Representative Projects
Roger Pearson
Economic
Development
Aerotropolis
/ Airport City
/ Aviation
Technology
Manufacturing
Development
Feasibility
General Industrial
Office
Commercial / Retail
Life Sciences
/ Higher Education
Sustainability in
Master Planning
Abu Dhabi, UAE 2014
Belo Horizonte, Brazil 2013 Pittsburgh, Pennsylvania 2012
Economic Development
3Representative Projects
Logistics City Master Plans, Qatar
Economic Development
 Site Area: 4 sites, 24.3 km2 / 6,004 acres
 Client: Qatar National Logistics Task
Force, Manateq Economic Zones
Company
 Highlight: Developing a strategy and
physical facilities to streamline Qatar’s
supply chain supporting FIFA 2022, post-
2022 legacy, and overall quality of life
Al Karaana Master Plan
Birkat Al Awamar Master Plan Al Wakrah Entry Concept
Birkat Al Awamar Superblock Concept
Al Wakrah
Service Centre
4
STAMP Master Plan & GEIS, Genesee County, New York, USA
Economic Development
 Site Area: 1,300 acres / 5.3 km2
 Client: Genesee Gateway Local
Development Corporation
 Highlight: On 7 Oct 2015, Governor
Cuomo and 1366 Technologies
announced plans to construct a solar
energy manufacturing facility at STAMP.
STAMP Master Plan 2012
7 Oct 2015 – 1366 Technologies AnnouncementAerial View of Master Plan
Representative Projects
STAMP Logo 2010
1366
Technologies
Site
5
Nanchang High-Tech Industrial Development Zone Master Plan, China
Economic Development
Representative Projects
 Site Area: 230 km2 / 56,800 acres
 Client: Nanchang High-Tech Industrial
Development Zone
 Highlight: Fulfilled Chinese government
mandate for master planning of all
significant development with “Smart City”
concepts and physical plan
Yao Lake Concept
High-Tech Industrial Development Zone Concept
Smart City ConceptsIndustry Pillars Analysis
6
Al Kharj Industrial City Master Plan, Al Kharj, KSA
Economic Development
Typical Industrial Area
Industrial City Entrance
Wadi ParkAKIC Master Plan 2011
Representative Projects
AKIC Site 2015
AKIC Site 2015
 Site Area: 95.3 km2 / 23,549 acres
 Client: MODON Saudi Industrial Property
Authority
 Highlight: Prepared master plan for the
largest of 4 new live-work-play based
industrial cities as part of a major
program to diversify the Kingdom’s
economy away from petrochemicals
AKIC Site 2015
7
Key Green Features: Auto Use Reduction & Minimized Land Disturbance
Sustainability in Master Planning – Al Kharj Industrial City Master Plan
Representative Projects
 Community centers varying in scale are distributed thru
the city to minimize auto travel distances and provide
options to walk or bike
 Existing wadi system preserved across the site to
minimize site disturbance and preserve natural
stormwater drainage channels
Labor Accommodation 2 km Radii Labor AccommodationCommunity Centers
Legend
Aerotropolis / Airport City / Aviation
9
BHMR Economic Master Plan, Belo Horizonte, Brazil
Aerotropolis / Airport City / Aviation
 Site Area: 1,368,958 acres / 5,540 km2
 Client: Economic Development
Secretariat, State of Minas Gerais, Brazil
& World Bank
 Highlight: EMP embraced by new political
administration after 2014 elections and is
proceeding through multiple activities with
the 39 municipalities in study area
Environmental Zones
Representative Projects
BHMR Economic Vision 2014
Target Area 4 – North Logistics Gateway
Land Use Plan
“Everything Connected”
Monocentric-to-Polycentric Urban Structure
10
Pittsburgh International Airport Development Master Plan, Pennsylvania, USA
Aerotropolis / Airport City / Aviation
Development Master Plan 2003 & 2010
 Site Area: 3,818 acres / 15.5 km2
 Client: Allegheny County Airport Authority
& Allegheny Conference on Community
Development
 Highlight: Over 2,465,500 SF / 229,052
m2 GFA new building space has been
built since original 2003 master plan
Master Plan View from South
Clinton Commerce Park World Trade CenterLand Use Context Dick’s Sporting Goods
Headquarters
Representative Projects
Technology Manufacturing
12
United Microelectronics Corporation Master Plan, Tainan, Taiwan
Technology Manufacturing
Representative Projects
 Site Area: 53 acres / 0.22 km2
 Client: United Microelectronics Corp
 Highlight: Master plan developed in short
timeframe to accommodate a fengshui
based semiconductor manufacturing
facility expansion on a tight, oddly shaped
site.
Existing UMC FAB Facility 2012
Concept Study
UMC Master Plan 2012 UMC Site 2015
Phase 1
13
Semiconductor Campus Master Plan Update, Hillsboro, Oregon, USA
Technology Manufacturing
Representative Projects
 Site Area: 454 acres / 1.8 km2
 Client: Confidential
 Highlight: Developed wetland-restoration
based master plan approved with
Nationwide permits that allowed overall
D1D fab programming, design,
construction, and commissioning to
proceed on a market-responsive schedule
Office Entry FAB & Office with Wetland “Front Yard”
Next Phase Concept 2001
Aerial View
MP Site 2015Master Plan 2001
14
Key Green Feature: Revitalized Wetland Ecosystem
Sustainability in Master Planning – Confidential Semiconductor Campus Master Plan Update
Representative Projects
 Relocated stream channel and created
wetlands serve as “front yard” for
office building & FAB
 Stream channel returned to historic
alignment from agricultural drainage
ditch that had become a wetland
Wetland Mitigation Concept 2001
Wetland Mitigation Concept 2001
Wetland Channel 2015
Balanced Economic Development Wildlife Habitat
Open Space
Attractive Front Yard
15
GlobalFoundries Semiconductor Campus Master Plan, Abu Dhabi, UAE
Technology Manufacturing
 Site Area: 2.1 km2 / 531 acres
 Client: GlobalFoundries & Mubadala
