110623 pgi cv_hospitals_english

815 views

Published on

Published in: Business, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
815
On SlideShare
0
From Embeds
0
Number of Embeds
2
Actions
Shares
0
Downloads
7
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

110623 pgi cv_hospitals_english

  1. 1. PGI Engineering, organization certified to ISO 9001¹ and ISO 14001 ², withregistration numbers ER-0339/2007 and GA-2009/0111 respectively, for theconsultancy and project preparation for MEP in buildings, obtaining openinglicenses and permissions from Spanish local authorities and supply companies,MEP contractor’s tenders , technical assistance and direction of MEP works.¹ Offices in Barcelona, Madrid and Girona. ² Delegation of Girona
  2. 2. INDEX1. PRESENTATION2. SERVICES3. PRIZES AND AWARDS4. RELATED WORKS 4.1 HOSPITALS AND HEALTHCARE CENTERS 4.2-LABORATORIES AND RESEARCH CENTERS 4.3 NURSING HOMES5. ENERGETIC EFFICIENCY 5.1 PRESENTATION 5.2 OBJECTIVES 5.3 AREAS AND SERVICES6. ARCHITECS7. DEVELOPPERS Página 2 de 31
  3. 3. 1.-PRESENTATIONPGI ENGINEERING is a group of companies of INTEGRATED SERVICES OFENGINEERING that since his creation in 1992 has experienced a steadyexpansion in the market thanks mainly to the high degree of professionalismof its human team, facing each project with utmost enthusiasm.At present the company consists of more than 100 engineers and techniciansdistributed in the several work centers located in Spain, North of Africa andLatin America. In these centers we find the following companies: • PeGI Engineering, S.L.P. • PGI Ingenieria Madrid S.L. • Consultoria de Projectes Girona SL / Consultoria de Projectes Girona SLP • PGI 2000 Consultoria i Enginyeria Barcelona SL /Consultoria de Projectes Barcelona SLP • CIASA / Consultoria Madrid SLP • URCULO / PGI Ingeniería • PGI Gest SLP • PGI Tarragona 2007 SLP • PGI Energy • PGI Group Atlas / Casablanca • PGI Perú (subsidiary in legalization process)During its career as Business of Engineering, PGI ENGINEERING hasparticipated in the design and construction of more than 3.000 Projects,working for all kinds of Clients, national and international.The company is formed by a wide range of specialized engineers andtechnicians with a high level of experience in designing, developing,monitoring and managing projects as well as in technical studies, related tothe installations engineering in the construction field. The basic criteria PGIENGINEERING / PGI GRUP follows to carry out this work are: • Rationalization of the design of the installations and services of a building, whether of industrial or services use, to obtain a reasonable and adjusted price of execution under the specifications of the client. • Development of the project until the last details, this being one of the main differentiating factors versus the competition. • Control of the execution of the works in order to obtain an equal or superior quality to the one indicated in the project and if possible at a lower price. That is to say, we will defend the client’s interests, both technical and economical. • Advice and assistance to manage more efficiently maintenance and infrastructure operations, improving design and facility management. Página 3 de 31
  4. 4. Today, PGI ENGINEERING is an important Engineering Company in theconstruction industry, responsible for the design and monitoring of installationsin the field of construction and with an approximate total amount of executedEngineering Installations MEP works over 125 million of €.Throughout its history, PGI ENGINEERING has provided a broad spectrum ofservices to an ever-expanding marketplace and we enjoy working with ourclients on a wide variety of projects. The projects include: • hospitals and medical buildings • resort and recreation developments • data Processing Centers • office and industrial parks • retail shopping centers • mixed-use development projects • academic and research institutions • residential developments • leisure, sport and culture facilities. PGI ENGINEERING / PGI GRUP belongs to the following associations: • ASINCA: (Tecniberia-FIDIC) Association of Enterprises of Engineering of Catalonia (SPAIN). • ASICMA: (Tecniberia-FIDIC) Association of Enterprises of Engineering, Consulting, Environment, Architecture and Technological Services of Madrid. • ACI: Association of Installations Consultancy of Catalonia (SPAIN). • AEM: Association of Maintenance Enterprises. • ATECYR: Spanish Technical Association of Refrigeration and Cooling Systems. • CEEC: Cluster of Energetic Efficiency of Catalonia (SPAIN). 2.-SERVICES PGI ENGINEERING develops his business activity offering the services that follow: Main activity: Engineering and Consulting in Mechanical, Electrical and Plumbing (MEP) Complementary activities: • Engineering and consulting in energy saving • Engineering and consulting in renewable energies • Engineering in energy infrastructures • (Generation, Cogeneration, Trigeneration, Distribution, etc.) • Engineering in acoustic and audiovisual infrastructures • Engineering in water supply / wastewater infrastructures (wastewater treatment, purge, purification, etc.) • Logistical and industrial buildings Página 4 de 31
