Housekeeping and Introductions
What is Planning Advisory
Service for?
“The Planning Advisory Service (PAS) is part of the
Local Government Association. The purpose of PAS
is to support local planning authorities to provide
effective and efficient planning services, to drive
improvement in those services and to respond to
and deliver changes in the planning system”
(Grant offer letter for 2014-15)
The Planning Advisory Service
We
• Are funded by £2m from DCLG to the LGA
• Work for English Planning Authorities
• Have been around ever since 2005 (Planning Act)
and subsequent reform
• Reduce cost, risk and delay through pilots, toolkits,
Q&A
We are not
• A thinktank, “experts”, a lobby group or researchers
Pre-app, PPAs,
conditionsEnforcement
Delivery
Viability
Training
CIL & S106s
Good
decisions
Improvement
Designation Peer support
Planning Quality Framework
Neighbourhood
plans
Events, toolkits and
materials
Local
plans
Leadership
Energy &
climate
change
Peer
challenges
Committee
training &
peer review
Essentials
Plans in place
Strategic
planning
Duty to
Cooperate
Strategic
issues
Evidence
Sustainability
Appraisal Housing needs
Community
engagement
Viability
Project mgmt
Successful
plan-making
Resources
Resource Review
Agenda and Aims
• Assessment of housing
and economic needs
• Understanding affordability
• Looking at supply
Science or Art?
• PPG tells us:
“Establishing future need for
housing is not an exact
science.”
• It also says:
“No single approach will
provide a definitive answer.”
Background
• The NPPF says
• Planning should meet objectively assessed need (for land)
• So far as there is sustainable capacity to do so
• As defined by the Framework
• For housing this means
• Prepare a Strategic Housing Market Assessment (SHMA)
• Working with neighbours when market areas cross admin boundaries
• To assess overall housing need
• Split it by size, mix and tenure
• Address affordable housing and ‘special needs’
• For economic land uses (‘economic development’) it means
• Plan proactively to encourage sustainable economic growth
• Not act as an impediment to growth
• Understand changing business needs
• And identify and address barriers to investment
• Planning should Integrate economic uses, housing & community facilities
Today’s agenda
• So the planning authority needs evidence bases to cover
• Housing
• Overall need (the OAN)
• Housing mix and tenure
• Affordable housing need
• Economic uses
• PAS has published advice on the housing OAN
• Technical advice note updated July 2015
• Not on today’s agenda
• Two further notes are in draft
• Housing mix, tenure and affordable need
• Economic development
• This morning you get a preview of each
• Your feedback will be gratefully received
Today’s agenda continued
• We’ll package the notes as a trilogy
• Technical advice on producing a HEDNA
• (Housing and Economic Development Needs Assessment)
• But it doesn’t have to be in one bundle
• It would be pretty large!
• Two (or three) separate studies is fine
• But they must be mutually consistent
• Show the same future population
• Numbers and profile
• And future jobs
• The OAN note discusses the links between
• Affordable and overall housing needs
• Population / housing and jobs
HDH Slides for PAS
Housing and Employment Needs
Assessment (HEDNA) and Strategic
Housing and Employment Land
Availability Assessments (SHELAAs)
Viability and development economics
London www.pas.gov.uk
Terminology
Objectively Assessed Need (OAN, overall need)
From CLG Household projections, tested / adjusted as per PPG 14 to 19.
Disaggregated as per PPG 20.
Affordable Need
Need for affordable as per
PPG 21 to 29
Specific Groups
Need for groups as per as
per PPG 20
Housing Target (Requirement)
The housing planned for,
taking into account affordable need, specific groups, Duty to Cooperate,
policy objectives and delivery constraints
Housing needs - mix, tenure and
affordable housing
• Why?
• How?
• So what?
• See PAS Note
Why?
• Because the NPPF tells us to
• Because the PPG tells us to
- but why…?
NPPF
50. ….plan for a mix of housing based on current and future
demographic trends, market trends and the needs of different
groups in the community … the size, type, tenure and range of
housing that is required in particular locations, reflecting local
demand …
159. Local planning authorities should … prepare a Strategic
Housing Market Assessment … identify the scale and mix of
housing and the range of tenures that the local population is
likely to need over the plan period which addresses the need for
all types of housing, including affordable housing and the needs
of different groups in the community..
PPG
2a-021-20150326 - Plan makers should therefore examine
current and future trends of:
• the proportion of the population of different age profile;
• the types of household (eg singles, couples, families by age
group, numbers of children and dependents);
• the current housing stock size of dwellings (eg one, two+
bedrooms);
• the tenure composition of housing.
This information should be drawn together to understand how
age profile and household mix relate to each other, and how this
may change in the future…..
But why?
2a-029-20140306 - The total affordable housing need
should then be considered in the context of its likely
delivery as a proportion of mixed market and affordable
housing developments, given the probable percentage
of affordable housing to be delivered by market
housing led developments. An increase in the total
housing figures included in the local plan should be
considered where it could help deliver the required
number of affordable homes.
So … (1)
• Affordable Housing
– ‘Policy off’ assessment to consider uplift
• Families with Children
– A disaggregation of OAN to assist mix
• Housing for Older People
– A disaggregation of OAN to assist mix (Specialist
Housing)
– The need for institutional not in OAN
… so … (2)
• Households with Specific Needs
– A disaggregation of OAN to assist mix (Specialist
Housing)
– The need for institutional not in OAN
• People Wishing to Build Their Own Homes
– Policy off assessment to consider specific
provision / policy
… so … (3)
• Student Housing
– Policy off assessment to consider uplift
– Understanding of supply to meet OAN
• Private Rented Sector (PRS)
• A disaggregation of OAN to assist mix
… and not mentioned
• Starter Homes
– Can starter homes meet affordable need (will
impact on level of uplift)?
– Relationship with PRS
– A disaggregation of OAN to assist mix
True or False?
Is the Affordable Need is a component of the OAN?
NO (and cannot be)
• Different methodologies
– OAN based on past trends
– OAN already includes adjustment for affordability market signal
– Affordable Need based on PPG method
• Different Outputs
– OAN a total requirement (single figure)
– Affordable Need is an annual flow (units per year)
• Different purposes
– OAN starting point for housing target
– Affordable need to consider increasing housing target to ‘help
deliver’
Confirmed by …
• 2a-021-20150326 - How should the needs for all
types of housing be addressed? Once an overall
housing figure has been identified, plan makers will
need to break this down by tenure, household type
(singles, couples and families) and household size.
Plan makers should therefore examine current and
future trends of……
• KLWN v SoS for CLG & Elm Park Holdings
How? – 3 outputs
• Disaggregation of OAN
– No specified methodology
• Affordable Need
– Specified methodology
• Specific Groups
– Suggested data sources
How – Affordable Need
• As per 22 to 29 of PPG
• Secondary data (not surveys)
• Use of waiting list
• Consultants or in-house
4 steps
• Stage 1: Current unmet gross need for affordable
housing (PPG 023 and 024). The amount of affordable
housing that is needed by existing households.
• Stage 2: Newly arising affordable housing need (PPG
025). The need for affordable housing of households that will
form in the future.
• Stage 3: Current affordable housing supply (PPG 026).
The affordable housing that is available at the time of the
assessment.
• Stage 4: Future housing supply of affordable rented re-
lets and intermediate affordable housing (PPG 027). How
much affordable housing will be available in the future.
Key checks
• Access levels (cost of entry level housing)
– Should it be lower quartile?
• Affordability Test (proportion of income spent
on housing)
– How is market functioning (policy off)
• Impact of benefit and housing reforms
– Benefit caps – particularly single person
households under 35
– Starter homes
– Role of PRS and Local Housing Allowance
How – Specific Groups
• As per 21 of PPG
• Secondary data (not surveys)
• Primary data from council records
• In house data
• Ask stakeholders (MOD, Universities etc)
How – Overall Mix
• A disaggregation of OAN
• No specified method
• Much can be taken from OAN
Key components
1. Understanding of current stock and how it is
used – including ‘inefficiencies’
2. Model houses to adequately house
households with OAN – modelling out or
correcting inadequate housing (over crowding
etc), but accepting inefficiencies continue.
3. Difference is requirement (2 minus 1) – when
adjusted for vacancies
A Model
So what?
• Should the housing target be increased to help
deliver affordable housing?
• Should housing target be adjusted to reflect
growth of specific groups (e.g. service families
or students)?
• Should specific provision be made for specific
groups (e.g. older people)?
• Should ‘mix’ policies be developed of market
and affordable housing?
• Amount of Starter Homes?
BUT….
• Must evidence decisions / use
• Just one element of the evidence base
• Must be considered with OAN
• May impact (positively or negatively) on
viability
• Must consider the whole plan and real world of
delivery
• Consider consultation / stakeholder input
Contact Details
Mark Aldridge
HDH Planning and Development Ltd
Clapham Woods Farm
Keasden
Nr Clapham
Lancaster
LA2 8ET
simon@HDHplanning.co.uk
015242 51831 / 07989 975 977
Economic Development Needs Assessment
4 February 2016
Overview
The NPPF
• Plans should be supported by an evidence base that
• Assesses needs for land and floorspace
• Both quantitative and qualitative
• For all foreseeable types of economic activity over plan period
• Reflects a clear understanding of business needs
• Is based on close work with the business community
• To understand their needs
• Also identify and address barriers to investment,
• Including lack of housing, infrastructure or viability
• [Comment
• In practice it’s mainly about the property industry]
• Authorities should co-operate
• With neighbouring authorities and County Councils
• And LEPs
The PPG
• The needs assessment should ignore supply constraints
• E.g. land availability, infrastructure, environmental impact
• Constraints bear on policy targets but not on ‘need’
• Assessments should cover market areas
• For economic uses these are FEMAs
• For main town centre uses they are trade draw areas
• [We thought main town centre uses were economic uses?
• Don’t worry, I’ll come back to this]
• Where joint studies aren’t practical
• Due to plan timetables
• Single-authority evidence bases are OK just this once
• In future you should co-ordinate timetables
• Paras 030-034 is headed ‘methodology’
• There’s no beginning-to-end narrative
• A long shopping list of bullet points
• Our step-by-step method (below) aims to satisfy them all
Definitions
• Better name the parts before we start
• What is ‘need’?
• It’s got to mean ‘effective demand’
• The land that would be developed and occupied for economic uses
• If planning did not restrict development
• The land will be developed only if floorspace is
• In demand (occupiers want it)
• Financially viable (developers and landowners want to provide it)
• That’s why property market assessment is so important
• Looking at property values and viability
• A huge part of the needs assessment
• [The PPG says ignore viability
• As a supply constraint
• I think we can ignore that?]
Definitions continued
• What is ‘economic development?’
• The PPG is not consistent
• But the NPPF is clear
• It’s construction and change of use for economic end uses
