Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.

Team 5 mep presentation

1,429 views

Published on

Published in: News & Politics, Business
  • Be the first to comment

  • Be the first to like this

Team 5 mep presentation

  1. 1. 57 Quayside Team 5 Andrew Tann, Amelia Mei Yen Tan, Mohammed Bari
  2. 2. Contents • Introduction • brief, client, site • Data Acquisition • city model, point cloud • Design Development • architectural, structural • Next... • MEP, Navisworks
  3. 3. Introduction brief, client, site
  4. 4. Brief • “...appointed to design a new office specifically tailored to legal firms and legal training...”
  5. 5. Client • Office spaces • Archive room • Meeting/board rooms • Break-out spaces • Moot room • Kitchenette/coffee points • WCs • Accessible lift • Storage room • Cleaners store • Central reception with guest waiting area
  6. 6. Rev. Amendment 1 Issued for Planning Date 24/09/2013 25 81 81 23 to 9 17 E AR CH 11 10 11 1 o1 8t AD O BR 19 16 to 12 21 81 10 o7 4t to 7 6 3 5 8 7 o4 1t 7 81 77 o3 1t 79 65 2 63 57 39 31 25 27 600 B1 E SID AY QU ER RIV NE TY Existing Site Plan 1 : 200 Status North Planning Project 57 Quayside Drawing Existing Site Plan Project No. 01234 Scale at A1 1 : 200 Dwg. No. Drawn A(00)EXP002 AMYT/MAB Checked Team 5 Rev. 1 Date 09/12/13 this drawing is copyright - check all dimensions on site - inform architect / so of any discrepancies - work to figured dimensions only - do not scale
  7. 7. Constraints • Adjacent buildings • Car park • Footpath • River Tyne
  8. 8. Data Acquisition city model, point cloud data
  9. 9. City Model
  10. 10. Point Cloud Data
  11. 11. Design Development architectural, structural
  12. 12. Precedence ...a lot of it...
  13. 13. MyZeil Shopping Mall / Studio Fuksas
  14. 14. Flashback: Sendai Mediatheque / Toyo Ito
  15. 15. BPGM Law Office / FGMF Arquitetos
  16. 16. The ICRAVE Studio / ICRAVE
  17. 17. Architecture go nuts...
  18. 18. Structure ...bring it back
  19. 19. MEP Air, AC, Power, Data, Lighting
  20. 20. • “holistically review integrated models and data with stakeholders to gain better control over project outcomes” Navisworks 2013
  21. 21. Thanks Team 5 Andrew Tann, Amelia Mei Yen Tan, Mohammed Bari

×