  1. BIM Process adoption for integrated design and construction 15th September 2015
  2. An Architect with 20 years of experience in Digital architecture, Design Systems Implementations, Automating the construction documents preparation using the up-to-date technology and tools. Has shared in Design and Production Process development in several large scale A/E Consultants in GCC. Key Speaker • Big 5 Show 2014 ( Dubai ) • BIG 5 Show 2014 ( Kuwait ) • BIM & Engineering Seminar 2013 ( Dubai ) • BIM Day By Autodesk 2012 ( Jeddah ) • BIM implementation and Design Process 2012 ( Jeddah, United Architects of Philippines ) Events and Seminars • BIM Strategy and Implementation Conference Stanford Uni. Abu Dhabi 2010 • BIM and Process transformation Workshop Harvard Uni. Jeddah 2010 Waleed Eliwa BIM Consultant Biography
  3. Experiences • Zuhair Fayez Partnership (Jeddah - Cairo), • Dimensions ( Dubai – Cairo ) • Saudi Diyar ( Jeddah – Cairo ) • NAGA Architects ( Dubai ) • Mazaya Consultants ( Dubai ) • EHAF Consulting Engineers • Founder BIMRoad BIM Social Group Certifications • Revit Architectural Provisional 2011, to 2015 • CADD and ADT • Network Administration, • Programming Techniques • Data Base Concepts News Letter • Autodesk News Letter ( BIM Implementation Successful Story ) 2012 Waleed Eliwa BIM Consultant Biography
  4. BIM & Design Process • What is BIM Part 1 • Current Design Process • BIM Definition • Drafting And Modeling • BIM Members • BIM implementation Part 2 • Key Words • Teams • What must and what must not • Selected Practicing Samples • Perfect Process workflow • Expectations Part 3 • Project Samples
  5. BIM & DESIGN PROCESS Applications and Implementation Workshop Presentation 19th November 2014 • What is BIM and What is not • Drafting And Modeling • BIM Members
  6. Design Process Key Words • Design Stages • Schematic SD • Conceptual CD • Development DD • Disciplines Scope • Architecture • Structure • MEP • Data Exchange • Data Workflow • Files Format • Files Relationship What Is BIM • Design Criteria • References • Codes • Quality Control • Coordination • Evaluation • Deliverables • Change Management • Time Management
  7. Developing Design Process • Drafting Capabilities • E-Coordination • Change Management • Staff Capabilities • Software • Infrastructure What Is BIM • Business Needs • Level of required enhancements • What is the benefits of changing what I use to do ? • Achievement against Risk • Targets • Expectations
  8. Current Design Process • A/E Design Process • Data Exchange • Data Workflow Schematic Development Construction Documents VER Views HOR Views Schedules3D Views Details Separate 2D Drawings • Design Language What Is BIM
  9. Schematic Development Construction Documents ~ 30% Lost ( Re-work, Data integration & Coordination ) Time Lose information as you move from phase to phase. • A/E Design Process • Data Exchange • Data Workflow Process Start Current Design Process What Is BIM
  10. Schematic Development Construction Documents In the traditional process, you lose information as you move from phase to phase. • A/E Design Process • Data Exchange • Data Workflow • Coordinated Drawings • Shop Drawing • Fractions • Change Management • As Built Drawings • Cost Management • BOQ Current Design Process What Is BIM
  11. Schematic Development Construction Documents In the traditional process, you lose information as you move from phase to phase. • A/E Design Process • Data Exchange • Data Workflow • Separated Elements • Lines to Draw objects • Editable Dimensions Value • Manual Cross References • No Drawing Integration • Drafting Schedules Current Design Process What Is BIM
  12. • Sub consultants • Shop Drawing • Change Management • As Built Drawings • Construction Cost Control Arch PlansMEP Data St Data On Site Coordination Time Lost / RFIs Lower Quality Current Design Process What Is BIM
  13. Model • Building Information Modeling (BIM) is a digital representation of physical and functional characteristics of a facility. • BIM is a shared knowledge resource for information about a facility forming a reliable basis for decisions during its life- cycle BIM Concept What Is BIM Sheets BOQ 2D ArchData Structure Data MEP Data
  14. • Emigration • From Draw to build • From 2D To 3D • From Element to Object • From Text To Label • Parametric • Object Relations • Object Behavior • Information injection and extraction • Information Integration BIM Concept What Is BIM It is Process Revolution Information Management New Design Thinking Construction Solutions
  15. • BIM is a process that involves creating and using an intelligent 3D model to inform and communicate project decisions. • Design, visualization & simulation BIM Definition What Is BIM
  16. BIM Is a Process Design Flow EvaluationManagement Serious Decision Team Investment Time and Money Saving Quality and Accuracy Tasks re-scheduling Information Parametric Objects Objects Behaviors Accumulative Knowledge Learning Curve Level Of Details Deliverables Data Exchange Design Validation Management Data Presentation Reports Document Management Facility Management Operation Fabrication As-BuiltWorkshop
  17. Re define and re think about • Design Process • Design, Information, Presentation & Deliverables • Design is a group of scheduled decision • Design is construction able solutions Give answer to : • What is the reason to do this by this way and when ? • Project Level of integrity You are moving : • From Text to Parameter • From Element to Object • Early Solutions On office before expensive on site New Definitions before Shifting to BIM What Is BIM
  18. BIM Members
  19. BIM Process adoption for integrated design and construction 15th September 2015
  20. Key Words Implementation • BIM Levels
  21. Key Words Implementation • Process • Project BIM Execution Plan • Project Phases Definitions • Conceptual Design • Design Developments • Construction Drawings • Check lists and QC • Software matching with process • Modeling Reference • Coordination • BOQ • National CAD Standard • LOD Definition Tinder CD DD CD File Format Information Deliverables
  22. Key Words Implementation • Deliverables • 2D PDF Files • IFC Format • DWF Format • Revit Model ( as Contract ) • DWG Format LOD 100 - Essentially the equivalent of conceptual design, the model would consist of overall building massing and the downstream users are authorized to perform whole building types of analysis (volume, building orientation, cost per square foot, etc.) LOD 200 - Similar to schematic design or design development, the model would consist of "generalized systems or assemblies with approximate quantities, size, shape, location and orientation.
