Document 27

214 views

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
214
On SlideShare
0
From Embeds
0
Number of Embeds
2
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Document 27

  1. 1. Procedure and Process for IP-TV standard Title: ETRI Source: DOCUMENT 27 Geneva, 4-5 April 2006 TELECOMMUNICATION STANDARDIZATION SECTOR TSB Director’s Consultation Meeting on IPTV standardization Document 27 – E INTERNATIONAL TELECOMMUNICATION UNION
  2. 2. Contents <ul><li>Structure of ITU-T SG </li></ul><ul><li>Configuration of IP-TV Standards </li></ul><ul><li>Standard requirements on IP-TV </li></ul><ul><li>Procedure for IP-TV Standards </li></ul><ul><li>Process for IP-TV Standards </li></ul><ul><li>Future Works </li></ul>
  3. 3. 1. Structure of ITU-T SGs: Vertical direction Transport Access Access Core Home Home FTTx, xDSL, Cable, Satellite, WLAN, WiMax, DMB etc. QoS/QoE/NP (SG12 + SG13) Traffic/NNAR (SG2) Control (SG11) SG9 (Cable), SG15 (Transport), SG19 (mobile), other SODs SG2+SG16 ? Charging/ Accounting (SG3) OAM/Manag. (SG4) Security (SG17) Overall Architecture Cable aspects (SG9) Other Telecom aspects (SG13) Mobile aspects (SG19) Middleware Service (User) Service (User) Service (Server)
  4. 4. 2. Configuration of IP-TV Standards <ul><li>Media Processing </li></ul><ul><li>Codec Control </li></ul><ul><li>Common Platform </li></ul><ul><li>QoS/NP </li></ul><ul><li>Broadcasting/ Multicasting/ Unicasting etc. </li></ul><ul><li>Traffic control </li></ul><ul><li>Security </li></ul><ul><li>IP-TV Services </li></ul><ul><li>Additional Services </li></ul><ul><li>Service Control/AAA </li></ul><ul><li>Transport Capability (Broadband etc.) </li></ul><ul><li>Service/User Profile </li></ul><ul><li>Security </li></ul><ul><li>IPR </li></ul>Program Program Program Program Program Program Program Service Provider Program Program Program Consumer IP Underline TP (Broadcasting) Underline TP (Fixed/Wireless) Underline TP (Mobile) Platform Platform Platform
  5. 5. <ul><li>IP-TV service definition ad relevant services (e.g. supplementary and/or additional services such as SMS over IP-TV, VoIP over IP-TV etc.) : SG2 and SG16 </li></ul><ul><li>Overall architecture of IP-TV and network capabilities : SG13 and SG19 (SG 9 from IPcable point of view) </li></ul><ul><li>Signaling and Network control : SG11 </li></ul><ul><li>Transport capabilities and network aspects : SG15 </li></ul><ul><li>Media processing, codec and service control : SG16 </li></ul><ul><li>Security on IP-TV : SG17 </li></ul><ul><li>QoS and Network Performance : SG12 and SG13 </li></ul><ul><li>OAM and Management : SG4 and SG13 </li></ul><ul><li>Traffic Control and NNAR : SG2 </li></ul><ul><li>Accounting and Charging: SG3 </li></ul>Possibly need involve most of Study Groups <ul><li>Too many coordination and too slow </li></ul><ul><li>Hard to coordinate </li></ul>2. Configuration of IP-TV Standards : Vertical + Horizontal
  6. 6. 3. Standard requirements on IP-TV <ul><li>Time to market: Some one already started and others are being ready </li></ul><ul><li>Encourage cooperation and competition: Support building Global Market </li></ul><ul><li>Harmonization for global standards: Incorporation of SDOs results </li></ul><ul><li>Adding Value through ITU-T </li></ul>SDO A SDO B SDO C SDO D ITU-T <ul><li>Management </li></ul><ul><li>Security </li></ul><ul><li>Configuration </li></ul><ul><li>Operation </li></ul><ul><li>Service and Business </li></ul><ul><li>Network and Business </li></ul>
  7. 7. 4. Procedure for IP-TV Standards <ul><li>Collection of Views </li></ul><ul><li>Views from Broadcasting Domain: Terrestrial + Satellite </li></ul><ul><li>Views from Cable Domain : IPcablecom </li></ul><ul><li>Views from Telecom Domain: Fixed + Mobile + Wireless </li></ul><ul><li>Analysis of Standards </li></ul><ul><li>Standards from Broadcasting Domain : ITU-R </li></ul><ul><li>Standards from Cable Domain : ITU-T SG9 </li></ul><ul><li>Standards from from Telecom Domain </li></ul><ul><li>Identify gaps and missing standards </li></ul><ul><li>Objectives and ToR </li></ul><ul><li>Set up common objectives </li></ul><ul><li>Build Terms of References on ITU-T activity </li></ul><ul><li>Action </li></ul><ul><li>Coordination with other SDOs and Develop Standards </li></ul>