  5. 5. 3.-PRIZES AND AWARDS- During the year 2010 several projects where PGI ENGINEERING has participated have been awarded: • The Building Espacio Baronda (Barcelona) has won the Award to the “Most innovative initiative in Architecture”. • The Headquarters of Layetana -Plaza Europa 31 (Barcelona) – have won the Award to the “Best Sustainable Building”. • The Seafront of Benidorm has won the “Prize of Architecture in Public Spaces and Infrastructures”. • The Hotel Aire in Bardenas has won the “Prize to the Hotel Architecture”. • The Can Framis Museum has been finalist to the “FAD Prize 2010”. • The Football Staudium RCDE Español has been chosen Worldwide Sportive Facility of the Year in the Stadium Business Award 2010. • The Football Stadium RCDE Español has won the “Catalonia Building Prize”, given by the Technicians in Architecture College of Catalonia.- The Building of Social Housing for Young People in the neighborhood of Sant Andreu (Barcelona) won the “FAD Prize 2008”- 2007 The “Telefonica City of Communications” project in Madrid won the “BEX Prize” (BUILDING EXCHANGE) Energy Sustainability.- 2006 PGI ENGINEERING won the “SUSTAINABLE ARCHITECTURE Prize” from the Junta de Castilla La Mancha for the Project TELEFÓNICA CALL CENTER- 1999 PGI GIRONA won the "CONSTRUMAT Prize 1999" to the technological innovation in building with the factory SIMON S.A. in Olot, Girona.- 1996 PGI MADRID won the “IDAE-CEI ANNUAL Prize 1996” on Electricity Saving Projects in lighting, for the design of the lighting system developed for the NCR BUILDING in Madrid. www.pgiengineering.com Página 5 de 31
  6. 6. 4.-WORKS 4.1 HOSPITALS AND HEALTHCARE CENTERS PUERTA DEL HIERRO HOSPITAL Installation Client Architecture Location budget FERROVIAL- Majadahonda 57.250.000 BERNA 10 NECSO (Madrid) € Date State Surface Project --- 145.250 m2 2004Observations: 850 Beds.Performance: Installations MEP Preliminary Design. SANT JOAN DE REUS HOSPITAL Installation Client Architecture Location budget COREA MORAN Reus 20.131.200 INNOVA – PICH (Tarragona) € AGUILERA Date State Surface Project Completed 106.000 m² 2007Observations: 460 Beds.Performance:Environmental Licence Project, Installations MEP Preliminary and Execution Design, Acoustic Design and Works Supervision. VALLECAS HOSPITAL Installation Client Architecture Location budget Vallecas 21.700.000 FERROVIAL BERNA 10 (Madrid) € Date State Surface Project Completed 85.400 m2 2005Observations: 324 Beds.Performance: Installations Preliminary Design. Página 6 de 31
  7. 7. NORTH HOSPITAL Installation Client Architecture Location budget S.S. de los Reyes FERROVIAL BERNA 10 16.010.000 € (Madrid) State Surface Date Project 2 Completed 84.300 m 2005Observations: 349 Beds.Performance: Installations MEP Preliminary Design. PARLA HOSPITAL Installation Client Architecture Location budget FERROVIAL BERNA 10 Parla (Madrid) 18.815.000 € State Surface Date Project Completed 75.200 m2 2005Observations: 250 Beds.Performance: Installations MEP Preliminary Design. HOSPITAL DEL MAR - EXTENSION Installation Client Architecture Location budget A.I.A. Arq -Hospital del Brullet Pineda Barcelona 4.600.000 € Mar Arq Date State Surface Project In Progress 30.100 m² 2007Observations: Refurbishment and extension of the “Hospital de Mar”, joined to the Faculty of Medicine to UPF.Performance:Environmental Licence Project, Installations MEP Preliminary and Execution Design, Installations MEP Works Supervision COSLADA HOSPITAL Installation Client Architecture Location budget Coslada 16.260.000 FERROVIAL BERNA 10 (Madrid) € Date State Surface Project Completed 60.160 m2 2005Observations: 239 Beds.Performance: Installations MEP Preliminary Design. Página 7 de 31
  8. 8. HOSPITAL DE ARGANDA Installation Client Architecture Location budget Arganda 11.950.000 FERROVIAL BERNA 10 (Madrid) € Date State Surface Project Completed 51.950 m2 2005Observations: 148 Beds.Performance: Installations MEP Preliminary Design. HOSPITAL DE SANT PAU – MASTER PLAN (PHASE I) Installation Client Architecture Location budget Javier Asarta – 4.000.000 € UNESCO Barcelona XavierGuitart (Fase I) Date State Surface Project In progress 45.280 m² 2007Performance: Installations MEP Master Plan for the refurbishment of 17 pavilions (45.280 m²) and the outside areas general infrastructures. HOSPITAL DEL TAJO Installation Client Architecture Location budget Aranjuez 11.550.000 FERROVIAL BERNA 10 (Madrid) € Date State Surface Project Completed 42.400 m2 2005Observations: 116 Beds.Performance: Preliminary Installations MEP Design.REFURBISHMENT AND EXTENSION OF THE HOSPITAL “LA MANCHA CENTRAL” Installation Client Architecture Location budget Alcázar de San SESCAM ARGOLA 7.200.000 € Juan (C. Real) Date State Surface Project In progress 25.000 m2 2003Performance: Installations MEP Execution Design. Página 8 de 31
