USEFULNESS OF
GANTT'S SYSTEM - F.W.
TAYLOR
Rajan Kumar
 Mr. Gantt's system is especially useful during the
difficult and delicate period of transition from the
slow pace of ordinary day work to the high speed
which is the leading characteristic of good
management.
 Mr. Gantt's system enables the workman to go
smoothly and with gradually accelerated speed
from the slower pace of improved day work to the
high speed of the new system.
 No workman can be expected to do a piece of
work the first time as fast as he will later.
 It should also be recognized that it takes a
certain
time for men who have worked at the ordinary
slow rate of speed to change to high speed.
 Mr. Gantt's plan can be adapted to meet both
of
these conditions by allowing the workman to
take a longer time to do the job at first and yet
earn his bonus; and later compelling him to
 The higher pressure of the differential rate is
the stimulant required by the workman to
maintain a high rate of speed and secure high
wages while
he has the steady swing that belongs to work
which is repeated over and over again.
 When, however, the work is of such variety
that each day presents an entirely new task,
the pressure of the differential rate is some
times too severe.
 engineering business of considerable variety
or engaged in constructing and erecting
miscellaneous machinery, it is necessary to
employ continuously a number of especially
skillful and high-priced mechanics.
 During off season shift from Regular skilled
work to Unskilled work
 Differential rate of Payment
Case study on introduction of
Differential rate of wages
 The first case in which a differential rate was
applied during the year 1884, in The Midvale
Steel Works Ltd.
 A standard steel forging, many thousands of
which are used each year, had for several
years been turned at the rate of from four to
five per day
under the ordinary system of piece work, 50
cents per piece being the price paid for the
work.
 After analyzing the job, and determining the
shortest time required to do each of the
elementary operations of which it was
composed, and then summing up the total, the
writer became convinced that it was possible
to turn ten pieces a day.
 In place of the 50 cent rate, that they had been
paid before, the men were given 35 cents per
piece when they turned them at the speed of
10 per day; and when they produced less than
ten they received only 25 cents per piece.
COST OF PRODUCTION PER
LATHE PER DAY
Man’s
Wages
Machine
Cost
Total Cost No of
Pieces
Produced
Cost Per
Piece
Ordinary
System
$2.50 $3.37 $5.87 5 $1.17
Differential
Rate
System
$3.50 $3.37 $6.87 10 $0.69
The exceedingly dull times that began in July, 1893 the differential rate
on the particular job above referred to was removed, and a straight
piece work rate of 25 cents per piece was substituted for it. The result
of abandoning the differential proved to be the best possible
demonstration of its value. Under straight piece work, the output
immediately fell to between six and eight pieces per day

More Related Content

Similar to Gantt system

Remuneration method
Remuneration methodRemuneration method
Remuneration methodsumitverma48
 
Production and material management
Production and material managementProduction and material management
Production and material managementsksbatish
 
Standardised work for garment industry- Prakhar Jain
Standardised work for garment industry- Prakhar JainStandardised work for garment industry- Prakhar Jain
Standardised work for garment industry- Prakhar JainPrakhar Jain
 
Theory of production
Theory of productionTheory of production
Theory of productionRAHULRAI300
 
Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)MohammedLahssaini1
 
Case study furniture industry
Case study   furniture industryCase study   furniture industry
Case study furniture industryGanesh TN
 
Cost Accounting - Labour costing
Cost Accounting - Labour costingCost Accounting - Labour costing
Cost Accounting - Labour costingMustak Deraiya
 
Consultancy: Work efficiency & Motivation (Kanpur PlastiPack Ltd.)
Consultancy: Work efficiency & Motivation (Kanpur PlastiPack Ltd.)Consultancy: Work efficiency & Motivation (Kanpur PlastiPack Ltd.)
Consultancy: Work efficiency & Motivation (Kanpur PlastiPack Ltd.)Varsha Chauhan
 
Training & Development of Supervisors
Training & Development of SupervisorsTraining & Development of Supervisors
Training & Development of SupervisorsShubham Singh
 
