Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.

Cecomp presentazione azienda

789 views

Published on

Presentazione CECOMP

Published in: Education
  • Be the first to comment

  • Be the first to like this

Cecomp presentazione azienda

  1. 1. 30 / 11 / 2012 “Give shape to ideas that drive the world” CENTER OF EXPERIMENTAL CONSTRUCTION OF MODELS AND PROTOTYPES COMPANY OVERVIEW
  2. 2. 30 / 11 / 2012 CENTER OF EXPERIMENTAL CONSTRUCTION OF MODELS AND PROTOTYPES Founded in 1978 by Giovanni Forneris – who was trained at the Fiat’s Styling Centre and with the most prestigious designers and body-makers in Turin, including Mr. Michelotti and Mr. Giugiaro – the company has been working, since the beginning, to harmonize two key factors of the industrial culture in Piedmont: artisanal care to quality and details and technology innovation. Over the years CECOMP has been gradually growing, based on both the continuous investments in new technology/ infrastructure and the extension of its product/service range. More recently the two sons of Giovanni got gradually the operative reins of the company: Gianluca, in charge of technical/commercial activities, and Paolo, responsible of the financial/administrative issues. The founder is still at the top, in the role of president. Nowadays CECOMP, as part of the ANFIA (Italian Association of the Automotive Industry), gives shape to ideas developed by designers, style centres, R&D departments of vehicle’s OEMs around the world. It performs all types of activities at style development phase, prototype stage, industrialization, as well as "turnkey" projects, up to the small-series production & supply of complete vehicles. 2 BACKGROUND
  3. 3. 30 / 11 / 2012 CENTER OF EXPERIMENTAL CONSTRUCTION OF MODELS AND PROTOTYPES 3 CAS/CAD/CAD/CAM N.C. MILLING STYLE MODELING PAINTING & FINISHING TOOLING HAMMER FORMING SHEET METAL STAMPING RESIN MOLDING METROLOGY ASSEMBLING PROTOTYPES & SPECIAL VEHICLES ELECTRIC VEHICLES ACTIVITIES OF THE COMPANY Style Models & Show Cars Tooling & Parts Vehicles
  4. 4. 30 / 11 / 2012 CENTER OF EXPERIMENTAL CONSTRUCTION OF MODELS AND PROTOTYPES 4 VEHICLES
  5. 5. 30 / 11 / 2012 CENTER OF EXPERIMENTAL CONSTRUCTION OF MODELS AND PROTOTYPES Various prototyping stages are required according to the complexity of the design. CECOMP have always used the most effective combination of human capabilities and high-technology to provide a prototype for the validation stage within the shortest possible space of time. The reduction in times and costs is guaranteed by the use of dedicated technologies for each specific component, always ensuring an ultra-high- quality product. The flexibility of our facility guarantees maximum discretion and privacy in working areas at all times. 5 RUNNING PROTOTYPES VEHICLES
  6. 6. 30 / 11 / 2012 CENTER OF EXPERIMENTAL CONSTRUCTION OF MODELS AND PROTOTYPES PROTOTYPE ASSEMBLING Each step of a vehicle assembling, from jigs conception and construction to the final assembly on metrological plate (with control tools for parts positioning), can be performed in accordance with our quality certifications and Client’s specifications. Dedicated and secreted areas can be set-up, with needed size, equipment, engineers and work procedure. Support of all internal departments. Based on the extensive experience developed by working with different OEMs and parts suppliers worldwide, a significant support can be given also for the 6 VEHICLES earlier phase of prototype study (layout, BOM, selection of carry-over parts, parts sourcing, …..).
  7. 7. 30 / 11 / 2012 CENTER OF EXPERIMENTAL CONSTRUCTION OF MODELS AND PROTOTYPES ELECTRIC/HYBRID VEHICLES: CECOMP holds specific experience in development, validation and production of an innovative electric car (at present, about 1’000 units/year): - Complete car development, including: styling models, CAS/CAD/CAE/CAM engineering, prototyping, testing, tooling, validation, certification and SOP (in 24 months). - New Chassys, B.I.W., Electric/Hybrid P.W.T., Interior/Exterior Trims, in respect of weight, drive range, lifespan, and safety targets. 7 VEHICLES
  8. 8. 30 / 11 / 2012 CENTER OF EXPERIMENTAL CONSTRUCTION OF MODELS AND PROTOTYPES SPECIAL VEHICLES 8 Customized and Armoured cars VEHICLES
  9. 9. 30 / 11 / 2012 CENTER OF EXPERIMENTAL CONSTRUCTION OF MODELS AND PROTOTYPES RESTORATION 9 ALFA ROMEO CANGURO Restoration of unique prototype No cad data available Original materials VEHICLES