  9. 9. HEALTH-CARE CENTER “COCHERAS DE BORBÓN” Installation Client Architecture Location budget CHC VITRE LA VINYA DE LA 4.236.563,2 Barcelona S.A. VILLA ARQ 5€ Date State Surface Project Completed 15.120 m2 2006Performance:Environmental Licence Project, Installations MEP Preliminary and Execution Design, Installations MEP Works Supervision.NURSING HOME AND HEALTH-CARE CENTER ECUADOR Installation Client Architecture Location budget ALONSO & REGESA Barcelona 3.000.000 € BALAGUER Date State Surface Project Completed 7.900 m² 2007Performances: Town-Planning Adequacy Certificate, Final LegalizationCertificate and Project for the MEP Installations, Installations MEP Preliminary and Execution Design, Installations MEP Works Supervision. HOSPITAL DE MONTECANAL Installation Client Architecture Location budget MANUELVIAMED SALUD Zaragoza 2.700.000 € BLASCO Date State Surface Project In execution 6.500 m2 2004Observations: 48 rooms, 6 surgery rooms, Emergency services, 5 offices and a unit of diagnosis.Performance:Environmental Licence Project, Installations MEP Preliminary and Execution Design, Installations MEP Works Supervision. TARAZONA HEALTH-CARE CENTER Installation Client Architecture Location budget GOBIERNO DE CÓDIGO Tarazona 1.560.000 € ARAGÓN ARQUITECTURA (Zaragoza) Date State Surface Project On Project 5.350 m2 2005Performance: Installations MEP Preliminary and Execution Design. Página 9 de 31
  10. 10. DAY CENTER, NURSING HOME AND HEALTH-CARE CENTER Installation Client Architecture Location budget OLIVERAS BOIX ReusAYTO. REUS 900.130 € ARQUITECTES (Tarragona) Date State Surface Project In progress 4.760 m² 2009Observations: Day center, nursing home and health-care center.Performances:Environmental Licence Project, Installations MEP Preliminary and Execution Design, Installations MEP Works Supervision. HEALTH PARK CAMP CLAR Installation Client Architecture Location budget RAHOLA VIDAL Camp Clar CATSALUT 1.300.000 € ARQ (Tarragona) Date State Surface Project In progress 3.500 m² 2009Performance:Environmental Licence Project, Installations MEP Preliminary and Execution Design, Installations MEP Works Supervision. HOSPITAL SANTA MARIA DE LLEIDA- REFURBISHMENT OF THE EAST WING Installation Client Architecture Location budgetHospital Sta. Intersalus - Maria de Lleida 1.449.675 € Albert Vitaller Lleida Date State Surface Project On Project 3.411 m² 2006Observations: Refurbishment of the East Wing of Santa Maria Hospital de LleidaPerformance: Environmental Licence Project, Preliminary and Execution Design, Installations MEP Works Supervision. Página 10 de 31
  11. 11. REFURBISHMENT AND EXTENSION OF THE EMERGENCY SERVICES AND THE 7th FLOOR OF THE HOSPITAL JOAN XXIII OF TARRAGONA Installation Client Architecture Location budget HOSPITAL ARQ. QUIÑOA Y JOAN XXIII ASOCIADOS, Tarragona 1.775.700€ DE S.L.TARRAGONA Date State Surface Project In progress 3.360 m² 2008Observations:Refurbishment and extension of the emergency services and the 7th floor of the hospital Joan XXIII of Tarragona.Performances:Environmental Licence Project, Installations MEP Preliminary and Execution Design, Installations MEP Works Supervision. “LA MILAGROSA” HEALTHCARE CENTER Installation Client Architecture Location budget MIGUELI. N. SALUD Soria 615.000 € COLMENARES Date State Surface ProjectIn execution 3.300 m2 2002Performance: Installations MEP Execution Design. DENTAL CLINIC – UNIVERSITAT DE SALAMANCA Installation Client Architecture Location budget Emilio Sanchez DRAGADOS Salamanca 700.000 € Gil Date State Surface Project Completed 2.500 m² 2003Performance: Installations MEP Preliminary and Execution Design, Installations MEP Works Supervision. PRIMARY HEALTH-CARE CENTER – SANT FELIU DE GUÍXOLS Installation Client Architecture Location budget CROUS, Sant Feliu de GISA GRABULEDA, Guíxols 1.000.000 € RIERA ARQ. (Girona) Data State Surface Project Completed 2.500 m² 2006Performances: Environmental Licence Project, Preliminary and Execution Design, Installations MEP Works Supervision. Página 11 de 31
  12. 12. PRIMARY HEALTH-CARE CENTER - NORD Installation Client Architecture Location budget GISA BAMMP Arq. Terrassa 820.000 € Data State Surface Project Completed 2.245 m² 2006Performances: Environmental Licence Project and Certificate, Installations MEP Preliminary and Execution Design, Installations MEP Works Supervision.REFURBISHMENT AND EXTENSION OF THE HOSPITAL PIUS DE VALLS Installation Client Architecture Location budget HOSPITAL DIEGO PIUS DE Valls 2.198.300 € NAKAMATSU VALLS Data State Surface Project In progress 2.230 m² 2009Observations: Refurbishment and extension of the Hospital Pius de Valls.Performances: Installations MEP Preliminary and Execution Design, Installations MEP Works Supervision. PRIMARY HEALTH-CARE CENTER – CONCÓRDIA Installation Client Architecture Location budget Sabadell GISA HAZ ARQ. 600.000 € (Barcelona) Data State Surface Project Completed 1.650 m² 2006Performances: Environmental Licence Project and Certificate, Installations MEP Preliminary and Execution Design, Installations MEP Works Supervision. PRIMARY HEALTH-CARE CENTER - PALAU SOLITÀ I PLEGAMANS Installation Client Architecture Location budget CASANOVAS, Palau Solità i GISA GRAUS, PEREZ Plegamans 470.500 € ARQ (Barcelona) Data State Surface Project Completed 1.500 m² 2007Performances: Environmental Licence Project and Certificate, Installations MEP Preliminary and Execution Design, Installations MEP Works Supervision. Página 12 de 31
