Mantra for Process Excellence 
Rajesh Kumar Mudiakal SAP Project Manager CMC Limited
Agile Methodology in SAP Implementations 
Theme: Mantra for Project Excellence 
Submitted by: Rajesh Kumar Mudiakal 
PMI National Conference 2014
Contents 
Abstract ......................................................................................................................................................... 4 
Introduction .................................................................................................................................................. 5 
Waterfall Approach with ASAP Methodology............................................................................................... 6 
Drawbacks of Waterfall Methodology .......................................................................................................... 6 
Agile Project Management ........................................................................................................................... 7 
Hybrid ASAP methodology ............................................................................................................................ 8 
Advantages of Agile Approach .................................................................................................................... 10 
Challenges and Risks of Agile Approach ..................................................................................................... 10 
Conclusion ................................................................................................................................................... 11 
References .................................................................................................................................................. 11
Abstract 
SAP implementations traditionally follow waterfall approach, which adopts ASAP methodology. Though the time to deploy has been reduced over the years, there is a lot of scope for improvement. ASAP methodology divides the SAP implementation into five phases Project Preparation, business Blue Print, Realization, Final Preparation and Go Live. In this approach, major part of process design happens at Business Blue Print stage where the client will have less visibility of SAP system. This result in stretching the Blue print phase and even after this, the business processes are not properly mapped resulting negative impacts ranging from client Dissatisfaction to the failure of the implementation. This also results in the project stretching beyond the timelines. This paper outlines new extension of ASAP methodology called Hybrid ASAP methodology which combines ASAP methodology and Agile methods like Scrum. Hybrid ASAP follows an iterative approach of project delivery with multiple sprints and tight control based on the principles of scrum. By adopting this methodology it is not only possible to reduce customer dissatisfaction to some extent but also can significantly reduce the time and the cost of implementation. The paper will discuss the Hybrid ASAP methodology in SAP implementations in detail.
Introduction 
The following table gives comparison of athletics world records for various distances and the average time taken for 100 meters in each of them. 
Distance 
World Record 
Time for 100m 
% saving if running in 100m sprint speed for full distance 
100 
9.58s 
9.58s 
0% 
200 
19.19s 
9.60s 
0.20% 
400 
43.18s 
10.80s 
12.70% 
800 
01:40.9 
12.61s 
31.60% 
1500 
03:26:00 
13.73s 
42.00% 
3000 
07:20.7 
14.66s 
53.00% 
5000 
12:37.4 
15.15s 
58.00% 
10000 
26:17.5 
15.77s 
64.00% 
Figure 1 (Ref: Wikipedia) 
From this table, it is evident that if a person runs at a speed of 100 meters sprint throughout the race, he can complete the race faster. The percentages of time saving increases with the distance. This is the essence of Agile Project Management Methodology. The project is divided into multiple sprints with clear cut deliverables known as product backlogs and multiple releases are planned to ensure speedy deployment. Going back to the racing example, as the distance increases, percentage saving of time also increases. So the longer the project, higher would be the time and cost saving. The length of typical SAP implementations range from 5 months to 2 years. So SAP implementation has stronger case for going Agile as the project duration is longer. Following sections would detail the how agile principles can be used in SAP implementations, its benefits and challenges.
Waterfall Approach with ASAP Methodology 
SAP implementations typically follow ASAP methodology (Accelerated SAP) which consists of five phases as described below. Each phase has quality gate and also project progress is measured in terms of phases. 
 Phase 1 Project Preparation: 
The first Phase includes initial planning of the project, project team formation and deployment, system landscape deployment etc. 
 Phase 2 Business Blueprint 
During Business blueprint phase, a detailed process study is performed to understand the business processes and mapping of them in SAP and possible gaps. The detailed project scope is documented during Business Blue Print stage. Configurations and customizations are performed strictly as per the Business Blue print document. 
 Phase 3 Realization 
This is the phase where the configuration, customizations, unit testing, integration testing and user acceptance testing happens. 
 Phase 4 Final Preparation 
Final preparation consists of key tasks like End user training, data migration, cut over activities and pre go live check. 
Phase 5 Go-Live and support 
This phase is a transition from pre-production environment to a production environment. 
Drawbacks of Waterfall Methodology 
Longer time duration for final deployment: 
Since the product is released for final testing and further deployment only after completion of the entire scope as per blueprint, there is possibility of considerable delays in the product deployment. Even a complexity or delay in one module or specific requirement could result in stretching the entire project time lines.
Possibility of Mistakes in process mapping: 
As the business blueprinting is done in the initial stages where the customer has little visibility of the end product, there is possibility of mistakes in process mapping due to lack of clarity. Since the implementation process follows a rigid approach, there won’t be a going back once a phase is passed and there is greater chance of these mistakes going in to production system. 
Potential Conflicts between Implementation Partners and the customers 
SAP implementations are normally affected by conflicts between Implementation partners and customers throughout the project life cycle. These conflicts usually result in delays in milestone completions. Conflicts during blue print phases are mainly due to lack of understanding of the scope, customer expectations, standard features in SAP, the customizations etc. Conflicts and customer dissatisfaction at later stages can be due to wrong mapping of the processes and also possible flaws in the processes, which get detected during testing phase, scope creep etc. 
