PM01 orders are General Maintenance orders mainly deals with
the low criticality works, these are mainly of LWC type. Following
works are to be involved PM01 type orders
PM02 are Corrective maintenance orders, these are
usually performed after the occurrence of defect. These
Orders are created from M2 notifications.
Pri-A:Defect needs to be attended in 3 days
Pri-C: Defect needs to be attended in 7 days
M1 Notification
• Pri-A:Defect needs to be attended in 3 days
• Pri-B: Defect needs to be attended in 7 days
• Pri-C:Shut down required
• Pri-D :Material required
• Priority-E: Emergency no need of
scheduling.Has to attend with in 1 day
M2 Notification
M1:Authorisation
 Operation :E6 and above
 Maintenance: All CP’s() for facilitating cable disconnection,
coupling/decoupling,dewatering..etc
Order series started with 1 for all M1 notifications
M1:FL based notification.Notification cannot be given on same FL to same Department.Planner group
and WC need to b defined manually.more flexibility
M2 Notification
Its equipment based notification
PG&WC will be captured by the system based on Equipment.
More details of the defect will be captured: System availability, Effect on
system, type of defect(detailed)
Raising of multiple notifications on same equipment to same
department is not allowed. However ,new defects may be added to
existing notification.
Raising of notification on same equipment to same department will be
allowed after 10 days raising initial notification, even if old one is
pending
Control keys
• WCM: Work Clearance Management-For applying PTW/LWC.Work approval
tab will be created after entering WCM key only.
• PM01: Plant maintenance :internal manpower –
Used for For material boking/gen jobs in which services are not required to
book. Confirmation is required.Rel button not necessary to press.
• PM03- External payments(Services).SES is mandatory. Materials can also be
booked. All Maintenance plans created with PM03 type
• PM03 to PM01 operation not possible, if service pack is defined in
maintenance plan that too before order confirmation only.
Attaching JSA in permit/LWC
• ROMP
• SFT
• PTW with WHP
• PTW with HWP
• PTW with CSP
• PTW with WHP & HWP
• PTW with CSP & HWP
• PTW with CSP & WHP
• PTW with CSP, WHP & HWP
• PTW with EWP
Special type of permits
WCD Templates
Total WCD’s defined in SAP (22.11.22)
Planner
Group
Train Grand
Total
CCR CHP DMP OFS SYD U01 U02 U03
AHD 248 1176 1424
BMD 659 684 824 2167
C&I 13 13
CHP 824 824
EMD 715 62 534 1565 1513 654 676 5719
OFS 254 242 99 595
TMD 60 96 441 597
Grand
Total
13 1539 316 836 1565 2615 2955 1500 11339
PM03/OH PERMITS ISSUED (01.04.2022-30.10.2022)
Train
Total PM/OH Permits
printed
Permits printed using
WCD’s
AHP 275
CCR 3
CHP 1778 1565
DMP 1273
OFS 878 59
OS1 1
SYD 28 3
U01 1546 65
U02 1205 31
U03 1465 222
Grand
Total
8452 1945
Notifications closing without orders
22
5648
246
Notification Data 2nd Quarter of
2022
Notification Completed with Order
Notification Completed without Order
Total:5894
(4.1%)
5974
393
Notification Data 2nd Quarter of 2022
(including Safety notifications-OS Type)
Notification Completed with Order
Notification Completed without Order
Total:6367
(6.1%)
325
252
12
374
161
6
892
306
94
1366
898
343
183
12
104
134
4
135
44
3
2 1 23 15 10 8 5
47
1
53 31 31
2 7 4 1 3 2
325
254
13
397
176
6
902
314
99
1413
1
951
374
214
14
111 138
5
138
46
3
0
200
400
600
800
1000
1200
1400
1600
M1 M2 M4 M1 M2 M4 M1 M2 M1 M2 M4 M1 M2 M3 M4 M1 M2 M4 M1 M2 M4
AHD BMD C&I CHP EMD OFS TMD
Notification Data 2nd Quarter of 2022
Notification Completed with Order Notification Completed without Order Grand Total
Linking of notifications with Order
Cost bookings
Type of booking
• Materials
• Services
Method of booking
• Order based
• Cost center based
• WBS Element based(Over hauling's, Project works)
Dept CC CM EX OH PM RE Grand Total
AHD 17,374.74 36,851,959.61 632,912.00 26,109,320.19 63,611,566.54
BMD 3,061,180.15 15,753,563.20 34,873,104.39 26,469,697.60 12,266,923.12 92,424,468.46
C&I 1,852,438.87 5,500,544.92 388,530.13 9,992,494.58 48,893,306.28 2,253,800.00 68,881,114.78
CHE 8,257,549.39 9,178,817.56 17,436,366.95
CHO 60,511,868.85 60,511,868.85
CHP 46,497,674.04 37,406,100.51 6,506,432.41 89,049,643.63 179,459,850.59
EMD 4,338,041.18 648,476.50 11,110,605.21 64,698,669.20 372,244.72 81,168,036.81
GEN 7,868,780.91 7,868,780.91
MGR 47,980,380.60 23,629,609.18 71,609,989.78
OFS 5,404,997.87 9,310,779.35 7,270,980.17 6,176,492.28 28,163,249.67
OPN 6,317,757.66 6,946,122.23 29,851,572.07 43,115,451.96
TMD (3,140,715.35) 11,504,147.00 (11,892.96) 10,163,101.85 6,821,467.68 219,231.92 25,555,340.14
Grand Total 128,455,460.06 123,921,693.32 376,637.17 80,549,630.61 391,390,464.52 15,112,199.76 739,806,085.44

