Wpd Offshore Eow 2009 Final

1,414 views

Published on

wpd offshore project pipeline worldwide.

Published in: Technology, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
1,414
On SlideShare
0
From Embeds
0
Number of Embeds
18
Actions
Shares
0
Downloads
40
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Wpd Offshore Eow 2009 Final

  1. 1. Installation of <br />FINO II<br />wpd offshore<br />development – project management – procurement – construction – operation<br />
  2. 2.
  3. 3. France:<br />3 windfarms, 39.5 MW<br />2 windfarms under construction, 20 MW<br />Operational wpd onshore projects Europe<br />02.10.2009<br />3<br /> Sweden:1 windfarm under construction, 4 MW<br /> Belgium:<br />1 windfarm in operation, 9 MW<br /> Germany:<br />164 windfarms i.o., 1,437.27 MW<br />17 windfarms u.c., 118.9 MW<br />9 solarfamrs, 7.37 MWp<br />11 biogas, 8 MW<br /> Spain:<br />2 windfarms, 64.5 MW<br /> Croatia:<br />1 windfarm i.o., 11.9 MW1 windfarm u.c., 9.6 MW<br /> Portugal:<br />1 solarfarm, 9 MWp<br /> Italy:<br />3 solarfarm, 2.892 MWp<br />
  4. 4. wpd onshore projects worldwide<br />02.10.2009<br />4<br /> Canada:<br />4 windfarms in planning stage (2010/2011), 40 MW<br /> Taiwan:<br />4 windfarms i.o. , 199.5 MW<br />1 windfarm u.c., 43.7 MW<br />12 windfarms in planning stage (2010/2011), 243.8 MW<br /> Europe:<br />RE-Projects in operation, 1,589.64 MW<br />RE-Projects under construction, 152,5 MW<br />RE-Projects in planning stage, 6,100 MW<br /> Panama:<br />3 windfarms in planning stage (2010/2011), 32 MW<br /> Australia:<br />1 windfarm in planning stage (2011), 30 MW<br /> Argentinia:<br />1 windfarm in planning stage (2011), 1.8 MW<br />
  5. 5. wpd Offshore Wind Business Highlights <br />Strategy<br /><ul><li>Development of a diversified European offshore wind farm portfolio
  6. 6. Expertise in project and construction management – also offered to third parties
  7. 7. Opportunity to ownership and operation at later stage</li></ul>Achievements<br /><ul><li>2.0 GW projects consented and sold
  8. 8. 9 - 10 GW projects under development</li></ul>Resources<br /><ul><li>European presence (project developments in 8 countries)
  9. 9. 60 employees, combining the record of developing 18 offshore-windfarms in Europe with the construction experience of five offshore wind projects</li></ul>wpd offshore<br />Project<br />Development<br />IRPP<br />Service<br />02.10.2009<br />
  10. 10. wpd offshore<br />Project<br />Development<br />IRPP<br />Service<br /><ul><li>Site evaluation
  11. 11. Micrositing
  12. 12. Permission process
  13. 13. Environmental and technical studies
  14. 14. Public relations</li></ul>Dropping of C-PODs counting porpoises at North-Sea project Aiolos (DE), July 2008<br /><ul><li>Ongoing development of 9 -10 GW in ongoing permission procedures in Europe
  15. 15. Background: Successful completion of the development of 5 wind farm projects(all permissions granted):
  16. 16. Swedish Kriegers Flak II
  17. 17. 2 German Baltic Sea projects (Baltic I, Kriegers Flak I)
  18. 18. 2 German North Sea projects (Hochseewindpark Nordsee, He Dreiht)</li></ul>Bird watching at Suurheikka (FI), September 2008<br />02.10.2009<br />
  19. 19. Project Pipeline<br />Baltic<br />I, GER <br />HochseeWP<br />Nord<br />-<br />Kriegers Flak III, <br />Suurhiekka<br />, FIN<br />(76 MW)<br />see<br />, GER (400 MW)<br />DAN (455 MW)<br />(400-600 MW)<br />Kriegers Flak I, GER <br />He <br />Dreiht<br />, GER <br />Korsn<br />ä<br />s<br />, FIN<br />(329 MW)<br />(595 MW)<br />(600-800 MW)<br />Kriegers Flak II, SE <br />Aiolos<br />, GER <br />Participation<br />in <br />round<br />(640 MW)<br />(1,050 MW)<br />3 <br />with<br />JV <br />partner<br />Storgrundet<br />**, SE<br />Kaikas<br />, GER <br />(230-265 MW)<br />(440 MW)<br />Finngrunden<br />, SE <br />Notos<br />, GER <br />(1,300<br />-<br />1,400 MW)<br />(250 MW)<br />Klockt<br />ä<br />rnan<br />**, SE<br />Calvados, F<br />(660 MW)<br />(250 MW)<br />Several projects in <br />Fecamps<br />, F<br />site evaluation/ early <br />(260 MW)<br />development stage<br />Projects X+Y+Z, F <br />(450+250+750MW)<br />Several<br />projects<br />in <br />site<br />Gargano<br />N*, IT<br />Gargano<br />S*, IT<br />Vend<br />é<br />e<br />, F<br />evaluation<br />(680 MW)<br />(855 MW)<br />(600MW)<br />5 projects with a total capacity of <br />7 projects with a total capacity of ~ 4,500 MW <br />~ 2,040 MW permitted and sold<br />(net) in advanced permission process <br />10 projects with a total capacity of <br />* <br />75<br />% <br />owned<br />Several projects under site evaluation<br />~ 5,000 MW (net) in early permission stage<br />** 80% <br />owned<br />02.10.2009<br />
  20. 20. Example: Development of Kriegers Flak Area<br /><ul><li>Kriegers Flak I (80 turbines)</li></ul> sold to EnBW<br /><ul><li>Kriegers Flak II (128 turbines)</li></ul>sold to Vattenfall<br /><ul><li>Kriegers Flak III (91 turbines)</li></ul> owned by wpd<br /><ul><li>Total of 320 turbines (up to 1,600 MW)
  21. 21. Developed by wpd since 2001
  22. 22. Europes largest advanced project area in terms of area, turbines and capacity
  23. 23. Area in the focus of EU: -Adamovitsch´s „best practice area“-150m € for grid connection </li></ul>02.10.2009<br />
  24. 24. wpd offshore<br />Project<br />Development<br />IRPP<br />Service<br /><ul><li>Calculations/ financial modelling
  25. 25. Business/deal structuring
  26. 26. Preparation of fact books/ project presentations
  27. 27. Coordination of approach of and negotiations with banks
  28. 28. Syndication of debt facilities
  29. 29. Excellent relationships with banks
  30. 30. Background: term sheets negotiated for Baltic I project</li></ul>Installation of met mast for <br />Storgrundet (SE), Oktober 2008<br />02.10.2009<br />
  31. 31. wpd offshore<br />Project Management<br /><ul><li>Budget planning
  32. 32. Time Scheduling
  33. 33. Resource planning and set up of project team, work packages and responsibilities
  34. 34. Identification of requirements and constraints of project and market
  35. 35. Management of resources and project team with spirit and commitment</li></ul>Project<br />Development<br />IRPP<br />Service<br />Procurement<br />Project<br /> Management<br />Design Basis& Certification<br />Construction<br />Management<br />Operation<br />M. Lehnhoff - 10<br />15.09.2009<br />
  36. 36. wpd offshore<br />Project Management<br /><ul><li>Core Competences in all work packages of an offshore wind farm:
  37. 37. Geotechnical know-how
  38. 38. Foundation concepts
  39. 39. Wind turbine technology
  40. 40. Offshore transformer station for structural as well as electrical design
  41. 41. Inter array grid </li></ul>Project<br />Development<br />IRPP<br />Service<br />Procurement<br />Project<br /> Management<br />Design Basis& Certification<br />Construction<br />Management<br />Operation<br />15.09.2009<br />M. Lehnhoff - 11<br />
  42. 42. wpd offshore<br />Design Basis & Certification<br /><ul><li>Permission management and Compliance
  43. 43. Management of EIA studies
  44. 44. Certification
  45. 45. Park Concept and Layout
  46. 46. Cooperation with transmission system operator</li></ul>Project<br />Development<br />IRPP<br />Service<br />Procurement<br />Project<br /> Management<br />Design Basis& Certification<br />Construction<br />Management<br />Operation<br />M. Lehnhoff - 12<br />15.09.2009<br />
  47. 47. wpd offshore<br />Design Basis & Certification<br /><ul><li>Reports on site conditions
  48. 48. Supervision of soil investigation
  49. 49. Basic Reports on site conditions and technical concept
  50. 50. Design Basis
