WHAT TO EXPECT TODAY
1. Share the LEED for Homes Experience – 2007 – THE
START OF A LEED EDUCATION
2. CASE STUDY: Describe the LEED process, in...
Mesa Verde, Colorado
Settled 1400 years ago
Continuously occupied for 700 years
THE LEED
FOR HOMES
EXPERINCE
myths I heard
GREEN MYTHS
GREEN IS TOO EXPENSIVE
GREEN MYTHS
GREEN IS UGLY
GREEN MYTHS
GREEN IS CONFUSING
GREEN MYTHS
GREEN IS POLITICAL
challenging finding a
team – became the GC
LEED EXPERIENCE BEGINS
MEDLOCK BEFORE
naïve, first time
What Medlock is, and isn’t
MEDLOCK IS NOT
Overview of LEED
An Architectural Award Winner The Perfect Green Home
MEDLOCK IS
The first LEED certified
single-family remodel in
Arizona
The second LEED Gold
certified single-family
remodel ...
• A good case study for green remodeling
• Well Planned Remodel
• A project that preserved all exterior walls
• An improve...
1 = 1 pt - High albedo materials installed
for at least 50% of the site’s hardscape
POINT SYSTEM
Inspiration, asu, etc
Conclusions: Remodel existing home, in the urban core & make it green. What is green? Need a rating system.
So, the LEED education begins…..
Single-Family Building Permits:
Phoenix and Maricopa County
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
2005 897 85...
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
2005 76 193 253 207 208 226 198 206 207 175 156 156
Pima
11166
2006 148...
RESIDENTIAL PERMIT ACTIVITY
ANNUAL RESIDENTIAL PERMIT ACTIVITY
PHOENIX-MESA-SCOTTSDALE, AZ MSA
SEPTEMBER 2009
0
10,000
20,...
SEPTEMBER 2005
Lessons learned
JULY 2009
1. Share the LEED for Homes Experience – 2007 – THE START
OF A LEED EDUCATION
2. CASE STUDY: Describe the LEED process, in...
Decisions Were Made with the
Best Available Information at
the Given Time
LEED EXPERIENCE
WHAT I HAVE TO DO
WHAT I WANT TO DO
WHAT I CAN DO
DECISION MAKING PROCESS
LEEDPREREQUISITES Innovation and Design (ID) 1.1 Preliminary Rating
Innovation and Design (ID) 2.1 and
2.2
Durability Plan...
WHAT I WANT TO DO
WHAT I WANT TO DO
TANKLESS ELECTRIC
Budget
Time
Durability
WHAT I WANT TO DO
REFLECTIVE ROOF
Resale
Aesthetics
WHAT I WANT TO DO
RAIN CAPTURE
Budget
Practicality
The water heater is responsible for 12% of the home’s energy
consumption. If 10% of Arizona’s homes had solar hot water he...
WHAT I WANT TO DO
PV SYSTEM
Budget
Existing design
HOA
WHAT I WANT TO DO
KITCHEN GARDEN
Dual flush toilets can save up to 67% of water compared to
traditional toilets, which use 1.6 gallons per flush.
WHAT I WA...
WHAT I WANT TO DO
NO VOC PAINTS
WHAT I WANT TO DO
FOAM INSULATION
Budget
Installation
WHAT I WANT TO DO
NEW HVAC
Budget
WHAT I WANT TO DO
NEW WINDOWS
Budget
City Codes
WHAT I WANT TO DO
WIND ENERGY
Budget
Time
HOA
WHAT I WANT TO DO
ALL DEPENDS ON:
In this lies… “what does green
mean? –importance of rating system
Who is the occupant? W...
1. Share the LEED for Homes Experience – 2007 – THE START
OF A LEED EDUCATION
2. CASE STUDY: Describe the LEED process, in...
WHAT DOES IT
MEAN TO GO
GREEN?
100 people = 100 answers I LEED & NAHB I Define LEED
IN SIMPLE TERMS:
GREEN =
REDUCING
ENVIRONMENTAL
IMPACT
LEED
NAHB
Scottsdale Green Building
Energy Star
Tucson: Regional Green Building
TEP: Guarantee Home
GREEN RATING SYSTEMS
Agency Cost Level Rating Type Tradeoffs Verify Medlock Provider
LEED
$525
$375 USGBC
Members
$4000 Consultation
Certified
...
Agency Cost Level Rating Type Tradeoffs Verify Medlock Provider
Scottsdale 0
Entry
Advanced
Point System
Organized by
Cons...
HIGHLIGHTS
•Cut energy consumption by over 50%
•Improved air quality by using low or no VOC materials
•Located within clos...
Water Reuse: LEED as A Design Tool
vs.
LEED EXPERIENCE
1 4
• Most recognized green rating system
• The Team Charette
• An Improved Project Team
• An excellent guide for a first time...
1. Share the LEED for Homes Experience – 2007 – THE START
OF A LEED EDUCATION
2. CASE STUDY: Describe the LEED process, in...
Medlock’s Design:
Defining a GREEN home
• Efficiency: Water and Energy
• IEQ
• Location
• Design – who is the Occupant?
• ...
GREEN: WATER EFFICIENCY & LANDSCAPE DESIGN
DEFINING A GREEN HOME
Site Stewardship At least 40% of lot
undisturbed. 1pt
Landscaping Drought tolerant
turf. Turf less
than 20% of lot.
Drough...
A front loading washer uses 22 gallons of water; a
top loading washer uses 45 gallons.
DEFINING A GREEN HOME
WATER CONSERV...
DEFINING A GREEN HOME
ENERGY EFFICIENCY
Acoustics
Thermal Comfort
1
2
2
Air Infiltration
MR 2.2 Emission EPP
Enhanced Insu...
DEFINING A GREEN HOME
ENERGY EFFICIENCY
DEFINING A GREEN HOME
ENERGY EFFICIENCY
4
3rd
Party Verified
DEFINING A GREEN HOME
ENERGY EFFICIENCY
Thermal imagery: MEDLOCK
DEFINING A GREEN HOME
GREEN DESIGN
The average single family home in the
U.S. is 40% larger today than it was 30
years ago.
DEFINING A GREEN HOME
GREEN DESIGN
5
4 bedrooms, 2140 sq ft
10Site Selection Existing lot. 2 pts
Preferred Location Infill and Previously
Developed. 3pts
Infrastructure Within ½ Mile...
DEFINING A GREEN HOME
GREEN DESIGN
VISTANCIA TO
DOWNTOWN PHX
= 38 MILES
($40 RT)
Preserve all exterior walls
Orientation
DEFINING A GREEN HOME
GREEN DESIGN
ORIGINAL
FLYER
FROM
1959
DEFINING A GREEN HOME
Making the old new,
photo tour
DEFINING A GREEN HOME
GREEN DESIGN
DEFINING A GREEN HOME
GREEN DESIGN
NEW SEWER LINE | DURABILITY
DEFINING A GREEN HOME
GREEN DESIGN
Healthy Home
Replaced
Galvanized Line
1
•Exterior wall shear non-wood
•Joists spaced greater than 16”
•Headers sized for actual loads
•2-stud corners
•Waste facto...
Where to put the kitchen? Support beam? Daylighting?
DEFINING A GREEN HOME
GREEN DESIGN
2
DEFINING A GREEN HOME
GREEN DESIGN
DEFINING A GREEN HOME
GREEN DESIGN
4
1. Share the LEED for Homes Experience – 2007 – THE START
OF A LEED EDUCATION
2. CASE STUDY: Describe the LEED process, in...
LEED EXPERIENCE
RECYCLING
3
LEED EXPERIENCE
RECYCLING
LEED EXPERIENCE
RECYCLING
3
LEED EXPERIENCE
REUSE & RECYCLING - Phoenix
LEED EXPERIENCE
REUSE & RECYCLING - Tucson
1. Share the LEED for Homes Experience – 2007 – THE START
OF A LEED EDUCATION
2. CASE STUDY: Describe the LEED process, in...
Decisions Were Made with the
Best Available Information at
the Given Time
LEED EXPERIENCE
MATERIAL SOURCING: STRATEGIES & ...
Credit Item Points Cost for Medlock Tradeoffs Payback
EA 2.1 Basic Insulation Preq $3000 Less expensive
Less efficient
No ...
Credit Item Points Cost for Medlock Tradeoffs Payback
Traditional
EA 4.1 Good Windows <.40 Preq $4500 - $6500
EA 4.2 Enhan...
LEED EXPERIENCE
Credit Item Points Cost for
Medlock
Tradeoffs Payback Medlock
Traditional HVAC – no design - $18000 Less e...
Credit Item Points Cost for
Medlock
Tradeoffs Payback Medlock
EA 10
(in 2007)
Renewable
Energy System
1-10 $60,000 (2007) ...
