SlideShare a Scribd company logo
1 of 27
Download to read offline
1
Uncertainty analysis of
Proposals via Milieu Analysis
Chakradhar Iyyunni, Ph.D. , Faculty L&T Institute of Project Management
Monika S. Purohith, PGPEM Student, NICMAR, Pune
27 September 2013
2Uncertainty in Proposals via Milieu Analysis in Engineering Outsourcing Industry
Agenda
Plan for the talk
Motivation – 1 slide
Background – 5 slides
Proposal : Role and Characterization of – 5 slides
An Illustration – 4 slides
Results, Conclusion, Future Work – 6 slides
Summary – 2 slides
3
Motivation
• With the induction of “Stakeholder Management” knowledge
area into PMBOK 5th Edition, we explore its influence on Project
Proposals.
Uncertainty in Proposals via Milieu Analysis in Engineering Outsourcing Industry
• The premise in the work relates to the important role given to the
project proposal
– address the needs of the customer milieu
– determine business viability ( read as: competitive advantage)
– Ensure delivery excellence
• The “service provider” / “EPC contractor” should develop
flexible, adaptive and innovative ways to market project
capabilities and operate beyond transactional (logic) response.
4
Background (1 / 5)
Industry “positioning” in India:
• Historical success and “optimistic” growth scenarios is not
enough
• Customer focus without technological competence is short-
sighted-ness
• Diversifying capabilities (to include industry-specific expertise
and consulting) as opposed to differentiating them
• Global “Plays” (by leveraging their competencies, breadth of
industry exposure and project execution capabilities) without
inclusiveness (segmented exposure)
Uncertainty in Proposals via Milieu Analysis in Engineering Outsourcing Industry
Level 3 behaviour – Leadership in Managing Uncertainty needed !
5
Background: Challenges for ESO (2 / 5)
• Teams are
– small in size, moderately skilled
– relegated to a support function in the minds of the customer's
engineering teams,
– use of the bottom of the talent pyramid (0-3years experience)
Uncertainty in Proposals via Milieu Analysis in Engineering Outsourcing Industry
• Projects are
– of short duration, needs to be delivered rapidly,
– lacks customer & industry big picture
– unable to absorb product liabilities.
– diffused scope statements which are lacking in specific work
expectation guidelines
• Customer Organizations are
– lack of clear engineering services outsourcing budgets
– emerging industry trends (low cost, specific functionality) create
over-optimistic expectations
6
Background: Current State of ESO (2 / 5)
• Teams are:
– small in size, moderately skilled
– relegated to a support function in the minds of the customer's
engineering teams,
– use of the bottom of the talent pyramid (0-3years experience)
Uncertainty in Proposals via Milieu Analysis in Engineering Outsourcing Industry
• Projects are
– of short duration, needs to be delivered rapidly,
– lacks customer & industry big picture
– unable to absorb product liabilities.
– diffused scope statements which are lacking in specific work
expectation guidelines
• Customer Organizations:
– lack of clear engineering services outsourcing budgets
– emerging industry trends (low cost, specific functionality) create
over-optimistic expectations
7
Background: Current State (3 / 5)
• Account / Customer-specific teams fall prey
– to discontinuous usage of engineer's skill, knowledge and
continuity in the type of work performed
– lacking both in maturity and value even though increased skill
level
– un-clear role among the various actors in the Proposal and
Delivery milieu
– significant effort for proposal creation – not billable
Uncertainty in Proposals via Milieu Analysis in Engineering Outsourcing Industry
The underlying uncertainties become risks and problem situations
• Organizational influence on poor proposals
– Undue impact of personality of the project account manager,
– Lack of synergy between sales and delivery teams,
– intense competition and attrition of account managers.
– unable to address the multiple levels of accountability in the
customer organization,
8
Background: Uncertainty Description (4 / 5)
Uncertainty in Proposals via Milieu Analysis in Engineering Outsourcing Industry
Category Type Uncertainty Description
Market
Internal
Business-specific (ESO is either an Imitator or
Innovator)
External
Market risk (Consumer specific, related to dynamic
aspects from PES(T)LE analysis)
Technology
Internal Novel to Organization not to the market
External Current work by your competitor (unknown to you)
People
Interaction &
Processes
Internal Motivation, Professional pride, organizational culture
External
Technical competence aligned to project
requirements
Customer
Relationship
& Information
Internal
Status of Sales-delivery synergy of internal milieu,
Tension from cultural dimensions mismatch
External
Status of Trust, Matching of requirement to
expectation between organization and customer
9
Background: Literature (5 / 5)
• Cova (2002) : reactive to pro-active approach to proposals
• Holstius (2xxx) : relational dimensions of proposals important
• Tikkanen (2007): two levels of relational dimensions
– (1)project level relations (2)firm-level relations
• Combined scope-schedule risks be managed at Proposal
level (Iyyunni 2013)
– address uncertainties: Market, Technology,
– role definition in the Milieu
Uncertainty in Proposals via Milieu Analysis in Engineering Outsourcing Industry
10
Proposal Dimensions (1 / 5)
• The interaction between actors in the Milieu that increases the
fitness of the proposal
• Two classes
– Functional class : Technical, Financial
– Relational class : Social, Political
Uncertainty in Proposals via Milieu Analysis in Engineering Outsourcing Industry
11
Proposal Dimensions (2 / 5)
• Technical:
– meet the technical specifications
– provide technical training to employees
– use of latest technology and offer customizations
– technology and domain knowledge availability
– technical resource availability
– alignment of technology with the scope of work
– certifications and accreditation
– access to and availability of infrastructure
– access to engineering consultants
– R&D activities in the sector
Uncertainty in Proposals via Milieu Analysis in Engineering Outsourcing Industry
12
Proposal Dimensions (3 / 5)
• Financial:
– favorable financial terms and conditions
– payment schedule and flexibility
