  1. 1. DIJOUX Sandrine / PAYET Emmanuelle / SELAMBAYE Jessica
  2. 2. ORESUND BRIDGEORESUND BRIDGE DIJOUX Sandrine SELAMBAYE Jessica PAYET Emmanuelle
  3. 3. History The bridge The railway and the tunnel Conclusion Webography
  4. 4. Denmark Sweden Oresund Strait Malmo Copenhagen 16 kilometers
  5. 5. 3,510 meter 4,055 meter Peberholm 7,845 meters 1 2 3
  6. 6. 17/7/95 Contract tunnel & contract the artificial island 6/1/99 The 20th and final tunnel element is placed in the tunnel trench 27/11/95 Øresundskonsort iet signs a contract 16/7/97 Svanen 9-12/6/2 000 thousands of people who walked, cycled or roller
  7. 7. 1/7/2 004 Oresund Bridge Birthday’s 1/4/2002 236,651 vehicles cross the bridge 29/6/2001 biological environmental demands 1/7/2 000 The inauguration of the Oresund Bridge 12/6/2 000 80,000 participants/ half marathon
  8. 8. Suspension bridge Main cable CablesDeck
  9. 9. Cable-stayed bridge, fan design Cable-stayed bridge, harp design
  10. 10. Parallel system (or harp system) Various point on the tower equal number on both sides
  11. 11. Total lenght: 7 845 m
  12. 12. Suspended lenght: 1 092 m Longest span: 490 m Total lenght: 7 845 M
  13. 13. Width: 23.5 m, for 4 lanes of traffic Suspended lenght: 1 092 m Longest span: 490 m Total lenght: 7 845 M
  14. 14. Clearance below: 57 m Pylon height: 203.5 m Width: 23.5 m Suspended lenght: 1 092 m Longest span: 490 m Total lenght: 7 845 M
  15. 15. vibrator concrete skip frames pipe driver trepan probe
  16. 16. Matériaux utilisés et quantités
  17. 17. Fabrication on-shore and transportation to the bridge line Main piers: construction insitu
  18. 18. 80 meters 80 meters 20 meters15 meters 30 meters 9 500 N
  19. 19. Bridge deck section The rail section is double track standard gauge (1435 mm) and capable of high-speeds exceeding 200 km/h.
  20. 20. The island is approximately four kilometres long, and connects the bridge and tunnel of the Øresund link
  21. 21. 10m 38,8m 8,6m Built: 1993 - 2000 Structural Type: Immersed tube tunnel Function / usage: Railroad tunnel Road tunnel length of immersed tube tunnel section 3 510 m number of tunnel units 20 tunnel unit weight 57 500 t Quantities used in construction concrete volume 660 000 m3 reinforcing steel 20 000 t
  22. 22. Heavy water-proof bulk heads The precast reinforced concrete units were 8m high, 40m wide and 175m long and they weighed 55,000 metric tons.
  23. 23. Dock The units floating in the flooded dry dock at Oresund, prior to being towed out. Precast reinforced concrete units The units under tow on their way to their final placing.
  24. 24. The precast reinforced concrete units The unit suspended over the dredged trench with the tugs holding the unit in position, ready for lowering to the sea bed.