More Related Content

Similar to New Microsoft PowerPoint Presentation.pptx

Nidec asi service capabilities overview
Nidec asi service capabilities overviewNidec asi service capabilities overview
Nidec asi service capabilities overviewNidec Corporation
 
Anciliary Services and Indian Power System
Anciliary Services and Indian Power SystemAnciliary Services and Indian Power System
Anciliary Services and Indian Power SystemIPPAI
 
eMDR Program and Process
eMDR Program and ProcesseMDR Program and Process
eMDR Program and ProcessGreenlight Guru
 
Unit - 01 Introduction to CNC System.ppt
Unit - 01 Introduction to CNC System.pptUnit - 01 Introduction to CNC System.ppt
Unit - 01 Introduction to CNC System.pptDark9Fantasy
 
Concept Of Grid Code Anilpatil Session Iii
Concept Of Grid Code Anilpatil Session  IiiConcept Of Grid Code Anilpatil Session  Iii
Concept Of Grid Code Anilpatil Session IiiAnil Patil
 
(Modifid)condition m0nitoring of longwall face supportd
(Modifid)condition m0nitoring of longwall face supportd(Modifid)condition m0nitoring of longwall face supportd
(Modifid)condition m0nitoring of longwall face supportdrockyraj19
 
Balu Resume
Balu ResumeBalu Resume
Balu ResumeBalu V
 
Supply chain design and operation
Supply chain design and operationSupply chain design and operation
Supply chain design and operationAngelainBay
 
HV Interface Presentation (1)
HV Interface Presentation (1)HV Interface Presentation (1)
HV Interface Presentation (1)paul doherty
 
Welding Construction Mngmt_revert
Welding Construction Mngmt_revertWelding Construction Mngmt_revert
Welding Construction Mngmt_revertMike Lewin
 

Similar to New Microsoft PowerPoint Presentation.pptx (20)

Devesh Khajanchi
Devesh KhajanchiDevesh Khajanchi
Devesh Khajanchi
 
Nidec asi service capabilities overview
Nidec asi service capabilities overviewNidec asi service capabilities overview
Nidec asi service capabilities overview
 
Anciliary Services and Indian Power System
Anciliary Services and Indian Power SystemAnciliary Services and Indian Power System
Anciliary Services and Indian Power System
 
eMDR Program and Process
eMDR Program and ProcesseMDR Program and Process
eMDR Program and Process
 
Unit - 01 Introduction to CNC System.ppt
Unit - 01 Introduction to CNC System.pptUnit - 01 Introduction to CNC System.ppt
Unit - 01 Introduction to CNC System.ppt
 