• Which comprise
• B-class uses
• AKA ‘employment, ‘business’
• Offices, industry & warehousing, R&D
• Main town centre uses
• Retail
• Leisure and culture
• (B1 offices = overlap with the B class)
• The rest
• E.g. health & education, energy & infrastructure
Structure of the study
• Here is a suggestion
• Part A The whole economy
• An overview of the economy
• To help inform the plan’s vision and strategy
• Include a view of future jobs
• Part B The B-class (‘employment’) uses
• Formerly known as employment land review
• Full assessment of demand for land
• To help inform provision targets
• And other planning policies and decisions
• (Other economic land uses are planned for in other ways
• Retail and leisure assessments
• A separate subject not covered here
• Land for schools etc is provided as part of housing schemes
• Hospitals, universities etc are planned for individually)
The whole economy
• Job growth over the plan period
• Start from formal economic forecasts
• Test against historical experience and policy aspiration
• But the plan must be realistic as well as ambitious
• Do not overstate future jobs
• Think of the implications for housing
• The balance of jobs and workers
• Reconcile the economy and housing evidence bases
• See the technical note on OAN and housing targets
• Formal assessments of retail and leisure needs
• There is no guidance on this
• Follow established good practice
• Overview of other economic land uses
• Identify major opportunities
• And resulting need for land over the plan period
• Focus on large one-off projects
• E.g. universities, major hospitals, tourism, culture
Defining the FEMA
• The CLG Economic Note (2010) explains what it’s about
• FEMAs are (mainly) sub-regional labour markets
• Defined by commuting containment
• Start from official Travel-to-Work Areas (TTWAs)
• Updated last year from the 2011 Census
• But they don’t always fit local authority boundaries
• Not even roughly
• The alternative
• Make a separate containment calculation
• Using Census commuting data
• And TTWA thresholds
• 75% or 66.7% depending on size
• Also talk to the property industry
• What do they think the sub-regional market is?
Commuting self-containment for Area X, persons, 2010-11
ource: ONS
Origin (trips from) Destination (trips to)
Area X Elsewhere
Total trips from
Area X
Origin containment
Area X 33,291 22,163 55,454 60%
Elsewhere 12,813
Total trips to Area X 46,104
Destination containment 72%
The employment land review
The logic
Introduction
Part 1
The current situation
Part 2
Demand and supply in
the long term
Part 3
Conclusions
Policy context
Economic forecasts
Sites inventory &
appraisal
Property market
profile
Demand-supply
balance
Summary & policy
implications
Future demand
Property market profile - analysis
• Best done by a property consultant
• Split between land uses
• Offices, industry / warehousing
• And maybe more finely sliced
• E.g. media, R&D, strategic warehousing
• Demand
• Floorspace take-up
• Who are the occupiers?
• What are they looking for?
• Can they get it?
• Drivers of change
• Supply and market balance
• Floorspace availability and pipeline
• Vacancy rate and years supply ratio
• Development in recent years – how successful?
• Rents and values
• What, where, is viable to develop?
• And to maintain?
Property market profile - conclusions
• Opportunities for development / redevelopment
• For whom? Occupier activities / profiles
• What and where?
• Existing employment sites surplus to requirements
• What and where?
• Why can’t be viably maintained or redeveloped?
• Implications
• Where is the demand for development land?
• Where are existing sites surplus to requirements?
• The Framework says don’t safeguard land for employment
• If it has no realistic prospect of being occupied for that use
• Now you should probably hold a stakeholder workshop
• To stress-test these answers
• It’s usually an eye-opener
• But still you’ll only have half the answer
• The market doesn’t look beyond next week or next year
• That’s why we do a separate analysis on the long term
Sites inventory and appraisal
• Still keep different land uses separate
• Quantity and qualitative appraisal
• Cover
• Existing employment sites
• Commitments
• Permissions and allocations
• Positive and negative
• Potential sites
• Proposed or under consideration for B-class development
• Mixed use is important and difficult
• Qualitative assessment is about market potential
• Existing sites
• Is it in demand and viable to maintain?
• Development redevelopment sites
• If offered to the market will it be developed and occupied?
• The property market profile tells you what you’re looking for
Demand and supply in the long term
Demand and supply in the long term continued
• Key points and pitfalls
• Employment forecasts
• Matching jobs and housing numbers
• Sector to land use
• Employment densities
• HCA Guide
• Yorkshire and the Humber study
• Gross and net change
• Dealing with mixed use
• Dealing with Permitted development rights
• Blending in the market analysis
Net change 2011-31 2011-31 p.a. 200
Jobs
Floorspaceper
job
sqmGEA
Employment
floorspace
sqmGEA
Plotratio
Employment
landha
Employment
floorspace
sqmGEA
Employment
landha
Em
f
Industrial/warehousing 3,566 67 238,929 40% 60 11,946 3.0
Offices 6,202 15 93,031 60% 16 4,652 0.8
Non-Buses 7,255 - -
Total 17,024 331,960 75 16,598 3.8
Conclusions and policy implications
• The quantity
• The total land provision that the area should aim for
• By land use, district and time period (net change)
• For a multi-authority HMA
• The allocation of that total between districts
• Site-specific policies / allocations
• Existing employment sites
• Committed development sites
• New sites to be allocated for employment
• Criteria-driven policies
• To cover those sites which will not be identified individually
in the plan;
• Other policies
• Positive policy intervention?
Optional addendum
Aligning housing and jobs
What not to do
• Buy a job forecast of the shelf
• Translate into demand for workers into population
• Translate into households into dwellings
• Why not?
• The forecast already shows future population
• But it’s not the same as you calculate at the end
• Usually a lot smaller
• Because the forecaster’s jobs-to-population factors are different
• Especially commuting and unemployment are not fixed
• In real life commuting adjusts to supply-demand shifts
• More important, activity rates are different
• You’re free to disagree with the forecaster on all this
• But if so you must re-run your assumptions through the model
• Say you expect lower activity rates
• The forecast job growth (demand) will go down
• Because the forecast derives local jobs from the national total
• So with lower activity rates nationally you get less job growth everywhere
• Including your district
What to do
• Take your preferred demographic future
• From the housing needs assessment
• The population that goes with the emerging OAN
• Determine expected job growth
• (Better don’t call it a target)
• From formal economic forecasts
• Tested against each other, past change and policy objectives
• See if the OAN provides enough workers to match the job growth
• If too many people, that’s fine
• Maybe not logical but that’s how it is
• If too few people, remodel the OAN
• Working with the economic forecaster
• So your jobs and your demography are consistent
• In short
• Plan for enough housing
• To support the jobs you are expecting and planning for
Local population
starting point
Demand for local
services e.g. retail
Local jobs demandNational job total
Commuting
Macroeconomic
factors
Local activity
rates & unemploymt
Local population
'required'
National activity rates
& unemploymt
Economic model Demographic model
How it all works
Thank you
Questions? Comments?
Strategic Housing and
Employment Land Availability
Assessments (SHELAAs)
Jo Lee
Peter Brett Associates
2 February 2016
National context
NPPF requires local planning authorities to:
• have an adequate, up to date and relevant
evidence base
• to ensure that these assessments for
housing and employment supply are
integrated.
• establish realistic assumptions about
availability, suitability and economic
viability
Landuses
Assess sites are available, suitable and achievable:
• Employment;
• Housing, including:
- Residential
- Student Accommodation
- Older person accommodation
- Caravans for Non-Travelling Romany Gypsies and Irish
Travellers
- Caravans for Travelling Gypsies and Travellers and
Travelling Showpeople
NPPG Method
Method – Stage 1
• Where
• Is the geographical area the same as HEDNA?
• Who
• Do you need to work together?
• Who needs to be involved?
• How will you involve them – Panel?
• What
• Site size thresholds
Method – Stage 1
Site identification process
• What has changed?
• What sites might be suitable from emerging
evidence / plan making?
• What do you know about already?
• What might members know/find out?
• How will sites for employment, caravans,
older people, students be identified?
Method – Stage 1
Call for sites
• Using a comprehensive form to capture all
the relevant information:
• ownership, history, investigations, constraints,
viability, possible uses, yield, timing
Survey process
• Designing an effective database to record
data
• Undertaking a desk based assessment
Method – Stage 2
• Is the site available?
• Is the site suitable?
• Is the site achievable and viable?
Methods include:
• Panel approach
• Broad testing of typologies
• Broad testing of all sites
• Hybrid – broad testing of sites or typologies
plus detailed testing of strategic sites
Method – Stage 2
• Calculating the development potential
• Using realistic lead in times and build out
rates
• Inspectors critical of over optimistic rates
• Assumptions based on transparent and robust
local evidence
• Use SHELAA panel to explore rates, test rates
against past performance and comparable
schemes, monitor what is delivered
• Implications for a future delivery test
Method – Stage 3 & 4
Including realistic windfall allowance
Assessment Review
• Trajectory – how much housing and employment
land provided and when
• Are discounts necessary and appropriate?
• Do you have enough sites to meet your need?
• Is there evidence to defend a stepped trajectory?
Method – Stage 5
Final evidence base – outputs
• Table of sites/broad locations and maps
• Assessment of suitability, availability and
achievability
• Type, quantity and timescale of development
Monitoring
• Rolling review of sites and identification of change
• Check status, assumptions and timescales
• Have you deviated from projections – why?
Specialist Accommodation
• Housing for older people
• Housing for students
• Caravans for Non-Travelling Romany
Gypsies and Irish Travellers
• Caravans for Travelling Gypsies and
Travellers and Travelling Showpeople
Other Issues
• Empty housing and buildings
• Is it making a significant contribution?
• Brownfield Register
• How best to use the SHELAA process to
identify and assess sites?
• Project management and skills required
• Identifying key issues
• Filling the gaps
Discussion: Workshop 1
• Geographical area
• Different landuses in the same study
• Link to Brownfield Register
• Member involvement
Discussion: Workshop 2
• Lead in time and build out rates
• Achievability and viability of sites
• Required skills and project management
Feedback, questions,
conclusion
We need your feedback
This is nice, but we want more
• We need to know what
you think
• Comments triply
welcome
• We read all of them
• We use your ideas to
change what we do
and how we do it
Follow-up evaluation
• We employ Arup to follow-up on our work
– On reflection, was today actually useful?
– 10 mins of feedback in return for £100’s of support
• Our board use this to decide what we do with our
grant. If we don’t get positive feedback we are
unlikely to continue
Recent & forthcoming PAS activity
• PAS Autumn Conference
• Planning Decisions
• Pre-Application Discussions
Three things to do before
10am tomorrow:
Sign up for the
PAS Bulletin
Follow us on
Twitter
Sign up to the
Khub
1
3
2
Please leave your badges
The support doesn’t end now:

