BUILDINGSMiddle East - BahrainI was on site on Marina Westproject for 8months in Budiya,Bahrain. It was the biggestproject...
BUILDINGSSaadiyat Island – AbuDhabi. February 2010 toJanuary 2011Here again I was on site,ensuring smooth flow ofconstruct...
BRIDGESSibaya InterchangeAssisted the Senior Engineerwith the design of this 4 span,post tensioned bridge over aNational h...
BRIDGESResident EngineerOn site for 1 year as BridgeSuperintendent or ResidentEngineer as its known in SouthAfrica. I pers...
BRIDGESFire Damage ReportI was responsible for compilingthe damage assessment andrepair strategy report for a firedamaged ...
BRIDGESConstructionmanagement - DubaiI spent 7 months on site at theNad Al Sheba racecourseaccess roads. The project had a...
BRIDGESConstructionmanagement - DubaiNad Al Sheba: The Main Bridge
BRIDGESConstructionmanagement - DubaiInvestigating the snapping ofwires during tensioningoperations.
BRIDGESConstructionmanagement - DubaiThe completed VIP bridge.
Constructionmanagement– South AfricaConstructing a twin bridge nextto existing one. Piling inprogress, oscillator piles to...
Resolving bursting steel – arriving ata practical workable arrangement.This was also checked bycalculation.
BRIDGESConstructionmanagement – SouthAfricaThe beams were 33m long andaround 64tons.
Rodney Wippenaar Pr Eng V1
Rodney Wippenaar Pr Eng V1
Rodney Wippenaar Pr Eng V1
Rodney Wippenaar Pr Eng V1
Rodney Wippenaar Pr Eng V1
Rodney Wippenaar Pr Eng V1
Rodney Wippenaar Pr Eng V1
Rodney Wippenaar Pr Eng V1
Rodney Wippenaar Pr Eng V1
Rodney Wippenaar Pr Eng V1
Rodney Wippenaar Pr Eng V1
Upcoming SlideShare
Loading in …5
×

Rodney Wippenaar Pr Eng V1

340 views

Published on

A photographic slideshow of my CV

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
340
On SlideShare
0
From Embeds
0
Number of Embeds
19
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Rodney Wippenaar Pr Eng V1

  1. 1. MY CAREER THUS FAR...
  2. 2. BUILDINGSMiddle East - BahrainI was on site on Marina Westproject for 8months in Budiya,Bahrain. It was the biggestproject at the time in Bahrain.See my CV for more details onmy involvement.
  3. 3. BUILDINGSSaadiyat Island – AbuDhabi. February 2010 toJanuary 2011Here again I was on site,ensuring smooth flow ofconstruction works. Myrelationship building skills alsohelped greatly as I was able togain the respect of the AbuDhabi government inspector.Before he would often rejectwork, causing delays to theworks.
  4. 4. BRIDGESSibaya InterchangeAssisted the Senior Engineerwith the design of this 4 span,post tensioned bridge over aNational highway in SouthAfrica, see details in my CV.
  5. 5. BRIDGESResident EngineerOn site for 1 year as BridgeSuperintendent or ResidentEngineer as its known in SouthAfrica. I personally alsodesigned the 30m long post-tensioned beams.
  6. 6. BRIDGESFire Damage ReportI was responsible for compilingthe damage assessment andrepair strategy report for a firedamaged bridge in Cape town.
  7. 7. BRIDGESConstructionmanagement - DubaiI spent 7 months on site at theNad Al Sheba racecourseaccess roads. The project had atotal of 7 bridges and twoseparate contractors, DutcoBeatty Balfour and Afcons.
  8. 8. BRIDGESConstructionmanagement - DubaiNad Al Sheba: The Main Bridge
  9. 9. BRIDGESConstructionmanagement - DubaiInvestigating the snapping ofwires during tensioningoperations.
  10. 10. BRIDGESConstructionmanagement - DubaiThe completed VIP bridge.
  11. 11. Constructionmanagement– South AfricaConstructing a twin bridge nextto existing one. Piling inprogress, oscillator piles to adepth of 40m.
  12. 12. Resolving bursting steel – arriving ata practical workable arrangement.This was also checked bycalculation.
  13. 13. BRIDGESConstructionmanagement – SouthAfricaThe beams were 33m long andaround 64tons.

×