LEED EXPERIENCE
ENVIRONMENTALLY PREFERRED PRODUCTS
MR 2.1 & 2.2
6-8
EPP .5 POINTS EMISSION SPECS .5 POINTS LOCAL PRODUCTION .5 POINTS
Recycled, FSC certified, or
Reclaimed.
No added formalde...
Credit Item Points Cost for
Medlock
Tradeoffs Payback
Traditional Carpet Padding
and
Carpet
- .50 cents sf or
$250
$2 sf o...
Credit Item Points Cost for
Medlock
Tradeoffs Payback
Traditional Paints and
Coatings
- $1080
(27 gallons)
MR 2.2 Paints a...
EPP .5 POINTS EMISSION SPECS .5 POINTS LOCAL PRODUCTION .5 POINTS
Recycled, FSC certified, or
Reclaimed.
No added formalde...
1. Share the LEED for Homes Experience – 2007 – THE START
OF A LEED EDUCATION
2. CASE STUDY: Describe the LEED process, in...
Traditional Green Tradeoffs Payback !0-year return
Insulation $2,500 $8,500 3 years *
Windows $4,500 $8,500 3-5 years *
Fr...
Traditional Green Tradeoffs Payback !0-year return
Third Party
Test
- $400
Electrical
Upgrade
$7,200 $7,200
New Plumbing
a...
1. Share the LEED for Homes Experience – 2007 – THE START
OF A LEED EDUCATION
2. CASE STUDY: Describe the LEED process, in...
LEED EXPERIENCE
ENERGY ANALYSIS
3313 E MEDLOCK COMPARED TO 3307 & 3319 E MEDLOCK
3 things used for analysis; SRP; Energy 1...
LEED EXPERIENCE
THE CLAIM
LEED EXPERIENCE
ENERGY 10: MEDLOCK
Explain Energy 10
Medlock uses
53.09% LESS
energy than
average
Valley home
3319 33073313
LEED EXPERIENCE
COMPARED TO NEIGHBORS
COMPARED TO NEIGHBORS
NEIGHBOR ‘MEDLOCK’ NEIGHBOR
Sq ft 1400
Occupants 2
Remodeled never
NEIGHBOR: 3319 E MEDLOCK
Sq ft 1700
Occupants 1
Remodeled 2007
NEIGHBOR: 3307 E MEDLOCK
Sq ft 2150
Occupants 1
Remodeled 2007
GREEN STREET HOME: 3313 E MEDLOCK
3307 3313 3319
August $158 vs. $308 $195 $132 vs. $302
Medlock 49% less 56% less
Energy 10 53% less
August 2008: Medlock v...
LEED EXPERIENCE
ENERGY ANALYSIS
3313 E MEDLOCK COMPARED TO 3307 & 3319 E MEDLOCK
3319 E MEDLOCK
LEED EXPERIENCE
ENERGY ANALYSIS
3313 E MEDLOCK COMPARED TO 3307 & 3319 E MEDLOCK
3313 E MEDLOCK
Time to test the market - April 2008
LEED EXPERIENCE
MARKET CRASHES IN PHOENIX
APRIL 2008
10 MINUTE
BREAK
Incentives and
NAHB
1. Share the LEED for Homes Experience – 2007 – THE START
OF A LEED EDUCATION
2. CASE STUDY: Describe the LEED process, in...
Vendor/
Manufacturer
FEDERAL STATE APS SRP TOTAL
HVAC York
$1500 rebate
Tax credit
30%
Includes labor
- SEER 13 $175
SEER ...
LEED EXPERIENCE
TAX CREDITS & REBATES
LEED EXPERIENCE
TAX CREDITS & REBATES
1. Share the LEED for Homes Experience – 2007 – THE START
OF A LEED EDUCATION
2. CASE STUDY: Describe the LEED process, in...
NAHB RATING SYSTEM
Green Street Homes: Crisis leads to Opportunity
NAHB RATING SYSTEM
•Located within ¼ mile of Light Rail
•The greenest building is the existing one
•Green-certified, verif...
Practical
Simple
Recognized
Non-document intensive
Easy to understand for trades
Third-party verified
NAHB RATING SYSTEM
N...
Water Heater not in conditioned space unless in separate
room with outdoor air source
Wall-to-wall carpeting is not instal...
Bronze – 20%
Silver – 34%
Gold – 43%
Emerald – 50%
NAHB RATING SYSTEM
NGBS RATING LEVELS
ANSI approved ICC-700 2008 Nation...
GREEN STREET
HOMES
150 W ELM
EMERALD
CERTIFIED
BEFORE
AFTER
BEFORE
AFTER
BEFORE
AFTER
BEFORE
AFTER
BEFORE
AFTER
AFTER
AFTER
150 W Elm – Before & After
Pre HERS 208
Post HERS 79
Annual Savings $1200
Water Savings 62%
Purchase Price 90k
Improvement...
New HVAC $6500
New Windows and Doors $13500
Foam Insulation $1500
Landscape and Hardscape $11,500
New roof $5500
Paint, in...
1818 W TURNEY – EMERALD CERTIFIED
WORKSHOP OVERVIEW
BEFOREAFTER
Pre HERS 284
Post HERS 76
Annual Savings $2000
Water Savings 72%
Purchase Price 39k
Improvement Cost 42k
Sales Price 119k
...
IMPROVEMENTS AND BUDGET
New HVAC $5400
New Windows and Doors $3500
Landscaping $6500
Insulation $1600
Appliances $2500
Sub...
5626 N 20TH DRIVE – BRONZE CERTIFIED
GREEN STREET HOMES
BEFOREAFTER
5626 N 20th
Dr – before/after
Pre HERS 195
Post HERS 120
Annual Savings $650
Water Savings 40%
Purchase Price 47k
Improvem...
IMPROVEMENTS AND BUDGET
Tune up HVAC and tighten ducts $1300
New appliances $2600
Caulk windows and weather
stripping
$250...
319 W VIRGINIA – GOLD CERTIFIED
GREEN STREET HOMES
BEFORE
319 W Virginia – before/after
Pre HERS 194
Post HERS 122 (37% improve)
Annual Savings $900
Water Savings 40%
Purchase Pric...
IMPROVEMENTS AND BUDGET
Foam Insulation $4000
Solar Water Heater $6500 (before incentives)
Caulk windows and weather strip...
RESIDENTIAL PERMIT ACTIVITY
ANNUAL RESIDENTIAL PERMIT ACTIVITY
PHOENIX-MESA-SCOTTSDALE, AZ MSA
SEPTEMBER 2009
0
10,000
20,...
1. Share the LEED for Homes Experience – 2007 – A GREEN
REMODEL EDUCATION
2. Lessons learned, the need for a Rating System...
1. Test ducts for tightness, and sealing of leaks.
2. Professional HVAC service, and install of programmable thermostat
3....
1. Foam insulation in the lid of the roof
2. New windows
3. New HVAC (always windows before HVAC, and Manual J required be...
1. Share the LEED for Homes Experience – 2007 – THE START
OF A LEED EDUCATION
2. CASE STUDY: Describe the LEED process, in...
greenstreetdev.com
602.466.7444
LEED GA
Why Build Green?
IN SIMPLE TERMS:
GREEN =
REDUCING
ENVIRONMENTAL
IMPACT
Conventional Building Process
vs
Integrative Design Process
To be eligible for the LEED Green Associate credential, you must have
previous experience supporting a project registered ...
To be eligible for the LEED AP credential, you must have previous
experience with a project registered for LEED certificat...
USGBC: U.S. Green
Building Council
LEED: Leadership in Energy
and Environmental Design
LEED OVERVIEW
LEED OVERVIEW
Not “LEEDS”
LEED OVERVIEW
LEED CERTIFIED
LEED ACCREDITED
PROFESSIONAL
LEED ACCREDITED PROFFESIONALS
aka LEED APs
go to:
www.gbci.org
www.usgbc.org
LEED OVERVIEW
BEFORE
CI
NC
EB
NOW
ID + C
BD +...
ID – Interior Design
BD – Building Design
C – Construction
OM – Operations and Maintenance
NOW
ID + C
BD + C
EB & OM
H
ND
...
• LEED for New Construction
• LEED for Existing Buildings (O&M)
• LEED for Commercial Interiors
• LEED for Schools
• LEED ...
•A “cool roof” system
•Consumes 40% less water
•Geothermal heat pump system
•Heating costs are reduced by between 30-70%
•...
•Diverting more than 80% of on-site construction wasteDiverting more than 80% of on-site construction waste
•Using green h...
•The process entailed 45 projects, including upgrading building control systems, retrofitting
lighting, and adding motion ...
TRENDS IN LEED DEVELOPMENT
10 MINUTE BREAK
Incentives and
NAHB
http://www.greenbuildingpages.com/links/weblinks_LEED.html
GSA
Requires all building projects starting design
in 2003 meet...
In the District, every new or substantially renovated nonresidential
privately owned building with at least 50,000 square ...