Development Company
 Highlight: Prepared master plan for the
first major semiconductor manufacturing
facility in the Middle East as part of the
UAE desire for economic diversification
and meaningful employment of young
UAE nationals
GFAD Master Plan 2010
Roadway View Towards Office and Phase 1 Fab
Representative Projects
Site Security PlanSite Circulation Plan Key GF Facility Locations
16
Dubai Silicon Oasis Master Plan, Dubai, UAE
Technology Manufacturing
DSO Master Plan 2003
 Site Area: 7.2 km2 / 1,766 acres
 Client: Dubai Airport Free Zone Authority
 Highlight: Originally master planned as a
semiconductor manufacturing community,
DSO has instead become a high-end
e-commerce community catering to a
range of office, logistics, and residential
uses
Representative Projects
LogisticsOffice
Residential Center Sport Center Residential Education
DSO Land Use Plan 2003 DSO 2015
Development Feasibility
18
Redlands Property Due Diligence, Redlands, California, USA
Development Feasibility
Representative Projects
 Site Area: 300 acres / 1.2 km2
 Client: Union Pacific Realty Company
 Highlight: Provided UPRC senior
management with high-level technical
analysis to assist with land acquisition
and/or development decision-making
Phase 1 Phase 2 Phase 3 Total
Onsite Costs $2,569,200 $4,698,500 $3,099,580 $10,367,280
Offsite Costs $2,980,000 $2,034,300 $1,788,700 $6,803,000
Total $5,549,200 $6,732,800 $4,888,280 $17,170,280
Cost / Net Salable Area 254.5 Acres $1.55 / SF
Cost / Gross Area 306.5 Acres $1.28 / SF
Concept Plan
Return On Investment Summary
Cost Analysis Summary
19
Imperial Land Site Capacity Study, Findlay Township, Pennsylvania, USA
Development Feasibility
Representative Projects
 Site Area: 1,069 acres / 4.3 km2
 Client: Allegheny Conference on
Community Development / Imperial Land
Corporation
 Highlight: High-level site analysis and
land use studies provided early rational
for revising prior land uses to a more
balanced and marketable mix of uses
LIGHT MANUFACTURING SITE CAPACITY DETAIL - 8 Jan 04 - Rev 3
Imperial Land Site Capacity Analysis
BUILDABLE AREA (SF) 8,677,152.00 100.00%
Acreage 199.20
LIGHT MANUFACTURING BUILDINGS
Building Footprint 75,000
Number of Levels 1
SF GFA per Building 75,000
Number of Buildings 31
Total SF GFA 2,325,000
FAR (GFA as Percent of Buildable Area) 26.79%
Building Footprint 75,000
Number of Buildings 31
Total Building Footprints (SF GFA) 2,325,000.00 26.79%
PARKING
Per Building @ 1.0 per 1,000 SF GFA (750 SF NFA) 75
Per Building Parking Area @ 400 SF per Space 30,000
Total Site @ 1.0 per 1,000 SF GFA 2,325
Total Site Parking Area @ 400 SF per Space 930,000
Per Building Surface Parking @ 100% 75
Total Site Surface Parking 2,325
Total Site Surface Parking Area @ 400 SF per Space 930,000.00 10.72%
LOADING
Per Building @ 1.0 per 13,333 SF GFA 6
Per Building Loading Area @ 9,000 SF SF per Space 50,626
Total Site @ 1.0 per 13,333 SF GFA 174
Total Site Loading Area @ 9,000 SF per Space 1,569,414.24 18.09%
DRIVEWAYS
Road Pavement @ 15% of Coverage 723,662.14 8.34%
OPEN SPACE WITHIN BUILDABLE AREA
Misc Open Space @ 20% of Coverage 964,882.85 11.12%
STORMWATER MANAGEMENT WITHIN BUILDABLE AREA
Provided at 5% Buildable Area 433,857.60 5.00%
Site Capacity Methodology
Buildable Area Plan
Alternate Land UseTownship Land Use
20
Junction/Panther Hollow Site Analysis, Pittsburgh, Pennsylvania, USA
Development Feasibility
Promotional Video Drive-Thru
Representative Projects
 Site Area: 105 acres / 0.4 km2
 Client: Allegheny Conference on
Community Development
 Highlight: Prepared high-level analysis
of the valley corridor linking the Oakland
& CMU area with development sites
along the Mon River to assist Oakland
Investment Committee discussions
A – Institutional Urban B – Residential Urban
C – Remote & Rural D – Urban Mixed
Site Analysis
General Industrial
22
Carrier Corporation Campus Reuse Master Plan, Syracuse, New York, USA
General Industrial
 Site Area: 257 acres / 1km2
 Client: Central New York Regional
Planning & Development Board / Carrier
Corporation
 Highlight: Reuse plan provided impetus
for Carrier to invest $5 million in site
redevelopment for the first time since the
manufacturing peak of the 1970s
Representative Projects
Existing Conditions 2006
Carrier Reuse Master Plan 2007
Master Plan 2007 Carrier Site 2015
Main Entry Sign Site Aerial 2006 Carrier Circle View Thompson Road R&D Spine Office Reuse
23
Key Green Feature: Adaptive Reuse of Aging Industrial Site
Sustainability in Master Planning – Carrier Corporation Campus Reuse Master Plan
Representative Projects
 Market analysis identified market demand for
development of a research park with existing
Carrier R&D units as the anchor
 Master plan proposed consolidation of existing
Carrier R&D functions to the center of the site
and development of the east and west sides as
new and/or re-purposed existing building space
 Financial analysis identified short and long-term
redevelopment finance options for Carrier
consideration
Market Demand Summary
Redevelopment Finance Options Summary
24
Trap Rock Industries Mining Reclamation Plan, Princeton, New Jersey, USA
General Industrial
Representative Projects
 Site Area: 500 acres / 2.0 km2
 Client: Trap Rock Industries
 Highlight: Reclamation plan was
approved by New Jersey Department of
Environmental Protection and paved the
way for rezoning the upper end of the site
for mining
Long Range Land Use & Transport Concept Quarry Edge Noise Attenuation
Existing Conditions Phase 1 Reclamation Final Phase Reclamation
Office
26
