Successfully reported this slideshow.
Your SlideShare is downloading. ×

Cheshire RESI: Sebastian Tibenham, executive director + Neil Culkin, senior planning director,  Pegasus Group

Ad
Ad
Ad
Ad
Ad
Ad
Ad
Ad
Ad
Ad
Ad

Check these out next

1 of 15 Ad

More Related Content

Slideshows for you (20)

Similar to Cheshire RESI: Sebastian Tibenham, executive director + Neil Culkin, senior planning director,  Pegasus Group (20)

Advertisement

More from Place North West (20)

Recently uploaded (20)

Advertisement

Cheshire RESI: Sebastian Tibenham, executive director + Neil Culkin, senior planning director,  Pegasus Group

  1. 1. Cheshire Resi Update Place NW Presentation
  2. 2. IT TAKES TWO TO TANGO! • Cheshire East - Site Allocations DPD, NPs & 5YS • Cheshire West - Local Plan Review, 5YS & Project Examples
  3. 3. Cheshire East • Part 1 Local Plan – Recap • Very long production and examination process • Adopted in July 2017 • 20 Year Plan Period (2010-2030) • 36,000 homes (1,800 per annum) • Strategic site allocations around Principal Towns and KSC inc. Green Belt release • Some developed but still a good number available and at various stages • Undefined in Part 1 and left to Part 2 Local Plan ◦ 3,500 homes in Local Service Centres ◦ 3,000 homes in smaller villages ◦ 400 in Central Crewe, and ◦ 500 in Central Macclesfield • 36,000 homes figure was based on an economic forecast of 31,000 new jobs (0.7%) • Since 2010 there have been 21,000 jobs created (1.4%) so hit 67% of their target. • However, since Brexit ref jobs growth reduced to 0.3%.
  4. 4. Cheshire East • Site Allocations DPD - Things to be aware of: • Additional Sites/Distribution focused on 13 Local Service Centres. • No small site allocations within Principle Towns (Macclesfield or Crewe) • Green Belt - No detailed review of village settlement boundaries or ‘washed over’ villages undertaken to omit land that no longer serves the purpose of Green Belt. • Local Landscape Designations – Nine large areas across Borough. No bespoke policies for each other than Peak fringe (preserve and enhance landscape). Policy SD4 in Part 1 Local Plan. • Airport Noise Policy – Highly restrictive over Mobberley and Knutsford. Policy goes beyond National Guidance on this matter. • Green Gap – No further strategic review of boundaries around Crewe & Nantwich. Some slight alterations • Jodrell Bank - Very restrictive around Holmes Chapel and Congleton area. • So where are Cheshire East going to go next as part of full LP Review? • Will we go back to the appeal playground of Crewe and Sandbach?
  5. 5. Cheshire East • Extensive Neighbourhood Plan Coverage. • 28x Made/Adopted (Purple) • 5x Examination stage (Red), • 4x Regulation 14 Draft (Dark Green), • 19x Under Preparation (Green) • Typically a tad unneighbourly! • Can provide useful direction and references to easy wins. • Policies can reference other key documents (e.g. Knutsford Design Guide and Knutsford Character Assessment). • 5 year supply threshold drops to 3 years if housing allocations made. • However, no residential allocations.
  6. 6. Cheshire East • 5 Year Supply – Things to be aware of: • Housing supply monitoring report issued 7th November 2019. • Claims 5 year supply of 17,733 homes (7.5 Years Supply). • Applies ‘Sedgepool 8’ approach + 5% buffer = 5 year need of 11,802. • ‘Sedgepool 8’ confirmed at Local Plan EiP date. Can Council continually push 8 year horizon forward? • Traditional Sedgefield approach = 5 year need of 13,211. • Successful 5YS Appeal Case = Win Sedgfield & remove >25% of Supply. • ‘Realistic prospect’ / St Modwen court case. • NPPF new definition of ‘deliverable’. • A sites = 10,815 homes (sites Under Construction or with Full Planning). • B sites + others = 6,839 (mainly outline / allocated / subject to s106). • T2T Tango! Council’s job is not complete on B sites. • Developer can’t start until s106, RM and conditions all signed off by LPA!
  7. 7. Cheshire West & Chester Update • Adopted Local Plans • 5 – year Local Plan Review • 5 – year housing land supply update • Case Studies: ◦ Green Belt ◦ Brownfield
  8. 8. Local Plan Update • Cheshire West and Chester Local Plan – Part One: • Adopted - 29th January 2015. • 5-year Local Plan Review – TCPA Regulations require a formal review of Local Plans every 5 years following their adoption to ensure it is effective and kept up to date. • Local Plan Review – Required by 29th January 2020. No action plan in place. • Cheshire West and Chester Local Plan – Part Two: • Adopted – 18th July 2019. • Redefined Settlement Boundaries – For key and local service centres, development restricted beyond these boundaries. • Land Allocations and Detailed Policies – Replacing those remaining policies from the Chester, Ellesmere Port and Vale Royal Local Plans