  23. Key Words Implementation • Deliverables • 2D PDF Files • IFC Format • DWF Format • Revit Model ( as Contract ) • DWG Format LOD 300 - Model elements are suitable for the generation of traditional construction documents and shop drawings. As such, analysis and simulation is authorized for detailed elements and systems. LOD 500 - The final level of development represents the project as it has been constructed - the as-built conditions. The model is suitable for maintenance and operations of the facility.
  24. Key Words Implementation • Tools / Software - Software price - Learning time - Data exchange - Meet business needs - Compatible with sub consultants tools - Integrated with design flow - Integrated with infrastructure - Employees investments to business income - Training and workshops - Updating Standers
  25. Key Words Implementation • BIM XD
  26. Key Words Implementation • Tools / Software • Design Tools • User interface • Drawing Generation • Complex Curved Surface Modeling • Other Tools-Level Capabilities • BIM Platform • Scalability • Library • Extensibility • Interoperability • Multiuser environment • Revit Platform • Bentley Systems • ArchiCAD • Digital Projects • Vectorworks • Tekla • Dprofiler • Autocad Based applications
  27. Key Words Implementation • BIM Team • Team Work Skills • 3D imagination • Familiar with objects properties, Parameters and data base initial concepts • Coordinated Decisions • Design Decision Maker • Construction Knowledge • Research Ability • Modeling Skills Core Core Team Support T Pilot Project 1.St Project Projects Team
  28. Key Words Implementation • Facts • BIM to enhance quality and productivity and have more projects not to reduce staff number • BIM for all who can fit with • Tasks and Duties will re schedule • Team Re-Tasking • A complete 3D model is every one task • Do it right from the first time • Any action will reflect all project Team and objects • Coordination and BOQ are every one Aim Core Core Team Support T Pilot Project 1.St Project Projects Team
  29. Key Words Implementation • Standards • BIM Workflow • Standard Naming Conventions • Material • Parameters • Families • Architectural Guidelines • Structural Guidelines • Mechanical Guidelines • Electrical Guidelines • Tele-Communication Guidelines • Plumbing and Fire Fighting Guidelines • Clash Detection Methodology
  30. Key Words Implementation • BIM Project Management • BIM Execution Plan • Model Construction • Links and Model Data Exchange • File format • Sub consultants and Disciplines tools • Project Contract and Deliverables • shall we submit models with the same fees ? • Readability and Model Author • Project pricing to BIM time saving
  31. BIM Process adoption for integrated design and construction 15th September 2015
  32. Governmental - KSA • Design Model, SD, DD, CD By Revit • Plans , Sections, Wall Sections, Elevations, Area Plans & Schedules • Drawing Details scale 1:400 to 1:1  Multi Disciplines Model  Site Area 47,000 m2  36,000 m2 office Building  30,000 m2 underground parking  Design SD to DD 3monthes
  33. Governmental - KSA • Design Model, SD, DD, CD By Revit • Plans , Sections, Wall Sections, Elevations, Area Plans & Schedules • Drawing Details scale 1:200 to 1:1 …..
  34. Governmental - KSA • Model Structure and Data Management Central Model Jeddah St CloudMEP Cloud Ar Cloud Local Model Local Model Local Model Local Model Local Model Ar ID St Me PG El Local Model Central Model Manila Coordination Model ETABS Model
  35. Governmental - KSA
  36. Governmental - KSA
  37. Commercial - KSA
  38. Commercial - KSA
  39. G+5+27 100% Tender Residential - UAE
  40. Residential BUA 36,800 m2 Commercial - UAE
  41. Residential
  42. 5 Stars Hotel
  43. Hotel Time DD Stage = 200 Hr
  44. Shopping Mall
  45. Detailing
  46. Detailing
  47. Team Architectural Interior Design AD Disabled Club
  48. Interior Design AD Disabled Club / Cafeteria
  49. Interior Design AD Disabled Club / GYM
  50. BIM Process adoption for integrated design and construction 15th September 2015 Info@BIMRoad.com