Quick Change Over (ENG)- PPT.pptx
Quick Change Over (ENG)- PPT.pptxQuick Change Over (ENG)- PPT.pptx
Quick Change Over (ENG)- PPT.pptxRakibHosain4
 
original cost Control 2024...........pdf
original cost Control 2024...........pdforiginal cost Control 2024...........pdf
original cost Control 2024...........pdfAhmed Khaskaya
 
project-presentation
project-presentationproject-presentation
project-presentationronybste
 

Similar to Gantt system (19)

SMED overview
SMED overviewSMED overview
SMED overview
 
Remuneration method
Remuneration methodRemuneration method
Remuneration method
 
DonnerCompany
DonnerCompanyDonnerCompany
DonnerCompany
 
Production and material management
Production and material managementProduction and material management
Production and material management
 
Standardised work for garment industry- Prakhar Jain
Standardised work for garment industry- Prakhar JainStandardised work for garment industry- Prakhar Jain
Standardised work for garment industry- Prakhar Jain
 
Theory of production
Theory of productionTheory of production
Theory of production
 
Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)
 
Wage payments methods
Wage payments methodsWage payments methods
Wage payments methods
 
Quick Smed Sample
Quick Smed SampleQuick Smed Sample
Quick Smed Sample
 
Case study furniture industry
Case study   furniture industryCase study   furniture industry
Case study furniture industry
 
Cost Accounting - Labour costing
Cost Accounting - Labour costingCost Accounting - Labour costing
Cost Accounting - Labour costing
 
CNC mc.pptx
CNC mc.pptxCNC mc.pptx
CNC mc.pptx
 
Consultancy: Work efficiency & Motivation (Kanpur PlastiPack Ltd.)
Consultancy: Work efficiency & Motivation (Kanpur PlastiPack Ltd.)Consultancy: Work efficiency & Motivation (Kanpur PlastiPack Ltd.)
Consultancy: Work efficiency & Motivation (Kanpur PlastiPack Ltd.)
 
Training & Development of Supervisors
Training & Development of SupervisorsTraining & Development of Supervisors
Training & Development of Supervisors
 
Quick Change Over (ENG)- PPT.pptx
Quick Change Over (ENG)- PPT.pptxQuick Change Over (ENG)- PPT.pptx
Quick Change Over (ENG)- PPT.pptx
 
original cost Control 2024...........pdf
original cost Control 2024...........pdforiginal cost Control 2024...........pdf
original cost Control 2024...........pdf
 
Time study
Time studyTime study
Time study
 
Classes of motor duty
Classes of motor dutyClasses of motor duty
Classes of motor duty
 
project-presentation
project-presentationproject-presentation
project-presentation
 

More from G Rajan Kumar

Hazardous waste management rules India
Hazardous waste management rules IndiaHazardous waste management rules India
Hazardous waste management rules IndiaG Rajan Kumar
 
Integrated Management System training,awareness,safety
Integrated Management System training,awareness,safetyIntegrated Management System training,awareness,safety
Integrated Management System training,awareness,safetyG Rajan Kumar
 
Safe and sustainable development for Industry
Safe and sustainable development for IndustrySafe and sustainable development for Industry
Safe and sustainable development for IndustryG Rajan Kumar
 
Integrated Management System, Training, IMS, Safety
Integrated Management System, Training, IMS, SafetyIntegrated Management System, Training, IMS, Safety
Integrated Management System, Training, IMS, SafetyG Rajan Kumar
 

More from G Rajan Kumar (6)

Hazardous waste management rules India
Hazardous waste management rules IndiaHazardous waste management rules India
Hazardous waste management rules India
 
Integrated Management System training,awareness,safety
Integrated Management System training,awareness,safetyIntegrated Management System training,awareness,safety
Integrated Management System training,awareness,safety
 
Safe and sustainable development for Industry
Safe and sustainable development for IndustrySafe and sustainable development for Industry
Safe and sustainable development for Industry
 
Top management
Top managementTop management
Top management
 
Integrated Management System, Training, IMS, Safety
Integrated Management System, Training, IMS, SafetyIntegrated Management System, Training, IMS, Safety
Integrated Management System, Training, IMS, Safety
 