  13. 13. PRIMARY HEALTH-CARE CENTER - GRÀCIA Installation Client Architecture Location budget Sabadell GISA CC245 ARQ 315.500 € (Barcelona) Data State Surface Project In progress 1.000 m² 2006Performances: Environmental Licence Project and Certificate, Installations MEP Preliminary and Execution Design, Installations MEP Works Supervision. HOSPITALIZATION UNIT (BUILDING B, 3th FLOOR) JOAN XXIII HOSPITAL OF TARRAGONA Installation Client Architecture Location budgetHospital Joan ARQ. Quiñoa y XXIII de Tarragona 510.000 € Asociados, S.L. Tarragona Date State Surface Project Completed 1.100 m² 2005Observations: Reform of hospitalization unit (3th Floor, Building B) of Joan’s XXIII Hospital, in Tarragona.Performance: Environmental Licence Project, Preliminary and Execution Design. ENDOSCOPY UNIT OF JOSEP TRUETA UNIVERSITY HOSPITAL Installation Client Architecture Location budget HospitalUniversitario PGI GRUP Girona 40.000 €Josep Trueta Date State Surface Project Completed 600 m² 2005Observations: Josep Trueta University HospitalPerformance: Environmental Licence Project, Preliminary and Execution Design, Installations MEP Works Supervision. Página 13 de 31
  14. 14. PRIMARY HEALTH-CARE CENTER – CASTELLÓ D’EMPURIES Installation Client Architecture Location budget ORDOÑEZ- Castelló GISA GARCÍA- Empuries 300.000 € FERRANDO UTE (Girona) Data State Surface Project Completed 500 m² 2006Performances: Environmental Licence Project and Certificate, Installations MEP Preliminary and Execution Design, Installations MEP Works Supervision. Página 14 de 31
  15. 15. 4.2- LABORATORIES AND RESEARCH CENTERS OFFICES AND LABORATORIES GIROC CT Installation Client Architecture Location budget Mollet delLABORATORIO JORDI MARCÈ Vallés 650.000 € S GIROC ARQ (Barcelona) Data State Surface Project In progress 2.000 m2 2009Performances: Installations MEP Execution Design for the renovation of the HVA facilities. ISDIN HEADQUATERS Installation Client Architecture Location budget ISDIN GCA Barcelona 650.000 € Data State Surface Project Completed 4.000 m2 2009Observations: Headquarters of the company in Barcelona on the 22@ district, 4.000 m². Building with research laboratories.Performances: Installations MEP Preliminary and Execution Design, Installations MEP Works Supervision. BARCELONA SUPERCOMPUTING CENTER Installation Client Architecture Location budget BAAS UPC Barcelona 3.797.700 € ARQUITECTES Data State Surface ProjectIn progress 12.500 m2 2008Performances: Environmental Licence Project and Certificate , Town- Planning Adequacy Certificate , solar collectorsjustification, Installations MEP Preliminary and Execution Design, CTE-SI justification, CTE-HE justification, Final Legalization Certificate and Project for the MEP Installations , Telecommunications Certificate, Emergency plan, Maintenance plan , Installations MEP Works Supervision . Página 15 de 31
  16. 16. TECNOCAMPUS MATARÓ PARK Installation Client Architecture Location budget MBM Mataró PUMSA 11.771.840 € ARQUITECTES (Barcelona) State Surface Data ProjectIn progress 46.940 m² 2007Observations: University campus facilities, with office and commercial units, parking and an auditorium.Performances: Environmental Licence Project and Certificate , Town-Planning Adequacy Certificate , solar collectors justification, InstallationsMEP Preliminary and Execution Design, CTE-SI justification, CTE- HE justification, Final Legalization Certificate and Project for the MEP Installations , Telecommunications Certificate, Emergency plan, Maintenance plan ,Installations MEP Works Supervision. I+D BUILDING OF THE POLYTECHNICAL CATALONIA UNIVERSITY Installation Client Architecture Location budget D. SOLDEVILA Castelldefells U.P.C. 1.100.000 € ARCHITECTURE (Barcelona) State Surface Data Project 2 Completed 2.600 m 2006Observations: Variable Refrigerant Flow (VRF) condensate for loop water. Loop supply trough adiabatic cooling tower and condensing boiler. Reinforced with an alternative system of collector panels for the heating, and lake superficial waters cooling for refrigeration.Performances: Environmental Licence Project, Installations MEP Execution Design AUDITORIUM ROOM CPD OF THE CAMPUS ESADE IN SANT CUGAT DEL VALLÉS Installation Client Architecture Location budget St. Cugat del FUNDACIÓN Vallés 540.000 € ESADE (Barcelona) Data State Surface Project Completed 600 m² 2005Observations: University campus consisting of: University buildings, Creativity center, Residence Hall, Sportive Areas, Green Areas, Parking and outdoor infrastructures.Performances: Preliminary and Execution Design, Installations MEP Works Supervision. Página 16 de 31