Agile Project Management 
Agile Principle was originated from lean Manufacturing and Kanban system of famous Toyota System. Agile project management follows an iterative approach with many time-boxed deliverables for project execution. Each iterative cycle is called a sprint. Sprints have duration between 2 to 4 weeks. The team should consist of a Product owner (e.g. Project Manager) and a development team (typically less than 9 people). Each sprint will result in releasable product or product improvement. There will be multiple releases starting after initial baseline build. With each release, the product gets improved. Product owner is the person responsible for the project, usually project manager. A Sprint consists of sprint planning, product backlog, daily monitoring of activities through daily scrum meetings, development work and sprint review. Product backlogs list all the features, functions, enhancements etc. to be done in the project. Daily scrum meetings last around 15 min, where the team members discuss about the activities and issues during daily scrum meetings. Product backlogs are displayed in visually in a board, tracked through project management system or through excel sheets.
Hybrid ASAP methodology 
Adopting a pure agile approach has some limitations when it comes to SAP implementations. Unlike other software projects, the scope is not fully developed at the start of the project especially for new implementations and we cannot eliminate blueprinting totally. Also the normal agile team size is about 9 people and SAP projects typically have a bigger team size. One approach to overcome the team size constraint would be to divide the team in to smaller groups and organize parallel sprints with each group. SAP devised a Hybrid approach combining both the waterfall and the agile methodologies in an effort to tap the best out of the both Agile and Water fall frameworks. Hybrid ASAP methodology starts with identifying the process owner who could be the Project manager and initial product backlog. SAP accelerators like SAP Best Practices and Rapid Deployment Systems (RDS) are used to create an initial build. This baseline build is fine-tuned through multiple iterations. Then a lean Business Blue Print is prepared with a complete list of project backlog, release plan and Business prioritization (Must have, could have, should have and nice to have). Throughout this process, there will be constant interaction with the customer. Multiple Sprints are planned as per the release planning. 
Figure 2 (Ref: ASAP 8 Agile webinar, www.sap.com) 
Project backlog is updated dynamically during the sprint as well as at the end. Each sprint is completed through “Done” event, which culminates the deliverables as planned for that sprint. Project Backlog is validated during the sprint through multiple demos and discussions with client. Within each sprint there can be multiple delta releases which will be documented and tested. In this approach, there is a constant interaction with the users and the gaps between the actual requirements and what is configured in the system are minimized.
Figure 3 (Ref: ASAP 8 Agile webinar, www.sap.com) 
For each release, there will be separate Quality Gates (Q-Gate). Releases are deployed after the final Tests like User acceptance Testing, Integration testing, stress testing etc. 
The figure below gives the summary of a typical release cycle. 
Figure 4 (Ref: ASAP 8 Agile webinar, www.sap.com)
Advantages of Agile Approach 
Advantages include simplicity, greater visibility, and frequent inspection by business users, reduction of waste and close engagement with business users and lower risk of failure. Also Since scrum involves daily scrum meetings and monitoring, better control is achieved. Also adoption of agile methodology helps in early identification on potential risks. It works in a pull system, where configurations built incrementally as per the requirement of the customer, which eliminates the possible design flaws because of lack of visibility of final product in a water fall approach. 
Challenges and Risks of Agile Approach 
Project Pricing Contracts 
One of the key risks for implementation partners who go with Agile is approach is an open blueprint (Project backlog) which gets refined in a continuous manner. This gives the customer an opportunity to demand unlimited requirements even in fixed price contracts. 
This risk can be mitigated in multiple ways. This risk can be tackled by adopting either of the following pricing strategies. 
1. Time and Money contract 
2. A hybrid of Time and Money and Fixed Price Contract (i.e. Fixed Price for the initial release and then Time and Money for rest of the releases) 
3. Separate fixed price contracts for each release. 
Formation of Scrum Teams 
A SAP can have large number of cross functional teams, dividing them in to various scrum teams is very much critical to the success of the project. Teams can be divided as per their module or sub modules, or based on business scenarios, different locations or legal entities etc. It is also vital to have coordination between all these teams as changes in one sprint might have some effect on the deliverables of other sprint. So there should be a sprint coordinator who controls all the cross sprint interactions. A product owner, project manager or scrum master can take up this role.
Release planning 
Correct Release planning is essential for the success of the project. Care should be taken to ensure that each release is complete and would not result in partially configured processes. It is always better to start with baseline configuration with standard features using accelerators like SAP Best Practices and Rapid Deployment systems and then build releases on top of it. This ensures that there will not be any fundamental flows in the system. The releases can be specific modules like CRM, portal or some features like workflows, process controls or plant roll outs etc. There should thorough analysis before deciding on the releases and sprint backlogs. 
Conclusion 
Agile practices gives the base for effectively managing the scope and also with the phased approach, companies can Go Live early to realize the benefits of the SAP system at the earliest and the processes are continuously refined throughout the project life cycle. But like any new idea, it will take some time before the companies embrace this methodology fully. For that they need to be adventurous and come out of their comfort zone. 
References 
http://www.rt-it-group.com/index.php?option=com_content&view=article&id=77:agile-erp- implementation&catid=42:implementation&Itemid=98 
http://www.sap.com/netherlands/services/consulting/pdf/Whitepaper_Agile_ENG.pdf 
SAP TechEd Sessions on SAP Solution Manager 7.1 
K.Schwaber, Agile Project Management with Scrum, Microsoft Press, 2004 
A.A.Fetouh, Dr.A.E.Abbassy, Dr.R.Moawad, “Applying Agile Approach in ERP Implementation”, IJCSNS International Journal of Computer Science and Network Security, VOL.11 No.8, August 2011