HOME STAR
Green Building: Washington Bill Requires LEED Certification For Sales and Use Tax Deferral
                    
A bill was...
QUESTIONS: USGBC
The installation of low-flow faucet
aerators at hand washing stations
will result in which two of the
fol...
DEFINING GREEN or LEED
Defining a GREEN home
• Efficiency: Water and Energy
• IEQ
• Location
• Design – who is the Occupant?
• Photo Tour
DEFININ...
• Sustainable Sites
• Water Efficiency
• Energy & Atmosphere
• Materials and Resources
• Indoor Environmental Quality
• In...
Sustainable Sites
• Transportation
• Site selection
• Site design and management
• Stormwater management
10Site Selection Existing lot. 2 pts
Preferred Location Infill and Previously
Developed. 3pts
Infrastructure Within ½ Mile...
Site Stewardship At least 40% of lot
undisturbed. 1pt
Landscaping Drought tolerant
turf. Turf less
than 20% of lot.
Drough...
DEFINING A GREEN HOME
GREEN DESIGN
5
4 bedrooms, 2140 sq ft
QUESTIONS: Sustainable Sites
A project that specifies exterior
surfaces with high solar reflectance
index (SRI) values is ...
Water Efficiency
• Indoor water
• Irrigation water
• Process water
A front loading washer uses 22 gallons of water; a
top loading washer uses 45 gallons.
DEFINING A GREEN HOME
WATER CONSERV...
QUESTIONS: Water Efficiency
What is the baseline water use for
water closets?
a) 0.8 gallons per flush
b) 1.0 gallons per ...
Energy and Atmosphere
• Energy demand
• Energy efficiency
• Renewable energy
• Ongoing energy performance
DEFINING A GREEN HOME
ENERGY EFFICIENCY
DEFINING A GREEN HOME
ENERGY EFFICIENCY
4
QUESTIONS: Energy and Atmosphere
What is the first step a project
team should consider when trying
to save energy?
a) Use ...
Materials and Resources
• Selection of sustainable materials
(life-cycle impacts)
• Waste management
WHAT I WANT TO DO
NO VOC PAINTS
Credit Item Points Cost for
Medlock
Tradeoffs Payback
Traditional Carpet Padding
and
Carpet
- .50 cents sf or
$250
$2 sf o...
LEED EXPERIENCE
RECYCLING
3
LEED EXPERIENCE
RECYCLING
3
QUESTIONS: Materials and Resources
LEED defines regional materials as
originating within________?
a) 50 miles of the proje...
Indoor Environmental Quality
• Indoor air quality
• Thermal comfort
• Lighting
• Acoustics
1
Indoor Environmental Quality: Air Quality
acoustics
Daylighting
QUESTIONS: Indoor Environmental Quality
The abbreviation VOC refers to?
a) Volatile Organic Compounds
b) Volatile Operatin...
INNOVATION IN DESIGN
•Innovation in Design
•Exemplary Performance
Innovation in Design
WIND ENERGY
TAKING THE LEED GA TEST
GBCI.ORG
greenstreetdev.com
602.466.7444
THANK YOU
April 6th
, Tucson
May 6th
, Jacksonville, FL
May 14th
, Flagstaff
May 17th
, Charlotte, NC
May 20th
, Phoenix
UPCOMING WO...
LEED GA Exam Prep
LEED GA Exam Prep
LEED GA Exam Prep
LEED GA Exam Prep
LEED GA Exam Prep
LEED GA Exam Prep
LEED GA Exam Prep
LEED GA Exam Prep
LEED GA Exam Prep
LEED GA Exam Prep
LEED GA Exam Prep
LEED GA Exam Prep
LEED GA Exam Prep
LEED GA Exam Prep
LEED GA Exam Prep
LEED GA Exam Prep
LEED GA Exam Prep
LEED GA Exam Prep
LEED GA Exam Prep
LEED GA Exam Prep
LEED GA Exam Prep
LEED GA Exam Prep
LEED GA Exam Prep
LEED GA Exam Prep
LEED GA Exam Prep
LEED GA Exam Prep
LEED GA Exam Prep
LEED GA Exam Prep
LEED GA Exam Prep
LEED GA Exam Prep
LEED GA Exam Prep
LEED GA Exam Prep
LEED GA Exam Prep
LEED GA Exam Prep
LEED GA Exam Prep
LEED GA Exam Prep
LEED GA Exam Prep
LEED GA Exam Prep
LEED GA Exam Prep
LEED GA Exam Prep
Upcoming SlideShare
Loading in …5
×

LEED GA Exam Prep

2,031 views

Published on

LEED GA Exam Prep for Arizona State University

Published in: Real Estate
  • How To Make Every Day Your Perfect Day By Raising Your Vibration ●●● http://t.cn/AiuvUCDd
       Reply 
    Are you sure you want to  Yes  No
    Your message goes here
  • The #1 Woodworking Resource With Over 16,000 Plans, Download 50 FREE Plans...  http://tinyurl.com/y3hc8gpw
       Reply 
    Are you sure you want to  Yes  No
    Your message goes here
  • Hello! Get Your Professional Job-Winning Resume Here - Check our website! https://vk.cc/818RFv
       Reply 
    Are you sure you want to  Yes  No
    Your message goes here

LEED GA Exam Prep

  1. 1. LEED CASE STUDY & LEED GA EXAM PREP
  2. 2. 4 hours total AIA: 2 CEU’s Sustainable Design ASID and IIDA: .2 CEU’s USGBC Green Associate qualified WHAT TO EXPECT TODAY
  3. 3. 1. Share the LEED for Homes Experience – 2007 – THE START OF A LEED EDUCATION 2. CASE STUDY: Describe the LEED process, including lessons learned, rating system comparisons, green by LEED definition, trade-offs of material selection, recycling, the project costs, energy analysis, and tax benefits. 3. Explain the NAHB Green Rating System and the utilization of it. And, the Top 10 lists 4. LEED GA PREP: Define LEED and the USGBC and share the overview of the rating system COMING UP > Myths | Why did I remodel a LEED house? | MRED | Existing home – no tear down | Preserve exterior walls TODAY’S OVERVIEW
  4. 4. Mesa Verde, Colorado Settled 1400 years ago Continuously occupied for 700 years
  5. 5. THE LEED FOR HOMES EXPERINCE myths I heard
  6. 6. GREEN MYTHS GREEN IS TOO EXPENSIVE
  7. 7. GREEN MYTHS GREEN IS UGLY
  8. 8. GREEN MYTHS GREEN IS CONFUSING
  9. 9. GREEN MYTHS GREEN IS POLITICAL challenging finding a team – became the GC
  10. 10. LEED EXPERIENCE BEGINS MEDLOCK BEFORE naïve, first time
  11. 11. What Medlock is, and isn’t
  12. 12. MEDLOCK IS NOT Overview of LEED An Architectural Award Winner The Perfect Green Home
  13. 13. MEDLOCK IS The first LEED certified single-family remodel in Arizona The second LEED Gold certified single-family remodel in the U.S.
  14. 14. • A good case study for green remodeling • Well Planned Remodel • A project that preserved all exterior walls • An improvement to traditional building code and practice MEDLOCK IS
  15. 15. 1 = 1 pt - High albedo materials installed for at least 50% of the site’s hardscape POINT SYSTEM Inspiration, asu, etc
  16. 16. Conclusions: Remodel existing home, in the urban core & make it green. What is green? Need a rating system.
  17. 17. So, the LEED education begins…..