– insurance against delivery problems
– Using right type of contract (fixed price, time and material,
profit-sharing etc.),
– financial risk assessment plan
Uncertainty in Proposals via Milieu Analysis in Engineering Outsourcing Industry
13
Proposal Dimensions (4 / 5)
• Social:
– extent of networking
– past customer feedback
– relationship with the end-user
– alignment with the vision, mission and goals with customer
– trust and reputation among customer's milieu
– articulation of the customer's need
– collaborative orientation of the customer
Uncertainty in Proposals via Milieu Analysis in Engineering Outsourcing Industry
14
Proposal Dimensions (5 / 5)
• Political:
– consideration of customer market position,
– market share of the product/service by customer
organization,
– ESO's market presence specific to service/solution
– local partners, referrals, influence on customer's milieu,
– understand and maintain clients reputation in industry-
segment and market
– customer's influence on peer-group in industry segment
– associationwith standard and professional bodies
– supply chain relationship,
– alignment to government regulations
Uncertainty in Proposals via Milieu Analysis in Engineering Outsourcing Industry
15
Why is a “Proposal” key to the organization?
Uncertainty in Proposals via Milieu Analysis in Engineering Outsourcing Industry
Illustration (1 / 4)
16
Illustration: Organizational Snap-shot (2 / 4)
• An ESO organization's account strategy is crucial to maintain a
sustained growth.
Uncertainty in Proposals via Milieu Analysis in Engineering Outsourcing Industry
• Account growth depends on success (size and volume )at
proposals
Data deleted
17
Illustration: Account snap-shot (3 / 4)
– Account Management is a complex process ~ market influences and
industry trends,
– customer organization's strategy and
– ESO‘s sales team priorities, technical team capabilities
– Age and Health of the accounts (mentioned in paper)
Uncertainty in Proposals via Milieu Analysis in Engineering Outsourcing Industry
Account
Number
Ratio of Current year to Previous Year Revenues
YoY-1 YoY-2 YoY-3 YoY-4
1 1.55 1.45 1.30 1.49
3 3.21 1.59 1.16 1.18
4 2.89 1.50 0.92 0.93
6 2.74 1.37 1.97 1.37
7 0.75 1.59 4.01 1.10
8 1.77 2.61 4.82 1.73
11 1.09 1.31 1.15 1.06
12 1.90 1.29 0.99 1.27
18
Illustration: Proposal Snap-shot (4 / 4)
• Proposals should be analyzed by industry type, market
conditions, customer profile, customer relationship parameters
Uncertainty in Proposals via Milieu Analysis in Engineering Outsourcing Industry
No. Proposal Description Win /
Loss
Reason for Win /
Loss
1
Large scale data (in PDM system) Win
Social, political,
Financial
2 Passenger bus for India launch Win Social, Political
3 Asset Management Win Technical
4 Large engineering engagement Win Social, Political
5
Engineering “Program” Win
Technical, Social,
Political
6
New PLM implementation program Loss
Social, Political,
Financial
7 Large Automotive design project Loss Technical
8 Medical device development Loss Political
19
Results: Proposal Characterization on
T,F,S,P dimensions (1 / 6)
Uncertainty in Proposals via Milieu Analysis in Engineering Outsourcing Industry
Proposal No. Rating on these aspects of Proposal
Technical Financial Social Political
1 4 4 3 3
2 4 4 3 3
3 4 4 4 3
4 3 4 3 3
5 4 3 3 4
6 4 4 2 2
7 2 4 3 3
8 3 4 1 1
• Customer profile is also a key determinant of proposal quality –
geography, market segment, R&D spend etc.
20
Results: Assessment (2 / 6)
Uncertainty in Proposals via Milieu Analysis in Engineering Outsourcing Industry
Dimension Scheme-1 Scheme-2 Scheme-3
Functional Technical 0.46 0.4 0.34
Financial 0.18 0.2 0.22
Relational Political 0.18 0.2 0.22
Social 0.18 0.2 0.22
Proposal No. Weighted assessment
Scheme-1 Scheme-2 Scheme-3
1 3.6 3.7 3.6
2 3.6 3.7 3.6
3 3.8 3.85 3.82
4 3.2 3.15 3.25
5 3.6 3.7 3.6
6 3.3 3.4 3.16
7 2.7 2.6 2.9
8 2.5 2.55 2.37
• cut-off score: (1) overall- 3.0 (2) technical dimension - 4.0
• 3.0 to 3.3 to be in the grey area (either a win or a loss)
21
Results: Milieu Characterization (3 / 6)
Internal Milieu
External Milieu
Uncertainty in Proposals via
Use for managing the appropriate
dimensions
Milieu Engagement plans by
Proposal Project Manager.
22
Results: Conclusion ( 4 / 6)
Uncertainty in Proposals via Milieu Analysis in Engineering Outsourcing Industry
Category Type Stakeholder Responsible
Proposal
dimension
Market
I Senior Marketing team Political
E
Sales person, Vertical Head Social,
Political
Technology
I Subject Matter Expert Technical
E Discipline Team Technical
People
Interaction &
Processes
I
Project Manager/ Account manager
; Delivery Team
Social
E Resource Management Team Social
Customer
Relationship
& information
I
Account Manager Social,
Political
E
Project Lead/ Project Manager Social,
Technical
I – Internal ; E – External
• Every stakeholder has a key role to play for ensuring proposal quality!
23
Results: Conclusion ( 5 / 6)
Uncertainty in Proposals via
• Invest to Build robust project/ program pipeline
• Stakeholder / Milieu role clarity is vital and crucial
24
Results: Future Work (6 / 6)
Uncertainty in Proposals via Milieu Analysis in Engineering Outsourcing Industry
What else?
Translating our understanding of
customer needs to functional and
relational dimensions
How?
2nd level of parameters listed here.
25
Summary ( 1/ 2)
• Relational dimensions play an important role in winning
proposals.
• Pre-sales practices facilitating intense action ‘upstream' of
project by anticipating, defining and constructing of project
scopes have to be developed and refined.
• Managing relationships and networks, during a proposal life-
cycle, and good decision making methodologies (like AHP) are
crucial. (PMBOK 5th Edition, Stakeholder engagement process
group)
Uncertainty in Proposals via Milieu Analysis in Engineering Outsourcing Industry
26
Summary: Directions and Good News (2 / 2)
Uncertainty in Proposals via
The Good news
• Engineering Service Organizations have understood the need
for relational dimensions. A rough guess that 40-60% revenues
come without the need to bid.
Directions
• Strategy dimensions: (1) Articulation of Customer need (2)
organization’s ability to differentiate technology for meeting the
need
• Measurement on the Social, Political dimensions and maturity (a la
CMM) is yet a distant goal.
• Correct excessive Customer focus with technological competence”
27
Thank You.
Presentation Title