More Related Content

What's hot

Presentation by subhajit bhattacharya2
Presentation by subhajit bhattacharya2Presentation by subhajit bhattacharya2
Presentation by subhajit bhattacharya2PMI_IREP_TP
 
Presentation by subhajit bhattacharya1
Presentation by subhajit bhattacharya1Presentation by subhajit bhattacharya1
Presentation by subhajit bhattacharya1PMI_IREP_TP
 
Presentation by dhruba jyoti chaudhuri
Presentation by dhruba jyoti chaudhuriPresentation by dhruba jyoti chaudhuri
Presentation by dhruba jyoti chaudhuriPMI_IREP_TP
 
Presentation by sameer murdeshwar
Presentation by sameer murdeshwarPresentation by sameer murdeshwar
Presentation by sameer murdeshwarPMI_IREP_TP
 
Presentation by vignesh swamidurai
Presentation by vignesh swamiduraiPresentation by vignesh swamidurai
Presentation by vignesh swamiduraiPMI_IREP_TP
 
Presentation by bhavesh thakkar
Presentation by bhavesh thakkarPresentation by bhavesh thakkar
Presentation by bhavesh thakkarPMI_IREP_TP
 
Presentation by lakshmi varagan d
Presentation by lakshmi varagan dPresentation by lakshmi varagan d
Presentation by lakshmi varagan dPMI_IREP_TP
 
Presentation by somdatta banerjee
Presentation by somdatta banerjeePresentation by somdatta banerjee
Presentation by somdatta banerjeePMI_IREP_TP
 
Presentation by anjali mogre
Presentation by anjali mogrePresentation by anjali mogre
Presentation by anjali mogrePMI_IREP_TP
 
Presentation by pavan adipuram
Presentation by pavan adipuramPresentation by pavan adipuram
Presentation by pavan adipuramPMI_IREP_TP
 
Presentation by dhruva sen
Presentation by dhruva senPresentation by dhruva sen
Presentation by dhruva senPMI_IREP_TP
 
Presentation by suhail qadir
Presentation by suhail qadirPresentation by suhail qadir
Presentation by suhail qadirPMI_IREP_TP
 
Presentation by parag saha
Presentation by parag sahaPresentation by parag saha
Presentation by parag sahaPMI_IREP_TP
 
Presentation by mangesh sardesai
Presentation by mangesh sardesaiPresentation by mangesh sardesai
Presentation by mangesh sardesaiPMI_IREP_TP
 
Presentation by somdatta banerjee
Presentation by somdatta banerjeePresentation by somdatta banerjee
Presentation by somdatta banerjeePMI_IREP_TP
 
Presentation by dattatraya pathak
Presentation by dattatraya pathakPresentation by dattatraya pathak
Presentation by dattatraya pathakPMI_IREP_TP
 