  18. 18. Single-Family Building Permits: Phoenix and Maricopa County Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec 2005 897 851 1239 1229 972 867 783 934 1028 754 774 1108 Maricopa 42727 2006 837 1239 925 632 1218 862 793 710 590 400 512 513 Maricopa 27812 2007 562 813 859 638 693 632 391 352 173 164 155 201 Maricopa 20183 2008 174 204 244 240 213 292 285 108 135 116 72 93 Maricopa 9643 2009 71 39 70 113 138 200 149 Maricopa 3728 131 107 128 100 90 2010 104 135
  19. 19. Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec 2005 76 193 253 207 208 226 198 206 207 175 156 156 Pima 11166 2006 148 148 190 147 196 186 136 140 113 103 96 93 Pima 8132 2007 107 104 140 163 170 159 136 125 88 96 70 64 Pima 4698 2008 62 64 72 62 64 65 54 46 42 37 24 23 Pima 2743 2009 20 21 28 37 40 48 Pima 384 Single-Family Building Permits: Tucson and Pima County
  20. 20. RESIDENTIAL PERMIT ACTIVITY ANNUAL RESIDENTIAL PERMIT ACTIVITY PHOENIX-MESA-SCOTTSDALE, AZ MSA SEPTEMBER 2009 0 10,000 20,000 30,000 40,000 50,000 60,000 70,000 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009est 2010prj 2011prj 2012prj 2013prj 2014prj Single Family Multi-Family 5-Year Forecast Annual Residential Permit Activity Phoenix – Mesa – Scottsdale, AZ MSA September 2009
  21. 21. SEPTEMBER 2005
  22. 22. Lessons learned JULY 2009
  23. 23. 1. Share the LEED for Homes Experience – 2007 – THE START OF A LEED EDUCATION 2. CASE STUDY: Describe the LEED process, including lessons learned, rating system comparisons, green by LEED definition, trade-offs of material selection, recycling, the project costs, energy analysis, and tax benefits. 3. Explain the NAHB Green Rating System and the utilization of it. And, the Top 10 lists 4. LEED GA PREP: Define LEED and the USGBC and share the overview of the rating system COMING UP > Myths | Why did I remodel a LEED house? | MRED | Existing home – no tear down | Preserve exterior walls TODAY’S OVERVIEW
  24. 24. Decisions Were Made with the Best Available Information at the Given Time LEED EXPERIENCE
  25. 25. WHAT I HAVE TO DO WHAT I WANT TO DO WHAT I CAN DO DECISION MAKING PROCESS
  26. 26. LEEDPREREQUISITES Innovation and Design (ID) 1.1 Preliminary Rating Innovation and Design (ID) 2.1 and 2.2 Durability Planning Durability Management Sustainable Sites (SS) 1.1 and 2.1 Erosion controls No invasive Plants Energy and Atmosphere (EA) 2.1, 3.1, 5.1, 6.1, 8.1, 11.1 Basic Insulation, Reduced Envelope Leakage, Good Windows, Reduced Distribution Losses, Good HVAC design, Energy Star Lights, Refrigerant Charge Test Materials and Resources (MR) 1.1, 2.1, 3.1 Framing Waste Factor, FSC Wood for EPP, Construction Waste Management Indoor Environmental Quality (EQ) 2.1, 4.1, 5.1, 6.1, 7.1, 9.1, 10.1 Basic Combusting Measures, Outdoor Air Ventilation, Local Exhaust, Manual J, Good filters, Radon- resistant, No HVAC in Garage Awareness and Education (AE) 1.1 Basic Operations Training WHAT I HAVE TO DO What I HAVE to do NAHB
  27. 27. WHAT I WANT TO DO
  28. 28. WHAT I WANT TO DO TANKLESS ELECTRIC Budget Time Durability
  29. 29. WHAT I WANT TO DO REFLECTIVE ROOF Resale Aesthetics
  30. 30. WHAT I WANT TO DO RAIN CAPTURE Budget Practicality
  31. 31. The water heater is responsible for 12% of the home’s energy consumption. If 10% of Arizona’s homes had solar hot water heaters, it would save enough energy to power more than 36,000 homes. aps.com WHAT I WANT TO DO SOLAR HOT WATER HEATER Budget Installation
  32. 32. WHAT I WANT TO DO PV SYSTEM Budget Existing design HOA
  33. 33. WHAT I WANT TO DO KITCHEN GARDEN
  34. 34. Dual flush toilets can save up to 67% of water compared to traditional toilets, which use 1.6 gallons per flush. WHAT I WANT TO DO LOW FLUSH TOILETS 1WE 3.1 =
  35. 35. WHAT I WANT TO DO NO VOC PAINTS
  36. 36. WHAT I WANT TO DO FOAM INSULATION Budget Installation
  37. 37. WHAT I WANT TO DO NEW HVAC Budget
  38. 38. WHAT I WANT TO DO NEW WINDOWS Budget City Codes
  39. 39. WHAT I WANT TO DO WIND ENERGY Budget Time HOA
  40. 40. WHAT I WANT TO DO ALL DEPENDS ON: In this lies… “what does green mean? –importance of rating system Who is the occupant? What is the budget? What is the time frame? Aesthetics? Environmental impact? Installation? Durability? Cool factor? City codes? New information or better knowledge Policy or government incentives
  41. 41. 1. Share the LEED for Homes Experience – 2007 – THE START OF A LEED EDUCATION 2. CASE STUDY: Describe the LEED process, including lessons learned, rating system comparisons, green by LEED definition, trade-offs of material selection, recycling, the project costs, energy analysis, and tax benefits. 3. Explain the NAHB Green Rating System and the utilization of it. And, the Top 10 lists 4. LEED GA PREP: Define LEED and the USGBC and share the overview of the rating system COMING UP > Myths | Why did I remodel a LEED house? | MRED | Existing home – no tear down | Preserve exterior walls TODAY’S OVERVIEW
  42. 42. WHAT DOES IT MEAN TO GO GREEN? 100 people = 100 answers I LEED & NAHB I Define LEED
  43. 43. IN SIMPLE TERMS: GREEN = REDUCING ENVIRONMENTAL IMPACT
  44. 44. LEED NAHB Scottsdale Green Building Energy Star Tucson: Regional Green Building TEP: Guarantee Home GREEN RATING SYSTEMS
  45. 45. Agency Cost Level Rating Type Tradeoffs Verify Medlock Provider LEED $525 $375 USGBC Members $4000 Consultation Certified Silver Gold Platinum Point System Organized by Environmental Impact Areas •Hi costs •Documentat ion •Not regional •Third-party inspected Blower Door Duct Test HERS Third-party LEED Gold Rich Franz- Ünder 520-740-6490 NAHB $500 $200 Members Consultation $450 *National Green Building Standard Bronze Silver Gold Morphing into ICC- 700, will include Emerald Point System Organized by Environmental Impact Areas •Less expensive than LEED •Code-able Third-party HERS Gold Hank Kryzsik 520.327.4846 Or Mick Dalrymple GREEN RATING SYSTEMS Means to an end ANSI approved ICC-700 2008 National Green Building Standard for residential construction.  The ICC-700 standard was developed by the National Association of Home Builders in partnership with the International Code Council
  46. 46. Agency Cost Level Rating Type Tradeoffs Verify Medlock Provider Scottsdale 0 Entry Advanced Point System Organized by Construction Categories •Regional •Expedite •Plan Review Plan Review Verified by Building Inspectors Advanced 480.312.4202 Energy Star Consultation $600 Energy Star Energy Star + IAP RESNET Standards •Limited HERS Rater HERS 55 602.532.2976 ext 3 Azhomeperforma nce.com Pima 0 Up to Emerald Launches August 5th Rich Franz- Ünder 520-740-6490 TEP No cost to the Builder – plan review to TEP specs Guaranteed Home Guaranteed •Only new construction Multiple inspections No remodels 520-623-7211 GREEN RATING SYSTEMS Since medlock is LEED lets talk in more detail
  47. 47. HIGHLIGHTS •Cut energy consumption by over 50% •Improved air quality by using low or no VOC materials •Located within close proximity of many local amenities •Minimum construction waste and preservation of all exterior walls •Designed to maximize livable area •Increased water efficiency using fixtures and native landscaping LEED What I walked away from the LEED-H remodel experience 3313 E MEDLOCK
  48. 48. Water Reuse: LEED as A Design Tool vs. LEED EXPERIENCE 1 4
  49. 49. • Most recognized green rating system • The Team Charette • An Improved Project Team • An excellent guide for a first timer • Management Plan • An improvement of traditional codes and practices WHY I’m Glad I Chose LEED 2 How does LEED define green? Environmental impact areas LEED EXPERIENCE
  50. 50. 1. Share the LEED for Homes Experience – 2007 – THE START OF A LEED EDUCATION 2. CASE STUDY: Describe the LEED process, including lessons learned, rating system comparisons, green by LEED definition, trade-offs of material selection, recycling, the project costs, energy analysis, and tax benefits. 3. Explain the NAHB Green Rating System and the utilization of it. And, the Top 10 lists 4. LEED GA PREP: Define LEED and the USGBC and share the overview of the rating system COMING UP > Myths | Why did I remodel a LEED house? | MRED | Existing home – no tear down | Preserve exterior walls TODAY’S OVERVIEW
  51. 51. Medlock’s Design: Defining a GREEN home • Efficiency: Water and Energy • IEQ • Location • Design – who is the Occupant? • Photo Tour DEFINING A GREEN HOME
  52. 52. GREEN: WATER EFFICIENCY & LANDSCAPE DESIGN DEFINING A GREEN HOME
  53. 53. Site Stewardship At least 40% of lot undisturbed. 1pt Landscaping Drought tolerant turf. Turf less than 20% of lot. Drought tolerant plants. 7pts Shading High-albedo used for at least 50% of site’s hardscape. 1pt Surface Water Management Professional design for erosion control. 6pts Irrigation Designed by licensed Professional. 4pts Central shut off. Time control for zones. Valves in heads inspected. 3pts Ar 22 DEFINING A GREEN HOME SITE STEWARDSHIP Landscaping
  54. 54. A front loading washer uses 22 gallons of water; a top loading washer uses 45 gallons. DEFINING A GREEN HOME WATER CONSERVATION 2EA 9.2 =
  55. 55. DEFINING A GREEN HOME ENERGY EFFICIENCY Acoustics Thermal Comfort 1 2 2 Air Infiltration MR 2.2 Emission EPP Enhanced Insulation
  56. 56. DEFINING A GREEN HOME ENERGY EFFICIENCY
  57. 57. DEFINING A GREEN HOME ENERGY EFFICIENCY 4 3rd Party Verified
  58. 58. DEFINING A GREEN HOME ENERGY EFFICIENCY Thermal imagery: MEDLOCK
  59. 59. DEFINING A GREEN HOME GREEN DESIGN The average single family home in the U.S. is 40% larger today than it was 30 years ago.