  17. 17. INNOVATION AND RESEARCH CENTER LA RIOJA Installation Client Architecture Location budgetFUNDACIÓN INTERSALUS Logroño 5.850.000 €RIOJA SALUD Data State Surface Project Completed 20.400 m² 2004Observations: Health, care, nursing, administration and research building belonging to the Health Rioja Foundation.Performances: Environmental Licence Project, Preliminary and Execution Design, Installations MEP Works Supervision. SCIENCE PARK UDG Installation Client Architecture Location budgetUNIVERSIDAD BOSCH- 2.498.270,0 Girona GIRONA TARRÚS ARQ. 0€ Data State Surface Project Completed 11.304 m2 2004Observations: Business building for renting to research enterprises.Performances: Environmental Licence Project, Preliminary and Execution Design, Installations MEP Works Supervision, Legalization Project for the MEP Installations and Emergency Plan. CERECO LABORATORIES Installation Client Architecture Location budget LABORATORIO DEINVESTIGACIÓN Maçanet de la ACIEROID 595.000 € Y Selva (Girona)ASESORAMIENT O, S.L. State Surface Data Project 2 Completed 1.800 m 2004Performances: Environmental Licence Project, Preliminary and Execution Design, Installations MEP Works Supervision. TELEFONICA CALL CENTER BUILDING Installation Client Architecture Location budget CASTILLA LA PICH Toledo 1.800.000 € MANCHA AGUILERA Data State Surface Project Completed 6.000 m² 2003Performances: Preliminary and Execution Design, Installations MEP Works Supervision. Página 17 de 31
  18. 18. BOTANICAL INSTITUTE Installation Client Architecture Location budget CARLOS C.S.I.C. Barcelona 400.000 € FARRATER Data State Surface Project Completed 2.800 m2 2000Observations: Educational and Research CenterPerformances: Preliminary and Execution Design, Installations MEP Works Supervision. MEDITERRANEAN CENTER OF SEA RESEARCH Installation Client Architecture Location budget CSIC RGA Arq Barcelona ---- Data State Surface Project Completed ---- 1998Observations:Filtration and Water treatment Design for the research water tanks.Performances:Environmental Licence Project, Installations MEP Preliminary and Execution Design, Installations MEP Works Supervision. Página 18 de 31
  19. 19. 4.5. – NURSING HOMES MEETING POINT BUILDING IN CAMP CLAR Installation Client Architecture Location budget AYTO. Jordi Marcè Tarragona 712.133€TARRAGONA State Surface Data ProjectIn progress 2.031,65m² 2009Observations: Meeting Point Building in Camp Clar (Tarragona).Performances: Environmental Licence Project, Installations MEP Preliminary and Execution Design, Installations MEP Works Supervision and Energetic Efficiency and Acoustic Design. CENTER FOR DISABLED PEOPLE Installation Client Architecture Location budget CÓDIGO IMSERSO Rabanedo(León 3.900.000 € ARQUITECTURA Data State Surface ProjectCompleted 13.400 m2 2005Observations: 123 rooms, auditorium 135 seats.Performances:Installations MEP Execution Design, Installations MEP Works Supervision. NURSING HOME COMPLEX Installation Client Architecture Location budget Villajoyosa URBIS ANGEL ASENJO 4.500.000 € (Alicante) Data State Surface Project Completed 16.500 m2 2004Observations: 3 buildings with 40 apartments y 150 rooms.Performances:Installations MEP Execution Design, Installations MEP Works Supervision. Página 19 de 31
  20. 20. NURSING HOME AND DAY CENTER Installation Client Architecture Location budget TYM Coslada AMMA 2.100.000 € ASOCIADOS (Madrid) Data State Surface Project Completed 10.100 m2 2003Observations: 164 rooms.Performances:Environmental Licence Project, Installations MEP Preliminary and Execution Design, Installations MEP Works Supervision and Emergency Plan. NURSING HOME AND DAY CENTER Installation Client Architecture Location budget TYM Vicálvaro AMMA 2.300.000 € ASOCIADOS (Madrid) Data State Surface Project Completed 10.450 m2 2002Observations: 147 rooms.Performances:Environmental Licence Project, Installations MEP Preliminary and Execution Design, Installations MEP Works Supervision and Emergency Plan. NURSING HOME AND DAY CENTER Installation Client Architecture Location budget TYM Colmenar Viejo AMMA 2.275.000 € ASOCIADOS (Madrid) Data State Surface Project Completed 10.400 m2 2002Observations: 164 rooms.Performances:Environmental Licence Project, Installations MEP Preliminary and Execution Design, Installations MEP Works Supervision and Emergency Plan. Página 20 de 31
  21. 21. NURSING HOME AND DAY CENTER Installation Client Architecture Location budget Puente de TYM AMMA Vallecas 2.250.000 € ASOCIADOS (Madrid) Data State Surface Project Completed 10.400 m2 2002Observations: 147 rooms.Performances:Environmental Licence Project, Installations MEP Preliminary and Execution Design, Installations MEP Works Supervision and Emergency Plan. NURSING HOME AND DAY CENTER Installation Client Architecture Location budget TYM Arganzuela - AMMA 2.100.000 € ASOCIADOS Madrid Data State Surface Project Completed 10.500 m2 2002Observations: 162 rooms.Performances:Environmental Licence Project, Installations MEP Preliminary and Execution Design, Installations MEP Works Supervision and Emergency Plan. MENTALLY HANDICAPPED CENTER “SAN JOSE” Installation Client Architecture Location budget GOBIERNO TYM Pamplona 1.660.000 €DE NAVARRA ASOCIADOS Data State Surface Project Completed 7.700 m2 2001Observations: 164 rooms.Performances: Installations MEP Preliminary and Execution Design, Installations MEP Works Supervision. Página 21 de 31