Managing Business Analysis for Agile Development
Managing Business Analysis for Agile DevelopmentManaging Business Analysis for Agile Development
Managing Business Analysis for Agile DevelopmentIJMER
 

What's hot (20)

Presentation by subhajit bhattacharya2
Presentation by subhajit bhattacharya2Presentation by subhajit bhattacharya2
Presentation by subhajit bhattacharya2
 
Presentation by subhajit bhattacharya1
Presentation by subhajit bhattacharya1Presentation by subhajit bhattacharya1
Presentation by subhajit bhattacharya1
 
Presentation by dhruba jyoti chaudhuri
Presentation by dhruba jyoti chaudhuriPresentation by dhruba jyoti chaudhuri
Presentation by dhruba jyoti chaudhuri
 
Presentation by sameer murdeshwar
Presentation by sameer murdeshwarPresentation by sameer murdeshwar
Presentation by sameer murdeshwar
 
Presentation by vignesh swamidurai
Presentation by vignesh swamiduraiPresentation by vignesh swamidurai
Presentation by vignesh swamidurai
 
Presentation by bhavesh thakkar
Presentation by bhavesh thakkarPresentation by bhavesh thakkar
Presentation by bhavesh thakkar
 
Presentation by lakshmi varagan d
Presentation by lakshmi varagan dPresentation by lakshmi varagan d
Presentation by lakshmi varagan d
 
Presentation by somdatta banerjee
Presentation by somdatta banerjeePresentation by somdatta banerjee
Presentation by somdatta banerjee
 
Presentation by anjali mogre
Presentation by anjali mogrePresentation by anjali mogre
Presentation by anjali mogre
 
Presentation by pavan adipuram
Presentation by pavan adipuramPresentation by pavan adipuram
Presentation by pavan adipuram
 
Presentation by dhruva sen
Presentation by dhruva senPresentation by dhruva sen
Presentation by dhruva sen
 
Presentation by suhail qadir
Presentation by suhail qadirPresentation by suhail qadir
Presentation by suhail qadir
 
Presentation by parag saha
Presentation by parag sahaPresentation by parag saha
Presentation by parag saha
 
Presentation by mangesh sardesai
Presentation by mangesh sardesaiPresentation by mangesh sardesai
Presentation by mangesh sardesai
 
Presentation by somdatta banerjee
Presentation by somdatta banerjeePresentation by somdatta banerjee
Presentation by somdatta banerjee
 
ETPM5
ETPM5ETPM5
ETPM5
 
DPPM2
DPPM2DPPM2
DPPM2
 
DPPM6
DPPM6DPPM6
DPPM6
 
Presentation by dattatraya pathak
Presentation by dattatraya pathakPresentation by dattatraya pathak
Presentation by dattatraya pathak
 
Managing Business Analysis for Agile Development
Managing Business Analysis for Agile DevelopmentManaging Business Analysis for Agile Development
Managing Business Analysis for Agile Development
 

Similar to Presentation by Rajesh Kumar Mudiakal

ASAP Methodology Roadmaps and Phases.pdf
ASAP Methodology Roadmaps and Phases.pdfASAP Methodology Roadmaps and Phases.pdf
ASAP Methodology Roadmaps and Phases.pdfmail2cnivas1
 
Erpasapimplementation 1214825612078403-9
Erpasapimplementation 1214825612078403-9Erpasapimplementation 1214825612078403-9
Erpasapimplementation 1214825612078403-9Hari Krishna
 
Erp Asap implementation 1214825612078403-9
Erp Asap implementation 1214825612078403-9Erp Asap implementation 1214825612078403-9
Erp Asap implementation 1214825612078403-9Hari Krishna
 
Agile Methodologies in SAP
Agile Methodologies in SAPAgile Methodologies in SAP
Agile Methodologies in SAPGaurav Ahluwalia
 
Software Development Process Models (SCRUM Methodology)
Software Development Process Models (SCRUM Methodology)Software Development Process Models (SCRUM Methodology)
Software Development Process Models (SCRUM Methodology)Muhammad Ahmed
 
Introduction to Agile & scrum
Introduction to Agile & scrumIntroduction to Agile & scrum
Introduction to Agile & scrumElad Sofer
 
Asap implementation methodology (2)
Asap implementation methodology (2)Asap implementation methodology (2)
Asap implementation methodology (2)Pradipta Mallick
 
Agile Process Introduction
Agile Process IntroductionAgile Process Introduction
Agile Process IntroductionNguyen Hai
 
Agile & SCRUM basics
Agile & SCRUM basicsAgile & SCRUM basics
Agile & SCRUM basicsArun R
 