National Reconnaissance Office Headquarters Master Plan, Fairfax, Virginia, USA
Office
Representative Projects
 Site Area: 67 acres / 0.3 km2
 Client: Rockwell International / Collins
International Service Company
 Highlight: Provided a 4-year, 1.5 million
SF master plan, site design, and
reforestation plan for a consolidation
headquarters for satellite reconnaissance
division of the CIA
NRO Master Plan
Drum Lacing
Newly Planted
1 Year Growth
Main Entrance Hardscape
Existing Site Main Entrance Hardscape
Perimeter
Reforestation
27
Innovation Ridge/MEDRAD Master Plans, Marshall Township, Pennsylvania, USA
Office
Innovation Ridge/MEDRAD Master Plan 2006
2007 Ed Massery 2007 Ed Massery
MEDRAD Visualization Tech 21 Groundbreaking MEDRAD Global Center MEDRAD Interior
Innovation Ridge 2014
Representative Projects
 Site Area: 223 acres / 0.9 km2
 Client: CB Richard Ellis / MEDRAD
 Highlight: Converted a planning process
mired in community controversy into a
successful stakeholder-based master
plan supported and approved by the local
jurisdiction and attracted a phase 1 user
to construct the initial 125,000 SF office
28
Key Green Feature: Minimized Land Disturbance & Energy Consumption
Sustainability in Master Planning – Innovation Ridge / MEDRAD Master Plans
Representative Projects
 Site development concept “nestled”
MEDRAD into existing topography to
minimize earthwork and reduce
clearing/removal of existing forest cover
 MEDRAD building is oriented with long
facades facing north and south to minimize
energy consumption and increase natural
light in office work areas
 The MEDRAD development received LEED
Gold Certification in 2008
MEDRAD South Façade Viewed on Approach
Grading Concept Minimizes Earthwork
Long North-South Façades
North
MEDRAD photos ©2007 Ed Massery
South Façade Light Shelf
2007 Ed Massery
29
US Embassy / Consulate Master Plans, Confidential, Africa Region
Office
Representative Projects
Consulate Site 2015
Consulate Master Plan 2005
Main CAC Consulate Garden
Aerial View
 Site Area: 5 sites, 50 acres / 0.2 km2
 Client: US Department of State, Overseas
Buildings Operations
 Highlight: In the wake of 911, prepared
master plan concepts utilizing strict US
State Department hardening specifications
intended to significantly upgrade safety of
consular facilities
Commercial / Retail
31
Bee Cave Community Advocacy, Bee Cave, Texas, USA
Commercial / Retail
Representative Projects
 Site Area: 10,080 acres / 40.1 km2
 Client: Village of Bee Cave, Citizens for a
Livable Bee Cave
 Highlight: Formed CLBC, defeated
WalMart/Lowes, created new comp
plan/development regs, changed Village
governance, Hill Country Galleria lifestyle
retail developed at Village center
Bee Cave Center in 2015
Comp Plan Land Uses in 2000 CLBC Logo
Big-Box Retail
Lifestyle Retail
Anchor Retail
Bee Cave City Hall Hotel
32
Key Green Feature: Reduction in Energy Consumption & Auto Use
Sustainability in Master Planning – Bee Cave Community Advocacy
Representative Projects
One of Five Original Slides Presented to Bee Cave Board of Aldermen
33
Greenbrier TIF District Master Plan, Chesapeake, Virginia, USA
Commercial / Retail
Representative Projects
TIF District Land Use Plan 2006
Streetscape Signage
Stephanie Way Plaza
Cinema Plaza TIF Funding Plan Summary
 Site Area: 1,900 acres / 7.7 km2
 Client: City of Chesapeake, Department
of Economic Development
 Highlight: Developed stakeholder-based
vision and implementation plan for tax-
increment-financing based revitalization
of an aging commercial center in this
Tidewater Virginia community
34
Tri-Party Design Guidelines, San Antonio, Texas, USA
Commercial / Retail
Representative Projects
 Site Area: 10 Principal Downtown Streets
 Client: San Antonio Tri-Party
 Highlight: Created stakeholder-based
structure plan to coordinate the work of
multiple design consultants for the
upgrading of principal downtown streets
as a means to enhance the Riverwalk
tourist experience
Alamo Plaza
Thematic AreasThematic Area 8 in 2015 Area 8 Diagram in 1985
Life Sciences / Higher Education
36
Innovation Park, Prince William County, Virginia, USA
Life Sciences / Higher Education
Representative Projects
 Site Area: 1,600 acres / 6.5 km2
 Client: Prince William County,
Department of Economic Development
 Highlight: Thru early 2009, Innovation
had become home to over 2,900 jobs,
attracted over $725 million in third-party
investment, and resulted in net income to
the County of over $1.4 million
2005 Sector Plan Sector Plan Area 2015
Innovation Park
GMU
S&T
Campus
Micron
37
GMU S&T Campus Master Plan, Prince William County, Virginia, USA
Life Sciences / Higher Education
Representative Projects
 Site Area: 134 acres / 0.5 km2
 Client: George Mason University / Prince
William County, Department of Economic
Development
 Highlight: Since beginning construction
in 1995, over 562,000 SF of academic
space has been built, accommodating
over 2,100 students in 2013-14
Upper Quad
Lower Quad
1995 Master Plan Concept
Freedom Aquatic
& Fitness Center
Discovery
Hall
Occoquan
Building
Bull Run Hall
Biomedical
Research
Laboratory
Beacon
Hall
Hylton
Performing Arts
Center
Life Sciences
Laboratory
Wetland Spine
Main Entry
Academic
Buildings
Phase 1
Area
Energy
Center
Ring Road
GMU Campus
2015
Representative Projects
Roger Pearson
Economic
Development
Aerotropolis
/ Airport City
/ Aviation
Technology
Manufacturing
Development
Feasibility
General Industrial
Office
Commercial / Retail
Life Sciences
/ Higher Education
Sustainability in
Master Planning
Abu Dhabi, UAE 2014
Belo Horizonte, Brazil 2013 Pittsburgh, Pennsylvania 2012