More Related Content

What's hot

Presentation by anipriya p
Presentation by anipriya pPresentation by anipriya p
Presentation by anipriya pPMI_IREP_TP
 
Presentation by piyush jain
Presentation by piyush jainPresentation by piyush jain
Presentation by piyush jainPMI_IREP_TP
 
Presentation by Gaurav Sapra
Presentation by Gaurav SapraPresentation by Gaurav Sapra
Presentation by Gaurav SapraPMI_IREP_TP
 
Presentation by parag saha
Presentation by parag sahaPresentation by parag saha
Presentation by parag sahaPMI_IREP_TP
 
Presentation by subhajit bhattacharya1
Presentation by subhajit bhattacharya1Presentation by subhajit bhattacharya1
Presentation by subhajit bhattacharya1PMI_IREP_TP
 
Presentation by shreyas bhargave
Presentation by shreyas bhargavePresentation by shreyas bhargave
Presentation by shreyas bhargavePMI_IREP_TP
 
How to Increase the Value of the PMMMs as a Business-oriented Framework
How to Increase the Value of the PMMMs as a Business-oriented FrameworkHow to Increase the Value of the PMMMs as a Business-oriented Framework
How to Increase the Value of the PMMMs as a Business-oriented FrameworkYasmin AbdelAziz
 
Universal Association Proposal
Universal Association ProposalUniversal Association Proposal
Universal Association ProposalCheryl Litwinczuk
 
Welingkar_final project_ppt_IMPORTANCE & NEED FOR TESTING
Welingkar_final project_ppt_IMPORTANCE & NEED FOR TESTINGWelingkar_final project_ppt_IMPORTANCE & NEED FOR TESTING
Welingkar_final project_ppt_IMPORTANCE & NEED FOR TESTINGSachin Pathania
 
Chap 2 Organization Strategy
Chap 2 Organization StrategyChap 2 Organization Strategy
Chap 2 Organization Strategyproject management
 
What is analytics
What is analyticsWhat is analytics
What is analyticsshweta saxena
 
Project Organizational Responsibility Model - ORM
Project Organizational Responsibility Model -  ORMProject Organizational Responsibility Model -  ORM
Project Organizational Responsibility Model - ORMGuttenberg Ferreira Passos
 
Strategic Analysis Framework
Strategic Analysis FrameworkStrategic Analysis Framework
Strategic Analysis FrameworkDavid Tracy
 
Jagadeesh dv abhaydesai
Jagadeesh dv abhaydesaiJagadeesh dv abhaydesai
Jagadeesh dv abhaydesaiPMI2011
 
Investment pattern v25_jul2012
Investment pattern v25_jul2012Investment pattern v25_jul2012
Investment pattern v25_jul2012Sunia Mukherjee
 
Project Selection Model
Project Selection ModelProject Selection Model
Project Selection ModelErsen çelebi
 
Project and program management differences
Project and program management differencesProject and program management differences
Project and program management differencesLee D Clemons MBA, PMP, CSM
 
The Total Economic Impact of Using ThoughtWorks' Agile Development Approach
The Total Economic Impact of Using ThoughtWorks' Agile Development ApproachThe Total Economic Impact of Using ThoughtWorks' Agile Development Approach
The Total Economic Impact of Using ThoughtWorks' Agile Development ApproachThoughtworks
 
Day 0 Introduction to PM
Day 0   Introduction to PMDay 0   Introduction to PM
Day 0 Introduction to PMJoyce Wong
 

What's hot (20)

Presentation by anipriya p
Presentation by anipriya pPresentation by anipriya p
Presentation by anipriya p
 
Presentation by piyush jain
Presentation by piyush jainPresentation by piyush jain
Presentation by piyush jain
 
Presentation by Gaurav Sapra
Presentation by Gaurav SapraPresentation by Gaurav Sapra
Presentation by Gaurav Sapra
 
Presentation by parag saha
Presentation by parag sahaPresentation by parag saha
Presentation by parag saha
 
Presentation by subhajit bhattacharya1
Presentation by subhajit bhattacharya1Presentation by subhajit bhattacharya1
Presentation by subhajit bhattacharya1
 
Presentation by shreyas bhargave
Presentation by shreyas bhargavePresentation by shreyas bhargave
Presentation by shreyas bhargave
 
How to Increase the Value of the PMMMs as a Business-oriented Framework
How to Increase the Value of the PMMMs as a Business-oriented FrameworkHow to Increase the Value of the PMMMs as a Business-oriented Framework
How to Increase the Value of the PMMMs as a Business-oriented Framework
 
Universal Association Proposal
Universal Association ProposalUniversal Association Proposal
Universal Association Proposal
 
Welingkar_final project_ppt_IMPORTANCE & NEED FOR TESTING
Welingkar_final project_ppt_IMPORTANCE & NEED FOR TESTINGWelingkar_final project_ppt_IMPORTANCE & NEED FOR TESTING
Welingkar_final project_ppt_IMPORTANCE & NEED FOR TESTING
 
Chap 2 Organization Strategy
Chap 2 Organization StrategyChap 2 Organization Strategy
Chap 2 Organization Strategy
 
What is analytics
What is analyticsWhat is analytics
What is analytics
 
Project Organizational Responsibility Model - ORM
Project Organizational Responsibility Model -  ORMProject Organizational Responsibility Model -  ORM
Project Organizational Responsibility Model - ORM
 
Strategic Analysis Framework
Strategic Analysis FrameworkStrategic Analysis Framework
Strategic Analysis Framework
 
Jagadeesh dv abhaydesai
Jagadeesh dv abhaydesaiJagadeesh dv abhaydesai
Jagadeesh dv abhaydesai
 
Investment pattern v25_jul2012
Investment pattern v25_jul2012Investment pattern v25_jul2012
Investment pattern v25_jul2012
 
Project Selection Model
Project Selection ModelProject Selection Model
Project Selection Model
 
Project and program management differences
Project and program management differencesProject and program management differences
Project and program management differences
 