More Related Content

Viewers also liked

Storyboard pt1
Storyboard pt1Storyboard pt1
Storyboard pt1joelsy98
 
Start Up Gathering 2015 - 'Driving Business Forward' TSSG & South East Bic
Start Up Gathering 2015 - 'Driving Business Forward' TSSG & South East BicStart Up Gathering 2015 - 'Driving Business Forward' TSSG & South East Bic
Start Up Gathering 2015 - 'Driving Business Forward' TSSG & South East BicTssg Wit
 
Photoshop Grids Before and After
Photoshop Grids Before and AfterPhotoshop Grids Before and After
Photoshop Grids Before and Aftermegkillen
 
Welcome to family martial arts and karate academy in san antonio
Welcome to family martial arts and karate academy in san antonioWelcome to family martial arts and karate academy in san antonio
Welcome to family martial arts and karate academy in san antonio3T Karate - San Antonio
 
A importância da formação continuada - identidade do professor e sua marca
A importância da formação continuada - identidade do professor e sua marcaA importância da formação continuada - identidade do professor e sua marca
A importância da formação continuada - identidade do professor e sua marcaRomulo Decussatti (Luke Marketwalker)
 
Partes internas de la computadora
Partes internas de  la computadoraPartes internas de  la computadora
Partes internas de la computadoraBaudilio Cahueque
 
Intro to ip and entertainment final version
Intro to ip and entertainment final versionIntro to ip and entertainment final version
Intro to ip and entertainment final versionBananaIP Counsels
 
7 Reasons to Choose Anaplan
7 Reasons to Choose Anaplan7 Reasons to Choose Anaplan
7 Reasons to Choose AnaplanAndrew Collins
 
MVP Canvas: Protótipos Organizados, Negócios Acelerados
MVP Canvas: Protótipos Organizados, Negócios AceleradosMVP Canvas: Protótipos Organizados, Negócios Acelerados
MVP Canvas: Protótipos Organizados, Negócios AceleradosSerge Rehem
 
Micro-Lançamentos em 7 Passos
Micro-Lançamentos em 7 PassosMicro-Lançamentos em 7 Passos
Micro-Lançamentos em 7 PassosSerge Rehem
 
Reconocimiento de placas matlab
Reconocimiento de placas matlabReconocimiento de placas matlab
Reconocimiento de placas matlabJhon Guapacha
 
Memory bits and bytes
Memory bits and bytesMemory bits and bytes
Memory bits and bytesmac_see
 

Viewers also liked (16)

Storyboard pt1
Storyboard pt1Storyboard pt1
Storyboard pt1
 
Networking with Solar Innovators
Networking with Solar InnovatorsNetworking with Solar Innovators
Networking with Solar Innovators
 
Start Up Gathering 2015 - 'Driving Business Forward' TSSG & South East Bic
Start Up Gathering 2015 - 'Driving Business Forward' TSSG & South East BicStart Up Gathering 2015 - 'Driving Business Forward' TSSG & South East Bic
Start Up Gathering 2015 - 'Driving Business Forward' TSSG & South East Bic
 
Photoshop Grids Before and After
Photoshop Grids Before and AfterPhotoshop Grids Before and After
Photoshop Grids Before and After
 
Welcome to family martial arts and karate academy in san antonio
Welcome to family martial arts and karate academy in san antonioWelcome to family martial arts and karate academy in san antonio
Welcome to family martial arts and karate academy in san antonio
 
A importância da formação continuada - identidade do professor e sua marca
A importância da formação continuada - identidade do professor e sua marcaA importância da formação continuada - identidade do professor e sua marca
A importância da formação continuada - identidade do professor e sua marca
 
Partes internas de la computadora
Partes internas de  la computadoraPartes internas de  la computadora
Partes internas de la computadora
 
Dispute resolution ent law
Dispute resolution   ent lawDispute resolution   ent law
Dispute resolution ent law
 
Intro to ip and entertainment final version
Intro to ip and entertainment final versionIntro to ip and entertainment final version
Intro to ip and entertainment final version
 
Ajmal Khan CV
Ajmal Khan CVAjmal Khan CV
Ajmal Khan CV
 
7 Reasons to Choose Anaplan
7 Reasons to Choose Anaplan7 Reasons to Choose Anaplan
7 Reasons to Choose Anaplan
 
MVP Canvas: Protótipos Organizados, Negócios Acelerados
MVP Canvas: Protótipos Organizados, Negócios AceleradosMVP Canvas: Protótipos Organizados, Negócios Acelerados
MVP Canvas: Protótipos Organizados, Negócios Acelerados
 
Micro-Lançamentos em 7 Passos
Micro-Lançamentos em 7 PassosMicro-Lançamentos em 7 Passos
Micro-Lançamentos em 7 Passos
 
Contracts entertainment law
Contracts entertainment lawContracts entertainment law
Contracts entertainment law
 
Reconocimiento de placas matlab
Reconocimiento de placas matlabReconocimiento de placas matlab
Reconocimiento de placas matlab
 
Memory bits and bytes
Memory bits and bytesMemory bits and bytes
Memory bits and bytes
 

Similar to HEDNA and SHELAA Exeter event

HEDNA and SHELAA London Event
HEDNA and SHELAA London EventHEDNA and SHELAA London Event
HEDNA and SHELAA London EventPAS_Team
 
Manchester 24 Feb HEDNA and SHELAA
Manchester 24 Feb HEDNA and SHELAAManchester 24 Feb HEDNA and SHELAA
Manchester 24 Feb HEDNA and SHELAAPAS_Team
 
Edna and sheila slideshare composite
Edna and sheila slideshare compositeEdna and sheila slideshare composite
Edna and sheila slideshare compositePAS_Team
 
Manchester 24 Feb HEDNA and SHELAA
Manchester 24 Feb HEDNA and SHELAAManchester 24 Feb HEDNA and SHELAA
Manchester 24 Feb HEDNA and SHELAAPAS_Team
 
HNA Slides Show and Tell 14.10.21
HNA Slides Show and Tell 14.10.21 HNA Slides Show and Tell 14.10.21
HNA Slides Show and Tell 14.10.21 PAS_Team
 
Pas topic paper housing august19 draft3
Pas topic paper housing august19 draft3Pas topic paper housing august19 draft3
Pas topic paper housing august19 draft3PAS_Team
 
Specialist Disability Accommodation Presentation
Specialist Disability Accommodation PresentationSpecialist Disability Accommodation Presentation
Specialist Disability Accommodation PresentationCPA Australia
 
Pas topic paper housing march20
Pas topic paper housing march20Pas topic paper housing march20
Pas topic paper housing march20PAS_Team
 
Northampton Housing Needs Assessment and Strategic Plan 11-2010
Northampton Housing Needs Assessment and Strategic Plan 11-2010Northampton Housing Needs Assessment and Strategic Plan 11-2010
Northampton Housing Needs Assessment and Strategic Plan 11-2010Adam Cohen
 
Hhrc eastern ontario municipal conference - presentation version circulated
Hhrc   eastern ontario municipal  conference - presentation version circulatedHhrc   eastern ontario municipal  conference - presentation version circulated
Hhrc eastern ontario municipal conference - presentation version circulatedOntarioEast
 