More Related Content

Similar to RP Portfolio-No Video Links-16dec15-small for online

How Municipalities Can Enable Net-Zero Construction
How Municipalities Can Enable Net-Zero ConstructionHow Municipalities Can Enable Net-Zero Construction
How Municipalities Can Enable Net-Zero ConstructionDerek Satnik
 
Net-Zero Municipal Policy Workshop - Energy Conscious Community Planning
Net-Zero Municipal Policy Workshop - Energy Conscious Community PlanningNet-Zero Municipal Policy Workshop - Energy Conscious Community Planning
Net-Zero Municipal Policy Workshop - Energy Conscious Community PlanningDerek Satnik
 
WS3 Project Realities
WS3 Project Realities WS3 Project Realities
WS3 Project Realities us2unionsquare
 
NESTLE ABAJI EIA PRESENTATION
NESTLE  ABAJI  EIA  PRESENTATIONNESTLE  ABAJI  EIA  PRESENTATION
NESTLE ABAJI EIA PRESENTATIONAdewunmi Okumodi
 
Formatted townboardpresentationdec5toocida
Formatted townboardpresentationdec5toocidaFormatted townboardpresentationdec5toocida
Formatted townboardpresentationdec5toocidaJMShaw
 
How Municipalities Can Enable Net-Zero Construction
How Municipalities Can Enable Net-Zero ConstructionHow Municipalities Can Enable Net-Zero Construction
How Municipalities Can Enable Net-Zero ConstructionDerek Satnik
 
Sustainable Modifications and Innovations using LEED of a Women University in...
Sustainable Modifications and Innovations using LEED of a Women University in...Sustainable Modifications and Innovations using LEED of a Women University in...
Sustainable Modifications and Innovations using LEED of a Women University in...Asadullah Malik
 
Municipal Tools for Catalyzing Net-Zero Energy Development
Municipal Tools for Catalyzing Net-Zero Energy DevelopmentMunicipal Tools for Catalyzing Net-Zero Energy Development
Municipal Tools for Catalyzing Net-Zero Energy DevelopmentDerek Satnik
 
Gemmen- Industrial Site Certification & Site Readiness
Gemmen- Industrial Site Certification & Site ReadinessGemmen- Industrial Site Certification & Site Readiness
Gemmen- Industrial Site Certification & Site ReadinessEMRoundtable
 
Clean Energy Finance and Investment Roadmap OECD.pdf
Clean Energy Finance and Investment Roadmap OECD.pdfClean Energy Finance and Investment Roadmap OECD.pdf
Clean Energy Finance and Investment Roadmap OECD.pdfOECD Environment
 
2009 Community Development Goals & Acomplishments
2009 Community Development Goals & Acomplishments2009 Community Development Goals & Acomplishments
2009 Community Development Goals & Acomplishmentsmckay
 
County Council Quarterly Update September 09
County Council Quarterly Update September 09County Council Quarterly Update September 09
County Council Quarterly Update September 09il4818leslie
 
Federal Capital Territory Administration
Federal  Capital Territory AdministrationFederal  Capital Territory Administration
Federal Capital Territory AdministrationTransformNG
 
#MP2013 Presentation of the Minister of the Federal Capital Territory Adminis...
#MP2013 Presentation of the Minister of the Federal Capital Territory Adminis...#MP2013 Presentation of the Minister of the Federal Capital Territory Adminis...
#MP2013 Presentation of the Minister of the Federal Capital Territory Adminis...FMINigeria
 
THE 2013 MINISTERIAL PLATFORM MID-TERM REPORT OF PRESIDENT GOODLUCK JONATHAN...
THE 2013 MINISTERIAL PLATFORM  MID-TERM REPORT OF PRESIDENT GOODLUCK JONATHAN...THE 2013 MINISTERIAL PLATFORM  MID-TERM REPORT OF PRESIDENT GOODLUCK JONATHAN...
THE 2013 MINISTERIAL PLATFORM MID-TERM REPORT OF PRESIDENT GOODLUCK JONATHAN...Nigeria Centenary
 