  9. 9. Local Plan Review • Paragraph 33 of NPPF requires Local Plan development strategies to be updated every 5 years. • No clear process by which a Local Plan should be reviewed. • NPPF updated in February 2019 with changes that supersede part 1 of the Local Plan. • Updates of strategic policy to respond to these changes. • Examples may include updated STRAT 9 in line with para 170(b) of NPPF. • Changes in Local Housing Need - Council could reduce requirement in line with new OAN figures. • Housing Delivery Test performance. • Deliverability of key site allocations. • Significant economic changes on a local or national scale which impacts viability. • Success of policies against indicators in Development Plan. • If no review is undertaken it is up to the decision maker as to the weight to be provided to relevant policies. Likely to be dependent on accordance with NPPF.
  10. 10. Cheshire West & Chester 5-Year Housing Land Supply • Council claimed over 7,000 deliver homes. • Secretary of State confirmed 5,838 deliverable homes in Darnhall Estate appeal. • Method of dealing with past over supply is disputed. • Represents a housing supply between 5.05 and 5.67 years as of 4th Nov 2019. • Large site allocations in Northwich, Winsford, Ellesmere Port and Chester provides question marks over deliverable supply. • Potential for sites to stall due to viability and remediation concerns. • Potential for further 5-year housing supply challenges over next few of years. • Fallout from Denhall Estate appeal may lead to a more detailed LP Review. • Also change in definition of ‘deliverable’ sites since adoption of Part 1 LP.
  11. 11. Conclusion • Council’s 5 Year Housing Supply not as large as previously thought – Could this pave the way for more speculative applications and appeals? • 5-year Local Plan Review is important and could lead to strategic policy changes across the Borough – What impact will updated housing numbers and updated NPPF have on part one of the Local Plan? • How Deliverable are the Council’s current housing allocations – Could this lead to an additional housing land review?
  12. 12. • Decoy Farm • Planning permission for 24 dwellings and 24 commercial (B1) units • Site comprised of commercial/ industrial former agricultural yard with B1, B2 and B8 consent. • The site is allocated within the designated Green Belt. • The application was granted at Appeal due to its sustainable live/work concept and the fact there would be neutral impact on the openness of the Green Belt. The design of the scheme utilised the volume and footprint of the commercial buildings to be demolished. • Pegasus dealt with this project from the outline planning right through to reserved matters and discharge of conditions. • The final conditions where discharged last week and now the developer is beginning on site. Green Belt Consents
  13. 13. • Lyndale Farm • The Decoy Farm application was also utilised at Lyndale Farm, Pulford with a similar scheme of 23 live/work units. • Demonstrated to the LPA that the site had been used as commercial use for a period of 10 years plus continuously • This led to the application site being considered as Brownfield Land within the allocated Green Belt. • Application submitted utilising the volume and footprint of the existing buildings to be demolished to form a live/ work scheme, meaning there would also be neutral impact on the openness of the Green Belt. • This application is currently being built out. Green Belt Consents
  14. 14. • Old Government House, Chester • Grade II listed building on Chester’s historic waterfront. • Planning and Listed Building consent granted for part conversion of existing office buildings, demolition of extension and development of new build apartments to create 9 residential units with associated landscaping, parking and boathouse • This development is now near to completion on site. • Meadow Lane, Ellesmere Port • Current pending proposal for 187 homes in Ellesmere Port • Development is to include over 50% affordable homes • Site is the former Van Leer Factory and is brownfield so remediation required • On the edge of a conservation area being the Shropshire Union Canal • Bringing a brownfield site back in to use leading to multiple social, economic and environmental benefits Brownfield Sites
  15. 15. Cheshire Resi Update Presentation to Place North West Contact: Seb Tibenham: sebastian.tibenham@pegasusgroup.co.uk Neil Culkin: neil.culkin@pegasusgroup.co.uk

×