  22. 22. NURSING HOME AND DAY CENTER Installation Client Architecture Location budget JOSE LUIS Poio URBIS 1.550.000 € PEREIRO (Pontevedra) Data State Surface Project Completed 6.250 m2 2003Observations: 115 rooms.Performances:Environmental Licence Project, Installations MEP Preliminary and Execution Design, Installations MEP Works Supervision. RESIDÈNCIA CREU DE PALAU EN GIRONA Installation Client Architecture Location budget Crous GISA Grabuleda Girona 2.448.573 € Arq State Surface Data Project Completed 9.252 m2 2003Observations: Reforma Residencia Creu de Palau en GironaPerformances: Environmental Licence Project, Installations MEP Preliminary and Execution Design, Installations MEP Works Supervision. NURSING HOME AND DAY CENTER EN ST. FELIU DE GUÍXOLS Client Architecture Location Installation budget AYTO. ST. FELIU DE Sant Feliu de Guíxols Jordi Casadevall 500.000 € GUÍXOLS (Girona) State Surface Data Project 2 Completed 3380 m 1997Performances: Environmental Licence Project, Installations MEP Preliminary and Execution Design. NURSING HOME AND DAY CENTER EN EMPURIABRAVA Client Architecture Location Installation budget AYTO. Palomeras Empuriabrava (Girona) 1.997.000 € EMPURIABRAVA Arquitectes State Surface Data Project Completed 13.500 m2 2006Performances: Environmental Licence Project, Installations MEP Preliminary and Execution Design. Página 22 de 31
  23. 23. NURSING HOME URBIS Client Architecture Location Installation budget URBIS Reyal Urbis, S.A. Badalona 2.208.274 € State Surface Data Project Completed 8.522 m² 2004Observations: Nursing home and Parking in Badalona.Performances:Environmental Licence Project, Installations MEP Preliminary and Execution Design, Installations MEP Works Supervision. Página 23 de 31
  24. 24. 5. - ENERGETIC EFFICIENCY DEPARTMENT 5.1. - PRESENTATIONPGI ENGINEERING created in 2006 the Department of Energy efficiency inthe Building, conscious of the need of a rational use of the energy and alsoto give response to a few needs of the market with regard to the newnormative frame in the energetic area. Understanding that the Building sector is one of the main energeticconsumers, it is important to work from the initial phase of developmentof the project aiming to obtain energetic important improvements that willreverberate positively in the whole building, in the air quality, in hismovement, in the comfort of the persons and likewise in the optimization ofequipments to obtain as final result a better saving. 5.2. - OBJECTIVES To give technical advice to our clients in order to obtain an optimizeddesign of the building, the installations and bringing the necessary tools for theenergetic management of the Buildings, in view to improve the savings and theenergetic efficiency during the life of the building. 5.3. - AREAS AND SERVICES The services that our department is offering are structured in fourstrategic areas which let us meet most of the requirements of our clients inthe energetic saving field. We are provided with a professional human team highly compromised,qualified and motivated, with a working methodology focused in theinnovation and the continuous improvement of the quality assurance andto give a high added value services. ENERGETIC ENERGETIC SERVICES ENGINEERING AREA AREAS BUILDING I+D+i ENERGETIC AREA CONSULTING AREA Página 24 de 31
  25. 25. 5.3. a-ENERGETIC ENGINEERING AREA Implementation of measures of energy savings and energetic efficiencyreferring as well the enclosure design as the installations from the early stageuntil the completion of the project. Using powerful software to achieve severalsimulation typologies allows us to optimize the final cost of the building. Compliance with the regulations of the CTE-DB-HE Energetic Qualification of the Buildings– Project Phase Energetic study of the building enclosure Energetic study of the installations MEP Energetic study of the building (EED) Energetic Qualification of the Buildings – Completion of the Work Phase. Justification of the Regulations of Water Saving Projects of renewable energy sources. Project of Justification of the Regulations of Thermal and Photovoltaic Solar Collection. 5.3. b-ENERGETIC SERVICES AREA Implementation of working methods which will allow to reduce the energyconsumption and to improve the energetic efficiency in a steady way duringthe life of the building according the established planning to reach the definedobjectives in the strategic plan of the company. Feasibility study auditing Energetic audit. Improvement proposals. Planning for the verification and measurement of the Savings (IPMVP) Maintenance Planning Energy Management Implementation of the proposals and Commissioning Training and Warning Technology. Implementation of the collaborative tools for the managing tasks. Commissioning Equipment Investment projects Assessment to the client Periodic Check and Follow-up 5.3. c-ENERGETIC CONSULTING AREA We assess our clients regarding the current and future energetic model insuch a way to provide them with the maximum information to take decisionsregarding several actions in environment and energy topics which can concernthem in the future. We work on the search of strategies and solutions that will allow our clientsto reduce the energy consumption, the CO2 emissions and to makeenvironment improvements. All this will have an impact on his activity and willincrease competitiveness. Página 25 de 31
