SCOPE OF WORK:
Scope of work includes 3D Model creation in Revit, Co-ordination, Clash Report generation in Navis, Shop drawing in
Cad Format with CSD and BOQ generation.
For more http://www.pinnaclecad.com/portfolio/cultural-forum/

Related Books

Free with a 30 day trial from Scribd

See all
  • Be the first to like this

Cultural forum art-entertainment-doha_qatar_jul13

  1. 1. 3D BIM Model Copyright © 2014 Pinnacle Infotech, Inc. Global Leader in BIM Services www.pinnaclecad.com BIM End Date BIM Start Date July, 2013 August, 2013 Project Area Client 49 Engineers Trans Gulf International Electro Mechanical W.L.L Team Size sheireb Properties, a subsidiary of Qatar Foundation, is creating a Mremarkable new cultural quarter in Doha, the first of its kind in the Middle East, as part of its ambitious QR20-billion Msheireb Downtown Doha development. Located adjacent to Al-Baraha, the largest open-air square at the heart of the Msheireb Downtown Doha, the Doha Cultural Forum will host a variety of cultural events, including arts and performances as well as educational programmes. As a community creative space spread over 18,996 square metres, it will also serve as a versatile venue for public art exhibitions and lessons in dance, music and fine arts, attracting both local and international visitors to the heart of Qatar’s capital city. Scope of Work Pinnacle’s Value Addition 3D BIM Model 600,000 Sq.Ft. Scope of work includes 3D Model creation in Revit, Co-ordination, Clash Report generation in Navis, Shop drawing in Cad Format with CSD and BOQ generation At first, according to the client's instruction, 3D model was created following the Shop drawing and elevation; but as it generated lot of coordination issues and hence client was informed through RFIs, there after these issues were solved by Pinnacle BIM Engineers on client's advice. Architect John Mcaslan & Partners + Burns & Mcdonnell, Inc. MEP Contractor/ Consultant Trans Gulf International Electro Mechanical W.L.L Owner Msheireb Properties Project Consultant HBK Contracting Co. WLL Another challenging thing was to solve the double height or void area issue in many places where IFC drawings shown services were running.

SCOPE OF WORK: Scope of work includes 3D Model creation in Revit, Co-ordination, Clash Report generation in Navis, Shop drawing in Cad Format with CSD and BOQ generation. For more http://www.pinnaclecad.com/portfolio/cultural-forum/