  51. 51. Project certification management</li></ul>Project<br />Development<br />IRPP<br />Service<br />Procurement<br />Project<br /> Management<br />Design Basis& Certification<br />Construction<br />Management<br />Operation<br />M. Lehnhoff - 13<br />15.09.2009<br />
  52. 52. wpd offshore<br />Procurement & Contract Management<br /><ul><li>Multi-contracting or EPC Concept
  53. 53. Identifcation of applicable rules
  54. 54. Establishing of ITTs
  55. 55. Market Analysis and evaluation of alternatives
  56. 56. Legal Management of contracts
  57. 57. Contract Management
  58. 58. Interface Management
  59. 59. Risk Analysis
  60. 60. Compliance of all contracts and procedures to the permission and applicable rules and regulations</li></ul>Project<br />Development<br />IRPP<br />Service<br />Procurement<br />Project<br /> Management<br />Design Basis& Certification<br />Construction<br />Management<br />Operation<br />M. Lehnhoff - 14<br />15.09.2009<br />
  61. 61. wpd offshore<br />Construction ManagementDesign & Manufacturing<br /><ul><li>Design evaluation, consultancy
  62. 62. Production Planning
  63. 63. Health, Safety and Environment:Concept and Implementation
  64. 64. Claim Management
  65. 65. Commissioning onshore</li></ul>Project<br />Development<br />IRPP<br />Service<br />Procurement<br />Project<br /> Management<br />Design Basis& Certification<br />Construction<br />Management<br />Operation<br />M. Lehnhoff - 15<br />15.09.2009<br />
  66. 66. wpd offshore<br />Construction ManagementQuality Control<br /><ul><li>Factory Audits
  67. 67. Material testing
  68. 68. Welding tests
  69. 69. Coating monitoring
  70. 70. Factory acceptance tests</li></ul>Project<br />Development<br />IRPP<br />Service<br />Procurement<br />Project<br /> Management<br />Design Basis& Certification<br />Construction<br />Management<br />Operation<br />M. Lehnhoff - 16<br />15.09.2009<br />
  71. 71. wpd offshore<br />Construction ManagementTransport & Installation<br /><ul><li>Logistics for harbours, transport or accommodation vessels, construction vessels
  72. 72. Site Management for preassembly, transport, installation and commissioning offshore until complete take-over</li></ul>Project<br />Development<br />IRPP<br />Service<br />Procurement<br />Project<br /> Management<br />Design Basis& Certification<br />Construction<br />Management<br />Operation<br />M. Lehnhoff - 17<br />15.09.2009<br />
  73. 73. wpd offshore<br />Operation Management<br /><ul><li>Technical management
  74. 74. Commercial management
  75. 75. Assistance according to service concept (transport and installation vessels, disposals etc.)
  76. 76. Continuous optimisation by evaluation of operating and service data</li></ul>Project<br />Development<br />IRPP<br />Service<br />Procurement<br />Project<br /> Management<br />Design Basis& Certification<br />Construction<br />Management<br />Operation<br />M. Lehnhoff - 18<br />15.09.2009<br />
  77. 77. wpd offshore<br />The Team<br /><ul><li>Well experienced team of engineers, lawyers, geologists and marine-, QA- and HSE experts
  78. 78. 20 employers, constantly growing
  79. 79. Team members bring in experience from several offshore projects such as: Utgrunden, Beatrice, Alpha Ventus, Baltic I, Kriegers Flak
  80. 80. Vast project management experience
  81. 81. Know-how in desktop studies, design evaluations and manufacturing as well as installation survey</li></ul>Project<br />Development<br />IRPP<br />Service<br />Procurement<br />Project<br /> Management<br />Design Basis& Certification<br />Construction<br />Management<br />Operation<br />M. Lehnhoff - 19<br />15.09.2009<br />
  82. 82. contact<br />Achim Berge Martin Lehnhoff<br />Managing Director Managing Director<br />wpd offshore GmbH wpd offshore service GmbH<br />a.berge@wpd.dem.lehnhoff@wpd.de<br />T+49 421 168 66 10 T+49 421 168 66 10<br />www.wpd.dewww.wpd.de<br />

×