Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.
Product Work LogName__________JoviGonyea_____________________________ Date ______________Product ___Conducting Train Runs ...
Product Work LogName_____________________________________________________ Date________________Product_____________________...
Product Work LogName__________________________________________________ Date ________________Product_______________________...
Product Work LogName__________________________________________________ Date ________________Product_______________________...
Product Work LogName__________________________________________________ Date ________________Product_______________________...
Product Work LogName__________________________________________________ Date ________________Product_______________________...
Senior Project Product Work Log 2011-12
Upcoming SlideShare
Loading in …5
×

Senior Project Product Work Log 2011-12

304 views

Published on

Published in: Education, Technology
  • Be the first to comment

  • Be the first to like this

Senior Project Product Work Log 2011-12

  1. 1. Product Work LogName__________JoviGonyea_____________________________ Date ______________Product ___Conducting Train Runs at the Southeaster Railway Museum_______________Date/Time: Activity:Started my first day as a Comment/Suggestions: Volunteer at the Southeastern RailwaySaturday, 1/14/12 Museum. Got to experience my first10:00 AM – 1:00 PM Cab ride in Locomotive #1026, as well as operating the main switch. Total Runs for the Day: Three Commentary:The experience itself was mostly a welcoming from the train crewTotal Time: 3 hrs.
  2. 2. Product Work LogName_____________________________________________________ Date________________Product________________________________________________________________________Date/Time: Activity:Today was my first real day as Comment/Suggestions: member of the Train Crew andSaturday, 1/28/12 Conductor at the Southeastern Railway10:00 AM – 1:00 PM museum. I was assigned a Member/Volunteer shirt and was designated as a trainee under Mr. John Majewski and his Father-in-Law, Mr. John Maulbery. Total Runs for the Day: Three Commentary:Today was a very nerve- racking experience as conductor of the Locomotive runs at the Museum.Total Time: 3hrs.
  3. 3. Product Work LogName__________________________________________________ Date ________________Product________________________________________________________________________Date/Time: Activity:Today I got the experience my Comment/Suggestions:Saturday, 2/11/12 first few runs as an unsupervised10:00 AM - 2:00 PM Conductor. The first two runs were uneventful; however the last run held an unlikely surprise and scare. Total Runs for the Day: Three Commentary:The last run of the day only confirmed what I have been told since day one. Safety is priority one.Total Time: 4 hrs.
  4. 4. Product Work LogName__________________________________________________ Date ________________Product________________________________________________________________________Date/Time: Activity: Arrived at the museum early Comment/Suggestions:Friday, 2/24/12 to discover that the Train was not10:00 AM – 2:30 PM running due to an unforeseen circumstance. Total Runs for the Day: Zero Commentary: Since the Trains are not running I am was the only member of the Train Crew today; therefore I helped out around the museum.Total Time: 4 hrs 30mins.
  5. 5. Product Work LogName__________________________________________________ Date ________________Product________________________________________________________________________Date/Time: Activity:Trains were still not running Comment/Suggestions:Saturday, 2/25/12 today, the rail is slated to be repaired in10:00 AM – 2:00 PM two weeks; therefore I continued my work around the museum until then. Commentary:The total time spent today was with my Facilitator with his other part in the museum, which is catering Parties and Special events that are scheduled during the week.Total Time: 4 hrs.
  6. 6. Product Work LogName__________________________________________________ Date ________________Product________________________________________________________________________Date/Time: Activity:The first day of Train Runs Comment/Suggestions:Saturday, 3/10/12 since the rails were repaired about a10:00 AM – 2:00 PM week ago, was mostly in charge of tickets, known as “Paper-work”, due to the fact that it is at this time I have to take the required safety test for Certification under the Southeastern Railway Museum. Commentary: Until I complete and obtain a passing grade on the Certification Exam I will be unable to Conduct any further runs.Total Time: 4 hrs.

×