  10. 10. 30 / 11 / 2012 CENTER OF EXPERIMENTAL CONSTRUCTION OF MODELS AND PROTOTYPES SUB-GROUPS ASSEMBLING An extensive experience has been developed in assembly jigs, control tools, metal-sheet parts connection and relevant value to cost trade-off for small and medium-series production. From simple sub-groups to complete vehicle-body, made of different kind of metals (steel, HSS, aluminum) and their combination. Welding/riveting tools (TIG and MIG welding, electron discharge machine, rivets, …), manual and robotized. 10 VEHICLES
  11. 11. 30 / 11 / 2012 CENTER OF EXPERIMENTAL CONSTRUCTION OF MODELS AND PROTOTYPES CECOMP has a dedicated workshop for low volume BIW assembling, who can reach up to 10 BIW per day (up to 20, with few integrations). End-of-line laser dimensional control to certificate each car-body assembled. 11 CAR-BODY ASSEMBLING VEHICLES
  12. 12. 30 / 11 / 2012 CENTER OF EXPERIMENTAL CONSTRUCTION OF MODELS AND PROTOTYPES Equipments: COORD3 MCT Star Light 60.25.20 Gantry automatic measuring machine (work area: X: 6000, Y: 2500, Z: 2000 mm). Gantry DEA mod. BETA (work area: 1200x2000x1000 to 5000x2300x2000 mm). Internal metrological department, able to control every step of tooling and prototypes realization: Positioning control; - Reverse engineering - Complete car-body dimensional control - Assembly jigs control; - doors assembly control during process… 12 Control and Reports in Production Working centre COORD mod. TR32 with PC display (work area: 3200x1300x1000 mm). No. 3 FARO PLATINUM machine portable measurement arm light 7 axes with 3D laser Scanner for the control and scanning. METROLOGY
  13. 13. 30 / 11 / 2012 CENTER OF EXPERIMENTAL CONSTRUCTION OF MODELS AND PROTOTYPES 13 SOME SHOWCARS (1) FERRARI SUPER AMERICA BOLLORE’ BLUE CAR I TOYOTA MR-J Running prototype totally hand- made in aluminum BMW ZAGATO ROADSTER TOYOTA UUV LANCIA FULVIA Running prototype totally hand-made in aluminum HONDA CIVIC SHOW AR TOYOTA RSC SHOW CAR
  14. 14. 30 / 11 / 2012 CENTER OF EXPERIMENTAL CONSTRUCTION OF MODELS AND PROTOTYPES 14 SOME SHOWCARS (2) CHANGAN CD101 KIA CEE’D TOYOTA YARIS CABRIO FIORAVANTI SKILL MASERATI CHICANE WEBASTO LIGHT TOYOTA IQ CONCEPT ICONA FUSELAGE
  15. 15. 30 / 11 / 2012 CENTER OF EXPERIMENTAL CONSTRUCTION OF MODELS AND PROTOTYPES 15 SOME SHOWCARS (3) BMW ZAGATO COUPE’ NLV QUANT IED X1/99 ICONA VULCANO
  16. 16. 30 / 11 / 2012 CENTER OF EXPERIMENTAL CONSTRUCTION OF MODELS AND PROTOTYPES 16 TOOLING & PARTS
  17. 17. 30 / 11 / 2012 CENTER OF EXPERIMENTAL CONSTRUCTION OF MODELS AND PROTOTYPES TOOLING Starting from a CAD file of a part/sub-system and according to the number of parts to be produced, tooling office is able to develop the complete set of tools, through all the steps of the proprietary procedure. Senior experts from the workshop work besides CAD/CAM engineers, since the beginning, in order to perform initial checks on the part’s shape and address the suitable development of production process/tooling. Sheet metal forming simulations are then used to verify and tune the details of geometry. Final checks/trials/tuning of tools, made before approval. Tooling Engineering experience: Hammer-forming; Sheet-metal stamping; Thermo-plastics; Hand-made FRP; Assembly jigs; Metrological tools (master cubing); Glazing forming; Policarbonate forming; 17 TOOLING & PARTS
  18. 18. 30 / 11 / 2012 CENTER OF EXPERIMENTAL CONSTRUCTION OF MODELS AND PROTOTYPES HAMMER FORMING A unique team of hand-hammer craftsmen and dedicated tools can be involved to manufacture real sheet parts, very quickly and with residual investments. This capability is peculiar for: •new products developments (early sampling), •style models (functional), •show-cars, •one-offs, •restoration of historical vehicles. 18 TOOLING & PARTS
  19. 19. 30 / 11 / 2012 CENTER OF EXPERIMENTAL CONSTRUCTION OF MODELS AND PROTOTYPES SHEET METAL STAMPING Extensive capability to manufacture small to large pieces of different sheet-metal (steel, HSS and aluminum), from Client’s tooling or, if required, starting from 3D geometry of the desired part and then develop, set-up and validate the complete production process and its relevant tooling. 7 Hydraulic and 4 Mechanical Presses up to 1’200 t. 4 Laser-cutting Machines (2D & 3D) and a dedicated Assembly Workshop. CECOMP is able to supply finished parts and assembled subgroups, just-in-time to Client’s plants. 19 TOOLING & PARTS
  20. 20. 30 / 11 / 2012 CENTER OF EXPERIMENTAL CONSTRUCTION OF MODELS AND PROTOTYPES ISO 9001:2008 QUALITY ISO/TS 16949:2009 ORGANIZATION 20
  21. 21. 30 / 11 / 2012 CENTER OF EXPERIMENTAL CONSTRUCTION OF MODELS AND PROTOTYPES ITALY - CECOMP S.p.A. HQ PROTOTYPING, TOOLING, B.I.W. - BC S.r.l. VEHICLE PRODUCTION - SELTAP S.r.l. UPHOLSTERY SLOVENIA - CECOMP D.o.o. HIGH VOLUME STAMPING CHINA - ICONA Ltd. DESIGN, ENG., PROTOTYPING 21 LOCATIONS
  22. 22. 30 / 11 / 2012 CENTER OF EXPERIMENTAL CONSTRUCTION OF MODELS AND PROTOTYPES THANK YOU FOR KIND ATTENTION 22

×