Advancing Sustainability in Discretionary Review 2
Advancing Sustainability in Discretionary Review 2Advancing Sustainability in Discretionary Review 2
Advancing Sustainability in Discretionary Review 2Wallace Roberts & Todd
 

Similar to RP Portfolio-No Video Links-16dec15-small for online (20)

draftstadiumeir
draftstadiumeirdraftstadiumeir
draftstadiumeir
 
How Municipalities Can Enable Net-Zero Construction
How Municipalities Can Enable Net-Zero ConstructionHow Municipalities Can Enable Net-Zero Construction
How Municipalities Can Enable Net-Zero Construction
 
Net-Zero Municipal Policy Workshop - Energy Conscious Community Planning
Net-Zero Municipal Policy Workshop - Energy Conscious Community PlanningNet-Zero Municipal Policy Workshop - Energy Conscious Community Planning
Net-Zero Municipal Policy Workshop - Energy Conscious Community Planning
 
WS3 Project Realities
WS3 Project Realities WS3 Project Realities
WS3 Project Realities
 
NESTLE ABAJI EIA PRESENTATION
NESTLE  ABAJI  EIA  PRESENTATIONNESTLE  ABAJI  EIA  PRESENTATION
NESTLE ABAJI EIA PRESENTATION
 
Formatted townboardpresentationdec5toocida
Formatted townboardpresentationdec5toocidaFormatted townboardpresentationdec5toocida
Formatted townboardpresentationdec5toocida
 
How Municipalities Can Enable Net-Zero Construction
How Municipalities Can Enable Net-Zero ConstructionHow Municipalities Can Enable Net-Zero Construction
How Municipalities Can Enable Net-Zero Construction
 
Sustainable Modifications and Innovations using LEED of a Women University in...
Sustainable Modifications and Innovations using LEED of a Women University in...Sustainable Modifications and Innovations using LEED of a Women University in...
Sustainable Modifications and Innovations using LEED of a Women University in...
 
Municipal Tools for Catalyzing Net-Zero Energy Development
Municipal Tools for Catalyzing Net-Zero Energy DevelopmentMunicipal Tools for Catalyzing Net-Zero Energy Development
Municipal Tools for Catalyzing Net-Zero Energy Development
 
Gemmen- Industrial Site Certification & Site Readiness
Gemmen- Industrial Site Certification & Site ReadinessGemmen- Industrial Site Certification & Site Readiness
Gemmen- Industrial Site Certification & Site Readiness
 
Clean Energy Finance and Investment Roadmap OECD.pdf
Clean Energy Finance and Investment Roadmap OECD.pdfClean Energy Finance and Investment Roadmap OECD.pdf
Clean Energy Finance and Investment Roadmap OECD.pdf
 
2009 Community Development Goals & Acomplishments
2009 Community Development Goals & Acomplishments2009 Community Development Goals & Acomplishments
2009 Community Development Goals & Acomplishments
 
County Council Quarterly Update September 09
County Council Quarterly Update September 09County Council Quarterly Update September 09
County Council Quarterly Update September 09
 
Clean Ohio Program Year 2020 Applicant Workshop
Clean Ohio Program Year 2020 Applicant WorkshopClean Ohio Program Year 2020 Applicant Workshop
Clean Ohio Program Year 2020 Applicant Workshop
 
Record of success 2011
Record of success 2011Record of success 2011
Record of success 2011
 
Federal Capital Territory Administration
Federal  Capital Territory AdministrationFederal  Capital Territory Administration
Federal Capital Territory Administration
 
#MP2013 Presentation of the Minister of the Federal Capital Territory Adminis...
#MP2013 Presentation of the Minister of the Federal Capital Territory Adminis...#MP2013 Presentation of the Minister of the Federal Capital Territory Adminis...
#MP2013 Presentation of the Minister of the Federal Capital Territory Adminis...
 
THE 2013 MINISTERIAL PLATFORM MID-TERM REPORT OF PRESIDENT GOODLUCK JONATHAN...
THE 2013 MINISTERIAL PLATFORM  MID-TERM REPORT OF PRESIDENT GOODLUCK JONATHAN...THE 2013 MINISTERIAL PLATFORM  MID-TERM REPORT OF PRESIDENT GOODLUCK JONATHAN...
THE 2013 MINISTERIAL PLATFORM MID-TERM REPORT OF PRESIDENT GOODLUCK JONATHAN...
 
Advancing Sustainability in Discretionary Review 2
Advancing Sustainability in Discretionary Review 2Advancing Sustainability in Discretionary Review 2
Advancing Sustainability in Discretionary Review 2
 
The Process of Building A Green Project
The Process of Building A Green ProjectThe Process of Building A Green Project
The Process of Building A Green Project
 

