Briggs Group Presentation

472 views

Published on

The Briggs Group Presentation 2011

0 Comments
1 Like
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total views
472
On SlideShare
0
From Embeds
0
Number of Embeds
14
Actions
Shares
0
Downloads
7
Comments
0
Likes
1
Embeds 0
No embeds

No notes for slide

Briggs Group Presentation

  1. 1. BRIGGS GROUP PRESENTATION<br />Briggs Marine & Environmental Services<br />The Briggs Group Presentation2011<br />
  2. 2. The Briggs Group<br />Our Services<br />With over 40 years experience, the Briggs Group has<br />grown to become market leaders in Marine &<br />Environmental Services with a strong reputation in:<br /><ul><li> Renewable Energy Services
  3. 3. Vessel Hire
  4. 4. Submarine Cable Repair & Installation
  5. 5. Marine Civil Engineering
  6. 6. Marine Salvage Services
  7. 7. Moorings & Aids to Navigation
  8. 8. Environmental : Consultancy, Training & Pollution Response
  9. 9. Oil & Gas Terminal Operations</li></li></ul><li>Project Experience<br />Offshore Wind<br />5<br />4<br />1<br />11<br />2<br />6<br />8<br />9<br />10<br />7<br />3<br />
  10. 10. Project Experience<br />Wave & Tidal<br />5<br />4<br />1<br />2<br />6<br />3<br />
  11. 11. A Selection of our Fleet<br />Vessel Hire<br />Forth Jouster<br />Kingdom of Fife<br />Cameron<br />Forth Hunter<br />Forth Guardsman<br />Forth Constructor<br />
  12. 12. Environment Agency<br />Coastal Survey Vessels<br />CSV - New Build<br />Length18.0m<br />Beam6.0m<br />Draft1.15m<br />Crew 3<br />Passengers 10<br />
  13. 13. Repair, Maintenance & Installation<br />Submarine Cables<br /><ul><li> Project Management
  14. 14. Installation
  15. 15. Shore-end Installation
  16. 16. Maintenance
  17. 17. Repair
  18. 18. PLGR
  19. 19. Planning
  20. 20. Permitting
  21. 21. Route Engineering
  22. 22. Cable Recovery
  23. 23. Cable Storage Facilities</li></li></ul><li>Our Services & Case Study<br />Marine Salvage Services<br />Hot Tapping, HMS Royal Oak Project Description:<br />The equipment to extract oil was designed and manufactured by Briggs. Based on Hot Tapping technology and techniques, a 2000 bar Zone II diesel-driven jetting unit, complete with standard abrasive water-cutting equipment; allows its <br />specialist <br />operators <br />to cut into <br />the hull of <br />vessels and <br />remove<br />furnace oil <br />from the <br />bunker <br />tanks.<br /><ul><li> Towage
  24. 24. Wreck Intervention & Removal
  25. 25. Legacy Wreck Management
  26. 26. Emergency Salvage Response
  27. 27. Port Clearance
  28. 28. Subsea Operations </li></li></ul><li>Installation & Maintenance<br />Aids to Navigation<br /><ul><li> Purpose built buoy storage facility
  29. 29. Maintenance
  30. 30. Refurbishment
  31. 31. Emergency Relights & Repositioning
  32. 32. Provision of Materials
  33. 33. Vessel Hire
  34. 34. Ultra high pressure water blasting bay
  35. 35. HGV with 65 TM hi-ab crane</li></ul>24,000m² External Storage Yard<br />3,600m² Covered Storage<br />
  36. 36. Our Services<br />Marine Civil Engineering<br /><ul><li> Project Management
  37. 37. Marine & Underwater Construction
  38. 38. All types of Seabed Foundations
  39. 39. Sea Defence
  40. 40. Demolition & Mechanical Deconstruction
  41. 41. Risk Management
  42. 42. Design & Construct
  43. 43. Project Implementation
  44. 44. Value & Option Engineering</li></li></ul><li>Our Services<br />Environmental Consultancy & Pollution Response<br /><ul><li> Environmental Impact Assessments
  45. 45. Consents / Licensing
  46. 46. Contingency Planning
  47. 47. Desk Studies
  48. 48. Waste Management
  49. 49. GIS Mapping
  50. 50. Oil Spill Response (OSR)
  51. 51. Training
  52. 52. Risk Assessment / Audits
  53. 53. Contaminated Land
  54. 54. Maintenance
  55. 55. Pollution Response Equipment </li></li></ul><li>Complete Management<br />Oil & Gas Terminal Operations<br /><ul><li> Pre-Arrival Activities
  56. 56. Co-ordination of Services
  57. 57. Berthing
  58. 58. Ship to Shore Interface
  59. 59. Operations
  60. 60. Maintenance, Electrical & Mechanical
  61. 61. Storage Operations
  62. 62. Documentation & Administration
  63. 63. Tank Cleaning
  64. 64. Product Loading
  65. 65. Security </li></li></ul><li>The Briggs Group<br />Key Successes<br /><ul><li> FPMS - 15 year contract - awarded December 2007
  66. 66. Forth Ports & Peel Ports – Aids to Navigation contracts
  67. 67. OGTO - Coryton and Immingham – both renewed for further 3 years
  68. 68. BP Fuel and Logistics (8 terminals) – awarded December 2009
  69. 69. Environment Agency – 15 year contract – awarded May 2010
  70. 70. Esso Fawley Marine Terminal – 5 year contract – awarded June 2010
  71. 71. 7 year extension to SSE Framework Agreement</li>

×