G037036048
G037036048G037036048
G037036048
 
The Total Economic Impact of Using ThoughtWorks' Agile Development Approach
The Total Economic Impact of Using ThoughtWorks' Agile Development ApproachThe Total Economic Impact of Using ThoughtWorks' Agile Development Approach
The Total Economic Impact of Using ThoughtWorks' Agile Development Approach
 
Day 0 Introduction to PM
Day 0   Introduction to PMDay 0   Introduction to PM
Day 0 Introduction to PM
 

Viewers also liked

Ch12 milieu therapy(3) (1)
Ch12 milieu therapy(3) (1)Ch12 milieu therapy(3) (1)
Ch12 milieu therapy(3) (1)philipgroza
 
Physic Project
Physic ProjectPhysic Project
Physic Projectcrazyelly
 
Chapter viii education in the new milieu
Chapter viii education in the new milieuChapter viii education in the new milieu
Chapter viii education in the new milieuCynthia Buque
 
Milieu therapy or therapeutic community
Milieu therapy or therapeutic communityMilieu therapy or therapeutic community
Milieu therapy or therapeutic communityDeblina Roy
 
Wind Energy Project Analysis
Wind Energy Project AnalysisWind Energy Project Analysis
Wind Energy Project AnalysisLeonardo ENERGY
 
Windstream - Wind Mills of Change
Windstream - Wind Mills of ChangeWindstream - Wind Mills of Change
Windstream - Wind Mills of ChangeKaren Ostromecki
 
wind energy Seminar
 wind energy Seminar wind energy Seminar
wind energy Seminarashine288
 
Wind energy basics
Wind energy basicsWind energy basics
Wind energy basicsNirav Daraniya
 
Wind Power Point Presentation
Wind Power Point PresentationWind Power Point Presentation
Wind Power Point PresentationKurt Kublbeck
 
Tender Process | A Complete Procurement Guide
Tender Process | A Complete Procurement GuideTender Process | A Complete Procurement Guide
Tender Process | A Complete Procurement GuideTender Process
 

Viewers also liked (11)

Ch12 milieu therapy(3) (1)
Ch12 milieu therapy(3) (1)Ch12 milieu therapy(3) (1)
Ch12 milieu therapy(3) (1)
 
Physic Project
Physic ProjectPhysic Project
Physic Project
 
Milieu therapy
Milieu therapyMilieu therapy
Milieu therapy
 
Chapter viii education in the new milieu
Chapter viii education in the new milieuChapter viii education in the new milieu
Chapter viii education in the new milieu
 
Milieu therapy or therapeutic community
Milieu therapy or therapeutic communityMilieu therapy or therapeutic community
Milieu therapy or therapeutic community
 
Wind Energy Project Analysis
Wind Energy Project AnalysisWind Energy Project Analysis
Wind Energy Project Analysis
 
Windstream - Wind Mills of Change
Windstream - Wind Mills of ChangeWindstream - Wind Mills of Change
Windstream - Wind Mills of Change
 
wind energy Seminar
 wind energy Seminar wind energy Seminar
wind energy Seminar
 
Wind energy basics
Wind energy basicsWind energy basics
Wind energy basics
 
Wind Power Point Presentation
Wind Power Point PresentationWind Power Point Presentation
Wind Power Point Presentation
 
Tender Process | A Complete Procurement Guide
Tender Process | A Complete Procurement GuideTender Process | A Complete Procurement Guide
Tender Process | A Complete Procurement Guide
 

Similar to Final chakradhar purohith proposal milieu analysis (without account data unpublished)

Day 1 1505 - 1550 - maple - chakradhar purohith
Day 1   1505 - 1550 - maple - chakradhar purohithDay 1   1505 - 1550 - maple - chakradhar purohith
Day 1 1505 - 1550 - maple - chakradhar purohithPMI2011
 
Day 201-20-201505-20-201550-20-20maple-20-20chakradhar-20purohith-13100801575...
Day 201-20-201505-20-201550-20-20maple-20-20chakradhar-20purohith-13100801575...Day 201-20-201505-20-201550-20-20maple-20-20chakradhar-20purohith-13100801575...
Day 201-20-201505-20-201550-20-20maple-20-20chakradhar-20purohith-13100801575...PMI_IREP_TP
 
20140831_Cirriculum Vitae
20140831_Cirriculum Vitae20140831_Cirriculum Vitae
20140831_Cirriculum VitaeIsh Preet Singh
 
M&E Module 4.docx
M&E Module 4.docxM&E Module 4.docx
M&E Module 4.docxswamy62
 
TET_Material_1_ BPlan_TechnoEconomicFeasibility_25.08.2015 - Copy.pdf
TET_Material_1_ BPlan_TechnoEconomicFeasibility_25.08.2015 - Copy.pdfTET_Material_1_ BPlan_TechnoEconomicFeasibility_25.08.2015 - Copy.pdf
TET_Material_1_ BPlan_TechnoEconomicFeasibility_25.08.2015 - Copy.pdfAmanKumar527652
 
Management & Engineering Consulting Services
Management & Engineering Consulting ServicesManagement & Engineering Consulting Services
Management & Engineering Consulting ServicesSSCG Consulting
 
Module 1 project planning and appraisal
Module 1 project planning and appraisalModule 1 project planning and appraisal
Module 1 project planning and appraisaldmkanchepalya
 
Project Selection
Project SelectionProject Selection
Project SelectionIan Cammack
 
Chakradhar iyyunniandmonikas purohith
Chakradhar iyyunniandmonikas purohithChakradhar iyyunniandmonikas purohith
Chakradhar iyyunniandmonikas purohithPMI2011
 
Chakradhariyyunniandmonikaspurohith 131008015751-phpapp01
Chakradhariyyunniandmonikaspurohith 131008015751-phpapp01Chakradhariyyunniandmonikaspurohith 131008015751-phpapp01
Chakradhariyyunniandmonikaspurohith 131008015751-phpapp01PMI_IREP_TP
 
J-Knolla Presentation S1000D Users Forum 2015-W-Notes
J-Knolla Presentation S1000D Users Forum 2015-W-NotesJ-Knolla Presentation S1000D Users Forum 2015-W-Notes
J-Knolla Presentation S1000D Users Forum 2015-W-NotesJohn Knolla
 
project management
project managementproject management
project managementKomalaselvanV1
 
