></ul><ul><ul><ul><li>New partnerships to come </li></ul></ul></ul>© Spot Image 2010
    4. 4. Content <ul><li>Spot Image in short </li></ul><ul><li>System status </li></ul><ul><li>First outlines </li></ul>© Spot Image 2010
    5. 5. Courtesy of Astrium Pléiades program March 08: platform integration at Astrium  EADS Astrium / CNES
    6. 6. May 08: antenna and M&C room  Spot Image / CNES
    7. 7. July 08: flight telescopes undergoing integration  EADS Astrium / CNES
    8. 8. September 08: Platform and telescope at Astrium  EADS Astrium / CNES
    9. 9. October 08: Processing room  Spot Image / CNES
    10. 10. © Spot Image 2008 Avril 09: Testing at Intespace  EADS Astrium / CNES / Intespace
    11. 11. January 2010: ground segment installed in Kiruna  Spot Image / CNES / SSC
    12. 12. Countdown engaged! <ul><ul><li>Pléiades 1 delivered to the CNES on 13 th of November – stored in clean room </li></ul></ul><ul><ul><li>Pléiades 2’s telescope integrated in December 2009 – testing at Intespace next April </li></ul></ul><ul><ul><li>Launch from Sinnamary, French Guiana, on a SOYUZ 2.1.a launcher. Launch contract with Arianespace for both Pléiades 1 & 2 </li></ul></ul><ul><ul><li>Planned launch window </li></ul></ul><ul><ul><ul><li>Q4 2010 for Pléiades 1 </li></ul></ul></ul><ul><ul><ul><li>9 to 15 months later for Pléiades 2 </li></ul></ul></ul>© Spot Image 2010
    13. 13. Content <ul><li>Spot Image in short </li></ul><ul><li>System status </li></ul><ul><li>First outlines </li></ul><ul><ul><li>precise, reactive, easy to access </li></ul></ul>© Spot Image 2010
    14. 14. Precise © Spot Image 2010 Imaging sensor One camera 1 panchromatic band 4 multispectral bands 12 bit Pixel depth at acquisition Colour Bundle Standard mode acquisition 3 m CE90 Prelaunch accuracy performance, without GCP With refined ephemeris data Pléiades products 50 cm Panchromatic Colour 3-band (pansharp) Colour 4-band (pansharp) 2 m 4-band multispectral Ortho Rectified As a standard. Fully automatic processing incl. for monopass mosaics. JPG 2000 Standard Format. Including RPC. Km² Pricing model
    15. 15. Reactive © Spot Image 2010 Constellation capabilities 1 day Revisit time 2 satellites @ 45° incidence (Equator) @ 30° incidence (Lat 40°) 20 km Widest swath of the VHR market Monopass collection scenarios Multi-target, Mosaic (1x1 sq deg), Stereo, tristereo, Border / coastal / corridor 25 s 11 s Slew time over 800 km Slew time over 200 km 1M sq. km Daily acquisition capacity using max imaging time per orbit Operational capabilities 3 per day # of tasking plans per satellite. One tasking plan every 8 hours. Up to 2 hours Before the acquisition window to post a Rush Collection Request Direct Tasking Up to 20 mn before actual acquisition 30 min 50 cm colour ortho production of a 20x20km area … 2 hours … for a 60 x 60km mosaic
    16. 16. Monopass collection scenarios Typically 15 targets over 1,000 km within a +/-30 deg corridor In a single pass 6,000 sq.km pairs 2,000 sq.km triplets Typically 1 square degree © Spot Image 2010 To follow linear targets such as coasts, borders, roads, pipelines, rivers Typically 15 targets over 1,000 km within a +/-30 deg corridor In a single pass, up to 6,000 sq.km pairs 2,000 sq.km triplets Typically 1 square degree Automatically orthorectified and mosaicked
    17. 17. Conclusion <ul><li>Pléiades, an outstanding system to answer users’ needs </li></ul><ul><ul><li>Unprecedented commercial availability </li></ul></ul><ul><ul><li>Committed to deliver </li></ul></ul><ul><li>Solid synergies with HR data from SPOT satellites </li></ul><ul><ul><ul><li>Get the perfect combination between global coverage and local resolution </li></ul></ul></ul><ul><li>All the more so in the perspective of SPOT 6 and 7! </li></ul><ul><ul><ul><li>4 years, 4 satellites </li></ul></ul></ul><ul><ul><ul><li>Secured continuity with SPOT 6 & 7 ; new outlooks with Pléiades twins </li></ul></ul></ul><ul><ul><ul><li>Operated as a real constellation (phased orbit for the four satellites) </li></ul></ul></ul>© Spot Image 2010
    18. 18. Pléiades – simulated image Cannes – France – 0,50 m Colour  CNES
    19. 19. Pléiades – simulated image Port de Bouc – France – 0,50 m Colour  CNES
    20. 20. © Spot Image 2009 © CNES
    21. 21. © Spot Image 2009

    ×