ABC Workshop: Housing Lens - Neighborhood Partnerships' RE:Conference 2014
ABC Workshop: Housing Lens - Neighborhood Partnerships' RE:Conference 2014ABC Workshop: Housing Lens - Neighborhood Partnerships' RE:Conference 2014
ABC Workshop: Housing Lens - Neighborhood Partnerships' RE:Conference 2014NeighborhoodPartnerships
 
Community Development Consolidated Plan, Action Plan & Budget
Community Development Consolidated Plan, Action Plan & BudgetCommunity Development Consolidated Plan, Action Plan & Budget
Community Development Consolidated Plan, Action Plan & BudgetCity of College Station
 
HDTAP 2020 21 workshop
HDTAP 2020 21 workshopHDTAP 2020 21 workshop
HDTAP 2020 21 workshopPAS_Team
 
Disabled Facilities Grant and Other Adaptations: External Review 2018
Disabled Facilities Grant and Other Adaptations: External Review 2018Disabled Facilities Grant and Other Adaptations: External Review 2018
Disabled Facilities Grant and Other Adaptations: External Review 2018Foundations
 
Plan making - getting your plan in place (July 2013)
Plan making - getting your plan in place (July 2013) Plan making - getting your plan in place (July 2013)
Plan making - getting your plan in place (July 2013) PAS_Team
 
National Urban Housing and Habitat Policy-2007
National  Urban Housing and Habitat Policy-2007National  Urban Housing and Habitat Policy-2007
National Urban Housing and Habitat Policy-2007JIT KUMAR GUPTA
 
DCLG Statistics User Engagement Day - House Building and Supply
DCLG Statistics User Engagement Day - House Building and SupplyDCLG Statistics User Engagement Day - House Building and Supply
DCLG Statistics User Engagement Day - House Building and SupplyDCLGStats
 
Leadership Essentials: Planning Delivering Economic Growth
Leadership Essentials: Planning Delivering Economic GrowthLeadership Essentials: Planning Delivering Economic Growth
Leadership Essentials: Planning Delivering Economic GrowthPAS_Team
 

Similar to HEDNA and SHELAA Exeter event (20)

HEDNA and SHELAA London Event
HEDNA and SHELAA London EventHEDNA and SHELAA London Event
HEDNA and SHELAA London Event
 
Manchester 24 Feb HEDNA and SHELAA
Manchester 24 Feb HEDNA and SHELAAManchester 24 Feb HEDNA and SHELAA
Manchester 24 Feb HEDNA and SHELAA
 
Edna and sheila slideshare composite
Edna and sheila slideshare compositeEdna and sheila slideshare composite
Edna and sheila slideshare composite
 
Manchester 24 Feb HEDNA and SHELAA
Manchester 24 Feb HEDNA and SHELAAManchester 24 Feb HEDNA and SHELAA
Manchester 24 Feb HEDNA and SHELAA
 
HNA Slides Show and Tell 14.10.21
HNA Slides Show and Tell 14.10.21 HNA Slides Show and Tell 14.10.21
HNA Slides Show and Tell 14.10.21
 
Pas topic paper housing august19 draft3
Pas topic paper housing august19 draft3Pas topic paper housing august19 draft3
Pas topic paper housing august19 draft3
 
Cuyahoga Countywide Housing Study
Cuyahoga Countywide Housing Study Cuyahoga Countywide Housing Study
Cuyahoga Countywide Housing Study
 
Specialist Disability Accommodation Presentation
Specialist Disability Accommodation PresentationSpecialist Disability Accommodation Presentation
Specialist Disability Accommodation Presentation
 
College Station Affordable Housing
College Station Affordable HousingCollege Station Affordable Housing
College Station Affordable Housing
 
Pas topic paper housing march20
Pas topic paper housing march20Pas topic paper housing march20
Pas topic paper housing march20
 
Northampton Housing Needs Assessment and Strategic Plan 11-2010
Northampton Housing Needs Assessment and Strategic Plan 11-2010Northampton Housing Needs Assessment and Strategic Plan 11-2010
Northampton Housing Needs Assessment and Strategic Plan 11-2010
 
Hhrc eastern ontario municipal conference - presentation version circulated
Hhrc   eastern ontario municipal  conference - presentation version circulatedHhrc   eastern ontario municipal  conference - presentation version circulated
Hhrc eastern ontario municipal conference - presentation version circulated
 
ABC Workshop: Housing Lens - Neighborhood Partnerships' RE:Conference 2014
ABC Workshop: Housing Lens - Neighborhood Partnerships' RE:Conference 2014ABC Workshop: Housing Lens - Neighborhood Partnerships' RE:Conference 2014
ABC Workshop: Housing Lens - Neighborhood Partnerships' RE:Conference 2014
 
Community Development Consolidated Plan, Action Plan & Budget
Community Development Consolidated Plan, Action Plan & BudgetCommunity Development Consolidated Plan, Action Plan & Budget
Community Development Consolidated Plan, Action Plan & Budget
 
HDTAP 2020 21 workshop
HDTAP 2020 21 workshopHDTAP 2020 21 workshop
HDTAP 2020 21 workshop
 
Disabled Facilities Grant and Other Adaptations: External Review 2018
Disabled Facilities Grant and Other Adaptations: External Review 2018Disabled Facilities Grant and Other Adaptations: External Review 2018
Disabled Facilities Grant and Other Adaptations: External Review 2018
 
Plan making - getting your plan in place (July 2013)
Plan making - getting your plan in place (July 2013) Plan making - getting your plan in place (July 2013)
Plan making - getting your plan in place (July 2013)
 
National Urban Housing and Habitat Policy-2007
National  Urban Housing and Habitat Policy-2007National  Urban Housing and Habitat Policy-2007
National Urban Housing and Habitat Policy-2007
 
DCLG Statistics User Engagement Day - House Building and Supply
DCLG Statistics User Engagement Day - House Building and SupplyDCLG Statistics User Engagement Day - House Building and Supply
DCLG Statistics User Engagement Day - House Building and Supply
 
Leadership Essentials: Planning Delivering Economic Growth
Leadership Essentials: Planning Delivering Economic GrowthLeadership Essentials: Planning Delivering Economic Growth
Leadership Essentials: Planning Delivering Economic Growth
 

More from PAS_Team

231121 SP slides - PAS workshop November 2023.pdf
231121 SP slides - PAS workshop November 2023.pdf231121 SP slides - PAS workshop November 2023.pdf
231121 SP slides - PAS workshop November 2023.pdfPAS_Team
 
So you want to apply for the Planning Skills Delivery Fund PAS Events August ...
So you want to apply for the Planning Skills Delivery Fund PAS Events August ...So you want to apply for the Planning Skills Delivery Fund PAS Events August ...
So you want to apply for the Planning Skills Delivery Fund PAS Events August ...PAS_Team
 
PAS BNG in Local Plans slides June 2023
PAS BNG in Local Plans slides June 2023PAS BNG in Local Plans slides June 2023
PAS BNG in Local Plans slides June 2023PAS_Team
 
Guildford BC BNG Policy June 2023.pdf
Guildford BC BNG Policy June 2023.pdfGuildford BC BNG Policy June 2023.pdf
Guildford BC BNG Policy June 2023.pdfPAS_Team
 
BNG at Salford City Council_June 2023.pdf
BNG at Salford City Council_June 2023.pdfBNG at Salford City Council_June 2023.pdf
BNG at Salford City Council_June 2023.pdfPAS_Team
 
PAS LNRS and role of Supporting Authorities_23_05_23_PAS slides.pptx
PAS LNRS and role of Supporting Authorities_23_05_23_PAS slides.pptxPAS LNRS and role of Supporting Authorities_23_05_23_PAS slides.pptx
PAS LNRS and role of Supporting Authorities_23_05_23_PAS slides.pptxPAS_Team
 
Leeds Beckett Lecture Career Advice.pptx
Leeds Beckett Lecture Career Advice.pptxLeeds Beckett Lecture Career Advice.pptx
Leeds Beckett Lecture Career Advice.pptxPAS_Team
 
Infrastructure Levy Technical Consultation (Workshop 3 Delivering Affordable ...
Infrastructure Levy Technical Consultation (Workshop 3 Delivering Affordable ...Infrastructure Levy Technical Consultation (Workshop 3 Delivering Affordable ...
Infrastructure Levy Technical Consultation (Workshop 3 Delivering Affordable ...PAS_Team
 
Infrastructure Levy Technical Consultation (Workshop 2 Spending the levy and ...
Infrastructure Levy Technical Consultation (Workshop 2 Spending the levy and ...Infrastructure Levy Technical Consultation (Workshop 2 Spending the levy and ...
Infrastructure Levy Technical Consultation (Workshop 2 Spending the levy and ...PAS_Team
 
Infrastructure Levy Technical Consultation (Workshop 1 Setting rates and char...
Infrastructure Levy Technical Consultation (Workshop 1 Setting rates and char...Infrastructure Levy Technical Consultation (Workshop 1 Setting rates and char...
Infrastructure Levy Technical Consultation (Workshop 1 Setting rates and char...PAS_Team
 
PAS Natural England Biodiversity Net Gain update 18_04_23
PAS Natural England Biodiversity Net Gain update 18_04_23PAS Natural England Biodiversity Net Gain update 18_04_23
PAS Natural England Biodiversity Net Gain update 18_04_23PAS_Team
 