  26. 26. Saving and energetic efficiency guides Implementation of renewable energy sources analysis Implementation of high technology and efficiency solutions Participation in technical days and presentation in the energy field Knowledge transfer/ Training to companies, associations, technical colleges. Knowledge transfer /Training to universities, teaching. Management and processing of the regional and state grants. Consulting in the Energy Management of the organization. Consulting in the Energy Management of the whole building. Consulting for the development of the Planning for the verification and measurement of the Energy and Water Savings. Feasibility study energy auditing Energetic classification of the building Certification of the Sustainable Building LEED Certification of the Sustainable Building “green building” Certification of Energy Management Auditing in the energetic management system. Processing of the Grants 4.3. d- I+D+i AREA Engagement in research projects, development of research strands withthe universities and the administration with the clear commitment ofimproving the systems, the technologies, the materials, the workingmethodologies etc…in such a way thay we can be able to minimize theenergetic consumption having a positive impact in the environment. I+D+i projects Energy research strands collaborating with the universities. Research strands with Technology companies. 4.4. - WORKS CÁMARA DE COMERCIO DE BARCELONA CORPORATE BUILDING Date: 2009 Location: Barcelona Area: 20.500 m2 Energy certification: A Status: in draft Energy study for architectural tender Double-skin facade optimization using simulation software Design of high performance air conditioning and lighting installation Client: CÁMARA DE COMERCIO DE BARCELONA. Página 26 de 31
  27. 27. BANCO DE SABADELL OFFICE BUILDINGDate: 2009Location: Sant Cugat del VallèsArea: 31.592 m2Energy certification: BStatus: under constructionEnergy studyCritical facades optimizationAir conditioning machinery selectionHeating/Cooling production and lighting optimizationLEED certification in processClient: BANCO DE SABADELL, S.A.COMISIÓN DEL MERCADO DE LASTELECOMUNICACIONES OFFICE BUILDINGDate: 2009Location: BarcelonaArea: 18.523 m2Energy certification: BStatus: FinishedEnergy studyCritical facades optimizationAir conditioning machinery selectionLighting optimizationICAEN grant management for green buildingsClient: GRUPO INMOBILIARIO CASTELLVÍPUERTO VENECIA SHOPPING CENTERDate: 2008Location: ZaragozaArea: 275.000 m2Status: under constructionEnergy studyCritical facades and sunscreen optimization using simulationsoftwareSunscreen design: expanded metal rotating facades with solartracking systemClient: EUROFUND INVESTMENTS ZARAGOZA, S.L.BARCELONA SUPERCOMPUTING CENTER BUILDINGDate: 2008Location: BarcelonaArea: 12.597 m2Energy certification: BStatus: under constructionEnergy studyCritical facades optimizationAir conditioning machinery selectionLighting optimizationICAEN grant management for green buildingsClient: CENTRO NACIONAL DE SUPERCOMPUTACÓN – BSC Página 27 de 31
  28. 28. HOSPITAL DEL MAR Date: 2008 Location: Barcelona Area: 92.542 m2 Status: under construction Energy study Critical facades optimization Air conditioning machinery and Heating/Cooling production selection Lighting optimization Client: CONSORCI SANITARI DE BARCELONAEstudi 21 juny – solstici d’estiu TORRE ONA BUILDING Date: 2008 Location: Barcelona Area: 32.000 m2 Energy certification: A Status: in draft Energy study Critical facades optimization Sunscreen design: expanded metal facades / natural light Client: BIMSA – AYUNTAMIENTO DE BARCELONA RBA EDITORES CORPORATE BUILDING Date: 2007 Location: Barcelona Area: 26.755 m2 Energy certification: B Status: Finished Energy study Critical facades optimization Design of high performance air conditioning and lighting installation ICAEN grant management for green buildings Client: RBA DIVISIÓN DE INMUEBLES, S.L. IGUZZINI ILUMINAZIONE CORPORATE BUILDING Date: 2007 Location: Sant Cugat del Vallès Area: 9.000 m2 Status: under de construction Energy study Critical facades optimization and sunscreen design using simulation software Sunscreen design: expanded metal rotating facades with solar tracking system Client: IGUZZINI ILUMINAZIONE ESPAÑA, S.A. Página 28 de 31