Maintenance Network
Maintenance NetworkMaintenance Network
Maintenance Network
 
Mahindra projects
Mahindra projectsMahindra projects
Mahindra projects
 
Concept Of Grid Code Anilpatil Session Iii
Concept Of Grid Code Anilpatil Session  IiiConcept Of Grid Code Anilpatil Session  Iii
Concept Of Grid Code Anilpatil Session Iii
 
Meter Operations in a Post AMI World
Meter Operations in a Post AMI WorldMeter Operations in a Post AMI World
Meter Operations in a Post AMI World
 
Power Generation: Coal-Fired
Power Generation: Coal-FiredPower Generation: Coal-Fired
Power Generation: Coal-Fired
 
Meter Operations in a Post AMI World
Meter Operations in a Post AMI WorldMeter Operations in a Post AMI World
Meter Operations in a Post AMI World
 
Meter Operations in a Post AMI World
Meter Operations in a Post AMI WorldMeter Operations in a Post AMI World
Meter Operations in a Post AMI World
 
Solutions for LNG facilities
Solutions for LNG facilitiesSolutions for LNG facilities
Solutions for LNG facilities
 
(Modifid)condition m0nitoring of longwall face supportd
(Modifid)condition m0nitoring of longwall face supportd(Modifid)condition m0nitoring of longwall face supportd
(Modifid)condition m0nitoring of longwall face supportd
 
Meter Operations in a Post AMI World
Meter Operations in a Post AMI WorldMeter Operations in a Post AMI World
Meter Operations in a Post AMI World
 
Balu Resume
Balu ResumeBalu Resume
Balu Resume
 
Supply chain design and operation
Supply chain design and operationSupply chain design and operation
Supply chain design and operation
 
Meter Operations in a Post AMI World
Meter Operations in a Post AMI WorldMeter Operations in a Post AMI World
Meter Operations in a Post AMI World
 
HV Interface Presentation (1)
HV Interface Presentation (1)HV Interface Presentation (1)
HV Interface Presentation (1)
 
Welding Construction Mngmt_revert
Welding Construction Mngmt_revertWelding Construction Mngmt_revert
Welding Construction Mngmt_revert
 

Recently uploaded

simpson-lee_house_dt20ajshsjsjsjsjj15.pdf
simpson-lee_house_dt20ajshsjsjsjsjj15.pdfsimpson-lee_house_dt20ajshsjsjsjsjj15.pdf
simpson-lee_house_dt20ajshsjsjsjsjj15.pdfLucyBonelli
 
Understanding Image Masking: What It Is and Why It's Matters
Understanding Image Masking: What It Is and Why It's MattersUnderstanding Image Masking: What It Is and Why It's Matters
Understanding Image Masking: What It Is and Why It's MattersCre8iveskill
 
ARCHITECTURAL PORTFOLIO CRISTOBAL HERAUD 2024.pdf
ARCHITECTURAL PORTFOLIO CRISTOBAL HERAUD 2024.pdfARCHITECTURAL PORTFOLIO CRISTOBAL HERAUD 2024.pdf
ARCHITECTURAL PORTFOLIO CRISTOBAL HERAUD 2024.pdfCristobalHeraud
 
LIGHTSCAPES: HOW MIGHT WE DESIGN AN INCLUSIVE AND ACCESSIBLE CLASSICAL CONCER...
LIGHTSCAPES: HOW MIGHT WE DESIGN AN INCLUSIVE AND ACCESSIBLE CLASSICAL CONCER...LIGHTSCAPES: HOW MIGHT WE DESIGN AN INCLUSIVE AND ACCESSIBLE CLASSICAL CONCER...
LIGHTSCAPES: HOW MIGHT WE DESIGN AN INCLUSIVE AND ACCESSIBLE CLASSICAL CONCER...Pranav Subramanian
 
ArtWaves 2024 - embracing Curves in Modern Homes
ArtWaves 2024 - embracing Curves in Modern HomesArtWaves 2024 - embracing Curves in Modern Homes
ArtWaves 2024 - embracing Curves in Modern HomesVellyslav Petrov
 
