1. Quick Historical View
2. Implementing ATN/VDLm...
Quick Historical
View
3 | European Data Link Challenges| WAC 4 Mar 2014 | © SITA 2014
• SITA:
• Operating the AIRCOM data link services for 25+
years
• Initially based on ACARS
• In support to AOC
• European ...
5
A/G Data Link for AOC Purpose
Airline Operations depend on Data Link
Aircraft Maintenance
Engine reports via ACARS
enabl...
6
SITA support for FANS & ATN
• 1995 : SITA supports
FANS-1 usage since first
certification
• 2000 SITA deploys VDL
capabi...
SITA VDLm2 Coverage in Europe
VDL service delivered:
• in Spain through
partnership with AENA
• in Germany through
partner...
Implementing
ATN/VDLm2 in
Europe
8 | European Data Link Challenges| WAC 4 Mar 2014 | © SITA 2014
9
Contents
1. Quick Historical View
2. Implementing ATN/VDLm2 in Europe
3. The Challenges associated with the
Implementing...
VGS Partnership Model
Win / Win Approach
- SITA outsources the provision of its
A/G communication service (AOC, ATC)
to th...
11
ATN Service Model
| European Data Link Challenges| WAC 4 Mar 2014 | © SITA 2014
The Challenges
associated with
the
Implementing
Rule
12 | European Data Link Challenges| WAC 4 Mar 2014 | © SITA 2014
13
The Challenges associated with the
Mandate
VDLm2 multifrequency
Testing and
Certifying
Performance/PAs
AOC/ATC
Co-exist...
Performance / PAs
14
 ATN Provider Abort: investigation within Data Link
Implementation Service Group (Eurocontrol CRO, A...
Performance / PAs
15
• An agreed service monitoring scope is required – taking
into account the complete end to end servic...
Certification Framework
16
• ATC usage of data link requires aviation certification authority
intervention
• European Avia...
Other Challenges
17
• How to reach non-AOC aircraft?
 Rules of Engagement defined by the Link 2000+ Program
 Need to rai...
Conclusions
18 | European Data Link Challenges| WAC 4 Mar 2014 | © SITA 2014
• Real time monitoring of the end to end service should be done/coordinated at
European level
• Certification and performa...
Thank You!
20
PSBD/ACS
| European Data Link Challenges| WAC 4 Mar 2014 | © SITA 2014
Upcoming SlideShare
Loading in …5
×

Patrick Geurts, SITA, European Data Link Challenges

1,299 views

Published on

Patrick Geurts, Senior Manager, Air Traffic Solution Business Development, spoke on European Data Link Challenges at World ATM Congress 2014

Published in: Technology
0 Comments
1 Like
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total views
1,299
On SlideShare
0
From Embeds
0
Number of Embeds
348
Actions
Shares
0
Downloads
19
Comments
0
Likes
1
Embeds 0
No embeds