2.requirements management
2.requirements management2.requirements management
2.requirements managementPanos Fitsilis
 
1 P a g e ECM40IS ISIT Strategy Coursework.docx
1  P a g e  ECM40IS ISIT Strategy  Coursework.docx1  P a g e  ECM40IS ISIT Strategy  Coursework.docx
1 P a g e ECM40IS ISIT Strategy Coursework.docxhoney725342
 
PSY 616 Milestone Three Guidelines and Rubric StrategyOverview.docx
PSY 616 Milestone Three Guidelines and Rubric StrategyOverview.docxPSY 616 Milestone Three Guidelines and Rubric StrategyOverview.docx
PSY 616 Milestone Three Guidelines and Rubric StrategyOverview.docxpotmanandrea
 
Resume Preparation Best practices
Resume Preparation Best practices Resume Preparation Best practices
Resume Preparation Best practices SupportGCI
 
Proposal For Designing And Proposing Business Research Project PowerPoint Pre...
Proposal For Designing And Proposing Business Research Project PowerPoint Pre...Proposal For Designing And Proposing Business Research Project PowerPoint Pre...
Proposal For Designing And Proposing Business Research Project PowerPoint Pre...SlideTeam
 
Entrepreneurship : project
Entrepreneurship : projectEntrepreneurship : project
Entrepreneurship : projectshweta saxena
 

Similar to Final chakradhar purohith proposal milieu analysis (without account data unpublished) (20)

Day 1 1505 - 1550 - maple - chakradhar purohith
Day 1   1505 - 1550 - maple - chakradhar purohithDay 1   1505 - 1550 - maple - chakradhar purohith
Day 1 1505 - 1550 - maple - chakradhar purohith
 
Day 201-20-201505-20-201550-20-20maple-20-20chakradhar-20purohith-13100801575...
Day 201-20-201505-20-201550-20-20maple-20-20chakradhar-20purohith-13100801575...Day 201-20-201505-20-201550-20-20maple-20-20chakradhar-20purohith-13100801575...
Day 201-20-201505-20-201550-20-20maple-20-20chakradhar-20purohith-13100801575...
 
20140831_Cirriculum Vitae
20140831_Cirriculum Vitae20140831_Cirriculum Vitae
20140831_Cirriculum Vitae
 
M&E Module 4.docx
M&E Module 4.docxM&E Module 4.docx
M&E Module 4.docx
 
TET_Material_1_ BPlan_TechnoEconomicFeasibility_25.08.2015 - Copy.pdf
TET_Material_1_ BPlan_TechnoEconomicFeasibility_25.08.2015 - Copy.pdfTET_Material_1_ BPlan_TechnoEconomicFeasibility_25.08.2015 - Copy.pdf
TET_Material_1_ BPlan_TechnoEconomicFeasibility_25.08.2015 - Copy.pdf
 
Management & Engineering Consulting Services
Management & Engineering Consulting ServicesManagement & Engineering Consulting Services
Management & Engineering Consulting Services
 
Module 1 project planning and appraisal
Module 1 project planning and appraisalModule 1 project planning and appraisal
Module 1 project planning and appraisal
 
Project Selection
Project SelectionProject Selection
Project Selection
 
Chakradhar iyyunniandmonikas purohith
Chakradhar iyyunniandmonikas purohithChakradhar iyyunniandmonikas purohith
Chakradhar iyyunniandmonikas purohith
 
Chakradhariyyunniandmonikaspurohith 131008015751-phpapp01
Chakradhariyyunniandmonikaspurohith 131008015751-phpapp01Chakradhariyyunniandmonikaspurohith 131008015751-phpapp01
Chakradhariyyunniandmonikaspurohith 131008015751-phpapp01
 
J-Knolla Presentation S1000D Users Forum 2015-W-Notes
J-Knolla Presentation S1000D Users Forum 2015-W-NotesJ-Knolla Presentation S1000D Users Forum 2015-W-Notes
J-Knolla Presentation S1000D Users Forum 2015-W-Notes
 
project management
project managementproject management
project management
 
2.requirements management
2.requirements management2.requirements management
2.requirements management
 
Pm 2 (1)
Pm 2 (1)Pm 2 (1)
Pm 2 (1)
 
1 P a g e ECM40IS ISIT Strategy Coursework.docx
1  P a g e  ECM40IS ISIT Strategy  Coursework.docx1  P a g e  ECM40IS ISIT Strategy  Coursework.docx
1 P a g e ECM40IS ISIT Strategy Coursework.docx
 
PSY 616 Milestone Three Guidelines and Rubric StrategyOverview.docx
PSY 616 Milestone Three Guidelines and Rubric StrategyOverview.docxPSY 616 Milestone Three Guidelines and Rubric StrategyOverview.docx
PSY 616 Milestone Three Guidelines and Rubric StrategyOverview.docx
 
Resume Preparation Best practices
Resume Preparation Best practices Resume Preparation Best practices
Resume Preparation Best practices
 
Proposal For Designing And Proposing Business Research Project PowerPoint Pre...
Proposal For Designing And Proposing Business Research Project PowerPoint Pre...Proposal For Designing And Proposing Business Research Project PowerPoint Pre...
Proposal For Designing And Proposing Business Research Project PowerPoint Pre...
 
PROJECT LIFE CYCLE
PROJECT LIFE CYCLEPROJECT LIFE CYCLE
PROJECT LIFE CYCLE
 
Entrepreneurship : project
Entrepreneurship : projectEntrepreneurship : project
Entrepreneurship : project
 

More from PMI2011

Bhavesh pmi final
Bhavesh  pmi finalBhavesh  pmi final
Bhavesh pmi finalPMI2011
 
Day 1 1410 - 1455 - pearl 2 - vijay sane
Day 1   1410 - 1455 - pearl 2 - vijay saneDay 1   1410 - 1455 - pearl 2 - vijay sane
Day 1 1410 - 1455 - pearl 2 - vijay sanePMI2011
 
Day 1 1620 - 1705 - maple - pranabendu bhattacharyya
Day 1   1620 - 1705 - maple - pranabendu bhattacharyyaDay 1   1620 - 1705 - maple - pranabendu bhattacharyya
Day 1 1620 - 1705 - maple - pranabendu bhattacharyyaPMI2011
 