General Simple Guide About AI in Design By: A.L. Samar Hossam ElDin
General Simple Guide About AI in Design By: A.L. Samar Hossam ElDinGeneral Simple Guide About AI in Design By: A.L. Samar Hossam ElDin
General Simple Guide About AI in Design By: A.L. Samar Hossam ElDinSamar Hossam ElDin Ahmed
 
CAPITAL GATE CASE STUDY -regional case study.pdf
CAPITAL GATE CASE STUDY -regional case study.pdfCAPITAL GATE CASE STUDY -regional case study.pdf
CAPITAL GATE CASE STUDY -regional case study.pdfAlasAlthaher
 
Niintendo Wii Presentation Template.pptx
Niintendo Wii Presentation Template.pptxNiintendo Wii Presentation Template.pptx
Niintendo Wii Presentation Template.pptxKevinYaelJimnezSanti
 
The spirit of digital place - game worlds and architectural phenomenology
The spirit of digital place - game worlds and architectural phenomenologyThe spirit of digital place - game worlds and architectural phenomenology
The spirit of digital place - game worlds and architectural phenomenologyChristopher Totten
 
STITCH: HOW MIGHT WE PROMOTE AN EQUITABLE AND INCLUSIVE URBAN LIFESTYLE PRIOR...
STITCH: HOW MIGHT WE PROMOTE AN EQUITABLE AND INCLUSIVE URBAN LIFESTYLE PRIOR...STITCH: HOW MIGHT WE PROMOTE AN EQUITABLE AND INCLUSIVE URBAN LIFESTYLE PRIOR...
STITCH: HOW MIGHT WE PROMOTE AN EQUITABLE AND INCLUSIVE URBAN LIFESTYLE PRIOR...Pranav Subramanian
 
Making and Unmaking of Chandigarh - A City of Two Plans2-4-24.ppt
Making and Unmaking of Chandigarh - A City of Two Plans2-4-24.pptMaking and Unmaking of Chandigarh - A City of Two Plans2-4-24.ppt
Making and Unmaking of Chandigarh - A City of Two Plans2-4-24.pptJIT KUMAR GUPTA
 
Imagist3D Architectural and Interior Rendering Portfolio
Imagist3D Architectural and Interior Rendering PortfolioImagist3D Architectural and Interior Rendering Portfolio
Imagist3D Architectural and Interior Rendering PortfolioAlinaLau2
 
Giulio Michelon, Founder di @Belka – “Oltre le Stime: Sviluppare una Mentalit...
Giulio Michelon, Founder di @Belka – “Oltre le Stime: Sviluppare una Mentalit...Giulio Michelon, Founder di @Belka – “Oltre le Stime: Sviluppare una Mentalit...
Giulio Michelon, Founder di @Belka – “Oltre le Stime: Sviluppare una Mentalit...Associazione Digital Days
 
Karim apartment ideas 02 ppppppppppppppp
Karim apartment ideas 02 pppppppppppppppKarim apartment ideas 02 ppppppppppppppp
Karim apartment ideas 02 pppppppppppppppNadaMohammed714321
 
How Apple strives for the perfect sky and revives cities
How Apple strives for the perfect sky and revives citiesHow Apple strives for the perfect sky and revives cities
How Apple strives for the perfect sky and revives citiesThomas Schielke
 
Cities Light Up in Solidarity With Ukraine: From Internationally Synchronized...
Cities Light Up in Solidarity With Ukraine: From Internationally Synchronized...Cities Light Up in Solidarity With Ukraine: From Internationally Synchronized...
Cities Light Up in Solidarity With Ukraine: From Internationally Synchronized...Thomas Schielke
 
10 Best WordPress Plugins to make the website effective in 2024
10 Best WordPress Plugins to make the website effective in 202410 Best WordPress Plugins to make the website effective in 2024
10 Best WordPress Plugins to make the website effective in 2024digital learning point
 
guest bathroom white and blue ssssssssss
guest bathroom white and blue ssssssssssguest bathroom white and blue ssssssssss
guest bathroom white and blue ssssssssssNadaMohammed714321
 
guest bathroom white and bluesssssssssss
guest bathroom white and bluesssssssssssguest bathroom white and bluesssssssssss
guest bathroom white and bluesssssssssssNadaMohammed714321
 
