  1. 1. FSO- Prem Pride –Confined Space Drill , Entry and other Activities 22nd March 2014
  2. 2. Activities of 22nd March -2014 Tool Box talks conducted for the following activities carried out : • Enclosed space rescue drill. • 3P C.O.T Entry/Inspection • v/v operation inside of 3P C.O.T • Renewal of cargo line dresser coupling . • Hydraulic line maintenance/renewal . • Securing of 3P cargo tank • Removal of I.G blank of cargo tanks.
  3. 3. Confined space rescue drill
  4. 4. 3 P C.O.T entry ,inspection and operation of cross over valve
  5. 5. Hydraulic line repairs/renewal Dresser coupling renewalDresser coupling renewal Isolation of no1 and 2 hydraulic pump carried out in ECR .
  6. 6. 3P cargo tank secured Removing I.G blanks of cargo tanks

×