Introduction to Scrum.ppt
Introduction to Scrum.pptIntroduction to Scrum.ppt
Introduction to Scrum.pptMohan Late
 
Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"David Pedreno
 
Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"David Pedreno
 
Scrum in IT Industry Part1
Scrum in IT Industry Part1Scrum in IT Industry Part1
Scrum in IT Industry Part1JayeshPatil149
 
Asap methodology sap Anilkumar chowdary
Asap methodology sap Anilkumar chowdaryAsap methodology sap Anilkumar chowdary
Asap methodology sap Anilkumar chowdaryANILKUMARPULIPATI1
 
The Agile Readiness Assessment Tool Essay
The Agile Readiness Assessment Tool EssayThe Agile Readiness Assessment Tool Essay
The Agile Readiness Assessment Tool EssayHeidi Owens
 
ASAP Methodology- SAP Project management
ASAP Methodology- SAP Project managementASAP Methodology- SAP Project management
ASAP Methodology- SAP Project managementArjunPawar29
 
Manoj Kolhe - Testing in Agile Environment
Manoj Kolhe - Testing in Agile EnvironmentManoj Kolhe - Testing in Agile Environment
Manoj Kolhe - Testing in Agile EnvironmentManoj Kolhe
 
Lean as Agile methodology – A Study
Lean as Agile methodology – A StudyLean as Agile methodology – A Study
Lean as Agile methodology – A StudyEswar Publications
 

Similar to Presentation by Rajesh Kumar Mudiakal (20)

ASAP Methodology Roadmaps and Phases.pdf
ASAP Methodology Roadmaps and Phases.pdfASAP Methodology Roadmaps and Phases.pdf
ASAP Methodology Roadmaps and Phases.pdf
 
Erpasapimplementation 1214825612078403-9
Erpasapimplementation 1214825612078403-9Erpasapimplementation 1214825612078403-9
Erpasapimplementation 1214825612078403-9
 
Erp Asap implementation 1214825612078403-9
Erp Asap implementation 1214825612078403-9Erp Asap implementation 1214825612078403-9
Erp Asap implementation 1214825612078403-9
 
Agile Methodologies in SAP
Agile Methodologies in SAPAgile Methodologies in SAP
Agile Methodologies in SAP
 
Software Development Process Models (SCRUM Methodology)
Software Development Process Models (SCRUM Methodology)Software Development Process Models (SCRUM Methodology)
Software Development Process Models (SCRUM Methodology)
 
Introduction to Agile & scrum
Introduction to Agile & scrumIntroduction to Agile & scrum
Introduction to Agile & scrum
 
Asap implementation methodology (2)
Asap implementation methodology (2)Asap implementation methodology (2)
Asap implementation methodology (2)
 
ASAP Methodology in Implementing ERP
ASAP Methodology in Implementing ERPASAP Methodology in Implementing ERP
ASAP Methodology in Implementing ERP
 
Agile Process Introduction
Agile Process IntroductionAgile Process Introduction
Agile Process Introduction
 
Agile & SCRUM basics
Agile & SCRUM basicsAgile & SCRUM basics
Agile & SCRUM basics
 
Introduction to Scrum.ppt
Introduction to Scrum.pptIntroduction to Scrum.ppt
Introduction to Scrum.ppt
 
Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"
 
Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"
 
Scrum in IT Industry Part1
Scrum in IT Industry Part1Scrum in IT Industry Part1
Scrum in IT Industry Part1
 
Asap methodology sap Anilkumar chowdary
Asap methodology sap Anilkumar chowdaryAsap methodology sap Anilkumar chowdary
Asap methodology sap Anilkumar chowdary
 
The Agile Readiness Assessment Tool Essay
The Agile Readiness Assessment Tool EssayThe Agile Readiness Assessment Tool Essay
The Agile Readiness Assessment Tool Essay
 
Scrum vs Kanban
Scrum vs KanbanScrum vs Kanban
Scrum vs Kanban
 
ASAP Methodology- SAP Project management
ASAP Methodology- SAP Project managementASAP Methodology- SAP Project management
ASAP Methodology- SAP Project management
 
Manoj Kolhe - Testing in Agile Environment
Manoj Kolhe - Testing in Agile EnvironmentManoj Kolhe - Testing in Agile Environment
Manoj Kolhe - Testing in Agile Environment
 
Lean as Agile methodology – A Study
Lean as Agile methodology – A StudyLean as Agile methodology – A Study
Lean as Agile methodology – A Study
 