EOR Webinar PAS presentation slidesFINAL.pptx
EOR Webinar PAS presentation slidesFINAL.pptxEOR Webinar PAS presentation slidesFINAL.pptx
EOR Webinar PAS presentation slidesFINAL.pptxPAS_Team
 
230329 IL Technical Consultation - launch event.pptx
230329 IL Technical Consultation - launch event.pptx230329 IL Technical Consultation - launch event.pptx
230329 IL Technical Consultation - launch event.pptxPAS_Team
 
PAS Pre-App March 2023.pdf
PAS Pre-App March 2023.pdfPAS Pre-App March 2023.pdf
PAS Pre-App March 2023.pdfPAS_Team
 
CBC Monitoring Review.pptx
CBC Monitoring  Review.pptxCBC Monitoring  Review.pptx
CBC Monitoring Review.pptxPAS_Team
 
PAS Salford Pre App Journey March 2023 JC.pptx
PAS Salford Pre App Journey March 2023 JC.pptxPAS Salford Pre App Journey March 2023 JC.pptx
PAS Salford Pre App Journey March 2023 JC.pptxPAS_Team
 
PAS BNG and Nature Recovery Autumn 2022 Events Evaluation.pdf
PAS BNG and Nature Recovery Autumn 2022 Events Evaluation.pdfPAS BNG and Nature Recovery Autumn 2022 Events Evaluation.pdf
PAS BNG and Nature Recovery Autumn 2022 Events Evaluation.pdfPAS_Team
 
PAS NERC guidance events Nov 22 web.pptx
PAS NERC guidance events Nov 22 web.pptxPAS NERC guidance events Nov 22 web.pptx
PAS NERC guidance events Nov 22 web.pptxPAS_Team
 
PAS Nature Recovery for LAs 8 Dec Post Event.pptx
PAS Nature Recovery for LAs 8 Dec Post Event.pptxPAS Nature Recovery for LAs 8 Dec Post Event.pptx
PAS Nature Recovery for LAs 8 Dec Post Event.pptxPAS_Team
 
PAS BNG and NR policy and strategy
PAS BNG and NR policy and strategy PAS BNG and NR policy and strategy
PAS BNG and NR policy and strategy PAS_Team
 

More from PAS_Team (20)

231121 SP slides - PAS workshop November 2023.pdf
231121 SP slides - PAS workshop November 2023.pdf231121 SP slides - PAS workshop November 2023.pdf
231121 SP slides - PAS workshop November 2023.pdf
 
So you want to apply for the Planning Skills Delivery Fund PAS Events August ...
So you want to apply for the Planning Skills Delivery Fund PAS Events August ...So you want to apply for the Planning Skills Delivery Fund PAS Events August ...
So you want to apply for the Planning Skills Delivery Fund PAS Events August ...
 
PAS BNG in Local Plans slides June 2023
PAS BNG in Local Plans slides June 2023PAS BNG in Local Plans slides June 2023
PAS BNG in Local Plans slides June 2023
 
Guildford BC BNG Policy June 2023.pdf
Guildford BC BNG Policy June 2023.pdfGuildford BC BNG Policy June 2023.pdf
Guildford BC BNG Policy June 2023.pdf
 
BNG at Salford City Council_June 2023.pdf
BNG at Salford City Council_June 2023.pdfBNG at Salford City Council_June 2023.pdf
BNG at Salford City Council_June 2023.pdf
 
PAS LNRS and role of Supporting Authorities_23_05_23_PAS slides.pptx
PAS LNRS and role of Supporting Authorities_23_05_23_PAS slides.pptxPAS LNRS and role of Supporting Authorities_23_05_23_PAS slides.pptx
PAS LNRS and role of Supporting Authorities_23_05_23_PAS slides.pptx
 
Leeds Beckett Lecture Career Advice.pptx
Leeds Beckett Lecture Career Advice.pptxLeeds Beckett Lecture Career Advice.pptx
Leeds Beckett Lecture Career Advice.pptx
 
Infrastructure Levy Technical Consultation (Workshop 3 Delivering Affordable ...
Infrastructure Levy Technical Consultation (Workshop 3 Delivering Affordable ...Infrastructure Levy Technical Consultation (Workshop 3 Delivering Affordable ...
Infrastructure Levy Technical Consultation (Workshop 3 Delivering Affordable ...
 
Infrastructure Levy Technical Consultation (Workshop 2 Spending the levy and ...
Infrastructure Levy Technical Consultation (Workshop 2 Spending the levy and ...Infrastructure Levy Technical Consultation (Workshop 2 Spending the levy and ...
Infrastructure Levy Technical Consultation (Workshop 2 Spending the levy and ...
 
Infrastructure Levy Technical Consultation (Workshop 1 Setting rates and char...
Infrastructure Levy Technical Consultation (Workshop 1 Setting rates and char...Infrastructure Levy Technical Consultation (Workshop 1 Setting rates and char...
Infrastructure Levy Technical Consultation (Workshop 1 Setting rates and char...
 
PAS Natural England Biodiversity Net Gain update 18_04_23
PAS Natural England Biodiversity Net Gain update 18_04_23PAS Natural England Biodiversity Net Gain update 18_04_23
PAS Natural England Biodiversity Net Gain update 18_04_23
 
EOR Webinar PAS presentation slidesFINAL.pptx
EOR Webinar PAS presentation slidesFINAL.pptxEOR Webinar PAS presentation slidesFINAL.pptx
EOR Webinar PAS presentation slidesFINAL.pptx
 
230329 IL Technical Consultation - launch event.pptx
230329 IL Technical Consultation - launch event.pptx230329 IL Technical Consultation - launch event.pptx
230329 IL Technical Consultation - launch event.pptx
 
PAS Pre-App March 2023.pdf
PAS Pre-App March 2023.pdfPAS Pre-App March 2023.pdf
PAS Pre-App March 2023.pdf
 
CBC Monitoring Review.pptx
CBC Monitoring  Review.pptxCBC Monitoring  Review.pptx
CBC Monitoring Review.pptx
 
PAS Salford Pre App Journey March 2023 JC.pptx
PAS Salford Pre App Journey March 2023 JC.pptxPAS Salford Pre App Journey March 2023 JC.pptx
PAS Salford Pre App Journey March 2023 JC.pptx
 
PAS BNG and Nature Recovery Autumn 2022 Events Evaluation.pdf
PAS BNG and Nature Recovery Autumn 2022 Events Evaluation.pdfPAS BNG and Nature Recovery Autumn 2022 Events Evaluation.pdf
PAS BNG and Nature Recovery Autumn 2022 Events Evaluation.pdf
 
PAS NERC guidance events Nov 22 web.pptx
PAS NERC guidance events Nov 22 web.pptxPAS NERC guidance events Nov 22 web.pptx
PAS NERC guidance events Nov 22 web.pptx
 
PAS Nature Recovery for LAs 8 Dec Post Event.pptx
PAS Nature Recovery for LAs 8 Dec Post Event.pptxPAS Nature Recovery for LAs 8 Dec Post Event.pptx
PAS Nature Recovery for LAs 8 Dec Post Event.pptx
 
PAS BNG and NR policy and strategy
PAS BNG and NR policy and strategy PAS BNG and NR policy and strategy
PAS BNG and NR policy and strategy
 

Recently uploaded

ISEIDP in Chikkaballapura, Karnataka, India
ISEIDP in Chikkaballapura, Karnataka, IndiaISEIDP in Chikkaballapura, Karnataka, India
ISEIDP in Chikkaballapura, Karnataka, IndiaTrinity Care Foundation
 
Health rights correspond to a checklisk.
Health rights correspond to a checklisk.Health rights correspond to a checklisk.
Health rights correspond to a checklisk.Christina Parmionova
 
Madison Cat Project - Foster Training: Lesson 1
Madison Cat Project - Foster Training: Lesson 1Madison Cat Project - Foster Training: Lesson 1
Madison Cat Project - Foster Training: Lesson 1KelleyWasmund
 
NL-FR Partnership - Water management roundtable 20240403.pdf
NL-FR Partnership - Water management roundtable 20240403.pdfNL-FR Partnership - Water management roundtable 20240403.pdf
NL-FR Partnership - Water management roundtable 20240403.pdfBertrand Coppin
 
1- Phase 8 Hope For Venezuelan Refugees Soup Program-Periods 4-6.pdf
1- Phase 8 Hope For Venezuelan Refugees Soup Program-Periods 4-6.pdf1- Phase 8 Hope For Venezuelan Refugees Soup Program-Periods 4-6.pdf
1- Phase 8 Hope For Venezuelan Refugees Soup Program-Periods 4-6.pdfCristal Montañéz
 
Item # 6 - TBG Partners Landscape Architectural Design Services
Item # 6 - TBG Partners Landscape Architectural Design ServicesItem # 6 - TBG Partners Landscape Architectural Design Services
Item # 6 - TBG Partners Landscape Architectural Design Servicesahcitycouncil
 
UN DESA: Finance for Development 2024 Report
UN DESA: Finance for Development 2024 ReportUN DESA: Finance for Development 2024 Report
UN DESA: Finance for Development 2024 ReportEnergy for One World
 
World Health Day theme 2024 is 'My health, my right’.
World Health Day theme 2024 is 'My health, my right’.World Health Day theme 2024 is 'My health, my right’.
World Health Day theme 2024 is 'My health, my right’.Christina Parmionova
 
Item # 4&5 - 415 & 423 Evans Ave. Replat
Item # 4&5 - 415 & 423 Evans Ave. ReplatItem # 4&5 - 415 & 423 Evans Ave. Replat
Item # 4&5 - 415 & 423 Evans Ave. Replatahcitycouncil
 
