GRID INTEGRATION OF LARGE
PHOTOVOLTAIC PLANTS SUPPORTED
WITH ENERGY STORAGE UNITS

Mr. LUIS MALUMBRES
SUMMARY
Start Date(*): 01/03/2014
End date(*): 30/09/2015
Budget:1.236.101€
Leader: IBERDROLA I&C
Subcontracting: TECNALIA...
Who is IBERDROLA I&C

IBERDROLA Group

Nuclear
Products
Generation
Products
Networks
Products

Renewable
Energy Products

...
Who is IBERDROLA I&C
The scope of the engineering and construction activities covers from
the execution of studies to comp...
Who is IBERDROLA I&C
THERMAL

HYDRO

WIND

SOLAR

NUCLEAR

T&D

Iberdrola

11,808

11,596

3,372

54

6 NPP

Full Support
...
Who is IBERDROLA I&C
Who is TECNALIA
TECNALIA is the first privately funded Applied Research Centre in
Spain and one of the leading such centre...
Who is TECNALIA
TECNALIA provides energy storage solutions all
throughout the value chain
Who is SINTEF
SUMMARY
Start Date(*): 01/03/2014
End date(*): 30/09/2015
Budget:1.236.101€
Leader: IBERDROLA I&C
Subcontracting: TECNALIA...
PROJECT: MAIN OBJETIVES

Design big PV farm with the support of storage units
• > 200 MW PV farm

• Characterization of
en...
Large PV plants

Optimal V level?
Large PV plants

Optimal ground layout?
Large PV plants

Protections configuration?
Large PV plants

Load Flow?
Energy storage
Use cases specification
Technical specification
Requirements
Time response

<1 second

Service time

75% Pn...
Energy storage
Techno economic analysis

Operational strategies
System sizing
System performance

Cost-benefit study
IRR, ...
Grid characterization
PROJECT: Market
PROJECT: MARKET
SUMMARY
Start Date(*): 01/03/2014
End date(*): 30/09/2015
Budget:1.236.101€
Leader: IBERDROLA I&C
Subcontracting: TECNALIA...
Conclusions

- Technological innovation
- Close to Market
- Appropriate partnertship
- Realistic budget and duration
GRID INTEGRATION OF LARGE
PHOTOVOLTAIC PLANTS SUPPORTED
WITH ENERGY STORAGE UNITS

Mr. LUIS MALUMBRES
Upcoming SlideShare
Loading in …5
×

SUNBATT -Almacenamiento de energía para grandes plantas fotovoltaicas

980 views

Published on

Jornada organizada por SPRI-Gobierno Vasco para dar a conocer entre las empresas vascas las posibilidades de financiación, a través de EEA-Grants de los mejores proyectos de I+D en las áreas de energías renovables, eficiencia energética, medio ambiente y cambio climático.

Published in: Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
980
On SlideShare
0
From Embeds
0
Number of Embeds
211
Actions
Shares
0
Downloads
12
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

SUNBATT -Almacenamiento de energía para grandes plantas fotovoltaicas

  1. 1. GRID INTEGRATION OF LARGE PHOTOVOLTAIC PLANTS SUPPORTED WITH ENERGY STORAGE UNITS Mr. LUIS MALUMBRES
  2. 2. SUMMARY Start Date(*): 01/03/2014 End date(*): 30/09/2015 Budget:1.236.101€ Leader: IBERDROLA I&C Subcontracting: TECNALIA y SINTEF. 1. Who is who 2. The project 3. Conclusions
  3. 3. Who is IBERDROLA I&C IBERDROLA Group Nuclear Products Generation Products Networks Products Renewable Energy Products EXTERNAL CLIENTS
  4. 4. Who is IBERDROLA I&C The scope of the engineering and construction activities covers from the execution of studies to complete Turn Key plant construction for energy facilities PROJECT MANAGEMENT ENGINEERING COMMISSIONING EPC TURNKEY PROJECTS PROCUREMENT CONSTRUCTION
  5. 5. Who is IBERDROLA I&C THERMAL HYDRO WIND SOLAR NUCLEAR T&D Iberdrola 11,808 11,596 3,372 54 6 NPP Full Support Third Parties 5,285 469 1,789 97 (PV) 18 NPP +27 Projects 17,222 MW 12,065 MW 5,160 MW 151 MW 24 NPP SUBSTATIONS COMBINED CYCLES WIND FARMS PHOTOVOLTAIC HYDRO POWER PLANTS BIOMASS DISTRICT HEATING COGENERATION NUCLEAR POWER PLANTS CSP SOLAR PROJECTS OFFSHORE WIND MONITORING CENTRES TRANSMISSION LINES TELECOMMUNICATION INFRASTRUCTURES
  6. 6. Who is IBERDROLA I&C
  7. 7. Who is TECNALIA TECNALIA is the first privately funded Applied Research Centre in Spain and one of the leading such centres in Europe
  8. 8. Who is TECNALIA TECNALIA provides energy storage solutions all throughout the value chain
  9. 9. Who is SINTEF
  10. 10. SUMMARY Start Date(*): 01/03/2014 End date(*): 30/09/2015 Budget:1.236.101€ Leader: IBERDROLA I&C Subcontracting: TECNALIA y SINTEF. 1. Who is who 2. The project 3. Conclusions
  11. 11. PROJECT: MAIN OBJETIVES Design big PV farm with the support of storage units • > 200 MW PV farm • Characterization of energy flux • Grid codes characterization • Storage requirements • PV requirements for grid code • HV grid connection • Energy balance tool for optimal design • Active and reactive stability • Energy shifting • Operation simulations •Storage needs for each grid code • SOC evolution Quality of service and Grid stability
  12. 12. Large PV plants Optimal V level?
  13. 13. Large PV plants Optimal ground layout?
  14. 14. Large PV plants Protections configuration?
  15. 15. Large PV plants Load Flow?
  16. 16. Energy storage Use cases specification Technical specification Requirements Time response <1 second Service time 75% Pnom. PV Cicles Energy storage costs 15 min Power Economic specification 500 / year Remuneration framework PV ramping improvement
  17. 17. Energy storage Techno economic analysis Operational strategies System sizing System performance Cost-benefit study IRR, LCOE, NPV Parametric analysis
  18. 18. Grid characterization
  19. 19. PROJECT: Market
  20. 20. PROJECT: MARKET
  21. 21. SUMMARY Start Date(*): 01/03/2014 End date(*): 30/09/2015 Budget:1.236.101€ Leader: IBERDROLA I&C Subcontracting: TECNALIA y SINTEF. 1. Who is who 2. The project 3. Conclusions
  22. 22. Conclusions - Technological innovation - Close to Market - Appropriate partnertship - Realistic budget and duration
  23. 23. GRID INTEGRATION OF LARGE PHOTOVOLTAIC PLANTS SUPPORTED WITH ENERGY STORAGE UNITS Mr. LUIS MALUMBRES

×