  60. 60. DEFINING A GREEN HOME GREEN DESIGN 5 4 bedrooms, 2140 sq ft
  61. 61. 10Site Selection Existing lot. 2 pts Preferred Location Infill and Previously Developed. 3pts Infrastructure Within ½ Mile of Water and Sewer Community Resources and Transit Within ½ mile of 14 Community Services. 3pts Access to Open Space Within ½ mile of Green Space. 1pt DEFINING A GREEN HOME LOCATION & LINKAGES
  62. 62. DEFINING A GREEN HOME GREEN DESIGN VISTANCIA TO DOWNTOWN PHX = 38 MILES ($40 RT)
  63. 63. Preserve all exterior walls Orientation DEFINING A GREEN HOME GREEN DESIGN
  64. 64. ORIGINAL FLYER FROM 1959 DEFINING A GREEN HOME Making the old new, photo tour
  65. 65. DEFINING A GREEN HOME GREEN DESIGN
  66. 66. DEFINING A GREEN HOME GREEN DESIGN NEW SEWER LINE | DURABILITY
  67. 67. DEFINING A GREEN HOME GREEN DESIGN Healthy Home Replaced Galvanized Line
  68. 68. 1
  69. 69. •Exterior wall shear non-wood •Joists spaced greater than 16” •Headers sized for actual loads •2-stud corners •Waste factor no more than 10% 3 DEFINING A GREEN HOME GREEN DESIGN
  70. 70. Where to put the kitchen? Support beam? Daylighting? DEFINING A GREEN HOME GREEN DESIGN
  71. 71. 2 DEFINING A GREEN HOME GREEN DESIGN
  72. 72. DEFINING A GREEN HOME GREEN DESIGN 4
  73. 73. 1. Share the LEED for Homes Experience – 2007 – THE START OF A LEED EDUCATION 2. CASE STUDY: Describe the LEED process, including lessons learned, rating system comparisons, green by LEED definition, trade-offs of material selection, recycling, the project costs, energy analysis, and tax benefits. 3. Explain the NAHB Green Rating System and the utilization of it. And, the Top 10 lists 4. LEED GA PREP: Define LEED and the USGBC and share the overview of the rating system COMING UP > Myths | Why did I remodel a LEED house? | MRED | Existing home – no tear down | Preserve exterior walls TODAY’S OVERVIEW
  74. 74. LEED EXPERIENCE RECYCLING 3
  75. 75. LEED EXPERIENCE RECYCLING
  76. 76. LEED EXPERIENCE RECYCLING 3
  77. 77. LEED EXPERIENCE REUSE & RECYCLING - Phoenix
  78. 78. LEED EXPERIENCE REUSE & RECYCLING - Tucson
  79. 79. 1. Share the LEED for Homes Experience – 2007 – THE START OF A LEED EDUCATION 2. CASE STUDY: Describe the LEED process, including lessons learned, rating system comparisons, green by LEED definition, trade-offs of material selection, recycling, the project costs, energy analysis, and tax benefits. 3. Explain the NAHB Green Rating System and the utilization of it. And, the Top 10 lists 4. LEED GA PREP: Define LEED and the USGBC and share the overview of the rating system COMING UP > Myths | Why did I remodel a LEED house? | MRED | Existing home – no tear down | Preserve exterior walls TODAY’S OVERVIEW
  80. 80. Decisions Were Made with the Best Available Information at the Given Time LEED EXPERIENCE MATERIAL SOURCING: STRATEGIES & DECISION MAKING
  81. 81. Credit Item Points Cost for Medlock Tradeoffs Payback EA 2.1 Basic Insulation Preq $3000 Less expensive Less efficient No additional points EA 2.2 Enhanced Insulation 2 $8500 Additional LEED points Efficiency Health acoustic 2 – 4 years EA 3.1 3.2 3,3 Air Infiltration Reduced Leakage Greatly Reduced Minimum 2 Planning +efficiency EA 5 Heating & Cooling 3 Planning +efficiency MR 2.2 EPP & Emissions .5 .5 no additional health 8 LEED EXPERIENCE EA 2: INSULATION
  82. 82. Credit Item Points Cost for Medlock Tradeoffs Payback Traditional EA 4.1 Good Windows <.40 Preq $4500 - $6500 EA 4.2 Enhanced Windows <.35 2 $5,500 - $7,500 2009 - $2500 vinyl, $4500 Premium Wood, $6,000 Custom Wood 18 months EA 4.3 Exceptional Windows <.30 3 $8,500 - $12,500 EA 6 Space Heating & Cooling 3 Design and Planning +efficiency 2+3 LEED EXPERIENCE EA 4: WINDOWS
  83. 83. LEED EXPERIENCE Credit Item Points Cost for Medlock Tradeoffs Payback Medlock Traditional HVAC – no design - $18000 Less efficiency EA 5.3 Minimal Distribution Losses Duct Tightness: Min Dist Losses <1 CFM per 100sf 3 Planning and Design +efficiency US Air Conditioning EA 6.1 EA 6.2 EA 6.3 GOOD – 13 SEER HIGH EFF – 14 SEER VERY HIGH 15 SEER Preq 2 points 4 points $10500 Manual J Programmable Thermostat Comfort Air quality 18 months 16 SEER US Air Cond EA 11 HVAC Refrigerant 1 Design and Planning environment US Air Conditioning 8 EA 5: DUCT TIGHTNESS / EA 6: SPACE HEATING & COOLING
  84. 84. Credit Item Points Cost for Medlock Tradeoffs Payback Medlock EA 10 (in 2007) Renewable Energy System 1-10 $60,000 (2007) 0 Points EA 10 (in 2009) Renewable Energy System 2009 10 $19,000 (2009 with rebates and credits) + Environmental: less CO emissions + value of home + LEED Platinum 6 years REC Solar LEED EXPERIENCE EA 5: DUCT TIGHTNESS / EA 6: SPACE HEATING & COOLING
  85. 85. LEED EXPERIENCE ENVIRONMENTALLY PREFERRED PRODUCTS MR 2.1 & 2.2 6-8
  86. 86. EPP .5 POINTS EMISSION SPECS .5 POINTS LOCAL PRODUCTION .5 POINTS Recycled, FSC certified, or Reclaimed. No added formaldehyde •Green Label + •100% hard flooring = auto .5 points •Paints and coatings = GS 11 •Finishes = SCAQM Manufactured within 500 miles of home COMPONENT MAX POINTS Flooring 2 pts Paints and coatings 1 pt Decking or patio 1 point Cabinets 1 point Counters 1 point Doors 1 point Trim 1 point LEED EXPERIENCE ENVIRONMENTALLY PREFERRED PRODUCTS (EPP) MR 2.1 & 2.2 South coast air quality management
  87. 87. Credit Item Points Cost for Medlock Tradeoffs Payback Traditional Carpet Padding and Carpet - .50 cents sf or $250 $2 sf or $1000 MR 2.2 Carpet Padding CRI + and Carpet .5 Emissions $1.20 sf or $600 $4 sf or $2000 health Health Traditional Traditional Bamboo - $1.95 sf or $3000 MR 2.2 Flooring: Bamboo .5 EPP $4.00 or $6000 More expensive Health LEED EXPERIENCE MR 2.2 SELECT ENVIRONMENTALLY PREFERABLE PRODUCTS FLOORING 1
  88. 88. Credit Item Points Cost for Medlock Tradeoffs Payback Traditional Paints and Coatings - $1080 (27 gallons) MR 2.2 Paints and Coatings .5 EPP –meets GS 43 .5 Emissions – GS 11 $1080 (27 gallons) Health Health LEED EXPERIENCE MR 2.2 SELECT ENVIRONMENTALLY PREFERABLE PRODUCTS PAINTS 1 Cost? Green more expensive? First review of MR 2.2
  89. 89. EPP .5 POINTS EMISSION SPECS .5 POINTS LOCAL PRODUCTION .5 POINTS Recycled, FSC certified, or Reclaimed. No added formaldehyde •Green Label + •100% hard flooring = auto .5 points •Paints and coatings = GS 11 •Finishes = SCAQM Manufactured within 500 miles of home COMPONENT MAX POINTS Flooring 2 pts Paints and coatings 1 pt Decking or patio 1 point Cabinets 1 point Counters 1 point Doors 1 point Trim 1 point LEED EXPERIENCE ENVIRONMENTALLY PREFERRED PRODUCTS (EPP) MR 2.1 & 2.2 Does it all make sense? Save energy?