World Health Day 2024 - Zero Discrimination, Affordable treatments, Respectfu...
World Health Day 2024 - Zero Discrimination, Affordable treatments, Respectfu...World Health Day 2024 - Zero Discrimination, Affordable treatments, Respectfu...
World Health Day 2024 - Zero Discrimination, Affordable treatments, Respectfu...Christina Parmionova
 
April 7th - World Health Day 2024 - My Health. My Right.
April 7th - World Health Day 2024 - My Health. My Right.April 7th - World Health Day 2024 - My Health. My Right.
April 7th - World Health Day 2024 - My Health. My Right.Christina Parmionova
 
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -16 April.
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -16 April.ECOSOC YOUTH FORUM 2024 - Side Events Schedule -16 April.
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -16 April.Christina Parmionova
 
PPT Item # 6 - TBG Partners Landscape Architectural Design Services.pdf
PPT Item # 6 - TBG Partners Landscape Architectural Design Services.pdfPPT Item # 6 - TBG Partners Landscape Architectural Design Services.pdf
PPT Item # 6 - TBG Partners Landscape Architectural Design Services.pdfahcitycouncil
 
Youth shaping sustainable and innovative solution - Reinforcing the 2030 agen...
Youth shaping sustainable and innovative solution - Reinforcing the 2030 agen...Youth shaping sustainable and innovative solution - Reinforcing the 2030 agen...
Youth shaping sustainable and innovative solution - Reinforcing the 2030 agen...Christina Parmionova
 
2024 ECOSOC YOUTH FORUM -logistical information - United Nations Economic an...
2024 ECOSOC YOUTH FORUM -logistical information -  United Nations Economic an...2024 ECOSOC YOUTH FORUM -logistical information -  United Nations Economic an...
2024 ECOSOC YOUTH FORUM -logistical information - United Nations Economic an...Christina Parmionova
 
PPT Item # 7 - Demolition & Replacement Structure Processes
PPT Item # 7 - Demolition & Replacement Structure ProcessesPPT Item # 7 - Demolition & Replacement Structure Processes
PPT Item # 7 - Demolition & Replacement Structure Processesahcitycouncil
 
Focusing on the rights of women and girls
Focusing on the rights of women and girlsFocusing on the rights of women and girls
Focusing on the rights of women and girlsChristina Parmionova
 
European Court of Human Rights: Judgment Verein KlimaSeniorinnen Schweiz and ...
European Court of Human Rights: Judgment Verein KlimaSeniorinnen Schweiz and ...European Court of Human Rights: Judgment Verein KlimaSeniorinnen Schweiz and ...
European Court of Human Rights: Judgment Verein KlimaSeniorinnen Schweiz and ...Energy for One World
 
2024: The FAR, Federal Acquisition Regulations - Part 24
2024: The FAR, Federal Acquisition Regulations - Part 242024: The FAR, Federal Acquisition Regulations - Part 24
2024: The FAR, Federal Acquisition Regulations - Part 24JSchaus & Associates
 

Recently uploaded (20)

ISEIDP in Chikkaballapura, Karnataka, India
ISEIDP in Chikkaballapura, Karnataka, IndiaISEIDP in Chikkaballapura, Karnataka, India
ISEIDP in Chikkaballapura, Karnataka, India
 
Health rights correspond to a checklisk.
Health rights correspond to a checklisk.Health rights correspond to a checklisk.
Health rights correspond to a checklisk.
 
Madison Cat Project - Foster Training: Lesson 1
Madison Cat Project - Foster Training: Lesson 1Madison Cat Project - Foster Training: Lesson 1
Madison Cat Project - Foster Training: Lesson 1
 
NL-FR Partnership - Water management roundtable 20240403.pdf
NL-FR Partnership - Water management roundtable 20240403.pdfNL-FR Partnership - Water management roundtable 20240403.pdf
NL-FR Partnership - Water management roundtable 20240403.pdf
 
1- Phase 8 Hope For Venezuelan Refugees Soup Program-Periods 4-6.pdf
1- Phase 8 Hope For Venezuelan Refugees Soup Program-Periods 4-6.pdf1- Phase 8 Hope For Venezuelan Refugees Soup Program-Periods 4-6.pdf
1- Phase 8 Hope For Venezuelan Refugees Soup Program-Periods 4-6.pdf
 
Item # 6 - TBG Partners Landscape Architectural Design Services
Item # 6 - TBG Partners Landscape Architectural Design ServicesItem # 6 - TBG Partners Landscape Architectural Design Services
Item # 6 - TBG Partners Landscape Architectural Design Services
 
UN DESA: Finance for Development 2024 Report
UN DESA: Finance for Development 2024 ReportUN DESA: Finance for Development 2024 Report
UN DESA: Finance for Development 2024 Report
 
World Health Day theme 2024 is 'My health, my right’.
World Health Day theme 2024 is 'My health, my right’.World Health Day theme 2024 is 'My health, my right’.
World Health Day theme 2024 is 'My health, my right’.
 
Item # 4&5 - 415 & 423 Evans Ave. Replat
Item # 4&5 - 415 & 423 Evans Ave. ReplatItem # 4&5 - 415 & 423 Evans Ave. Replat
Item # 4&5 - 415 & 423 Evans Ave. Replat
 
World Health Day 2024 - Zero Discrimination, Affordable treatments, Respectfu...
World Health Day 2024 - Zero Discrimination, Affordable treatments, Respectfu...World Health Day 2024 - Zero Discrimination, Affordable treatments, Respectfu...
World Health Day 2024 - Zero Discrimination, Affordable treatments, Respectfu...
 
April 7th - World Health Day 2024 - My Health. My Right.
April 7th - World Health Day 2024 - My Health. My Right.April 7th - World Health Day 2024 - My Health. My Right.
April 7th - World Health Day 2024 - My Health. My Right.
 
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -16 April.
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -16 April.ECOSOC YOUTH FORUM 2024 - Side Events Schedule -16 April.
ECOSOC YOUTH FORUM 2024 - Side Events Schedule -16 April.
 
PPT Item # 6 - TBG Partners Landscape Architectural Design Services.pdf
PPT Item # 6 - TBG Partners Landscape Architectural Design Services.pdfPPT Item # 6 - TBG Partners Landscape Architectural Design Services.pdf
PPT Item # 6 - TBG Partners Landscape Architectural Design Services.pdf
 
Youth shaping sustainable and innovative solution - Reinforcing the 2030 agen...
Youth shaping sustainable and innovative solution - Reinforcing the 2030 agen...Youth shaping sustainable and innovative solution - Reinforcing the 2030 agen...
Youth shaping sustainable and innovative solution - Reinforcing the 2030 agen...
 
2024 ECOSOC YOUTH FORUM -logistical information - United Nations Economic an...
2024 ECOSOC YOUTH FORUM -logistical information -  United Nations Economic an...2024 ECOSOC YOUTH FORUM -logistical information -  United Nations Economic an...
2024 ECOSOC YOUTH FORUM -logistical information - United Nations Economic an...
 
PPT Item # 7 - Demolition & Replacement Structure Processes
PPT Item # 7 - Demolition & Replacement Structure ProcessesPPT Item # 7 - Demolition & Replacement Structure Processes
PPT Item # 7 - Demolition & Replacement Structure Processes
 
Focusing on the rights of women and girls
Focusing on the rights of women and girlsFocusing on the rights of women and girls
Focusing on the rights of women and girls
 
European Court of Human Rights: Judgment Verein KlimaSeniorinnen Schweiz and ...
European Court of Human Rights: Judgment Verein KlimaSeniorinnen Schweiz and ...European Court of Human Rights: Judgment Verein KlimaSeniorinnen Schweiz and ...
European Court of Human Rights: Judgment Verein KlimaSeniorinnen Schweiz and ...
 
2024: The FAR, Federal Acquisition Regulations - Part 24
2024: The FAR, Federal Acquisition Regulations - Part 242024: The FAR, Federal Acquisition Regulations - Part 24
2024: The FAR, Federal Acquisition Regulations - Part 24
 
Housing For All - Fair Housing Choice Report
Housing For All - Fair Housing Choice ReportHousing For All - Fair Housing Choice Report
Housing For All - Fair Housing Choice Report
 

