Publicly Available NY Energy Data

1,558 views

Published on

The event is hosted by Vivian Zhang at NYC Open Data Meetup
Event link:http://www.meetup.com/NYC-Open-Data/events/147381472/
Copyright owner: Lucas Finco


Published in: Education, Business, Technology
0 Comments
1 Like
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total views
1,558
On SlideShare
0
From Embeds
0
Number of Embeds
564
Actions
Shares
0
Downloads
19
Comments
0
Likes
1
Embeds 0
No embeds

No notes for slide
  • Prep: coned.com, nyiso.com, nyspsc login, per-load 2 ConEdpdfs
  • BloggingNot sanctionedLegal
  • http://gigaom.com/2013/02/06/the-most-important-chart-in-energy
  • http://gigaom.com/2013/02/06/the-most-important-chart-in-energy
  • Note the summer months!!!, winter electric heat
  • Note the top 4,000MW operate for ONLY66 HOURS!!! Minimum=12,055 MW Maximum=33,956 MW
  • SC 2 cannot exceed 10kW demandAssume Rate 1
  • Drop these in your Excel file. Delivery charges ONLY!
  • Publicly Available NY Energy Data

    1. 1. Publicly Available NY Energy Data Lucas Finco
    2. 2. Table of Contents I. II. III. NYISO Data Case Study: ConEd Rates NY Public Service Commission
    3. 3. Disclaimer
    4. 4. De-Regulated Market • Generation & Transmission • Competitive Marketplace • Market “managed” by an Independent System Operator • NYISO in NY (1999) • Distribution • Regulated Utilities (ConEd) • NY Public Service Commission (PSC)
    5. 5. De-Regulated Market
    6. 6. De-Regulated Market NYISO managed ConEd regulated NY PSC
    7. 7. Load Duration Curve • “Most important chart in energy” • Helps determine generation mix in NY state
    8. 8. Load Duration Curve • Download NY load area electric loads by hour from NYISO website: • • • • http://www.nyiso.com Market & Operation Data Load Data NYISO Hourly Loads
    9. 9. nyiso_loads.csv Year Month 2013 2013 2013 2013 2013 2013 2013 2013 2013 2013 2013 2013 2013 2013 2013 2013 Day 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Hr1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Hr2 16469 16201 17133 16807 16562 16096 15207 16190 15756 15446 15608 15396 14930 14221 15146 15696 Hr3 15722 15734 16510 16137 15869 15345 14706 15553 15211 14805 15000 14661 14222 13745 14699 15135 Hr4 15045 15420 16166 15727 15374 14910 14420 15255 14903 14436 14658 14217 13791 13463 14380 14850 Hr5 14643 15366 16064 15605 15141 14648 14372 15159 14835 14352 14568 13987 13571 13408 14307 14793 Hr6 14528 15663 16320 15801 15124 14609 14676 15386 15084 14558 14790 13976 13527 13661 14582 15032 14694 16613 17280 16677 15402 14797 15697 16367 16070 15584 15726 14292 13713 14634 15567 15969
    10. 10. NY Load Plot • Melt, then plot:
    11. 11. NY Load Duration Curve • Then sort by load:
    12. 12. Zone Map
    13. 13. Table of Contents I. II. III. NYISO Data Case Study: ConEd Rates NY Public Service Commission
    14. 14. ConEd Rates • Download ConEdison rate documents here: • http://www.coned.com/rates • Click on Electric Rates and Tariffs • Then Service Classifications ("SC"s) • We will be tackling SC 2 – Small Business (pg. 10) • Rate 1 – Non-time-of-day rate • Rate 2 – Time-of-day rate (on peak/off peak)
    15. 15. SS - Customer Charge SC2 General - Small Rate I Customer Charge June, July, August, and September first 2,000 kWhr over 2,000 kWhr Other Months first 2,000 kWhr over 2,000 kWhr Weighted Average 24.06 per Month 9.91 cents/kWhr 6.19 cents/kWhr 8.35 cents/kWhr 4.55 cents/kWhr 8.87 cents/kWhr Rate II Customer Charge June, July, August, and September on peak M-F 8a-10p off peak Other Months on peak M-F 8a-10p off peak 29.18 per Month 21.21 cents/kWhr 0.77 cents/kWhr 10.44 cents/kWhr 0.77 cents/kWhr
    16. 16. Cost of Energy • SC 2 refers to Rule 25 for Supply Charge: Rules 25 through 30 and Application Forms