  90. 90. 1. Share the LEED for Homes Experience – 2007 – THE START OF A LEED EDUCATION 2. CASE STUDY: Describe the LEED process, including lessons learned, rating system comparisons, green by LEED definition, trade-offs of material selection, recycling, the project costs, energy analysis, and tax benefits. 3. Explain the NAHB Green Rating System and the utilization of it. And, the Top 10 lists 4. LEED GA PREP: Define LEED and the USGBC and share the overview of the rating system COMING UP > Myths | Why did I remodel a LEED house? | MRED | Existing home – no tear down | Preserve exterior walls TODAY’S OVERVIEW
  91. 91. Traditional Green Tradeoffs Payback !0-year return Insulation $2,500 $8,500 3 years * Windows $4,500 $8,500 3-5 years * Framing $25,000 $22,000 HVAC $15,000 $8,500 immed * Landscape w/ hardscape $20,000 $45,000 LEED Landscape Design $1,000 $8,500 Recessed Lighting $100 $1500 * Bamboo Flooring $4,000 $8,000 health Countertops $13,000 $13,000 Cabinets $18,000 $22,000 Backsplash $1,800 $2,800 Toilets $900 $900 1 year LEED EXPERIENCE PRO FORMA ITEMS COMBINE FOR $30,000 ENERGY SAVINGS OVER 15 YEARS
  92. 92. Traditional Green Tradeoffs Payback !0-year return Third Party Test - $400 Electrical Upgrade $7,200 $7,200 New Plumbing and Sewer $10,500 $10,500 LEED Certification - $4,600 Fixtures $2,500 $2,500 * Sub-Total $190,000 $218,000 2009 Tax Credits -$5,575 15-year energy savings -$30,000 TOTAL $190,000 $182,425 PROVE $30,000 IN ENERGY SAVINGS LEED EXPERIENCE PRO FORMA
  93. 93. 1. Share the LEED for Homes Experience – 2007 – THE START OF A LEED EDUCATION 2. CASE STUDY: Describe the LEED process, including lessons learned, rating system comparisons, green by LEED definition, trade-offs of material selection, recycling, the project costs, energy analysis, and tax benefits. 3. Explain the NAHB Green Rating System and the utilization of it. And, the Top 10 lists 4. LEED GA PREP: Define LEED and the USGBC and share the overview of the rating system COMING UP > Myths | Why did I remodel a LEED house? | MRED | Existing home – no tear down | Preserve exterior walls TODAY’S OVERVIEW
  94. 94. LEED EXPERIENCE ENERGY ANALYSIS 3313 E MEDLOCK COMPARED TO 3307 & 3319 E MEDLOCK 3 things used for analysis; SRP; Energy 10; Energy Star
  95. 95. LEED EXPERIENCE THE CLAIM
  96. 96. LEED EXPERIENCE ENERGY 10: MEDLOCK Explain Energy 10 Medlock uses 53.09% LESS energy than average Valley home
  97. 97. 3319 33073313 LEED EXPERIENCE COMPARED TO NEIGHBORS COMPARED TO NEIGHBORS NEIGHBOR ‘MEDLOCK’ NEIGHBOR
  98. 98. Sq ft 1400 Occupants 2 Remodeled never NEIGHBOR: 3319 E MEDLOCK
  99. 99. Sq ft 1700 Occupants 1 Remodeled 2007 NEIGHBOR: 3307 E MEDLOCK
  100. 100. Sq ft 2150 Occupants 1 Remodeled 2007 GREEN STREET HOME: 3313 E MEDLOCK
  101. 101. 3307 3313 3319 August $158 vs. $308 $195 $132 vs. $302 Medlock 49% less 56% less Energy 10 53% less August 2008: Medlock versus 3307 and 3319 3307 and 3319 rate if as efficient as Medlock LEED EXPERIENCE ENERGY ANALYSIS 3313 E MEDLOCK COMPARED TO 3307 & 3319 E MEDLOCK
  102. 102. LEED EXPERIENCE ENERGY ANALYSIS 3313 E MEDLOCK COMPARED TO 3307 & 3319 E MEDLOCK 3319 E MEDLOCK
  103. 103. LEED EXPERIENCE ENERGY ANALYSIS 3313 E MEDLOCK COMPARED TO 3307 & 3319 E MEDLOCK 3313 E MEDLOCK
  104. 104. Time to test the market - April 2008
  105. 105. LEED EXPERIENCE MARKET CRASHES IN PHOENIX APRIL 2008
  106. 106. 10 MINUTE BREAK Incentives and NAHB
  107. 107. 1. Share the LEED for Homes Experience – 2007 – THE START OF A LEED EDUCATION 2. CASE STUDY: Describe the LEED process, including lessons learned, rating system comparisons, green by LEED definition, trade-offs of material selection, recycling, the project costs, energy analysis, and tax benefits. 3. Explain the NAHB Green Rating System and the utilization of it. And, the Top 10 lists 4. LEED GA PREP: Define LEED and the USGBC and share the overview of the rating system COMING UP > Myths | Why did I remodel a LEED house? | MRED | Existing home – no tear down | Preserve exterior walls TODAY’S OVERVIEW
  108. 108. Vendor/ Manufacturer FEDERAL STATE APS SRP TOTAL HVAC York $1500 rebate Tax credit 30% Includes labor - SEER 13 $175 SEER 14 – 16 $425 SEER 17 $525 SEER 15 $200 SEER 16 $300 SEER 17 $400 $3525 INSULATION 30% of cost Includes Labor ($1500 total home) $1500 WINDOWS (skylights) Manufacturer 30% Not including labor Less than .30 U Factor $2250 DUCTS TEST .75 x cost of repair, up to $75 $75 DUCTS REPAIR .75 x cost of repair up to $175 $175 Water Heaters SW Gas $75 30% tax credit SOLAR HOT WATER HEATER 30% tax credit, no maximum 25% of the cost up to $1000 $.75/kWh of estimated first year savings up to 50% of system cost Utility Rebate $.50/kWh of installed kWh $3800 - $4000 HOME SELLER selling energy efficient home Personal Deduction 5% of sales price, up to 5k $5000 LEED EXPERIENCE TAX CREDITS & REBATES Discuss handouts I Energy efficient – state stimulus
  109. 109. LEED EXPERIENCE TAX CREDITS & REBATES
  110. 110. LEED EXPERIENCE TAX CREDITS & REBATES
  111. 111. 1. Share the LEED for Homes Experience – 2007 – THE START OF A LEED EDUCATION 2. CASE STUDY: Describe the LEED process, including lessons learned, rating system comparisons, green by LEED definition, trade-offs of material selection, recycling, the project costs, energy analysis, and tax benefits. 3. Explain the NAHB Green Rating System and the utilization of it. And, the Top 10 lists 4. LEED GA PREP: Define LEED and the USGBC and share the overview of the rating system COMING UP > Myths | Why did I remodel a LEED house? | MRED | Existing home – no tear down | Preserve exterior walls TODAY’S OVERVIEW
  112. 112. NAHB RATING SYSTEM Green Street Homes: Crisis leads to Opportunity
  113. 113. NAHB RATING SYSTEM •Located within ¼ mile of Light Rail •The greenest building is the existing one •Green-certified, verified, recognized •Affordable- priced at or below market •Energy Rated GREEN STREET HOMES
  114. 114. Practical Simple Recognized Non-document intensive Easy to understand for trades Third-party verified NAHB RATING SYSTEM NEEDED A RATING SYSTEM THAT WAS:
  115. 115. Water Heater not in conditioned space unless in separate room with outdoor air source Wall-to-wall carpeting is not installed adjacent to water closets or bathing fixtures All bathrooms are vented to outdoors at least 50 cfm Clothes dryer is vented to the outdoors. Kitchen exhaust at least 400 cfm Existing unsealed combustion gas dryer is sealed with sealed exhaust vent NAHB RATING SYSTEM PRE-1980 HAVE-TO’S:
  116. 116. Bronze – 20% Silver – 34% Gold – 43% Emerald – 50% NAHB RATING SYSTEM NGBS RATING LEVELS ANSI approved ICC-700 2008 National Green Building Standard for residential construction.  The ICC-700 standard was developed by the National Association of Home Builders in partnership with the International Code Council
  117. 117. GREEN STREET HOMES
  118. 118. 150 W ELM EMERALD CERTIFIED
  119. 119. BEFORE
  120. 120. AFTER
  121. 121. BEFORE
  122. 122. AFTER
  123. 123. BEFORE
  124. 124. AFTER
  125. 125. BEFORE