  8. 8. 5. Process for IP-TV Standards SG 2 SG 19 ITU-T TSB Director IP-TV Focus Group SDO A SDO Y Bring expertise Harmoni- zation <ul><li>Need special entity: for speed up activity but flexible to collaborate with SDOs </li></ul><ul><li>Project approach: one group, one time plan and limited life </li></ul><ul><li>ITU-T Recommendation A.7: Focus Group could be the best </li></ul>
  9. 9. 5. Process for IP-TV Standards ITU-T TSB Director IP-TV FG Management WG Work Area WG 1 <ul><li>Strategic Coordination Group: Coordination with other SDOs </li></ul><ul><li>Develop how to incorporate SDOs results into ITU-T work </li></ul><ul><li>Arrange work scope and areas jointly with relevant SDOs </li></ul><ul><li>Terminology on IP-TV </li></ul>WG 2 <ul><li>Service requirements and types </li></ul><ul><li>Media processing and control technology </li></ul>WG 3 <ul><li>Architecture and Network capabilities </li></ul><ul><li>Any-casting technology: Broad-, Multi-, Uni-casting etc. </li></ul>WG 4 <ul><li>QoS and Network Performance aspects </li></ul><ul><li>Traffic and resource control </li></ul>WG 5 <ul><li>Operation technology: NNAR, Billing and Security </li></ul><ul><li>Management aspects: Network and service management </li></ul>
  10. 10. 5. Process for IP-TV Standards FG Management Chairman: 1 Vice Chairman: 2 WG Management Technical Leaders : 3 (each WG) Secretariat Coordinator (ITU) Coordinator (SDO A) Coordinator (SDO Y)
  11. 11. <ul><li>1 st stage (End of 2006) : Solve the urgent market demands and interoperability problem </li></ul><ul><ul><li>Possible functional architecture and service deployment scenarios </li></ul></ul><ul><ul><li>Available Protocol and interface specifications </li></ul></ul><ul><li>2 nd stage (End of 2007) : Solve the outstanding technical issues on QoS, Mobility, Security, Charging, etc. </li></ul><ul><ul><li>Provide end-to-end QoS, network/application security </li></ul></ul><ul><ul><li>Provide usage-based charging, etc. </li></ul></ul><ul><li>3 rd stage(2008 ~): solve the on-going technical issues and business convergence scenarios </li></ul><ul><ul><li>Develop protocols and service scenarios with voice and video encoding and security options </li></ul></ul><ul><ul><li>Extend NGN capabilities for IP TV service in terms of location, QoS control, navigation, directory, processing, and storaging, etc. </li></ul></ul>Stage Procedures of IP TV Standardization 6. Future Works
  12. 12. 6. Future Works Overall Time Plan for IP TV Standardization IPTV Focus Group Study Groups Various multimedia business models Converged business models Based on existing service provider environments Operations & Managements Converged business scenarios and protocols Support the release 2 requirements and open architecture Available solutions by using the existing systems and technologies Service Scenarios & Protocols Capabilities to support various IP TV scenarios Release 2 capabilities on interactive controls and multimedia features Alignment with NGN Release 1 Requirements Consider new system and technology evolution Converged solutions from near-term market demands Minimum interoperability among different solutions Remarks Converged architecture Open architecture for different scenarios Alignment with the existing NGN-FRA Network & Service Architecture Support various IP TV business solutions Solve Technical Problems for Converged Transport and Service Minimum integrations among different solutions Overall Services 3 rd Stage (2008 ~ ) 2 nd Stage (2007) 1 st Stage (~ 2006)
  13. 13. 6. Future Works Detailed Time Plan for IP TV Standardization Outside Geneva Continue development of standards Joint sessions with other relevant SDOs 31.July~4 Aug. 2006 Outside Geneva Continue development of standards Joint sessions with other relevant SDOs 25~29 Sep. 2006 Geneva Finalization all deliverables Transfer to Study Groups April 2007 Other place or Geneva Continue development of standards Preparation for final documentations 29 Jan. ~ 2 Feb. 2007 Outside Geneva Continue development of standards Joint sessions with other relevant SDOs 13~17 Nov. 2006 Geneva Kick Off Meeting and appoint WG leaders Requirements, Functional Architecture Analysis of SDOS and their standards Initiate development of standards 22~26 May 2006 Geneva Launch IPTV FG Set up ToR, WGs and Managements 4~5 April 2006 Place Objective Date

×