5 s House keeping
5 s   House keeping5 s   House keeping
5 s House keeping
 

Recently uploaded

FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTFUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTSneha Padhiar
 
The Satellite applications in telecommunication
The Satellite applications in telecommunicationThe Satellite applications in telecommunication
The Satellite applications in telecommunicationnovrain7111
 
Artificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewArtificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewsandhya757531
 
Immutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfImmutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfDrew Moseley
 
Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionSneha Padhiar
 
Structural Integrity Assessment Standards in Nigeria by Engr Nimot Muili
Structural Integrity Assessment Standards in Nigeria by Engr Nimot MuiliStructural Integrity Assessment Standards in Nigeria by Engr Nimot Muili
Structural Integrity Assessment Standards in Nigeria by Engr Nimot MuiliNimot Muili
 
Novel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsNovel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsResearcher Researcher
 
70 POWER PLANT IAE V2500 technical training
70 POWER PLANT IAE V2500 technical training70 POWER PLANT IAE V2500 technical training
70 POWER PLANT IAE V2500 technical trainingGladiatorsKasper
 
Javier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptxJavier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptxJavier Fernández Muñoz
 
AntColonyOptimizationManetNetworkAODV.pptx
AntColonyOptimizationManetNetworkAODV.pptxAntColonyOptimizationManetNetworkAODV.pptx
AntColonyOptimizationManetNetworkAODV.pptxLina Kadam
 
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfComprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfalene1
 
Substation Automation SCADA and Gateway Solutions by BRH
Substation Automation SCADA and Gateway Solutions by BRHSubstation Automation SCADA and Gateway Solutions by BRH
Substation Automation SCADA and Gateway Solutions by BRHbirinder2
 
STATE TRANSITION DIAGRAM in psoc subject
STATE TRANSITION DIAGRAM in psoc subjectSTATE TRANSITION DIAGRAM in psoc subject
STATE TRANSITION DIAGRAM in psoc subjectGayathriM270621
 
Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Romil Mishra
 
tourism-management-srs_compress-software-engineering.pdf
tourism-management-srs_compress-software-engineering.pdftourism-management-srs_compress-software-engineering.pdf
tourism-management-srs_compress-software-engineering.pdfchess188chess188
 
CS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfCS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfBalamuruganV28
 
A brief look at visionOS - How to develop app on Apple's Vision Pro
A brief look at visionOS - How to develop app on Apple's Vision ProA brief look at visionOS - How to develop app on Apple's Vision Pro
A brief look at visionOS - How to develop app on Apple's Vision ProRay Yuan Liu
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...Erbil Polytechnic University
 
ADM100 Running Book for sap basis domain study
ADM100 Running Book for sap basis domain studyADM100 Running Book for sap basis domain study
ADM100 Running Book for sap basis domain studydhruvamdhruvil123
 

Recently uploaded (20)

FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTFUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
 
The Satellite applications in telecommunication
The Satellite applications in telecommunicationThe Satellite applications in telecommunication
The Satellite applications in telecommunication
 
Artificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewArtificial Intelligence in Power System overview
Artificial Intelligence in Power System overview
 
Immutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfImmutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdf
 
Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based question
 
Structural Integrity Assessment Standards in Nigeria by Engr Nimot Muili
Structural Integrity Assessment Standards in Nigeria by Engr Nimot MuiliStructural Integrity Assessment Standards in Nigeria by Engr Nimot Muili
Structural Integrity Assessment Standards in Nigeria by Engr Nimot Muili
 
Novel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsNovel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending Actuators
 
70 POWER PLANT IAE V2500 technical training
70 POWER PLANT IAE V2500 technical training70 POWER PLANT IAE V2500 technical training
70 POWER PLANT IAE V2500 technical training
 
ASME-B31.4-2019-estandar para diseño de ductos
ASME-B31.4-2019-estandar para diseño de ductosASME-B31.4-2019-estandar para diseño de ductos
ASME-B31.4-2019-estandar para diseño de ductos
 
