YASH performed the production upgrade successfully. Entire upgrade was done at offshore development center. YASH employed a team of four consultants which includes two ABAP consultants, one Basis consultant, and one security consultant.

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
435
On SlideShare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
7
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

SAP Upgrade Success Story @ YASH

  1. 1. SAP Upgrade Success Story @ YASH Industry The Client Manufacturing Colder Products Company is the leading provider of quick disconnects couplings for industrial, biopharmaceutical, medical, chemical, and packaging markets. Geography Project Objectives USA SAP Version Upgrade to meet the increasing demand of the business Implement new functionality available with new version Hardware Migration from 32 bit server to 64 bit OS Upgrade from 32 bit OS to 64 bit OS“Partnering with YASH has provided an efficient, flexible, cost-effective solution for SAP upgrade. We are impressed with thecontributions YASH has made and have found a true partner for our ITneeds.” Director, IT - Colder Products Company
  2. 2. Key ChallengesServices Offered Commitment of 30 Hour downtime to minimize business impact Due to unavoidable reasons, security consultant was not available from the client’s side Pathfinder road map, an excellent Upgrade Assessment YASH consultant helped the Colder onsite team in solving the security issues service to reduce time and cost Unexpected connectivity error in the new cluster environment of upgrade significantly Hardware Migration from 32 bit to 64 bit server Engagement Model Solution manager setup YASH performed the production upgrade successfully. Entire upgrade was done at offshore ABAP/4 adjustments development center. YASH employed a team of four consultants which includes two ABAP consultants, one Basis consultant, and one security consultant. There was one onsite Basis support Project Manager provided by Colder. R/3 Security adjustments Load Monitoring Environment Details Performance Tuning Resources Before Upgrade After Upgrade System Maintenance tasks SAP Version 4.6C ECC 6.0 Knowledge Transfer Database MSSQL 2000 SQL 2005 Operating System Windows 2003 (32 Bit) Windows 2003 (64 bit) Landscape 3 System Landscape (Dev, QA, Prod) Two Cluster Environment - Application server for Production Box .Cluster in 3 System LandscapeYASH Accelerators Production environment Pathfinder, an Upgrade Assessment Accelerator Solution YASH SAP Version Upgrade Completely executed from Offshore Installation guide Downtime minimized methodology followed Colder Specific Upgrade road map document 45 man days taken for completing the upgrade Upgrade checklist Onsite–Offshore responsibility Solution Highlights checklist Timestamp checklist Cost benefits to tune of 60% because of offshore model Performance analysis report Reduced downtime through proactive upgrade and resource planning Upgrade related risk mitigation Safeguarded against future issues and problems by engaging post-upgrade support plan Cost-effective and minimized time of doing upgrade with identified best practices and using YASH Accelerators, such as PathFinder For More Information: YASH Technologies 841 Avenue of the Cities, East Moline, IL 61244 Tel: 309-755-0433, Fax: 309-755-3742 Toll Free: 877-369-YASH (9274) Email: sap@yash.com Web: www.yash.com USA Europe MEA Asia Pacific ©2007-2008 YASH Technologies. All rights reserved. Referred products/ services may be registered trademarks of belonging companies.

×