Interior Design for Office a cura di RMG Project Studio
Interior Design for Office a cura di RMG Project StudioInterior Design for Office a cura di RMG Project Studio
Interior Design for Office a cura di RMG Project StudioRMG Project Studio
 

Recently uploaded (20)

simpson-lee_house_dt20ajshsjsjsjsjj15.pdf
simpson-lee_house_dt20ajshsjsjsjsjj15.pdfsimpson-lee_house_dt20ajshsjsjsjsjj15.pdf
simpson-lee_house_dt20ajshsjsjsjsjj15.pdf
 
Understanding Image Masking: What It Is and Why It's Matters
Understanding Image Masking: What It Is and Why It's MattersUnderstanding Image Masking: What It Is and Why It's Matters
Understanding Image Masking: What It Is and Why It's Matters
 
ARCHITECTURAL PORTFOLIO CRISTOBAL HERAUD 2024.pdf
ARCHITECTURAL PORTFOLIO CRISTOBAL HERAUD 2024.pdfARCHITECTURAL PORTFOLIO CRISTOBAL HERAUD 2024.pdf
ARCHITECTURAL PORTFOLIO CRISTOBAL HERAUD 2024.pdf
 
LIGHTSCAPES: HOW MIGHT WE DESIGN AN INCLUSIVE AND ACCESSIBLE CLASSICAL CONCER...
LIGHTSCAPES: HOW MIGHT WE DESIGN AN INCLUSIVE AND ACCESSIBLE CLASSICAL CONCER...LIGHTSCAPES: HOW MIGHT WE DESIGN AN INCLUSIVE AND ACCESSIBLE CLASSICAL CONCER...
LIGHTSCAPES: HOW MIGHT WE DESIGN AN INCLUSIVE AND ACCESSIBLE CLASSICAL CONCER...
 
ArtWaves 2024 - embracing Curves in Modern Homes
ArtWaves 2024 - embracing Curves in Modern HomesArtWaves 2024 - embracing Curves in Modern Homes
ArtWaves 2024 - embracing Curves in Modern Homes
 
General Simple Guide About AI in Design By: A.L. Samar Hossam ElDin
General Simple Guide About AI in Design By: A.L. Samar Hossam ElDinGeneral Simple Guide About AI in Design By: A.L. Samar Hossam ElDin
General Simple Guide About AI in Design By: A.L. Samar Hossam ElDin
 
CAPITAL GATE CASE STUDY -regional case study.pdf
CAPITAL GATE CASE STUDY -regional case study.pdfCAPITAL GATE CASE STUDY -regional case study.pdf
CAPITAL GATE CASE STUDY -regional case study.pdf
 
Niintendo Wii Presentation Template.pptx
Niintendo Wii Presentation Template.pptxNiintendo Wii Presentation Template.pptx
Niintendo Wii Presentation Template.pptx
 
The spirit of digital place - game worlds and architectural phenomenology
The spirit of digital place - game worlds and architectural phenomenologyThe spirit of digital place - game worlds and architectural phenomenology
The spirit of digital place - game worlds and architectural phenomenology
 
STITCH: HOW MIGHT WE PROMOTE AN EQUITABLE AND INCLUSIVE URBAN LIFESTYLE PRIOR...
STITCH: HOW MIGHT WE PROMOTE AN EQUITABLE AND INCLUSIVE URBAN LIFESTYLE PRIOR...STITCH: HOW MIGHT WE PROMOTE AN EQUITABLE AND INCLUSIVE URBAN LIFESTYLE PRIOR...
STITCH: HOW MIGHT WE PROMOTE AN EQUITABLE AND INCLUSIVE URBAN LIFESTYLE PRIOR...
 