  126. 126. AFTER
  127. 127. BEFORE
  128. 128. AFTER
  129. 129. AFTER
  130. 130. AFTER
  131. 131. 150 W Elm – Before & After Pre HERS 208 Post HERS 79 Annual Savings $1200 Water Savings 62% Purchase Price 90k Improvement Cost 70k Sales Price 240k WORKSHOP OVERVIEW
  132. 132. New HVAC $6500 New Windows and Doors $13500 Foam Insulation $1500 Landscape and Hardscape $11,500 New roof $5500 Paint, interior and exterior $6500 Sub-total $41,500 WORKSHOP OVERVIE 150 W Elm – IMPROVEMENTS & BUDGET
  133. 133. 1818 W TURNEY – EMERALD CERTIFIED WORKSHOP OVERVIEW BEFOREAFTER
  134. 134. Pre HERS 284 Post HERS 76 Annual Savings $2000 Water Savings 72% Purchase Price 39k Improvement Cost 42k Sales Price 119k 1818 W TURNEY – Before & After GREEN STREET HOMES
  135. 135. IMPROVEMENTS AND BUDGET New HVAC $5400 New Windows and Doors $3500 Landscaping $6500 Insulation $1600 Appliances $2500 Sub-total $19,500 GREEN STREET HOMES 1818 W TURNEY – IMPROVEMENTS & BUDGET
  136. 136. 5626 N 20TH DRIVE – BRONZE CERTIFIED GREEN STREET HOMES BEFOREAFTER
  137. 137. 5626 N 20th Dr – before/after Pre HERS 195 Post HERS 120 Annual Savings $650 Water Savings 40% Purchase Price 47k Improvement Cost 31k Sales Price 124k 1818 W TURNEY – Before & After GREEN STREET HOMES
  138. 138. IMPROVEMENTS AND BUDGET Tune up HVAC and tighten ducts $1300 New appliances $2600 Caulk windows and weather stripping $250 New water heater $400 Cellulose Insulation $400 CFL’s $50 Sub-total $5000 GREEN STREET HOMES IMPROVEMENTS & BUDGET
  139. 139. 319 W VIRGINIA – GOLD CERTIFIED GREEN STREET HOMES BEFORE
  140. 140. 319 W Virginia – before/after Pre HERS 194 Post HERS 122 (37% improve) Annual Savings $900 Water Savings 40% Purchase Price 178k Improvement Cost 90k Sales Price 409k 319 W VIRGINIA – Before & After GREEN STREET HOMES
  141. 141. IMPROVEMENTS AND BUDGET Foam Insulation $4000 Solar Water Heater $6500 (before incentives) Caulk windows and weather strip $300 CFL’s $50 Landscape $3700 Water Sense Fixtures and Toilets $1500 Sub-total $16050 GREEN STREET HOMES 319 W VIRGINIA – IMPROVEMENTS & BUDGET
  142. 142. RESIDENTIAL PERMIT ACTIVITY ANNUAL RESIDENTIAL PERMIT ACTIVITY PHOENIX-MESA-SCOTTSDALE, AZ MSA SEPTEMBER 2009 0 10,000 20,000 30,000 40,000 50,000 60,000 70,000 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009est 2010prj 2011prj 2012prj 2013prj 2014prj Single Family Multi-Family 5-Year Forecast Annual Residential Permit Activity Phoenix – Mesa – Scottsdale, AZ MSA September 2009
  143. 143. 1. Share the LEED for Homes Experience – 2007 – A GREEN REMODEL EDUCATION 2. Lessons learned, the need for a Rating System, Green by Definition, Material Selection, Recycling, The Cost, A LEED Case Study 3. Tax Credits, Rebates, and Stimulus Funds 4. Explain the NAHB Green Rating System 5. Putting the NAHB Green Rating System to Practice 6. TOP 10 List – low budget or open budget 7. Q & A: Expert Panel WORKSHOP OVERVIEW
  144. 144. 1. Test ducts for tightness, and sealing of leaks. 2. Professional HVAC service, and install of programmable thermostat 3. Caulking of and leaks in the building envelope, including windows and doors 4. The use of a recycle bin in the kitchen. 5. Replacement of incandescent lighting with cfl’s 6. The use of household cleaners that do not contain toxic chemicals. Homemade cleaners are best, using items such as vinegar, baking soda, and tea tree oil. And, the elimination of all chemical air fresheners. 7. The use of shading via plants or screens on walls or windows with high sun exposure. 8. The installation of daylighting in dark areas of your home to reduce the need for lights and to improve mental health 9. Upgrade insulation to a higher R value 10. Installation of highly reflective window film TOP TEN LOW BUDGET GREEN HOME IMPROVEMENTS:
  145. 145. 1. Foam insulation in the lid of the roof 2. New windows 3. New HVAC (always windows before HVAC, and Manual J required before determining size of unit) 4. Solar Hot water heater (current incentives and rebates results in a $1500 net cost to homeowner) 5. Front loading clothes washer, will reduce water usage by more than 60% compared to a top loading washers) 6. Native landscaping along with an irrigation system, and turf reduction 7. Consideration of low environmental impact materials when selecting new cabinets, flooring, countertops, or paint. 8. A rain capture system, and consideration to low flush toilets and Water Sense labeled fixtures 9. A Photovoltaic system once doing all the above building envelope improvements, which will reduce the size of the PV system needed 10. Get your project LEED or NAHB certified TOP TEN MEDIUM TO HIGH BUDGET GREEN HOME IMPROVEMENTS:
  146. 146. 1. Share the LEED for Homes Experience – 2007 – THE START OF A LEED EDUCATION 2. CASE STUDY: Describe the LEED process, including lessons learned, rating system comparisons, green by LEED definition, trade-offs of material selection, recycling, the project costs, energy analysis, and tax benefits. 3. Explain the NAHB Green Rating System and the utilization of it. And, the Top 10 lists 4. LEED GA PREP: Define LEED and the USGBC and share the overview of the rating system COMING UP > Myths | Why did I remodel a LEED house? | MRED | Existing home – no tear down | Preserve exterior walls TODAY’S OVERVIEW
  147. 147. greenstreetdev.com 602.466.7444 LEED GA
  148. 148. Why Build Green?
  149. 149. IN SIMPLE TERMS: GREEN = REDUCING ENVIRONMENTAL IMPACT
  150. 150. Conventional Building Process vs Integrative Design Process
  151. 151. To be eligible for the LEED Green Associate credential, you must have previous experience supporting a project registered for LEED certification, working in a sustainable field of work, or attending an education program that addresses green building principles. Only one of these criteria is required to be met to demonstrate eligibility. The LEED Green Associate exam is a 2-hour exam. The LEED Green Associate exam is neither a prerequisite nor an eligibility requirement for the LEED AP or any other GBCI exam.
  152. 152. To be eligible for the LEED AP credential, you must have previous experience with a project registered for LEED certification within three years of your application submittal date. This work experience must be documented in the form of a letter of attestation from a supervisor, client, or project manager and must describe your involvement on the LEED Project as a consultant, contracted worker, member of the LEED project team, LEED Homes Provider, LEED Reviewer, LEED for Homes Green Rater, or staff member of a Certifying Body (CB). The LEED AP is a 4-hour exam comprised of two parts: the LEED Green Associate and LEED AP specialty exams. (If you are enrolling or currently hold an active LEED Green Associate or LEED AP credential, you are exempt from the first part.) If you wish to take the exam in two 2-hour sessions, you may first apply for and earn the LEED Green Associate and then apply for the LEED AP including demonstrating eligibility and paying the applicable fees.