More from PMI_IREP_TP

Presentation by shubham vyas
Presentation by shubham vyasPresentation by shubham vyas
Presentation by shubham vyasPMI_IREP_TP
 
Presentation by beebejan valiyakath
Presentation by beebejan valiyakathPresentation by beebejan valiyakath
Presentation by beebejan valiyakathPMI_IREP_TP
 
Presentation by vikas dubey
Presentation by vikas dubeyPresentation by vikas dubey
Presentation by vikas dubeyPMI_IREP_TP
 
Presentation by pranal dongare
Presentation by pranal dongarePresentation by pranal dongare
Presentation by pranal dongarePMI_IREP_TP
 
Presentation by shreyas bhargave
Presentation by shreyas bhargavePresentation by shreyas bhargave
Presentation by shreyas bhargavePMI_IREP_TP
 
Presentation by anipriya p
Presentation by anipriya pPresentation by anipriya p
Presentation by anipriya pPMI_IREP_TP
 
Presentation by rahul ghodke
Presentation by rahul ghodkePresentation by rahul ghodke
Presentation by rahul ghodkePMI_IREP_TP
 
Presentation by Ruchika Wadhwa
Presentation by Ruchika WadhwaPresentation by Ruchika Wadhwa
Presentation by Ruchika WadhwaPMI_IREP_TP
 
Presentation by prameela kumar
Presentation by prameela kumarPresentation by prameela kumar
Presentation by prameela kumarPMI_IREP_TP
 
Presentation by jayanta debnath
Presentation by jayanta debnathPresentation by jayanta debnath
Presentation by jayanta debnathPMI_IREP_TP
 

More from PMI_IREP_TP (10)

Presentation by shubham vyas
Presentation by shubham vyasPresentation by shubham vyas
Presentation by shubham vyas
 
Presentation by beebejan valiyakath
Presentation by beebejan valiyakathPresentation by beebejan valiyakath
Presentation by beebejan valiyakath
 
Presentation by vikas dubey
Presentation by vikas dubeyPresentation by vikas dubey
Presentation by vikas dubey
 
Presentation by pranal dongare
Presentation by pranal dongarePresentation by pranal dongare
Presentation by pranal dongare
 
Presentation by shreyas bhargave
Presentation by shreyas bhargavePresentation by shreyas bhargave
Presentation by shreyas bhargave
 
Presentation by anipriya p
Presentation by anipriya pPresentation by anipriya p
Presentation by anipriya p
 
Presentation by rahul ghodke
Presentation by rahul ghodkePresentation by rahul ghodke
Presentation by rahul ghodke
 
Presentation by Ruchika Wadhwa
Presentation by Ruchika WadhwaPresentation by Ruchika Wadhwa
Presentation by Ruchika Wadhwa
 
Presentation by prameela kumar
Presentation by prameela kumarPresentation by prameela kumar
Presentation by prameela kumar
 
Presentation by jayanta debnath
Presentation by jayanta debnathPresentation by jayanta debnath
Presentation by jayanta debnath
 