Making and Unmaking of Chandigarh - A City of Two Plans2-4-24.ppt
Making and Unmaking of Chandigarh - A City of Two Plans2-4-24.pptMaking and Unmaking of Chandigarh - A City of Two Plans2-4-24.ppt
Making and Unmaking of Chandigarh - A City of Two Plans2-4-24.ppt
 
Imagist3D Architectural and Interior Rendering Portfolio
Imagist3D Architectural and Interior Rendering PortfolioImagist3D Architectural and Interior Rendering Portfolio
Imagist3D Architectural and Interior Rendering Portfolio
 
Giulio Michelon, Founder di @Belka – “Oltre le Stime: Sviluppare una Mentalit...
Giulio Michelon, Founder di @Belka – “Oltre le Stime: Sviluppare una Mentalit...Giulio Michelon, Founder di @Belka – “Oltre le Stime: Sviluppare una Mentalit...
Giulio Michelon, Founder di @Belka – “Oltre le Stime: Sviluppare una Mentalit...
 
Karim apartment ideas 02 ppppppppppppppp
Karim apartment ideas 02 pppppppppppppppKarim apartment ideas 02 ppppppppppppppp
Karim apartment ideas 02 ppppppppppppppp
 
How Apple strives for the perfect sky and revives cities
How Apple strives for the perfect sky and revives citiesHow Apple strives for the perfect sky and revives cities
How Apple strives for the perfect sky and revives cities
 
Cities Light Up in Solidarity With Ukraine: From Internationally Synchronized...
Cities Light Up in Solidarity With Ukraine: From Internationally Synchronized...Cities Light Up in Solidarity With Ukraine: From Internationally Synchronized...
Cities Light Up in Solidarity With Ukraine: From Internationally Synchronized...
 
10 Best WordPress Plugins to make the website effective in 2024
10 Best WordPress Plugins to make the website effective in 202410 Best WordPress Plugins to make the website effective in 2024
10 Best WordPress Plugins to make the website effective in 2024
 
guest bathroom white and blue ssssssssss
guest bathroom white and blue ssssssssssguest bathroom white and blue ssssssssss
guest bathroom white and blue ssssssssss
 
guest bathroom white and bluesssssssssss
guest bathroom white and bluesssssssssssguest bathroom white and bluesssssssssss
guest bathroom white and bluesssssssssss
 
Interior Design for Office a cura di RMG Project Studio
Interior Design for Office a cura di RMG Project StudioInterior Design for Office a cura di RMG Project Studio
Interior Design for Office a cura di RMG Project Studio
 