  153. 153. USGBC: U.S. Green Building Council LEED: Leadership in Energy and Environmental Design LEED OVERVIEW
  154. 154. LEED OVERVIEW
  155. 155. Not “LEEDS” LEED OVERVIEW LEED CERTIFIED LEED ACCREDITED PROFESSIONAL
  156. 156. LEED ACCREDITED PROFFESIONALS aka LEED APs go to: www.gbci.org www.usgbc.org LEED OVERVIEW BEFORE CI NC EB NOW ID + C BD + C EB & OM H ND NEW: Green Associate NEW: LEED Fellow ID – Interior Design BD – Building Design C – Construction OM – Operations and Maintenance
  157. 157. ID – Interior Design BD – Building Design C – Construction OM – Operations and Maintenance NOW ID + C BD + C EB & OM H ND NEW: Green Associate NEW: LEED Fellow Buildings? I Certificate LEED OVERVIEW
  158. 158. • LEED for New Construction • LEED for Existing Buildings (O&M) • LEED for Commercial Interiors • LEED for Schools • LEED for Core and Shell • LEED for Retail • LEED for Healthcare • LEED for Neighborhood Development • LEED for Homes LEED RATING SYSTEMS
  159. 159. •A “cool roof” system •Consumes 40% less water •Geothermal heat pump system •Heating costs are reduced by between 30-70% •Local industry and businesses were supported by the use of regional materials LEED Charlottesville Transit Center – NC Gold
  160. 160. •Diverting more than 80% of on-site construction wasteDiverting more than 80% of on-site construction waste •Using green housekeeping productsUsing green housekeeping products •Making daylight and window views available to more than 90% of occupantsMaking daylight and window views available to more than 90% of occupants •Providing centrally located recycling collection areasProviding centrally located recycling collection areas •Retrofitting plumbing fixtures to increase water efficiencyRetrofitting plumbing fixtures to increase water efficiency LEED Kimball Office Headquarters – CI Silver
  161. 161. •The process entailed 45 projects, including upgrading building control systems, retrofitting lighting, and adding motion sensors.  •The designation culminates a five-year, $1.1 million campaign to maximize the sustainability and energy efficiency of the building, which opened in 1996.  •Electricity consumption has been reduced by 35 percent; irrigation water use has decreased by 75 percent. LEED Adobe Corporate Offices – EB Platinum
  162. 162. TRENDS IN LEED DEVELOPMENT
  163. 163. 10 MINUTE BREAK Incentives and NAHB
  164. 164. http://www.greenbuildingpages.com/links/weblinks_LEED.html GSA Requires all building projects starting design in 2003 meet LEED certified level standards with a target of LEED Silver. Arizona Currently requiring LEED Silver on all state- funded buildings and requires incorporation of renewable energy. California Executive Order #S-20-04 requires all new and renovated state-owned facilities to be LEED Silver Los Angeles Requires LEED Certification of all public works construction projects over 7,500 gsf. Georgia Tech requires LEED Gold for all new buildings and renovations ASU all new buildings must be LEED
  165. 165. In the District, every new or substantially renovated nonresidential privately owned building with at least 50,000 square feet of gross floor area must submit a green building checklist with its application for a building permit. Beginning Jan. 1, 2012, every new nonresidential building, regardless of size, must be LEED certified. In Montgomery County, every new or extensively modified commercial or multifamily residential building with at least 10,000 square feet of gross floor area must be LEED certified.
  166. 166. HOME STAR
  167. 167. Green Building: Washington Bill Requires LEED Certification For Sales and Use Tax Deferral                      A bill was introduced in the Washington State Legislature yesterday that will require LEED certification for sales and use tax deferral on select construction projects. If this bill (SB 6598) becomes law, projects will have to achieve a certain level of LEED certification to qualify for deferral of sales and use tax on materials and other components of the work. The higher the project's LEED certification, the greater the amount of sales and use tax that's deferred. This chart identifies the percentage of sales and use tax each level of certification will deliver: LEED Certification Level Percentage of Sales and Use Tax Deferred Platinum 100% Gold 75% Silver 50% Less Than Silver 25%
  168. 168. QUESTIONS: USGBC The installation of low-flow faucet aerators at hand washing stations will result in which two of the following? a) Reduced hours of occupancy b) Reduced energy use c) Reduced water use d) Increased occupant productivity e) Reduced storm water runoff Credit weightings are based on _____? a) Relative costs and benefits of each credit b) Environmental impacts and human benefits c) Carbon footprint and embodied energy d) Expected environmental performance
  169. 169. DEFINING GREEN or LEED
  170. 170. Defining a GREEN home • Efficiency: Water and Energy • IEQ • Location • Design – who is the Occupant? • Photo Tour DEFINING A GREEN HOME
  171. 171. • Sustainable Sites • Water Efficiency • Energy & Atmosphere • Materials and Resources • Indoor Environmental Quality • Innovation and Design LEED CATEGORIES
  172. 172. Sustainable Sites • Transportation • Site selection • Site design and management • Stormwater management
  173. 173. 10Site Selection Existing lot. 2 pts Preferred Location Infill and Previously Developed. 3pts Infrastructure Within ½ Mile of Water and Sewer Community Resources and Transit Within ½ mile of 14 Community Services. 3pts Access to Open Space Within ½ mile of Green Space. 1pt DEFINING A GREEN HOME LOCATION & LINKAGES
  174. 174. Site Stewardship At least 40% of lot undisturbed. 1pt Landscaping Drought tolerant turf. Turf less than 20% of lot. Drought tolerant plants. 7pts Shading High-albedo used for at least 50% of site’s hardscape. 1pt Surface Water Management Professional design for erosion control. 6pts Irrigation Designed by licensed Professional. 4pts Central shut off. Time control for zones. Valves in heads inspected. 3pts Ar 22 DEFINING A GREEN HOME SITE STEWARDSHIP Landscaping
  175. 175. DEFINING A GREEN HOME GREEN DESIGN 5 4 bedrooms, 2140 sq ft
  176. 176. QUESTIONS: Sustainable Sites A project that specifies exterior surfaces with high solar reflectance index (SRI) values is contributing to which environmental benefit? a) Reduced heat island effect b) Support for renewable energy c) Protection of the dark-sky initiative d) Improved stormwater quality Prior to the final selection of the project site, the owner and the design team should confirm that the site is_____? a) Compliant with the green design criteria b) Compliant with the sustainable building codes c) Previously undeveloped d) Removed from other development
  177. 177. Water Efficiency • Indoor water • Irrigation water • Process water
  178. 178. A front loading washer uses 22 gallons of water; a top loading washer uses 45 gallons. DEFINING A GREEN HOME WATER CONSERVATION 2EA 9.2 =
  179. 179. QUESTIONS: Water Efficiency What is the baseline water use for water closets? a) 0.8 gallons per flush b) 1.0 gallons per flush c) 1.6 gallons per flush d) 3.2 gallons per flush What is the primary standard used to establish the baseline case for indoor water use? a) The Clean Water Act b) Energy Policy Act of 1992 c) ASHRAE Standard 90.1 d) National Environmental Policy Act
  180. 180. Energy and Atmosphere • Energy demand • Energy efficiency • Renewable energy • Ongoing energy performance
  181. 181. DEFINING A GREEN HOME ENERGY EFFICIENCY
  182. 182. DEFINING A GREEN HOME ENERGY EFFICIENCY 4
  183. 183. QUESTIONS: Energy and Atmosphere What is the first step a project team should consider when trying to save energy? a) Use on-site renewable energy b) Reduce energy demand c) Adopt energy efficient measures d) Install submetering equipment One of the most cost-effective ways to ensure optimal ongoing energy performance is to _______? a) Commission building systems b) Upgrade mechanical systems c) Install renewable energy systems d) Maintain trees and landscaping features
  184. 184. Materials and Resources • Selection of sustainable materials (life-cycle impacts) • Waste management
  185. 185. WHAT I WANT TO DO NO VOC PAINTS
  186. 186. Credit Item Points Cost for Medlock Tradeoffs Payback Traditional Carpet Padding and Carpet - .50 cents sf or $250 $2 sf or $1000 MR 2.2 Carpet Padding CRI + and Carpet .5 Emissions $1.20 sf or $600 $4 sf or $2000 health Health Traditional Traditional Bamboo - $1.95 sf or $3000 MR 2.2 Flooring: Bamboo .5 EPP $4.00 or $6000 More expensive Health LEED EXPERIENCE MR 2.2 SELECT ENVIRONMENTALLY PREFERABLE PRODUCTS FLOORING 1
  187. 187. LEED EXPERIENCE RECYCLING 3
  188. 188. LEED EXPERIENCE RECYCLING 3
  189. 189. QUESTIONS: Materials and Resources LEED defines regional materials as originating within________? a) 50 miles of the project site b) 250 miles of the project site c) 500 miles of the project site d) 750 miles of the project site What is the first step in a successful waste management policy? a) Recycle all possible construction materials b) Reuse existing materials c) Reduce the total quantity of waste d) Specify recyclable materials e) Determine the embodied energy of the product
  190. 190. Indoor Environmental Quality • Indoor air quality • Thermal comfort • Lighting • Acoustics
  191. 191. 1
  192. 192. Indoor Environmental Quality: Air Quality
  193. 193. acoustics
  194. 194. Daylighting
  195. 195. QUESTIONS: Indoor Environmental Quality The abbreviation VOC refers to? a) Volatile Organic Compounds b) Volatile Operating Conditions c) Variable Ozone Contaminants d) Versatile Organized Composites According to the Environmental Protection Agency, what percentage of time do Americans spend indoors? a) 75% b) 65% c) 90% d) 50%
  196. 196. INNOVATION IN DESIGN •Innovation in Design •Exemplary Performance
  197. 197. Innovation in Design WIND ENERGY
  198. 198. TAKING THE LEED GA TEST GBCI.ORG
  199. 199. greenstreetdev.com 602.466.7444 THANK YOU
  200. 200. April 6th , Tucson May 6th , Jacksonville, FL May 14th , Flagstaff May 17th , Charlotte, NC May 20th , Phoenix UPCOMING WORKSHOPS

×