RP Portfolio-No Video Links-16dec15-small for online

  • 1. Representative Projects Roger Pearson Economic Development Aerotropolis / Airport City / Aviation Technology Manufacturing Development Feasibility General Industrial Office Commercial / Retail Life Sciences / Higher Education Sustainability in Master Planning Abu Dhabi, UAE 2014 Belo Horizonte, Brazil 2013 Pittsburgh, Pennsylvania 2012
  • 3. 3Representative Projects Logistics City Master Plans, Qatar Economic Development  Site Area: 4 sites, 24.3 km2 / 6,004 acres  Client: Qatar National Logistics Task Force, Manateq Economic Zones Company  Highlight: Developing a strategy and physical facilities to streamline Qatar’s supply chain supporting FIFA 2022, post- 2022 legacy, and overall quality of life Al Karaana Master Plan Birkat Al Awamar Master Plan Al Wakrah Entry Concept Birkat Al Awamar Superblock Concept Al Wakrah Service Centre
  • 4. 4 STAMP Master Plan & GEIS, Genesee County, New York, USA Economic Development  Site Area: 1,300 acres / 5.3 km2  Client: Genesee Gateway Local Development Corporation  Highlight: On 7 Oct 2015, Governor Cuomo and 1366 Technologies announced plans to construct a solar energy manufacturing facility at STAMP. STAMP Master Plan 2012 7 Oct 2015 – 1366 Technologies AnnouncementAerial View of Master Plan Representative Projects STAMP Logo 2010 1366 Technologies Site
  • 5. 5 Nanchang High-Tech Industrial Development Zone Master Plan, China Economic Development Representative Projects  Site Area: 230 km2 / 56,800 acres  Client: Nanchang High-Tech Industrial Development Zone  Highlight: Fulfilled Chinese government mandate for master planning of all significant development with “Smart City” concepts and physical plan Yao Lake Concept High-Tech Industrial Development Zone Concept Smart City ConceptsIndustry Pillars Analysis
  • 6. 6 Al Kharj Industrial City Master Plan, Al Kharj, KSA Economic Development Typical Industrial Area Industrial City Entrance Wadi ParkAKIC Master Plan 2011 Representative Projects AKIC Site 2015 AKIC Site 2015  Site Area: 95.3 km2 / 23,549 acres  Client: MODON Saudi Industrial Property Authority  Highlight: Prepared master plan for the largest of 4 new live-work-play based industrial cities as part of a major program to diversify the Kingdom’s economy away from petrochemicals AKIC Site 2015
  • 7. 7 Key Green Features: Auto Use Reduction & Minimized Land Disturbance Sustainability in Master Planning – Al Kharj Industrial City Master Plan Representative Projects  Community centers varying in scale are distributed thru the city to minimize auto travel distances and provide options to walk or bike  Existing wadi system preserved across the site to minimize site disturbance and preserve natural stormwater drainage channels Labor Accommodation 2 km Radii Labor AccommodationCommunity Centers Legend
  • 8. Aerotropolis / Airport City / Aviation
  • 9. 9 BHMR Economic Master Plan, Belo Horizonte, Brazil Aerotropolis / Airport City / Aviation  Site Area: 1,368,958 acres / 5,540 km2  Client: Economic Development Secretariat, State of Minas Gerais, Brazil & World Bank  Highlight: EMP embraced by new political administration after 2014 elections and is proceeding through multiple activities with the 39 municipalities in study area Environmental Zones Representative Projects BHMR Economic Vision 2014 Target Area 4 – North Logistics Gateway Land Use Plan “Everything Connected” Monocentric-to-Polycentric Urban Structure
  • 10. 10 Pittsburgh International Airport Development Master Plan, Pennsylvania, USA Aerotropolis / Airport City / Aviation Development Master Plan 2003 & 2010  Site Area: 3,818 acres / 15.5 km2  Client: Allegheny County Airport Authority & Allegheny Conference on Community Development  Highlight: Over 2,465,500 SF / 229,052 m2 GFA new building space has been built since original 2003 master plan Master Plan View from South Clinton Commerce Park World Trade CenterLand Use Context Dick’s Sporting Goods Headquarters Representative Projects
  • 12. 12 United Microelectronics Corporation Master Plan, Tainan, Taiwan Technology Manufacturing Representative Projects  Site Area: 53 acres / 0.22 km2  Client: United Microelectronics Corp  Highlight: Master plan developed in short timeframe to accommodate a fengshui based semiconductor manufacturing facility expansion on a tight, oddly shaped site. Existing UMC FAB Facility 2012 Concept Study UMC Master Plan 2012 UMC Site 2015 Phase 1
  • 13. 13 Semiconductor Campus Master Plan Update, Hillsboro, Oregon, USA Technology Manufacturing Representative Projects  Site Area: 454 acres / 1.8 km2  Client: Confidential  Highlight: Developed wetland-restoration based master plan approved with Nationwide permits that allowed overall D1D fab programming, design, construction, and commissioning to proceed on a market-responsive schedule Office Entry FAB & Office with Wetland “Front Yard” Next Phase Concept 2001 Aerial View MP Site 2015Master Plan 2001
  • 14. 14 Key Green Feature: Revitalized Wetland Ecosystem Sustainability in Master Planning – Confidential Semiconductor Campus Master Plan Update Representative Projects  Relocated stream channel and created wetlands serve as “front yard” for office building & FAB  Stream channel returned to historic alignment from agricultural drainage ditch that had become a wetland Wetland Mitigation Concept 2001 Wetland Mitigation Concept 2001 Wetland Channel 2015 Balanced Economic Development Wildlife Habitat Open Space Attractive Front Yard