New Microsoft PowerPoint Presentation.pptx

  • 1. Training on PTW System & Expenditure booking Date:23.11.22
  • 2. PM01 orders are General Maintenance orders mainly deals with the low criticality works, these are mainly of LWC type. Following works are to be involved PM01 type orders PM02 are Corrective maintenance orders, these are usually performed after the occurrence of defect. These Orders are created from M2 notifications.
  • 3. Pri-A:Defect needs to be attended in 3 days Pri-C: Defect needs to be attended in 7 days M1 Notification
  • 4. • Pri-A:Defect needs to be attended in 3 days • Pri-B: Defect needs to be attended in 7 days • Pri-C:Shut down required • Pri-D :Material required • Priority-E: Emergency no need of scheduling.Has to attend with in 1 day M2 Notification
  • 5. M1:Authorisation  Operation :E6 and above  Maintenance: All CP’s() for facilitating cable disconnection, coupling/decoupling,dewatering..etc Order series started with 1 for all M1 notifications
  • 6. M1:FL based notification.Notification cannot be given on same FL to same Department.Planner group and WC need to b defined manually.more flexibility
  • 7.
  • 8. M2 Notification Its equipment based notification PG&WC will be captured by the system based on Equipment. More details of the defect will be captured: System availability, Effect on system, type of defect(detailed) Raising of multiple notifications on same equipment to same department is not allowed. However ,new defects may be added to existing notification. Raising of notification on same equipment to same department will be allowed after 10 days raising initial notification, even if old one is pending
  • 9.
  • 10.
  • 11.
  • 12.
  • 13.
  • 14. Control keys • WCM: Work Clearance Management-For applying PTW/LWC.Work approval tab will be created after entering WCM key only. • PM01: Plant maintenance :internal manpower – Used for For material boking/gen jobs in which services are not required to book. Confirmation is required.Rel button not necessary to press. • PM03- External payments(Services).SES is mandatory. Materials can also be booked. All Maintenance plans created with PM03 type • PM03 to PM01 operation not possible, if service pack is defined in maintenance plan that too before order confirmation only.
  • 15.
  • 16. Attaching JSA in permit/LWC
  • 17. • ROMP • SFT • PTW with WHP • PTW with HWP • PTW with CSP • PTW with WHP & HWP • PTW with CSP & HWP • PTW with CSP & WHP • PTW with CSP, WHP & HWP • PTW with EWP Special type of permits
  • 18. WCD Templates Total WCD’s defined in SAP (22.11.22) Planner Group Train Grand Total CCR CHP DMP OFS SYD U01 U02 U03 AHD 248 1176 1424 BMD 659 684 824 2167 C&I 13 13 CHP 824 824 EMD 715 62 534 1565 1513 654 676 5719 OFS 254 242 99 595 TMD 60 96 441 597 Grand Total 13 1539 316 836 1565 2615 2955 1500 11339
  • 19. PM03/OH PERMITS ISSUED (01.04.2022-30.10.2022) Train Total PM/OH Permits printed Permits printed using WCD’s AHP 275 CCR 3 CHP 1778 1565 DMP 1273 OFS 878 59 OS1 1 SYD 28 3 U01 1546 65 U02 1205 31 U03 1465 222 Grand Total 8452 1945
  • 20.
  • 21.
  • 22. Notifications closing without orders 22 5648 246 Notification Data 2nd Quarter of 2022 Notification Completed with Order Notification Completed without Order Total:5894 (4.1%) 5974 393 Notification Data 2nd Quarter of 2022 (including Safety notifications-OS Type) Notification Completed with Order Notification Completed without Order Total:6367 (6.1%)
  • 23. 325 252 12 374 161 6 892 306 94 1366 898 343 183 12 104 134 4 135 44 3 2 1 23 15 10 8 5 47 1 53 31 31 2 7 4 1 3 2 325 254 13 397 176 6 902 314 99 1413 1 951 374 214 14 111 138 5 138 46 3 0 200 400 600 800 1000 1200 1400 1600 M1 M2 M4 M1 M2 M4 M1 M2 M1 M2 M4 M1 M2 M3 M4 M1 M2 M4 M1 M2 M4 AHD BMD C&I CHP EMD OFS TMD Notification Data 2nd Quarter of 2022 Notification Completed with Order Notification Completed without Order Grand Total
  • 25. Cost bookings Type of booking • Materials • Services Method of booking • Order based • Cost center based • WBS Element based(Over hauling's, Project works)
  • 26. Dept CC CM EX OH PM RE Grand Total AHD 17,374.74 36,851,959.61 632,912.00 26,109,320.19 63,611,566.54 BMD 3,061,180.15 15,753,563.20 34,873,104.39 26,469,697.60 12,266,923.12 92,424,468.46 C&I 1,852,438.87 5,500,544.92 388,530.13 9,992,494.58 48,893,306.28 2,253,800.00 68,881,114.78 CHE 8,257,549.39 9,178,817.56 17,436,366.95 CHO 60,511,868.85 60,511,868.85 CHP 46,497,674.04 37,406,100.51 6,506,432.41 89,049,643.63 179,459,850.59 EMD 4,338,041.18 648,476.50 11,110,605.21 64,698,669.20 372,244.72 81,168,036.81 GEN 7,868,780.91 7,868,780.91 MGR 47,980,380.60 23,629,609.18 71,609,989.78 OFS 5,404,997.87 9,310,779.35 7,270,980.17 6,176,492.28 28,163,249.67 OPN 6,317,757.66 6,946,122.23 29,851,572.07 43,115,451.96 TMD (3,140,715.35) 11,504,147.00 (11,892.96) 10,163,101.85 6,821,467.68 219,231.92 25,555,340.14 Grand Total 128,455,460.06 123,921,693.32 376,637.17 80,549,630.61 391,390,464.52 15,112,199.76 739,806,085.44