  29. 29. MEDIATIC 22@ OFFICE BUILDINGDate: 2006Location: BarcelonaArea: 23.105 m2Status: FinishedEnergy studyCritical facades, air conditioning machinery and lighting optimizationControl of ETFE skin30% global energy savingsLEED certification in processClient: CONSORCIO DE LA ZONA FRANCALAYETANA INMOBILIARIA OFFICE BUILDINGDate: 2006Location: Hospitalet de LlobregatArea: 12.634 m2Energy certification: AStatus: FinishedEnergy studyLEED Certification obtainedICAEN grant management for green buildingsClient: LAYETANA DESARROLLOS INMOBILIARIOS, S.L.UNIVERSITAT DE BARCELONA BUILDINGS ENERGY AUDITDate: 2010Location: BarcelonaArea: 130.000 m2 – 7 buildingsCurrent consumption: Electricity17 GWh/year; Gas 9.7 GWh/year;Water 95,000 m3/yearClient: UNIVERSITAT DE BARCELONAGENERALITAT DE CATALUNYA BUILDINGS ENERGY AUDITDate:2008 - 2009Location: CataluñaEnergy audit in all Generalitat de Catalunya buildingsDesign of remote management system in 200 Community HealthCenters and consumption analysisClient: GENERALITAT DE CATALUNYABARCELONA LAW COURTS – CITY OF JUSTICECOMISSIONING MANAGEMENTDate: 2006Location: BarcelonaArea: 233.000 m2Comissioning Management of all buildings located in Barcelona Cityof JusticeClient: Urbs ludex et Causidicus (URBICSA) Página 29 de 31
  30. 30. 6.-ARCHITECTSThese are the architects with we have had the pleasure andAAAR EMBT (MIRALLES - TAGLIABUE) NICOLAU PARÉS, CARLESAB-A EMMA OCTAVIO MESTREABALOS & HERREROS ESPIGA-MONEO ARCHITECTURES OVE ARUP PARTNERSACP ESTUDIO ARQ. JORGE SALVAT PASCUAL I ARGENTÉ, JOANALIA ESTUDIO LAMELA PICH-AGUILERA ARCHITECTURESALLENDE ARCHITECTURES ESTUDIO VILLARROEL POMAR MARIN. ÁNGEL M.ALONSO & BALAGUER FARGAS ASSOCIATS PRADA I JAÉN, PERE DEARQUITECTURA ALTERNATIVA FERRATER, CARLOS PROYECTOS A+UARQ-SOCIS FINA, PERE PERÁLVAREZ RUIZ, ANTONIOARTEM ARCHITECTURES F.I.V.Z. RAVENTÓS, IGNASIARTIGUES & SANABRIA F.O.A. REDONDO I DOMÍNGUEZ, ERNESTARQUITECTURA OSCAR TUSQUETS FONT – VIÑOLAS ARCHITECTURES REID FENWICK.ARREMENTERIA, IÑAKI G.V. ARQUITECTES ASSOCIATS RELIMAC RGA (RIERA-GUTIÉRREZ &ARROYO, EDUARDO GOAR ASSOCIATS)AURREKOETXEA, IÑAKI GASULLA ARQUITECTURA ROBUFFO, ROBERTOB.S.T. (BONET, STEGMAN, GIBAULT-LAGACHE, ROMEU, ENRIQUETIANA) ARCHITECTURESBADOSA/DOÑATE, GIMENO I GONZÁLEZ, PILAR ROS I BALLESTEROS, JORDIARCHITECTURESBLANC-CONCA ARCHITECTURES GUALLART FURIÓ, VICENTE RUBIO&ALVAREZ-SALABORO, J. GUIBERNAU, JOAN RUIZ, ELENABORRELL ARCHITECTURES INDYA SALAZAR, JAVIERBRU, EDUARD JUNQUERA, JERÓNIMO SÁNCHEZ GIL, EMILIOBRULLET I ASSOCIATS, S.L. JUVANTENY I REIXACH, F. XAVIER SANS GIRONELLA, CÉSARBRINGAS & BELLOD KATSURA, ARQUIT. Y URBANISMO SANTOS, JOSÉ ANGELCALAFELL I LAFUENTE, EDUARD KM+P (KAUFMAN, MEEKS) SANZ RUEDA, ÁNGELCALVO ONTORIA, ELADIO L35 SGA ESTUDIOS (VITORIA)CAPELLA I SAMPER, JULI LARROSA I PADRÓ, MANEL SISTERNAS I SURIS, JOSEP LLUISCASADEVALL I DALMAU, JORDI LÁZARO, CARLOS SMITH, JOSÉ S.O.B. ARQUITECTESCHAPMAN TAYLOR LÓPEZ, FERNANDO (SOLER/BATALLA)CHURTICHAGA+CUADRA SALCEDO LÓPEZ, VÍCTOR SOLÀ I BUSQUETS, PERECLOTET.PARICIO & ASSOCIATS LOSADA, RAMÓN SOLID ARQUITECTURACÓDIGO ARQUITECTURA MARTÍN MIRANDA, JOSÉ MANUEL SUÁREZ, JUAN JOSÉCOLLADO, ÁNGEL MARTORELL BOHIGAS MACKAY SURÍS I SALA, JOAN S.COLMENARES, MIGUEL MATEO I MARTÍNEZ, JOSEP-LLUIS SUTRÍAS I FIGUERAS, JORDICOOT ARQUITECTURA MATEU POMAR, ELENA T.A.C.CROUS-GRABULEDA-RIERA METRICA TIP TDB ARQUITECTURA,CRUZ Y ORTIZ, ARCHITECTURES MESTRE ARAMENDIA, OCTAVIO T.D.A. TÉCNICADAVID CHIPPERFIELD ARCHITECTS MINGO & ARCHITECTURES TYM ASOCIADOSDÍAZ, JOSÉ LUÍS MONEO, RAFAEL ÚBEDA, PASCUALDOMÍNGUEZ, HORACIO MXC (MONSÓ, CONCEJAL)ECHEVARRÍA SAINZ, FEDERICO NADAL MARCÈ, ARCHITECTURES Página 30 de 31
  31. 31. 7.-DEVELOPPERSACCOR FORUM 2004 PRESTIGE HOTELS-HOTEL ROSINCSACIEROID FUNDACIÓ PROMEDIC PRIMA INMOBILIARIAADFINSA GALERIES TARRAGONA, S.A. PROCOM DESARROLLOS URBANOSAGBAR GAS NATURAL PROCREU, S.L.AGUIRRE NEWMAN GERENS PROINOSAARQUITECTURAAIG LINCOLN ESPAÑA GENERALITAT DE CATALUNYA PROMODEICOAMENA GINKOPLANET CLIENTA TORMAAPEX GIVAUDAN ROURE, S.A. PUNT DIARIARQUITÈCNICS G.M.P. RAFAEL HOTELESASEPEYO GOLF EMPORDÀ RED ELÉCTRICA DE ESPAÑA RESIDENCIAL PEDRALBES - CARRERAS,AUTOLICA-QUADIS GRUP FERRAN S.L.BLUENET GRUP TÈCNIC RETEVISIÓN MÓVILES, S.A.BOVIS LEND LEASE GRUPO PALOMO RETEVISIÓN S.A.BOUYGUES INMOBILIARIA GRUPO REYAL REYAL HOTELESBUY BUSINESS GRUPO V. MUÑOZ-POMER RIOFISACAMPS MOTOR, S.A. HABITAT ROCKAL PROPERTIESCANDESA HEWLETT PACKARD RODAMCOCASER HINES S B GRUP – SUBIRATS BERENGUER, S.A.CENTRO INSULAR DE DEPORTES HOTUSA SAT-SUISCHAMPION – GRUPO IDEA SEATCONTINENTECIMEX ING REAL STATE SEGURFONDO DE INVERSIÓNCOBEGA INMOBILIARIA COLONIAL SELENIUM CONSTRUCTCODECSA, S.A. INMOBILIARIA PUIGSACALM SERVIHABITATCONDEMINAS INMOBILIARIA URBIS SFERA JOVENCONSTRUCTORA ÁVALOS JAIME MASCARÓ, S.A. SIMON, S.A.CONSTRUCTORA SAN JOSÉ JOYERÍA SUÁREZ TASINSACOPCISA LANDSCAPE TELEFÓNICACOPERFIL LAYETANA TERRASSA, S.L. TESTA INMUEBLESCORSAN - CORVIAM LAR GROSVENOR TIFSACOYMAR M & S MODE TORRA, S.A.DIAGONAL MAR RESIDENCIAL MANGO TORRE BONANOVA GRUP INMOBILIARIEDICSA MAXOR TRADE CENTER HOTEL, S.L.EL CORTE INGLÉS MERKAMUEBLE TRANSPORTES AZKARELECNOR MIGDIA PROMOCIÓ TRAVEL LODGE HOTELESE.M.V. MADRID MIQUEL ALIMENTACIÓ UGC CINE CITÉ ESPAÑAENRESA M.J.C.M. INMOBILIARIA UNIVERSAL STUDIOS PORT AVENTURAERALAN NATUR HOTEL CATALUNYA, S.L. UNIVERSIDAD DE DEUSTOESPAIS NECSO UNIVERSITAT DE GIRONAFALGÀS NEXITY ESPAÑA VALLEHERMOSOFERROVIAL-AGROMAN NIKE VIAMED SALUDFERROVIAL INMOBILIARIA PANINI ESPAÑA, S.A. VILA-SABARICH, S.L.FINCAS PEDRALBES-STELGROC PERFUMERÍA GAL ZUMOS PAGOFIRA 2.000 PITNEY BOWNESFLEX P. FÚNEBRES B.LLOBREGAT Página 31 de 31

×