Presentation by Rajesh Kumar Mudiakal

  • 1. Mantra for Process Excellence Rajesh Kumar Mudiakal SAP Project Manager CMC Limited
  • 2. Agile Methodology in SAP Implementations Theme: Mantra for Project Excellence Submitted by: Rajesh Kumar Mudiakal PMI National Conference 2014
  • 3. Contents Abstract ......................................................................................................................................................... 4 Introduction .................................................................................................................................................. 5 Waterfall Approach with ASAP Methodology............................................................................................... 6 Drawbacks of Waterfall Methodology .......................................................................................................... 6 Agile Project Management ........................................................................................................................... 7 Hybrid ASAP methodology ............................................................................................................................ 8 Advantages of Agile Approach .................................................................................................................... 10 Challenges and Risks of Agile Approach ..................................................................................................... 10 Conclusion ................................................................................................................................................... 11 References .................................................................................................................................................. 11
  • 4. Abstract SAP implementations traditionally follow waterfall approach, which adopts ASAP methodology. Though the time to deploy has been reduced over the years, there is a lot of scope for improvement. ASAP methodology divides the SAP implementation into five phases Project Preparation, business Blue Print, Realization, Final Preparation and Go Live. In this approach, major part of process design happens at Business Blue Print stage where the client will have less visibility of SAP system. This result in stretching the Blue print phase and even after this, the business processes are not properly mapped resulting negative impacts ranging from client Dissatisfaction to the failure of the implementation. This also results in the project stretching beyond the timelines. This paper outlines new extension of ASAP methodology called Hybrid ASAP methodology which combines ASAP methodology and Agile methods like Scrum. Hybrid ASAP follows an iterative approach of project delivery with multiple sprints and tight control based on the principles of scrum. By adopting this methodology it is not only possible to reduce customer dissatisfaction to some extent but also can significantly reduce the time and the cost of implementation. The paper will discuss the Hybrid ASAP methodology in SAP implementations in detail.
  • 5. Introduction The following table gives comparison of athletics world records for various distances and the average time taken for 100 meters in each of them. Distance World Record Time for 100m % saving if running in 100m sprint speed for full distance 100 9.58s 9.58s 0% 200 19.19s 9.60s 0.20% 400 43.18s 10.80s 12.70% 800 01:40.9 12.61s 31.60% 1500 03:26:00 13.73s 42.00% 3000 07:20.7 14.66s 53.00% 5000 12:37.4 15.15s 58.00% 10000 26:17.5 15.77s 64.00% Figure 1 (Ref: Wikipedia) From this table, it is evident that if a person runs at a speed of 100 meters sprint throughout the race, he can complete the race faster. The percentages of time saving increases with the distance. This is the essence of Agile Project Management Methodology. The project is divided into multiple sprints with clear cut deliverables known as product backlogs and multiple releases are planned to ensure speedy deployment. Going back to the racing example, as the distance increases, percentage saving of time also increases. So the longer the project, higher would be the time and cost saving. The length of typical SAP implementations range from 5 months to 2 years. So SAP implementation has stronger case for going Agile as the project duration is longer. Following sections would detail the how agile principles can be used in SAP implementations, its benefits and challenges.
  • 6. Waterfall Approach with ASAP Methodology SAP implementations typically follow ASAP methodology (Accelerated SAP) which consists of five phases as described below. Each phase has quality gate and also project progress is measured in terms of phases.  Phase 1 Project Preparation: The first Phase includes initial planning of the project, project team formation and deployment, system landscape deployment etc.  Phase 2 Business Blueprint During Business blueprint phase, a detailed process study is performed to understand the business processes and mapping of them in SAP and possible gaps. The detailed project scope is documented during Business Blue Print stage. Configurations and customizations are performed strictly as per the Business Blue print document.  Phase 3 Realization This is the phase where the configuration, customizations, unit testing, integration testing and user acceptance testing happens.  Phase 4 Final Preparation Final preparation consists of key tasks like End user training, data migration, cut over activities and pre go live check. Phase 5 Go-Live and support This phase is a transition from pre-production environment to a production environment. Drawbacks of Waterfall Methodology Longer time duration for final deployment: Since the product is released for final testing and further deployment only after completion of the entire scope as per blueprint, there is possibility of considerable delays in the product deployment. Even a complexity or delay in one module or specific requirement could result in stretching the entire project time lines.