No notes for slide

Patrick Geurts, SITA, European Data Link Challenges

  1. 1. European Data Link Challenges WAC Aviation Arena 4/Mar/2014 By: Patrick GEURTS, Senior Manager ATM Business Development
  2. 2. 2 | European Data Link Challenges| WAC 4 Mar 2014 | © SITA 2014 Contents 1. Quick Historical View 2. Implementing ATN/VDLm2 in Europe 3. The Challenges associated with the Implementing Rule 4. Conclusion
  3. 3. Quick Historical View 3 | European Data Link Challenges| WAC 4 Mar 2014 | © SITA 2014
  4. 4. • SITA: • Operating the AIRCOM data link services for 25+ years • Initially based on ACARS • In support to AOC • European Data Link Mandate • Introducing CPDLC/ATN in European upper airspace • Based on VDLm2 • Sharing the same infrastructure for AOC and ATC • Challenges 4 Introduction | European Data Link Challenges| WAC 4 Mar 2014 | © SITA 2014
  5. 5. 5 A/G Data Link for AOC Purpose Airline Operations depend on Data Link Aircraft Maintenance Engine reports via ACARS enable preventive maintenance avoiding costly in-flight breakdowns Operations Control Aircraft movement reports via ACARS key to synchronize operations through airports Flight Planning Flight plans & weather transmission to cockpit enable efficient operation of modern aircraft Airline Operations have already made the transition to Data Link | European Data Link Challenges| WAC 4 Mar 2014 | © SITA 2014
  6. 6. 6 SITA support for FANS & ATN • 1995 : SITA supports FANS-1 usage since first certification • 2000 SITA deploys VDL capability developed in 1990’s • 2005 SITA adds operational ATN routers for Eurocontrol • 2008 SITA is ATN/VDLm2 CSP for Eurocontrol Maastricht • SITA has VDL partnerships with ANSP’s of Germany, France, Switzerland, Spain, Portugal, Saudi Arabia. ATC Center Airline FANS CPDLC/ ACARS/VDL ICAO CPDLC/ ATN VDL ATN Router ACARS Processor AOC ACARS/ VDL | European Data Link Challenges| WAC 4 Mar 2014 | © SITA 2014
  7. 7. SITA VDLm2 Coverage in Europe VDL service delivered: • in Spain through partnership with AENA • in Germany through partnership with DFS • in France through partnership with DSNA • in Portugal through partnership with NAV Portugal • In Switzerland through partnership with Skyguide 7 | European Data Link Challenges| WAC 4 Mar 2014 | © SITA 2014
  8. 8. Implementing ATN/VDLm2 in Europe 8 | European Data Link Challenges| WAC 4 Mar 2014 | © SITA 2014
  9. 9. 9 Contents 1. Quick Historical View 2. Implementing ATN/VDLm2 in Europe 3. The Challenges associated with the Implementing Rule 4. Conclusion | European Data Link Challenges| WAC 4 Mar 2014 | © SITA 2014
  10. 10. VGS Partnership Model Win / Win Approach - SITA outsources the provision of its A/G communication service (AOC, ATC) to the ANSP - SITA contributes to the ANSP costs for operating the A/G infrastructure - The ANSP deploys a state-of-the art A/G datalink communication infrastructure at a fraction of the costs it would sustain if developed from scratch - The ANSP owns and operates the infrastructure and develops its know-how - The ANSP receives a cost contribution that is directly linked to the volume of AOC traffic 10 | European Data Link Challenges| WAC 4 Mar 2014 | © SITA 2014
  11. 11. 11 ATN Service Model | European Data Link Challenges| WAC 4 Mar 2014 | © SITA 2014
  12. 12. The Challenges associated with the Implementing Rule 12 | European Data Link Challenges| WAC 4 Mar 2014 | © SITA 2014
  13. 13. 13 The Challenges associated with the Mandate VDLm2 multifrequency Testing and Certifying Performance/PAs AOC/ATC Co-existence Non-AOC Operators | European Data Link Challenges| WAC 4 Mar 2014 | © SITA 2014
  14. 14. Performance / PAs 14  ATN Provider Abort: investigation within Data Link Implementation Service Group (Eurocontrol CRO, ANSP, CSP, airlines, aircraft and avionics manufacturers)  Detected and investigated since the early implementation of ATN CPDLC during LINK2000+ PSG meeting, now DLISG.  Several problems have been confirmed and corrected (CSP radio or network, VDR Deafness, CMU software)  New problems appear and require further investigations. | European Data Link Challenges| WAC 4 Mar 2014 | © SITA 2014
  15. 15. Performance / PAs 15 • An agreed service monitoring scope is required – taking into account the complete end to end service delivery chain  Role of the Central Reporting Office  Harmonization of indicators, their metrics and the reporting process • If investigations indicate frequency congestion, then stakeholders may consider to expedite multi frequency in Europe • This is a dynamically changing ecosystem | European Data Link Challenges| WAC 4 Mar 2014 | © SITA 2014
  16. 16. Certification Framework 16 • ATC usage of data link requires aviation certification authority intervention • European Aviation Safety Agency plans to certify ATC use of VHF data link and in some way the VHF data link networks used – impact is unclear • Regulatory framework (i.e. Regulation 552/2004) applies to ATC Components or systems, but what about a service? • ATC usage can create liabilities that cannot be sustained or justified by airline community VHF data link network operators • ANSP’s often need to comply with government policy on contractual liability which may be incompatible with airline community network operator policies • Better certification harmonization is required at European Levels • Avoid contradicting national requirements • Streamline and optimize the certification process | European Data Link Challenges| WAC 4 Mar 2014 | © SITA 2014
  17. 17. Other Challenges 17 • How to reach non-AOC aircraft?  Rules of Engagement defined by the Link 2000+ Program  Need to raise awareness of non-AOC aircraft Operators • VDL Multi-frequency  CSC Channel loading is increasing but still low (av. ~ 10%)  If investigations conclude CSC congestion, then stakeholders may consider to expedite multi frequency in Europe  Deployment of multi frequency will require close cooperation between all operators • Tight Schedule – Limited Resources  The next deadline, February 2015, is around the corner  All ANSPs in the 2015 group are knocking at the door  We have to address requests in sequence | European Data Link Challenges| WAC 4 Mar 2014 | © SITA 2014
  18. 18. Conclusions 18 | European Data Link Challenges| WAC 4 Mar 2014 | © SITA 2014
  19. 19. • Real time monitoring of the end to end service should be done/coordinated at European level • Certification and performance requirements imposed by ATC usage of VDL should be harmonized in Europe • Airlines and ANSPs need to recognize that ATC usage of VDL will fundamentally change the VHF data link network operation • ATC sharing of VDL avionics is a compromise – it avoids airlines needing additional avionics but the resulting sharing of VDL channels and stations requires the networks to change to meet ATC requirements • SITA is keen to continue the collaboration to further investigate VDL / ATN issues, but it must be a joint effort from all communication operators (CSPs and ANSPs) as well as other parties like airframers and avionic vendors 19 Conclusion | European Data Link Challenges| WAC 4 Mar 2014 | © SITA 2014
  20. 20. Thank You! 20 PSBD/ACS | European Data Link Challenges| WAC 4 Mar 2014 | © SITA 2014

×