HEDNA and SHELAA Exeter event

  • 1. HEDNA and SHELAA Adam Dodgshon – Principal Consultant 4th Feb - Exeter www.pas.gov.uk
  • 3. What is Planning Advisory Service for? “The Planning Advisory Service (PAS) is part of the Local Government Association. The purpose of PAS is to support local planning authorities to provide effective and efficient planning services, to drive improvement in those services and to respond to and deliver changes in the planning system” (Grant offer letter for 2014-15)
  • 4. The Planning Advisory Service We • Are funded by £2m from DCLG to the LGA • Work for English Planning Authorities • Have been around ever since 2005 (Planning Act) and subsequent reform • Reduce cost, risk and delay through pilots, toolkits, Q&A We are not • A thinktank, “experts”, a lobby group or researchers
  • 5. Pre-app, PPAs, conditionsEnforcement Delivery Viability Training CIL & S106s Good decisions Improvement Designation Peer support Planning Quality Framework Neighbourhood plans Events, toolkits and materials Local plans Leadership Energy & climate change Peer challenges Committee training & peer review Essentials Plans in place Strategic planning Duty to Cooperate Strategic issues Evidence Sustainability Appraisal Housing needs Community engagement Viability Project mgmt Successful plan-making Resources Resource Review
  • 6. Agenda and Aims • Assessment of housing and economic needs • Understanding affordability • Looking at supply
  • 7. Science or Art? • PPG tells us: “Establishing future need for housing is not an exact science.” • It also says: “No single approach will provide a definitive answer.”
  • 8. Background • The NPPF says • Planning should meet objectively assessed need (for land) • So far as there is sustainable capacity to do so • As defined by the Framework • For housing this means • Prepare a Strategic Housing Market Assessment (SHMA) • Working with neighbours when market areas cross admin boundaries • To assess overall housing need • Split it by size, mix and tenure • Address affordable housing and ‘special needs’ • For economic land uses (‘economic development’) it means • Plan proactively to encourage sustainable economic growth • Not act as an impediment to growth • Understand changing business needs • And identify and address barriers to investment • Planning should Integrate economic uses, housing & community facilities
  • 9. Today’s agenda • So the planning authority needs evidence bases to cover • Housing • Overall need (the OAN) • Housing mix and tenure • Affordable housing need • Economic uses • PAS has published advice on the housing OAN • Technical advice note updated July 2015 • Not on today’s agenda • Two further notes are in draft • Housing mix, tenure and affordable need • Economic development • This morning you get a preview of each • Your feedback will be gratefully received
  • 10. Today’s agenda continued • We’ll package the notes as a trilogy • Technical advice on producing a HEDNA • (Housing and Economic Development Needs Assessment) • But it doesn’t have to be in one bundle • It would be pretty large! • Two (or three) separate studies is fine • But they must be mutually consistent • Show the same future population • Numbers and profile • And future jobs • The OAN note discusses the links between • Affordable and overall housing needs • Population / housing and jobs
  • 11. HDH Slides for PAS Housing and Employment Needs Assessment (HEDNA) and Strategic Housing and Employment Land Availability Assessments (SHELAAs) Viability and development economics London www.pas.gov.uk
  • 12. Terminology Objectively Assessed Need (OAN, overall need) From CLG Household projections, tested / adjusted as per PPG 14 to 19. Disaggregated as per PPG 20. Affordable Need Need for affordable as per PPG 21 to 29 Specific Groups Need for groups as per as per PPG 20 Housing Target (Requirement) The housing planned for, taking into account affordable need, specific groups, Duty to Cooperate, policy objectives and delivery constraints
  • 13. Housing needs - mix, tenure and affordable housing • Why? • How? • So what? • See PAS Note
  • 14. Why? • Because the NPPF tells us to • Because the PPG tells us to - but why…?
  • 15. NPPF 50. ….plan for a mix of housing based on current and future demographic trends, market trends and the needs of different groups in the community … the size, type, tenure and range of housing that is required in particular locations, reflecting local demand … 159. Local planning authorities should … prepare a Strategic Housing Market Assessment … identify the scale and mix of housing and the range of tenures that the local population is likely to need over the plan period which addresses the need for all types of housing, including affordable housing and the needs of different groups in the community..
  • 16. PPG 2a-021-20150326 - Plan makers should therefore examine current and future trends of: • the proportion of the population of different age profile; • the types of household (eg singles, couples, families by age group, numbers of children and dependents); • the current housing stock size of dwellings (eg one, two+ bedrooms); • the tenure composition of housing. This information should be drawn together to understand how age profile and household mix relate to each other, and how this may change in the future…..
  • 17. But why? 2a-029-20140306 - The total affordable housing need should then be considered in the context of its likely delivery as a proportion of mixed market and affordable housing developments, given the probable percentage of affordable housing to be delivered by market housing led developments. An increase in the total housing figures included in the local plan should be considered where it could help deliver the required number of affordable homes.
  • 18. So … (1) • Affordable Housing – ‘Policy off’ assessment to consider uplift • Families with Children – A disaggregation of OAN to assist mix • Housing for Older People – A disaggregation of OAN to assist mix (Specialist Housing) – The need for institutional not in OAN
  • 19. … so … (2) • Households with Specific Needs – A disaggregation of OAN to assist mix (Specialist Housing) – The need for institutional not in OAN • People Wishing to Build Their Own Homes – Policy off assessment to consider specific provision / policy
  • 20. … so … (3) • Student Housing – Policy off assessment to consider uplift – Understanding of supply to meet OAN • Private Rented Sector (PRS) • A disaggregation of OAN to assist mix
  • 21. … and not mentioned • Starter Homes – Can starter homes meet affordable need (will impact on level of uplift)? – Relationship with PRS – A disaggregation of OAN to assist mix
  • 22. True or False? Is the Affordable Need is a component of the OAN? NO (and cannot be) • Different methodologies – OAN based on past trends – OAN already includes adjustment for affordability market signal – Affordable Need based on PPG method • Different Outputs – OAN a total requirement (single figure) – Affordable Need is an annual flow (units per year) • Different purposes – OAN starting point for housing target – Affordable need to consider increasing housing target to ‘help deliver’
  • 23. Confirmed by … • 2a-021-20150326 - How should the needs for all types of housing be addressed? Once an overall housing figure has been identified, plan makers will need to break this down by tenure, household type (singles, couples and families) and household size. Plan makers should therefore examine current and future trends of…… • KLWN v SoS for CLG & Elm Park Holdings
  • 24. How? – 3 outputs • Disaggregation of OAN – No specified methodology • Affordable Need – Specified methodology • Specific Groups – Suggested data sources
  • 25. How – Affordable Need • As per 22 to 29 of PPG • Secondary data (not surveys) • Use of waiting list • Consultants or in-house
  • 26. 4 steps • Stage 1: Current unmet gross need for affordable housing (PPG 023 and 024). The amount of affordable housing that is needed by existing households. • Stage 2: Newly arising affordable housing need (PPG 025). The need for affordable housing of households that will form in the future. • Stage 3: Current affordable housing supply (PPG 026). The affordable housing that is available at the time of the assessment. • Stage 4: Future housing supply of affordable rented re- lets and intermediate affordable housing (PPG 027). How much affordable housing will be available in the future.
  • 27. Key checks • Access levels (cost of entry level housing) – Should it be lower quartile? • Affordability Test (proportion of income spent on housing) – How is market functioning (policy off) • Impact of benefit and housing reforms – Benefit caps – particularly single person households under 35 – Starter homes – Role of PRS and Local Housing Allowance
  • 28. How – Specific Groups • As per 21 of PPG • Secondary data (not surveys) • Primary data from council records • In house data • Ask stakeholders (MOD, Universities etc)
  • 29. How – Overall Mix • A disaggregation of OAN • No specified method • Much can be taken from OAN
  • 30. Key components 1. Understanding of current stock and how it is used – including ‘inefficiencies’ 2. Model houses to adequately house households with OAN – modelling out or correcting inadequate housing (over crowding etc), but accepting inefficiencies continue. 3. Difference is requirement (2 minus 1) – when adjusted for vacancies
  • 32. So what? • Should the housing target be increased to help deliver affordable housing? • Should housing target be adjusted to reflect growth of specific groups (e.g. service families or students)? • Should specific provision be made for specific groups (e.g. older people)? • Should ‘mix’ policies be developed of market and affordable housing? • Amount of Starter Homes?
  • 33. BUT…. • Must evidence decisions / use • Just one element of the evidence base • Must be considered with OAN • May impact (positively or negatively) on viability • Must consider the whole plan and real world of delivery • Consider consultation / stakeholder input
  • 34. Contact Details Mark Aldridge HDH Planning and Development Ltd Clapham Woods Farm Keasden Nr Clapham Lancaster LA2 8ET simon@HDHplanning.co.uk 015242 51831 / 07989 975 977
  • 35. Economic Development Needs Assessment 4 February 2016
  • 37. The NPPF • Plans should be supported by an evidence base that • Assesses needs for land and floorspace • Both quantitative and qualitative • For all foreseeable types of economic activity over plan period • Reflects a clear understanding of business needs • Is based on close work with the business community • To understand their needs • Also identify and address barriers to investment, • Including lack of housing, infrastructure or viability • [Comment • In practice it’s mainly about the property industry] • Authorities should co-operate • With neighbouring authorities and County Councils • And LEPs
  • 38. The PPG • The needs assessment should ignore supply constraints • E.g. land availability, infrastructure, environmental impact • Constraints bear on policy targets but not on ‘need’ • Assessments should cover market areas • For economic uses these are FEMAs • For main town centre uses they are trade draw areas • [We thought main town centre uses were economic uses? • Don’t worry, I’ll come back to this] • Where joint studies aren’t practical • Due to plan timetables • Single-authority evidence bases are OK just this once • In future you should co-ordinate timetables • Paras 030-034 is headed ‘methodology’ • There’s no beginning-to-end narrative • A long shopping list of bullet points • Our step-by-step method (below) aims to satisfy them all
  • 39. Definitions • Better name the parts before we start • What is ‘need’? • It’s got to mean ‘effective demand’ • The land that would be developed and occupied for economic uses • If planning did not restrict development • The land will be developed only if floorspace is • In demand (occupiers want it) • Financially viable (developers and landowners want to provide it) • That’s why property market assessment is so important • Looking at property values and viability • A huge part of the needs assessment • [The PPG says ignore viability • As a supply constraint • I think we can ignore that?]
