Cyclone aila recovery programme british red cross

874 views

Published on

Published in: Technology, Business
0 Comments
1 Like
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total views
874
On SlideShare
0
From Embeds
0
Number of Embeds
3
Actions
Shares
0
Downloads
0
Comments
0
Likes
1
Embeds 0
No embeds

No notes for slide

Cyclone aila recovery programme british red cross

  1. 2. Devastation of Aila <ul><li>May-2009 </li></ul><ul><li>SW of Bangladesh ( Khulna & Satkhira District) </li></ul><ul><li>61,000 families </li></ul><ul><li>300,000 members </li></ul><ul><li>72,000 houses damaged </li></ul><ul><li>60,000 latrine damaged </li></ul><ul><li>1450 wells & ponds </li></ul><ul><li>polluted. </li></ul>
  2. 3. Devastation of Aila
  3. 4. Devastation of Aila
  4. 5. Devastation of Aila
  5. 6. Devastation of Aila
  6. 7. Devastation of Aila
  7. 8. Devastation of Aila
  8. 9. Devastation of Aila
  9. 10. British Red Cross Assessment <ul><li>July-2010 </li></ul><ul><li>Dacope & Koyra Sub-Districts </li></ul><ul><li>Maheswaripur union of Koyra sub district </li></ul><ul><li>Ward 1 & 2 of Nowani/Amtola village. </li></ul><ul><li>Other areas are either still inundated </li></ul><ul><li>Shymnagar-worst affected but saturated by work of other organisations. </li></ul>
  10. 11. British Red Cross Assessment <ul><li>July-2010 </li></ul><ul><li>Dacope & Koyra Sub-Districts </li></ul><ul><li>Maheswaripur union of Koyra sub district </li></ul><ul><li>Ward 1 & 2 of Nowani/Amtola village. </li></ul><ul><li>Other areas are either still inundated </li></ul><ul><li>Shymnagar-worst affected but saturated by work of other organisations. </li></ul>
  11. 12. Problem Identified <ul><li>Shelter , WatSan and livelihood </li></ul><ul><li>Shelter -Makeshift & Transitional </li></ul><ul><li>Water -Bring pond water from far area </li></ul><ul><li>Sanitation - Mostly inundated, some are newly installed by NGOs. </li></ul><ul><li>Living on cash grant & relief work </li></ul>
  12. 13. Shelter & WatSan Program
  13. 14. FGD-Community Consultation
  14. 15. FGD-Community Consultation
  15. 16. Shelter Design Process <ul><li>Review available designs of other organization </li></ul><ul><li>IFRC, Swiss Red Cross, Spanish Red Cross, CARE, Caritas etc. </li></ul><ul><li>Develop a draft design </li></ul><ul><li>Share with Community </li></ul><ul><li>Value Engineering Exercises </li></ul><ul><li>Finalization of the design </li></ul><ul><li>Construction of Model Shelter </li></ul><ul><li>Fine tune the Final Design </li></ul>
  16. 17. Shelter Design Philosophy <ul><li>Core Shelter </li></ul><ul><li>Future Extension </li></ul><ul><li>Community Acceptance </li></ul><ul><li>DRR & Long term sustainability </li></ul><ul><li>Cost effective </li></ul><ul><li>Cyclone Resilient </li></ul><ul><li>Flood Proofed </li></ul><ul><li>Use of local materials </li></ul>
  17. 18. Shelter Design Philosophy <ul><li>Core Shelter </li></ul><ul><li>Future Extension </li></ul><ul><li>Community Acceptance </li></ul><ul><li>Long term sustainability </li></ul><ul><li>Cost effective </li></ul><ul><li>Cyclone Resilient </li></ul><ul><li>Flood Proofed </li></ul><ul><li>Use of local materials </li></ul>
  18. 19. Shelter Design Process
  19. 20. Shelter Design Process
  20. 21. Shelter Design Process
  21. 22. Overview of Shelter Design <ul><li>615 Nos Shelter, 180 sq ft floor area . </li></ul><ul><li>Hip Roof by CGI Sheet 28 Gauge </li></ul><ul><li>Steel Truss ( 38x38x3 mm) with cross bracings. </li></ul><ul><li>8 RCC Pillar </li></ul><ul><li>Wooden grade Beam </li></ul><ul><li>3 feet high plinth </li></ul><ul><li>Bamboo cladding wall </li></ul><ul><li>1 door and 3 windows </li></ul><ul><li>Cross-bracings between columns. </li></ul><ul><li>Cost: Approx BDT 86,000 ( GBP 820, US$ 1210) </li></ul>
  22. 23. Overview of Shelter Design
  23. 24. Overview of Shelter Design
  24. 25. Overview of Shelter Design
  25. 26. Overview of Shelter Design
  26. 27. Model Shelter Construction
  27. 28. Model Shelter Construction
  28. 29. Model Shelter Construction
  29. 30. Model Shelter Construction
  30. 31. <ul><li>Question? </li></ul>

×