SlideShare a Scribd company logo
1 of 2
Download to read offline
Building Schools for the Future—Burnley Campus—Value £32M
Building Schools for the Future—Burnley Campus—Value £32M

More Related Content

Viewers also liked (8)

Marina p. tsunami
Marina p.   tsunamiMarina p.   tsunami
Marina p. tsunami
 
dexia_crediop_ss
dexia_crediop_ssdexia_crediop_ss
dexia_crediop_ss
 
232 ptx3 or crp
232 ptx3 or crp232 ptx3 or crp
232 ptx3 or crp
 
Poster_Bracht
Poster_BrachtPoster_Bracht
Poster_Bracht
 
4tenedores
4tenedores4tenedores
4tenedores
 
The Basics of Good Metric Generation
The Basics of Good Metric GenerationThe Basics of Good Metric Generation
The Basics of Good Metric Generation
 
Toma de decisiones en los adolescentes
Toma de decisiones en los adolescentesToma de decisiones en los adolescentes
Toma de decisiones en los adolescentes
 
Quality Control Circle
Quality Control CircleQuality Control Circle
Quality Control Circle
 

More from Sally Kelly

More from Sally Kelly (6)

The Rose
The RoseThe Rose
The Rose
 
SJT&RW
SJT&RWSJT&RW
SJT&RW
 
Southlands
SouthlandsSouthlands
Southlands
 
West Craven
West CravenWest Craven
West Craven
 
Fleetwood
FleetwoodFleetwood
Fleetwood
 
Barnoldswick
BarnoldswickBarnoldswick
Barnoldswick
 

Burnley Campus