  • 15. 15 GlobalFoundries Semiconductor Campus Master Plan, Abu Dhabi, UAE Technology Manufacturing  Site Area: 2.1 km2 / 531 acres  Client: GlobalFoundries & Mubadala Development Company  Highlight: Prepared master plan for the first major semiconductor manufacturing facility in the Middle East as part of the UAE desire for economic diversification and meaningful employment of young UAE nationals GFAD Master Plan 2010 Roadway View Towards Office and Phase 1 Fab Representative Projects Site Security PlanSite Circulation Plan Key GF Facility Locations
  • 16. 16 Dubai Silicon Oasis Master Plan, Dubai, UAE Technology Manufacturing DSO Master Plan 2003  Site Area: 7.2 km2 / 1,766 acres  Client: Dubai Airport Free Zone Authority  Highlight: Originally master planned as a semiconductor manufacturing community, DSO has instead become a high-end e-commerce community catering to a range of office, logistics, and residential uses Representative Projects LogisticsOffice Residential Center Sport Center Residential Education DSO Land Use Plan 2003 DSO 2015
  • 18. 18 Redlands Property Due Diligence, Redlands, California, USA Development Feasibility Representative Projects  Site Area: 300 acres / 1.2 km2  Client: Union Pacific Realty Company  Highlight: Provided UPRC senior management with high-level technical analysis to assist with land acquisition and/or development decision-making Phase 1 Phase 2 Phase 3 Total Onsite Costs $2,569,200 $4,698,500 $3,099,580 $10,367,280 Offsite Costs $2,980,000 $2,034,300 $1,788,700 $6,803,000 Total $5,549,200 $6,732,800 $4,888,280 $17,170,280 Cost / Net Salable Area 254.5 Acres $1.55 / SF Cost / Gross Area 306.5 Acres $1.28 / SF Concept Plan Return On Investment Summary Cost Analysis Summary
  • 19. 19 Imperial Land Site Capacity Study, Findlay Township, Pennsylvania, USA Development Feasibility Representative Projects  Site Area: 1,069 acres / 4.3 km2  Client: Allegheny Conference on Community Development / Imperial Land Corporation  Highlight: High-level site analysis and land use studies provided early rational for revising prior land uses to a more balanced and marketable mix of uses LIGHT MANUFACTURING SITE CAPACITY DETAIL - 8 Jan 04 - Rev 3 Imperial Land Site Capacity Analysis BUILDABLE AREA (SF) 8,677,152.00 100.00% Acreage 199.20 LIGHT MANUFACTURING BUILDINGS Building Footprint 75,000 Number of Levels 1 SF GFA per Building 75,000 Number of Buildings 31 Total SF GFA 2,325,000 FAR (GFA as Percent of Buildable Area) 26.79% Building Footprint 75,000 Number of Buildings 31 Total Building Footprints (SF GFA) 2,325,000.00 26.79% PARKING Per Building @ 1.0 per 1,000 SF GFA (750 SF NFA) 75 Per Building Parking Area @ 400 SF per Space 30,000 Total Site @ 1.0 per 1,000 SF GFA 2,325 Total Site Parking Area @ 400 SF per Space 930,000 Per Building Surface Parking @ 100% 75 Total Site Surface Parking 2,325 Total Site Surface Parking Area @ 400 SF per Space 930,000.00 10.72% LOADING Per Building @ 1.0 per 13,333 SF GFA 6 Per Building Loading Area @ 9,000 SF SF per Space 50,626 Total Site @ 1.0 per 13,333 SF GFA 174 Total Site Loading Area @ 9,000 SF per Space 1,569,414.24 18.09% DRIVEWAYS Road Pavement @ 15% of Coverage 723,662.14 8.34% OPEN SPACE WITHIN BUILDABLE AREA Misc Open Space @ 20% of Coverage 964,882.85 11.12% STORMWATER MANAGEMENT WITHIN BUILDABLE AREA Provided at 5% Buildable Area 433,857.60 5.00% Site Capacity Methodology Buildable Area Plan Alternate Land UseTownship Land Use
  • 20. 20 Junction/Panther Hollow Site Analysis, Pittsburgh, Pennsylvania, USA Development Feasibility Promotional Video Drive-Thru Representative Projects  Site Area: 105 acres / 0.4 km2  Client: Allegheny Conference on Community Development  Highlight: Prepared high-level analysis of the valley corridor linking the Oakland & CMU area with development sites along the Mon River to assist Oakland Investment Committee discussions A – Institutional Urban B – Residential Urban C – Remote & Rural D – Urban Mixed Site Analysis
  • 22. 22 Carrier Corporation Campus Reuse Master Plan, Syracuse, New York, USA General Industrial  Site Area: 257 acres / 1km2  Client: Central New York Regional Planning & Development Board / Carrier Corporation  Highlight: Reuse plan provided impetus for Carrier to invest $5 million in site redevelopment for the first time since the manufacturing peak of the 1970s Representative Projects Existing Conditions 2006 Carrier Reuse Master Plan 2007 Master Plan 2007 Carrier Site 2015 Main Entry Sign Site Aerial 2006 Carrier Circle View Thompson Road R&D Spine Office Reuse
  • 23. 23 Key Green Feature: Adaptive Reuse of Aging Industrial Site Sustainability in Master Planning – Carrier Corporation Campus Reuse Master Plan Representative Projects  Market analysis identified market demand for development of a research park with existing Carrier R&D units as the anchor  Master plan proposed consolidation of existing Carrier R&D functions to the center of the site and development of the east and west sides as new and/or re-purposed existing building space  Financial analysis identified short and long-term redevelopment finance options for Carrier consideration Market Demand Summary Redevelopment Finance Options Summary
  • 24. 24 Trap Rock Industries Mining Reclamation Plan, Princeton, New Jersey, USA General Industrial Representative Projects  Site Area: 500 acres / 2.0 km2  Client: Trap Rock Industries  Highlight: Reclamation plan was approved by New Jersey Department of Environmental Protection and paved the way for rezoning the upper end of the site for mining Long Range Land Use & Transport Concept Quarry Edge Noise Attenuation Existing Conditions Phase 1 Reclamation Final Phase Reclamation