Wilso anandaraj balasubramaniankrishnamurthy
Wilso anandaraj balasubramaniankrishnamurthyWilso anandaraj balasubramaniankrishnamurthy
Wilso anandaraj balasubramaniankrishnamurthyPMI2011
 
Vs velan dchakravarty_ppchakraborti
Vs velan dchakravarty_ppchakrabortiVs velan dchakravarty_ppchakraborti
Vs velan dchakravarty_ppchakrabortiPMI2011
 
Vineet jain
Vineet jainVineet jain
Vineet jainPMI2011
 
Yamuna padmanaban
Yamuna padmanabanYamuna padmanaban
Yamuna padmanabanPMI2011
 
Vimal kumarkhanna
Vimal kumarkhannaVimal kumarkhanna
Vimal kumarkhannaPMI2011
 
Venkatraman l
Venkatraman lVenkatraman l
Venkatraman lPMI2011
 
Soumen de
Soumen deSoumen de
Soumen dePMI2011
 
Sujit sopan barhate
Sujit sopan barhateSujit sopan barhate
Sujit sopan barhatePMI2011
 
Sharad pandey abhisek goswami
Sharad pandey abhisek goswamiSharad pandey abhisek goswami
Sharad pandey abhisek goswamiPMI2011
 
Soma roy sarkar
Soma roy sarkarSoma roy sarkar
Soma roy sarkarPMI2011
 
Shallu soni mymoonshabana_lavanya raghuraman
Shallu soni mymoonshabana_lavanya raghuramanShallu soni mymoonshabana_lavanya raghuraman
Shallu soni mymoonshabana_lavanya raghuramanPMI2011
 
Regeena pererira sujithn_rai_suchitrajoyceb
Regeena pererira sujithn_rai_suchitrajoycebRegeena pererira sujithn_rai_suchitrajoyceb
Regeena pererira sujithn_rai_suchitrajoycebPMI2011
 
Ramesh ganiga
Ramesh ganigaRamesh ganiga
Ramesh ganigaPMI2011
 
Pranabendu
PranabenduPranabendu
PranabenduPMI2011
 
Rt sundari ashutosh_pandey
Rt sundari ashutosh_pandeyRt sundari ashutosh_pandey
Rt sundari ashutosh_pandeyPMI2011
 
Pradeep n singh_praveenkyadav
Pradeep n singh_praveenkyadavPradeep n singh_praveenkyadav
Pradeep n singh_praveenkyadavPMI2011
 
Parvathi karthik
Parvathi karthikParvathi karthik
Parvathi karthikPMI2011
 

More from PMI2011 (20)

Bhavesh pmi final
Bhavesh  pmi finalBhavesh  pmi final
Bhavesh pmi final
 
Day 1 1410 - 1455 - pearl 2 - vijay sane
Day 1   1410 - 1455 - pearl 2 - vijay saneDay 1   1410 - 1455 - pearl 2 - vijay sane
Day 1 1410 - 1455 - pearl 2 - vijay sane
 
Day 1 1620 - 1705 - maple - pranabendu bhattacharyya
Day 1   1620 - 1705 - maple - pranabendu bhattacharyyaDay 1   1620 - 1705 - maple - pranabendu bhattacharyya
Day 1 1620 - 1705 - maple - pranabendu bhattacharyya
 
Wilso anandaraj balasubramaniankrishnamurthy
Wilso anandaraj balasubramaniankrishnamurthyWilso anandaraj balasubramaniankrishnamurthy
Wilso anandaraj balasubramaniankrishnamurthy
 
Vs velan dchakravarty_ppchakraborti
Vs velan dchakravarty_ppchakrabortiVs velan dchakravarty_ppchakraborti
Vs velan dchakravarty_ppchakraborti
 
Vineet jain
Vineet jainVineet jain
Vineet jain
 
Yamuna padmanaban
Yamuna padmanabanYamuna padmanaban
Yamuna padmanaban
 
Vimal kumarkhanna
Vimal kumarkhannaVimal kumarkhanna
Vimal kumarkhanna
 
Venkatraman l
Venkatraman lVenkatraman l
Venkatraman l
 
Soumen de
Soumen deSoumen de
Soumen de
 
Sujit sopan barhate
Sujit sopan barhateSujit sopan barhate
Sujit sopan barhate
 
Sharad pandey abhisek goswami
Sharad pandey abhisek goswamiSharad pandey abhisek goswami
Sharad pandey abhisek goswami
 
Soma roy sarkar
Soma roy sarkarSoma roy sarkar
Soma roy sarkar
 
Shallu soni mymoonshabana_lavanya raghuraman
Shallu soni mymoonshabana_lavanya raghuramanShallu soni mymoonshabana_lavanya raghuraman
Shallu soni mymoonshabana_lavanya raghuraman
 
Regeena pererira sujithn_rai_suchitrajoyceb
Regeena pererira sujithn_rai_suchitrajoycebRegeena pererira sujithn_rai_suchitrajoyceb
Regeena pererira sujithn_rai_suchitrajoyceb
 
Ramesh ganiga
Ramesh ganigaRamesh ganiga
Ramesh ganiga
 
Pranabendu
PranabenduPranabendu
Pranabendu
 
Rt sundari ashutosh_pandey
Rt sundari ashutosh_pandeyRt sundari ashutosh_pandey
Rt sundari ashutosh_pandey
 
Pradeep n singh_praveenkyadav
Pradeep n singh_praveenkyadavPradeep n singh_praveenkyadav
Pradeep n singh_praveenkyadav
 
Parvathi karthik
Parvathi karthikParvathi karthik
Parvathi karthik
 

Recently uploaded

APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxFinancial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxsaniyaimamuddin
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Peter Ward
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environmentelijahj01012
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfShashank Mehta
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Doge Mining Website
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
8447779800, Low rate Call girls in Dwarka mor Delhi NCR
8447779800, Low rate Call girls in Dwarka mor Delhi NCR8447779800, Low rate Call girls in Dwarka mor Delhi NCR
8447779800, Low rate Call girls in Dwarka mor Delhi NCRashishs7044
 

Recently uploaded (20)

APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxFinancial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environment
 
