Advertisement
Advertisement

More Related Content

Advertisement

IHG Development Documents

  1. Development and Hotel Lifecycle & Growth – Rebranding projects process workflow Activity Desktop Brand Due Diligence Developer Hotel Visit Desktop PIP D&E Hotel Visit Opening trigger for Openings within next 120 days Purpose Overall Brand alignment and very high-level scope Validate Desktop Brand Due Diligence and call out any major FLS. Conduct desktop property assessment and prepare scope of works for all facilities and FLS non-compliances. Desktop PIP , Timeline & Ballpark cost estimates to be aligned with Owner Full engineering FLS check & validate Desktop PIP Meeting to activate team to open hotel Teams R :Development A : C :D&E, NHOPs, Ops ,Commercial, IA R :Development A : C : R :D&E A :D&E & IT C :IT R :D&E (Design can be virtual) A :D&E & IT C :IT, Local based hotel teams R :Development Teams to Trigger : NHOP, D&E, Commercial, Finance , HR & IT Required Info • Hotel website • internet imagery – Google, TripAdvisor, Agoda , etc. • Visit photos • Developer Top FLS checklist . This checklist is not for the Owners. It’s meant for Developers to verify top FLS items onsite. • Facility factsheet • Floor plans with dimensions • Elevational plans • M&E plans • Heating, Air-conditioning and mechanical ventilation system (HVAC) • Electrical (power and lighting) system • Telephone, Data, TV, CCTV, Access Control systems • Plumbing and drainage system • Fire alarm and fire protection system + PA systems • Lifts • IT checklist • OS&E questionnaire • FLS & MEP detailed checklist • Door lock questionnaire ** • Owner budget & timeline expectation • Site findings - images • FLS & MEP detailed checklist • Final PIP Owner Request for Information(RFI) • Commercial • Human resources (Managed only) • Finance (Managed only) Output • Brand options • 2-word PIP (Definition provided in following slides) • Direct to brand or SP Code • Call out any major FLS, allows for D&E to look for cost effective solutions • Desktop PIP • Timeline • Ballpark cost estimates can be provided if facility areas are available (only if requested) • Full Detailed PIP* • Updated cost estimates with any FLS findings • Consultant recommendation • Trigger all operations workstreams to open hotel Sample Output • Holiday Inn or voco • Public Areas: Hard - Non-structural • Guest Rooms: Light & Hallmarks • Direct to Brand link link Data room template R: responsible A: accountable C: consulted I: informed Pre-HMA/FA med. probability Pre-HMA/FA high probability Pre-LOI low probability **only if IT checklist identifies non-compliance DESKTOP PIP / TIMELINE / BALLPARK COSTS DETAILED PIP OPENING TRIGGER *to be legalized at high probability
  2. Refurbishment Scale Scope of work Hallmarks only 1. FLS 2. Brand related hallmarks 3. IT Light & Hallmarks 1. FLS 2. Brand related hallmarks 3. IT 4. Redecoration of existing Guestrooms, Corridors & Public Areas • 50% replacement or repair of case goods • Replace approx. 25% sanitaryware • Replace light fittings, switch plates, power/IT sockets • 100% replacement of FF&E and OS&E, allow for upgrade of IT/AV/Telecom. • The works include new carpets & wall decoration • Replace light fittings • New Artwork Hard - Non-Structural 1. FLS 2. Brand related hallmarks 3. IT 4. Strip out of existing decorative finishes and replacement to Guestrooms, Corridors & Public Areas • The works include replacement of doors & ironmongery • New Sanitaryware, replacement of bathroom tiles; • New Wall, floor and ceiling finishes • New Case-goods & artwork • Replacement of FCU’s & Plant • Refit lift cars • Replace light fittings, switch plates, power/IT sockets. • New FF&E, OS&E and IT/AV/Telecom. Hard - Structural In addition to above Non-structural scope, additional allowance for external envelope and structural repairs . This scope doesn’t include real estate re-use ie. conversion of Commercial to Hotel. 2-word PIP guidance
Advertisement