Javier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptxJavier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptx
 
AntColonyOptimizationManetNetworkAODV.pptx
AntColonyOptimizationManetNetworkAODV.pptxAntColonyOptimizationManetNetworkAODV.pptx
AntColonyOptimizationManetNetworkAODV.pptx
 
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfComprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
 
Substation Automation SCADA and Gateway Solutions by BRH
Substation Automation SCADA and Gateway Solutions by BRHSubstation Automation SCADA and Gateway Solutions by BRH
Substation Automation SCADA and Gateway Solutions by BRH
 
STATE TRANSITION DIAGRAM in psoc subject
STATE TRANSITION DIAGRAM in psoc subjectSTATE TRANSITION DIAGRAM in psoc subject
STATE TRANSITION DIAGRAM in psoc subject
 
Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________
 
tourism-management-srs_compress-software-engineering.pdf
tourism-management-srs_compress-software-engineering.pdftourism-management-srs_compress-software-engineering.pdf
tourism-management-srs_compress-software-engineering.pdf
 
CS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfCS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdf
 
A brief look at visionOS - How to develop app on Apple's Vision Pro
A brief look at visionOS - How to develop app on Apple's Vision ProA brief look at visionOS - How to develop app on Apple's Vision Pro
A brief look at visionOS - How to develop app on Apple's Vision Pro
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...
 
ADM100 Running Book for sap basis domain study
ADM100 Running Book for sap basis domain studyADM100 Running Book for sap basis domain study
ADM100 Running Book for sap basis domain study
 

Gantt system

  • 1. USEFULNESS OF GANTT'S SYSTEM - F.W. TAYLOR Rajan Kumar
  • 2.  Mr. Gantt's system is especially useful during the difficult and delicate period of transition from the slow pace of ordinary day work to the high speed which is the leading characteristic of good management.  Mr. Gantt's system enables the workman to go smoothly and with gradually accelerated speed from the slower pace of improved day work to the high speed of the new system.
  • 3.  No workman can be expected to do a piece of work the first time as fast as he will later.  It should also be recognized that it takes a certain time for men who have worked at the ordinary slow rate of speed to change to high speed.  Mr. Gantt's plan can be adapted to meet both of these conditions by allowing the workman to take a longer time to do the job at first and yet earn his bonus; and later compelling him to
  • 4.  The higher pressure of the differential rate is the stimulant required by the workman to maintain a high rate of speed and secure high wages while he has the steady swing that belongs to work which is repeated over and over again.  When, however, the work is of such variety that each day presents an entirely new task, the pressure of the differential rate is some times too severe.
  • 5.  engineering business of considerable variety or engaged in constructing and erecting miscellaneous machinery, it is necessary to employ continuously a number of especially skillful and high-priced mechanics.  During off season shift from Regular skilled work to Unskilled work  Differential rate of Payment
  • 6. Case study on introduction of Differential rate of wages  The first case in which a differential rate was applied during the year 1884, in The Midvale Steel Works Ltd.  A standard steel forging, many thousands of which are used each year, had for several years been turned at the rate of from four to five per day under the ordinary system of piece work, 50 cents per piece being the price paid for the work.
  • 7.  After analyzing the job, and determining the shortest time required to do each of the elementary operations of which it was composed, and then summing up the total, the writer became convinced that it was possible to turn ten pieces a day.  In place of the 50 cent rate, that they had been paid before, the men were given 35 cents per piece when they turned them at the speed of 10 per day; and when they produced less than ten they received only 25 cents per piece.
  • 8. COST OF PRODUCTION PER LATHE PER DAY Man’s Wages Machine Cost Total Cost No of Pieces Produced Cost Per Piece Ordinary System $2.50 $3.37 $5.87 5 $1.17 Differential Rate System $3.50 $3.37 $6.87 10 $0.69 The exceedingly dull times that began in July, 1893 the differential rate on the particular job above referred to was removed, and a straight piece work rate of 25 cents per piece was substituted for it. The result of abandoning the differential proved to be the best possible demonstration of its value. Under straight piece work, the output immediately fell to between six and eight pieces per day