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdf
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
8447779800, Low rate Call girls in Dwarka mor Delhi NCR
8447779800, Low rate Call girls in Dwarka mor Delhi NCR8447779800, Low rate Call girls in Dwarka mor Delhi NCR
8447779800, Low rate Call girls in Dwarka mor Delhi NCR
 

Final chakradhar purohith proposal milieu analysis (without account data unpublished)

  • 1. 1 Uncertainty analysis of Proposals via Milieu Analysis Chakradhar Iyyunni, Ph.D. , Faculty L&T Institute of Project Management Monika S. Purohith, PGPEM Student, NICMAR, Pune 27 September 2013
  • 2. 2Uncertainty in Proposals via Milieu Analysis in Engineering Outsourcing Industry Agenda Plan for the talk Motivation – 1 slide Background – 5 slides Proposal : Role and Characterization of – 5 slides An Illustration – 4 slides Results, Conclusion, Future Work – 6 slides Summary – 2 slides
  • 3. 3 Motivation • With the induction of “Stakeholder Management” knowledge area into PMBOK 5th Edition, we explore its influence on Project Proposals. Uncertainty in Proposals via Milieu Analysis in Engineering Outsourcing Industry • The premise in the work relates to the important role given to the project proposal – address the needs of the customer milieu – determine business viability ( read as: competitive advantage) – Ensure delivery excellence • The “service provider” / “EPC contractor” should develop flexible, adaptive and innovative ways to market project capabilities and operate beyond transactional (logic) response.
  • 4. 4 Background (1 / 5) Industry “positioning” in India: • Historical success and “optimistic” growth scenarios is not enough • Customer focus without technological competence is short- sighted-ness • Diversifying capabilities (to include industry-specific expertise and consulting) as opposed to differentiating them • Global “Plays” (by leveraging their competencies, breadth of industry exposure and project execution capabilities) without inclusiveness (segmented exposure) Uncertainty in Proposals via Milieu Analysis in Engineering Outsourcing Industry Level 3 behaviour – Leadership in Managing Uncertainty needed !
  • 5. 5 Background: Challenges for ESO (2 / 5) • Teams are – small in size, moderately skilled – relegated to a support function in the minds of the customer's engineering teams, – use of the bottom of the talent pyramid (0-3years experience) Uncertainty in Proposals via Milieu Analysis in Engineering Outsourcing Industry • Projects are – of short duration, needs to be delivered rapidly, – lacks customer & industry big picture – unable to absorb product liabilities. – diffused scope statements which are lacking in specific work expectation guidelines • Customer Organizations are – lack of clear engineering services outsourcing budgets – emerging industry trends (low cost, specific functionality) create over-optimistic expectations
  • 6. 6 Background: Current State of ESO (2 / 5) • Teams are: – small in size, moderately skilled – relegated to a support function in the minds of the customer's engineering teams, – use of the bottom of the talent pyramid (0-3years experience) Uncertainty in Proposals via Milieu Analysis in Engineering Outsourcing Industry • Projects are – of short duration, needs to be delivered rapidly, – lacks customer & industry big picture – unable to absorb product liabilities. – diffused scope statements which are lacking in specific work expectation guidelines • Customer Organizations: – lack of clear engineering services outsourcing budgets – emerging industry trends (low cost, specific functionality) create over-optimistic expectations
  • 7. 7 Background: Current State (3 / 5) • Account / Customer-specific teams fall prey – to discontinuous usage of engineer's skill, knowledge and continuity in the type of work performed – lacking both in maturity and value even though increased skill level – un-clear role among the various actors in the Proposal and Delivery milieu – significant effort for proposal creation – not billable Uncertainty in Proposals via Milieu Analysis in Engineering Outsourcing Industry The underlying uncertainties become risks and problem situations • Organizational influence on poor proposals – Undue impact of personality of the project account manager, – Lack of synergy between sales and delivery teams, – intense competition and attrition of account managers. – unable to address the multiple levels of accountability in the customer organization,
  • 8. 8 Background: Uncertainty Description (4 / 5) Uncertainty in Proposals via Milieu Analysis in Engineering Outsourcing Industry Category Type Uncertainty Description Market Internal Business-specific (ESO is either an Imitator or Innovator) External Market risk (Consumer specific, related to dynamic aspects from PES(T)LE analysis) Technology Internal Novel to Organization not to the market External Current work by your competitor (unknown to you) People Interaction & Processes Internal Motivation, Professional pride, organizational culture External Technical competence aligned to project requirements Customer Relationship & Information Internal Status of Sales-delivery synergy of internal milieu, Tension from cultural dimensions mismatch External Status of Trust, Matching of requirement to expectation between organization and customer
  • 9. 9 Background: Literature (5 / 5) • Cova (2002) : reactive to pro-active approach to proposals • Holstius (2xxx) : relational dimensions of proposals important • Tikkanen (2007): two levels of relational dimensions – (1)project level relations (2)firm-level relations • Combined scope-schedule risks be managed at Proposal level (Iyyunni 2013) – address uncertainties: Market, Technology, – role definition in the Milieu Uncertainty in Proposals via Milieu Analysis in Engineering Outsourcing Industry
  • 10. 10 Proposal Dimensions (1 / 5) • The interaction between actors in the Milieu that increases the fitness of the proposal • Two classes – Functional class : Technical, Financial – Relational class : Social, Political Uncertainty in Proposals via Milieu Analysis in Engineering Outsourcing Industry
  • 11. 11 Proposal Dimensions (2 / 5) • Technical: – meet the technical specifications – provide technical training to employees – use of latest technology and offer customizations – technology and domain knowledge availability – technical resource availability – alignment of technology with the scope of work – certifications and accreditation – access to and availability of infrastructure – access to engineering consultants – R&D activities in the sector Uncertainty in Proposals via Milieu Analysis in Engineering Outsourcing Industry