  • 7. Possibility of Mistakes in process mapping: As the business blueprinting is done in the initial stages where the customer has little visibility of the end product, there is possibility of mistakes in process mapping due to lack of clarity. Since the implementation process follows a rigid approach, there won’t be a going back once a phase is passed and there is greater chance of these mistakes going in to production system. Potential Conflicts between Implementation Partners and the customers SAP implementations are normally affected by conflicts between Implementation partners and customers throughout the project life cycle. These conflicts usually result in delays in milestone completions. Conflicts during blue print phases are mainly due to lack of understanding of the scope, customer expectations, standard features in SAP, the customizations etc. Conflicts and customer dissatisfaction at later stages can be due to wrong mapping of the processes and also possible flaws in the processes, which get detected during testing phase, scope creep etc. Agile Project Management Agile Principle was originated from lean Manufacturing and Kanban system of famous Toyota System. Agile project management follows an iterative approach with many time-boxed deliverables for project execution. Each iterative cycle is called a sprint. Sprints have duration between 2 to 4 weeks. The team should consist of a Product owner (e.g. Project Manager) and a development team (typically less than 9 people). Each sprint will result in releasable product or product improvement. There will be multiple releases starting after initial baseline build. With each release, the product gets improved. Product owner is the person responsible for the project, usually project manager. A Sprint consists of sprint planning, product backlog, daily monitoring of activities through daily scrum meetings, development work and sprint review. Product backlogs list all the features, functions, enhancements etc. to be done in the project. Daily scrum meetings last around 15 min, where the team members discuss about the activities and issues during daily scrum meetings. Product backlogs are displayed in visually in a board, tracked through project management system or through excel sheets.
  • 8. Hybrid ASAP methodology Adopting a pure agile approach has some limitations when it comes to SAP implementations. Unlike other software projects, the scope is not fully developed at the start of the project especially for new implementations and we cannot eliminate blueprinting totally. Also the normal agile team size is about 9 people and SAP projects typically have a bigger team size. One approach to overcome the team size constraint would be to divide the team in to smaller groups and organize parallel sprints with each group. SAP devised a Hybrid approach combining both the waterfall and the agile methodologies in an effort to tap the best out of the both Agile and Water fall frameworks. Hybrid ASAP methodology starts with identifying the process owner who could be the Project manager and initial product backlog. SAP accelerators like SAP Best Practices and Rapid Deployment Systems (RDS) are used to create an initial build. This baseline build is fine-tuned through multiple iterations. Then a lean Business Blue Print is prepared with a complete list of project backlog, release plan and Business prioritization (Must have, could have, should have and nice to have). Throughout this process, there will be constant interaction with the customer. Multiple Sprints are planned as per the release planning. Figure 2 (Ref: ASAP 8 Agile webinar, www.sap.com) Project backlog is updated dynamically during the sprint as well as at the end. Each sprint is completed through “Done” event, which culminates the deliverables as planned for that sprint. Project Backlog is validated during the sprint through multiple demos and discussions with client. Within each sprint there can be multiple delta releases which will be documented and tested. In this approach, there is a constant interaction with the users and the gaps between the actual requirements and what is configured in the system are minimized.
  • 9. Figure 3 (Ref: ASAP 8 Agile webinar, www.sap.com) For each release, there will be separate Quality Gates (Q-Gate). Releases are deployed after the final Tests like User acceptance Testing, Integration testing, stress testing etc. The figure below gives the summary of a typical release cycle. Figure 4 (Ref: ASAP 8 Agile webinar, www.sap.com)
  • 10. Advantages of Agile Approach Advantages include simplicity, greater visibility, and frequent inspection by business users, reduction of waste and close engagement with business users and lower risk of failure. Also Since scrum involves daily scrum meetings and monitoring, better control is achieved. Also adoption of agile methodology helps in early identification on potential risks. It works in a pull system, where configurations built incrementally as per the requirement of the customer, which eliminates the possible design flaws because of lack of visibility of final product in a water fall approach. Challenges and Risks of Agile Approach Project Pricing Contracts One of the key risks for implementation partners who go with Agile is approach is an open blueprint (Project backlog) which gets refined in a continuous manner. This gives the customer an opportunity to demand unlimited requirements even in fixed price contracts. This risk can be mitigated in multiple ways. This risk can be tackled by adopting either of the following pricing strategies. 1. Time and Money contract 2. A hybrid of Time and Money and Fixed Price Contract (i.e. Fixed Price for the initial release and then Time and Money for rest of the releases) 3. Separate fixed price contracts for each release. Formation of Scrum Teams A SAP can have large number of cross functional teams, dividing them in to various scrum teams is very much critical to the success of the project. Teams can be divided as per their module or sub modules, or based on business scenarios, different locations or legal entities etc. It is also vital to have coordination between all these teams as changes in one sprint might have some effect on the deliverables of other sprint. So there should be a sprint coordinator who controls all the cross sprint interactions. A product owner, project manager or scrum master can take up this role.
  • 11. Release planning Correct Release planning is essential for the success of the project. Care should be taken to ensure that each release is complete and would not result in partially configured processes. It is always better to start with baseline configuration with standard features using accelerators like SAP Best Practices and Rapid Deployment systems and then build releases on top of it. This ensures that there will not be any fundamental flows in the system. The releases can be specific modules like CRM, portal or some features like workflows, process controls or plant roll outs etc. There should thorough analysis before deciding on the releases and sprint backlogs. Conclusion Agile practices gives the base for effectively managing the scope and also with the phased approach, companies can Go Live early to realize the benefits of the SAP system at the earliest and the processes are continuously refined throughout the project life cycle. But like any new idea, it will take some time before the companies embrace this methodology fully. For that they need to be adventurous and come out of their comfort zone. References http://www.rt-it-group.com/index.php?option=com_content&view=article&id=77:agile-erp- implementation&catid=42:implementation&Itemid=98 http://www.sap.com/netherlands/services/consulting/pdf/Whitepaper_Agile_ENG.pdf SAP TechEd Sessions on SAP Solution Manager 7.1 K.Schwaber, Agile Project Management with Scrum, Microsoft Press, 2004 A.A.Fetouh, Dr.A.E.Abbassy, Dr.R.Moawad, “Applying Agile Approach in ERP Implementation”, IJCSNS International Journal of Computer Science and Network Security, VOL.11 No.8, August 2011