    17. 17. GR-25 The MSC includes the following cost components, adjusted for losses: (1) the cost of energy based on NYISO market prices; (2) the cost of capacity based on NYISO market prices; (3) Ancillary Services Charges including certain NYISO Schedule 1 charges, such as the Scheduling, System Control & Dispatch ("S, SC & D") Service Charge, Local Reliability S, SC & D Service Charge and Market Administration and Control Area Service Charge, and any other NYISO commodity-related charges; (4) NYPA Transmission Adjustment Charge (“NTAC”); and (5) certain other transmission-related charges and credits.
    18. 18. Cost of Energy • Get from the NYISO http://www.nyiso.com/public/markets_operations/market_data/custom_re port • Day-Ahead Market LBMP – Zonal • Dunwood – Southern Westchester • Millwood – Northern Westchester • N.Y.C …
    19. 19. Location Based Marginal Price 12/31/2011 22:00 DUNWOD 12/31/2011 22:00 MILLWD 12/31/2011 22:00 N.Y.C. 12/31/2011 23:00 DUNWOD 12/31/2011 23:00 MILLWD 12/31/2011 23:00 N.Y.C. AVERAGE 61760 61759 61761 61760 61759 61761 35.1 2.96 35.13 2.99 35.37 3.21 33.56 2.62 33.62 2.68 33.84 2.9 48.19051979 in $/MWhr 4.819051979 in cents/kWhr 0 0 -0.01 -0.09 -0.09 -0.09 1 1 1 1 1 1
    20. 20. Cost of Energy • We will take a simple average of the three 12/31/2011 22:00 DUNWOD 12/31/2011 22:00 MILLWD 12/31/2011 22:00 N.Y.C. 12/31/2011 23:00 DUNWOD 12/31/2011 23:00 MILLWD 12/31/2011 23:00 N.Y.C. AVERAGE 61760 61759 61761 61760 61759 61761 35.1 35.13 35.37 33.56 33.62 33.84 48.19051979 in $/MWhr 4.819051979 in cents/kWhr 2.96 2.99 3.21 2.62 2.68 2.9
    21. 21. Cost of Capacity • Get from NYISO http://www.nyiso.com/public/markets_operations/market_data/icap/index. jsp Summer 2011 Strip Auction Results for UCAP, Auction Starting 05/2011 Posted Date: 03/31/2011 16:37 PM LI Awarded (MW) 1.2 Price ($/kW - Month) $0.55 NYC Awarded (MW) Price ($/kW - Month) 726.5 $13.54
    22. 22. SS - Energy & Capacity Cost of Energy NYISO 2011 Average Zones H, I, & J 4.82 cents/kWhr Cost of Capacity NYC Strip Auction Summer 2011 estimated power hours per month Estimate 13.54 $/kW-Month 3 kW 732 hr/Month 5.55 cents/kWhr
    23. 23. Ancillary Services & NTAC • Get from ConEd.com/rates • Click on this link for additional information on supply charges • Ancillary Services Charges and New York Power Authority (NYPA)Transmission Adjustment Charges (“NTAC”)
    24. 24. Ancillary Services & NTAC Summary of "Ancillary Services Charges" and NYPA Transmission Adjustment Charges ("NTAC") Applicable to electric customers who purchase supply from Con Edison Date ASC NTAC (in cents/kWh) (in cents/kWh) NYC Westchester NYC Westchester 1/12/2011 0.2243 0.2243 0.0659 0.0659 2/11/2011 0.3676 0.3676 0.0693 0.0693 3/15/2011 0.2762 0.2762 0.0845 0.0845 4/13/2011 0.2423 0.2423 0.0965 0.0965 5/12/2011 0.2289 0.2289 0.0907 0.0907 6/13/2011 0.2195 0.2195 0.1254 0.1254 7/13/2011 0.5922 0.5922 0.1349 0.1349 8/11/2011 0.2455 0.2455 0.0723 0.0723 9/12/2011 0.3855 0.3855 0.0659 0.0659 10/12/2011 0.2027 0.2027 0.0475 0.0475 11/9/2011 0.1868 0.1868 0.0637 0.0637 12/13/2011 0.1773 0.1773 0.0679 0.0679 Average 0.279066667 0.082041667
    25. 25. MSC Adjustment Factors • ConEd.com/rates • Summary of Statement of Adjustment Factors – MSC
    26. 26. Merchant Function Charge • ConEd.com/rates • Statement of Merchant Function Charge
    27. 27. SS – Miscellaneous Ancillary Services Charges 2011 Average NTAC 2011 Average MSC Adjustments 0.279 cents/kWhr 0.082 cents/kWhr -0.434 cents/kWhr MFC 0.4507 cents/kWhr Other cents/kWhr SC 2 Rate estimate 19.6 cents/kWhr
    28. 28. Table of Contents I. NYISO Data II. Case Study: ConEd Rates III. NY Public Service Commission
    29. 29. NYS Public Service Commission • http://www.dps.ny.gov/ • More... • Case 07-M-0548 - Energy Efficiency Portfolio Standard • EEPS HOME • SEARCH -> Latest Filings (All Documents) • DMM (Document and Matter Management) • Case 09-E-0115 – Demand Response fillings
    30. 30. Questions?

    ×