  • 12. 12 Proposal Dimensions (3 / 5) • Financial: – favorable financial terms and conditions – payment schedule and flexibility – insurance against delivery problems – Using right type of contract (fixed price, time and material, profit-sharing etc.), – financial risk assessment plan Uncertainty in Proposals via Milieu Analysis in Engineering Outsourcing Industry
  • 13. 13 Proposal Dimensions (4 / 5) • Social: – extent of networking – past customer feedback – relationship with the end-user – alignment with the vision, mission and goals with customer – trust and reputation among customer's milieu – articulation of the customer's need – collaborative orientation of the customer Uncertainty in Proposals via Milieu Analysis in Engineering Outsourcing Industry
  • 14. 14 Proposal Dimensions (5 / 5) • Political: – consideration of customer market position, – market share of the product/service by customer organization, – ESO's market presence specific to service/solution – local partners, referrals, influence on customer's milieu, – understand and maintain clients reputation in industry- segment and market – customer's influence on peer-group in industry segment – associationwith standard and professional bodies – supply chain relationship, – alignment to government regulations Uncertainty in Proposals via Milieu Analysis in Engineering Outsourcing Industry
  • 15. 15 Why is a “Proposal” key to the organization? Uncertainty in Proposals via Milieu Analysis in Engineering Outsourcing Industry Illustration (1 / 4)
  • 16. 16 Illustration: Organizational Snap-shot (2 / 4) • An ESO organization's account strategy is crucial to maintain a sustained growth. Uncertainty in Proposals via Milieu Analysis in Engineering Outsourcing Industry • Account growth depends on success (size and volume )at proposals Data deleted
  • 17. 17 Illustration: Account snap-shot (3 / 4) – Account Management is a complex process ~ market influences and industry trends, – customer organization's strategy and – ESO‘s sales team priorities, technical team capabilities – Age and Health of the accounts (mentioned in paper) Uncertainty in Proposals via Milieu Analysis in Engineering Outsourcing Industry Account Number Ratio of Current year to Previous Year Revenues YoY-1 YoY-2 YoY-3 YoY-4 1 1.55 1.45 1.30 1.49 3 3.21 1.59 1.16 1.18 4 2.89 1.50 0.92 0.93 6 2.74 1.37 1.97 1.37 7 0.75 1.59 4.01 1.10 8 1.77 2.61 4.82 1.73 11 1.09 1.31 1.15 1.06 12 1.90 1.29 0.99 1.27
  • 18. 18 Illustration: Proposal Snap-shot (4 / 4) • Proposals should be analyzed by industry type, market conditions, customer profile, customer relationship parameters Uncertainty in Proposals via Milieu Analysis in Engineering Outsourcing Industry No. Proposal Description Win / Loss Reason for Win / Loss 1 Large scale data (in PDM system) Win Social, political, Financial 2 Passenger bus for India launch Win Social, Political 3 Asset Management Win Technical 4 Large engineering engagement Win Social, Political 5 Engineering “Program” Win Technical, Social, Political 6 New PLM implementation program Loss Social, Political, Financial 7 Large Automotive design project Loss Technical 8 Medical device development Loss Political
  • 19. 19 Results: Proposal Characterization on T,F,S,P dimensions (1 / 6) Uncertainty in Proposals via Milieu Analysis in Engineering Outsourcing Industry Proposal No. Rating on these aspects of Proposal Technical Financial Social Political 1 4 4 3 3 2 4 4 3 3 3 4 4 4 3 4 3 4 3 3 5 4 3 3 4 6 4 4 2 2 7 2 4 3 3 8 3 4 1 1 • Customer profile is also a key determinant of proposal quality – geography, market segment, R&D spend etc.
  • 20. 20 Results: Assessment (2 / 6) Uncertainty in Proposals via Milieu Analysis in Engineering Outsourcing Industry Dimension Scheme-1 Scheme-2 Scheme-3 Functional Technical 0.46 0.4 0.34 Financial 0.18 0.2 0.22 Relational Political 0.18 0.2 0.22 Social 0.18 0.2 0.22 Proposal No. Weighted assessment Scheme-1 Scheme-2 Scheme-3 1 3.6 3.7 3.6 2 3.6 3.7 3.6 3 3.8 3.85 3.82 4 3.2 3.15 3.25 5 3.6 3.7 3.6 6 3.3 3.4 3.16 7 2.7 2.6 2.9 8 2.5 2.55 2.37 • cut-off score: (1) overall- 3.0 (2) technical dimension - 4.0 • 3.0 to 3.3 to be in the grey area (either a win or a loss)
  • 21. 21 Results: Milieu Characterization (3 / 6) Internal Milieu External Milieu Uncertainty in Proposals via Use for managing the appropriate dimensions Milieu Engagement plans by Proposal Project Manager.
  • 22. 22 Results: Conclusion ( 4 / 6) Uncertainty in Proposals via Milieu Analysis in Engineering Outsourcing Industry Category Type Stakeholder Responsible Proposal dimension Market I Senior Marketing team Political E Sales person, Vertical Head Social, Political Technology I Subject Matter Expert Technical E Discipline Team Technical People Interaction & Processes I Project Manager/ Account manager ; Delivery Team Social E Resource Management Team Social Customer Relationship & information I Account Manager Social, Political E Project Lead/ Project Manager Social, Technical I – Internal ; E – External • Every stakeholder has a key role to play for ensuring proposal quality!
  • 23. 23 Results: Conclusion ( 5 / 6) Uncertainty in Proposals via • Invest to Build robust project/ program pipeline • Stakeholder / Milieu role clarity is vital and crucial
  • 24. 24 Results: Future Work (6 / 6) Uncertainty in Proposals via Milieu Analysis in Engineering Outsourcing Industry What else? Translating our understanding of customer needs to functional and relational dimensions How? 2nd level of parameters listed here.
  • 25. 25 Summary ( 1/ 2) • Relational dimensions play an important role in winning proposals. • Pre-sales practices facilitating intense action ‘upstream' of project by anticipating, defining and constructing of project scopes have to be developed and refined. • Managing relationships and networks, during a proposal life- cycle, and good decision making methodologies (like AHP) are crucial. (PMBOK 5th Edition, Stakeholder engagement process group) Uncertainty in Proposals via Milieu Analysis in Engineering Outsourcing Industry
  • 26. 26 Summary: Directions and Good News (2 / 2) Uncertainty in Proposals via The Good news • Engineering Service Organizations have understood the need for relational dimensions. A rough guess that 40-60% revenues come without the need to bid. Directions • Strategy dimensions: (1) Articulation of Customer need (2) organization’s ability to differentiate technology for meeting the need • Measurement on the Social, Political dimensions and maturity (a la CMM) is yet a distant goal. • Correct excessive Customer focus with technological competence”