  • 26. 26 National Reconnaissance Office Headquarters Master Plan, Fairfax, Virginia, USA Office Representative Projects  Site Area: 67 acres / 0.3 km2  Client: Rockwell International / Collins International Service Company  Highlight: Provided a 4-year, 1.5 million SF master plan, site design, and reforestation plan for a consolidation headquarters for satellite reconnaissance division of the CIA NRO Master Plan Drum Lacing Newly Planted 1 Year Growth Main Entrance Hardscape Existing Site Main Entrance Hardscape Perimeter Reforestation
  • 27. 27 Innovation Ridge/MEDRAD Master Plans, Marshall Township, Pennsylvania, USA Office Innovation Ridge/MEDRAD Master Plan 2006 2007 Ed Massery 2007 Ed Massery MEDRAD Visualization Tech 21 Groundbreaking MEDRAD Global Center MEDRAD Interior Innovation Ridge 2014 Representative Projects  Site Area: 223 acres / 0.9 km2  Client: CB Richard Ellis / MEDRAD  Highlight: Converted a planning process mired in community controversy into a successful stakeholder-based master plan supported and approved by the local jurisdiction and attracted a phase 1 user to construct the initial 125,000 SF office
  • 28. 28 Key Green Feature: Minimized Land Disturbance & Energy Consumption Sustainability in Master Planning – Innovation Ridge / MEDRAD Master Plans Representative Projects  Site development concept “nestled” MEDRAD into existing topography to minimize earthwork and reduce clearing/removal of existing forest cover  MEDRAD building is oriented with long facades facing north and south to minimize energy consumption and increase natural light in office work areas  The MEDRAD development received LEED Gold Certification in 2008 MEDRAD South Façade Viewed on Approach Grading Concept Minimizes Earthwork Long North-South Façades North MEDRAD photos ©2007 Ed Massery South Façade Light Shelf 2007 Ed Massery
  • 29. 29 US Embassy / Consulate Master Plans, Confidential, Africa Region Office Representative Projects Consulate Site 2015 Consulate Master Plan 2005 Main CAC Consulate Garden Aerial View  Site Area: 5 sites, 50 acres / 0.2 km2  Client: US Department of State, Overseas Buildings Operations  Highlight: In the wake of 911, prepared master plan concepts utilizing strict US State Department hardening specifications intended to significantly upgrade safety of consular facilities
  • 31. 31 Bee Cave Community Advocacy, Bee Cave, Texas, USA Commercial / Retail Representative Projects  Site Area: 10,080 acres / 40.1 km2  Client: Village of Bee Cave, Citizens for a Livable Bee Cave  Highlight: Formed CLBC, defeated WalMart/Lowes, created new comp plan/development regs, changed Village governance, Hill Country Galleria lifestyle retail developed at Village center Bee Cave Center in 2015 Comp Plan Land Uses in 2000 CLBC Logo Big-Box Retail Lifestyle Retail Anchor Retail Bee Cave City Hall Hotel
  • 32. 32 Key Green Feature: Reduction in Energy Consumption & Auto Use Sustainability in Master Planning – Bee Cave Community Advocacy Representative Projects One of Five Original Slides Presented to Bee Cave Board of Aldermen
  • 33. 33 Greenbrier TIF District Master Plan, Chesapeake, Virginia, USA Commercial / Retail Representative Projects TIF District Land Use Plan 2006 Streetscape Signage Stephanie Way Plaza Cinema Plaza TIF Funding Plan Summary  Site Area: 1,900 acres / 7.7 km2  Client: City of Chesapeake, Department of Economic Development  Highlight: Developed stakeholder-based vision and implementation plan for tax- increment-financing based revitalization of an aging commercial center in this Tidewater Virginia community
  • 34. 34 Tri-Party Design Guidelines, San Antonio, Texas, USA Commercial / Retail Representative Projects  Site Area: 10 Principal Downtown Streets  Client: San Antonio Tri-Party  Highlight: Created stakeholder-based structure plan to coordinate the work of multiple design consultants for the upgrading of principal downtown streets as a means to enhance the Riverwalk tourist experience Alamo Plaza Thematic AreasThematic Area 8 in 2015 Area 8 Diagram in 1985
  • 35. Life Sciences / Higher Education
  • 36. 36 Innovation Park, Prince William County, Virginia, USA Life Sciences / Higher Education Representative Projects  Site Area: 1,600 acres / 6.5 km2  Client: Prince William County, Department of Economic Development  Highlight: Thru early 2009, Innovation had become home to over 2,900 jobs, attracted over $725 million in third-party investment, and resulted in net income to the County of over $1.4 million 2005 Sector Plan Sector Plan Area 2015 Innovation Park GMU S&T Campus Micron
  • 37. 37 GMU S&T Campus Master Plan, Prince William County, Virginia, USA Life Sciences / Higher Education Representative Projects  Site Area: 134 acres / 0.5 km2  Client: George Mason University / Prince William County, Department of Economic Development  Highlight: Since beginning construction in 1995, over 562,000 SF of academic space has been built, accommodating over 2,100 students in 2013-14 Upper Quad Lower Quad 1995 Master Plan Concept Freedom Aquatic & Fitness Center Discovery Hall Occoquan Building Bull Run Hall Biomedical Research Laboratory Beacon Hall Hylton Performing Arts Center Life Sciences Laboratory Wetland Spine Main Entry Academic Buildings Phase 1 Area Energy Center Ring Road GMU Campus 2015
  • 38. Representative Projects Roger Pearson Economic Development Aerotropolis / Airport City / Aviation Technology Manufacturing Development Feasibility General Industrial Office Commercial / Retail Life Sciences / Higher Education Sustainability in Master Planning Abu Dhabi, UAE 2014 Belo Horizonte, Brazil 2013 Pittsburgh, Pennsylvania 2012