  • 40. Definitions continued • What is ‘economic development?’ • The PPG is not consistent • But the NPPF is clear • It’s construction and change of use for economic end uses • Which comprise • B-class uses • AKA ‘employment, ‘business’ • Offices, industry & warehousing, R&D • Main town centre uses • Retail • Leisure and culture • (B1 offices = overlap with the B class) • The rest • E.g. health & education, energy & infrastructure
  • 41. Structure of the study • Here is a suggestion • Part A The whole economy • An overview of the economy • To help inform the plan’s vision and strategy • Include a view of future jobs • Part B The B-class (‘employment’) uses • Formerly known as employment land review • Full assessment of demand for land • To help inform provision targets • And other planning policies and decisions • (Other economic land uses are planned for in other ways • Retail and leisure assessments • A separate subject not covered here • Land for schools etc is provided as part of housing schemes • Hospitals, universities etc are planned for individually)
  • 42. The whole economy • Job growth over the plan period • Start from formal economic forecasts • Test against historical experience and policy aspiration • But the plan must be realistic as well as ambitious • Do not overstate future jobs • Think of the implications for housing • The balance of jobs and workers • Reconcile the economy and housing evidence bases • See the technical note on OAN and housing targets • Formal assessments of retail and leisure needs • There is no guidance on this • Follow established good practice • Overview of other economic land uses • Identify major opportunities • And resulting need for land over the plan period • Focus on large one-off projects • E.g. universities, major hospitals, tourism, culture
  • 43.
  • 44. Defining the FEMA • The CLG Economic Note (2010) explains what it’s about • FEMAs are (mainly) sub-regional labour markets • Defined by commuting containment • Start from official Travel-to-Work Areas (TTWAs) • Updated last year from the 2011 Census • But they don’t always fit local authority boundaries • Not even roughly • The alternative • Make a separate containment calculation • Using Census commuting data • And TTWA thresholds • 75% or 66.7% depending on size • Also talk to the property industry • What do they think the sub-regional market is?
  • 45.
  • 46.
  • 47. Commuting self-containment for Area X, persons, 2010-11 ource: ONS Origin (trips from) Destination (trips to) Area X Elsewhere Total trips from Area X Origin containment Area X 33,291 22,163 55,454 60% Elsewhere 12,813 Total trips to Area X 46,104 Destination containment 72%
  • 49. The logic Introduction Part 1 The current situation Part 2 Demand and supply in the long term Part 3 Conclusions Policy context Economic forecasts Sites inventory & appraisal Property market profile Demand-supply balance Summary & policy implications Future demand
  • 50. Property market profile - analysis • Best done by a property consultant • Split between land uses • Offices, industry / warehousing • And maybe more finely sliced • E.g. media, R&D, strategic warehousing • Demand • Floorspace take-up • Who are the occupiers? • What are they looking for? • Can they get it? • Drivers of change • Supply and market balance • Floorspace availability and pipeline • Vacancy rate and years supply ratio • Development in recent years – how successful? • Rents and values • What, where, is viable to develop? • And to maintain?
  • 51. Property market profile - conclusions • Opportunities for development / redevelopment • For whom? Occupier activities / profiles • What and where? • Existing employment sites surplus to requirements • What and where? • Why can’t be viably maintained or redeveloped? • Implications • Where is the demand for development land? • Where are existing sites surplus to requirements? • The Framework says don’t safeguard land for employment • If it has no realistic prospect of being occupied for that use • Now you should probably hold a stakeholder workshop • To stress-test these answers • It’s usually an eye-opener • But still you’ll only have half the answer • The market doesn’t look beyond next week or next year • That’s why we do a separate analysis on the long term
  • 52. Sites inventory and appraisal • Still keep different land uses separate • Quantity and qualitative appraisal • Cover • Existing employment sites • Commitments • Permissions and allocations • Positive and negative • Potential sites • Proposed or under consideration for B-class development • Mixed use is important and difficult • Qualitative assessment is about market potential • Existing sites • Is it in demand and viable to maintain? • Development redevelopment sites • If offered to the market will it be developed and occupied? • The property market profile tells you what you’re looking for
  • 53.
  • 54.
  • 55.
  • 56. Demand and supply in the long term
  • 57. Demand and supply in the long term continued • Key points and pitfalls • Employment forecasts • Matching jobs and housing numbers • Sector to land use • Employment densities • HCA Guide • Yorkshire and the Humber study • Gross and net change • Dealing with mixed use • Dealing with Permitted development rights • Blending in the market analysis
  • 58. Net change 2011-31 2011-31 p.a. 200 Jobs Floorspaceper job sqmGEA Employment floorspace sqmGEA Plotratio Employment landha Employment floorspace sqmGEA Employment landha Em f Industrial/warehousing 3,566 67 238,929 40% 60 11,946 3.0 Offices 6,202 15 93,031 60% 16 4,652 0.8 Non-Buses 7,255 - - Total 17,024 331,960 75 16,598 3.8
  • 59. Conclusions and policy implications • The quantity • The total land provision that the area should aim for • By land use, district and time period (net change) • For a multi-authority HMA • The allocation of that total between districts • Site-specific policies / allocations • Existing employment sites • Committed development sites • New sites to be allocated for employment • Criteria-driven policies • To cover those sites which will not be identified individually in the plan; • Other policies • Positive policy intervention?
  • 61. What not to do • Buy a job forecast of the shelf • Translate into demand for workers into population • Translate into households into dwellings • Why not? • The forecast already shows future population • But it’s not the same as you calculate at the end • Usually a lot smaller • Because the forecaster’s jobs-to-population factors are different • Especially commuting and unemployment are not fixed • In real life commuting adjusts to supply-demand shifts • More important, activity rates are different • You’re free to disagree with the forecaster on all this • But if so you must re-run your assumptions through the model • Say you expect lower activity rates • The forecast job growth (demand) will go down • Because the forecast derives local jobs from the national total • So with lower activity rates nationally you get less job growth everywhere • Including your district
  • 62. What to do • Take your preferred demographic future • From the housing needs assessment • The population that goes with the emerging OAN • Determine expected job growth • (Better don’t call it a target) • From formal economic forecasts • Tested against each other, past change and policy objectives • See if the OAN provides enough workers to match the job growth • If too many people, that’s fine • Maybe not logical but that’s how it is • If too few people, remodel the OAN • Working with the economic forecaster • So your jobs and your demography are consistent • In short • Plan for enough housing • To support the jobs you are expecting and planning for
  • 63. Local population starting point Demand for local services e.g. retail Local jobs demandNational job total Commuting Macroeconomic factors Local activity rates & unemploymt Local population 'required' National activity rates & unemploymt Economic model Demographic model How it all works
  • 65. Strategic Housing and Employment Land Availability Assessments (SHELAAs) Jo Lee Peter Brett Associates 2 February 2016
  • 66. National context NPPF requires local planning authorities to: • have an adequate, up to date and relevant evidence base • to ensure that these assessments for housing and employment supply are integrated. • establish realistic assumptions about availability, suitability and economic viability
  • 67. Landuses Assess sites are available, suitable and achievable: • Employment; • Housing, including: - Residential - Student Accommodation - Older person accommodation - Caravans for Non-Travelling Romany Gypsies and Irish Travellers - Caravans for Travelling Gypsies and Travellers and Travelling Showpeople
  • 69. Method – Stage 1 • Where • Is the geographical area the same as HEDNA? • Who • Do you need to work together? • Who needs to be involved? • How will you involve them – Panel? • What • Site size thresholds
  • 70. Method – Stage 1 Site identification process • What has changed? • What sites might be suitable from emerging evidence / plan making? • What do you know about already? • What might members know/find out? • How will sites for employment, caravans, older people, students be identified?
  • 71. Method – Stage 1 Call for sites • Using a comprehensive form to capture all the relevant information: • ownership, history, investigations, constraints, viability, possible uses, yield, timing Survey process • Designing an effective database to record data • Undertaking a desk based assessment
  • 72. Method – Stage 2 • Is the site available? • Is the site suitable? • Is the site achievable and viable? Methods include: • Panel approach • Broad testing of typologies • Broad testing of all sites • Hybrid – broad testing of sites or typologies plus detailed testing of strategic sites
  • 73. Method – Stage 2 • Calculating the development potential • Using realistic lead in times and build out rates • Inspectors critical of over optimistic rates • Assumptions based on transparent and robust local evidence • Use SHELAA panel to explore rates, test rates against past performance and comparable schemes, monitor what is delivered • Implications for a future delivery test
  • 74. Method – Stage 3 & 4 Including realistic windfall allowance Assessment Review • Trajectory – how much housing and employment land provided and when • Are discounts necessary and appropriate? • Do you have enough sites to meet your need? • Is there evidence to defend a stepped trajectory?
  • 75. Method – Stage 5 Final evidence base – outputs • Table of sites/broad locations and maps • Assessment of suitability, availability and achievability • Type, quantity and timescale of development Monitoring • Rolling review of sites and identification of change • Check status, assumptions and timescales • Have you deviated from projections – why?
  • 76. Specialist Accommodation • Housing for older people • Housing for students • Caravans for Non-Travelling Romany Gypsies and Irish Travellers • Caravans for Travelling Gypsies and Travellers and Travelling Showpeople
  • 77. Other Issues • Empty housing and buildings • Is it making a significant contribution? • Brownfield Register • How best to use the SHELAA process to identify and assess sites? • Project management and skills required • Identifying key issues • Filling the gaps
  • 78. Discussion: Workshop 1 • Geographical area • Different landuses in the same study • Link to Brownfield Register • Member involvement
  • 79. Discussion: Workshop 2 • Lead in time and build out rates • Achievability and viability of sites • Required skills and project management
  • 81. We need your feedback
  • 82. This is nice, but we want more • We need to know what you think • Comments triply welcome • We read all of them • We use your ideas to change what we do and how we do it
  • 83. Follow-up evaluation • We employ Arup to follow-up on our work – On reflection, was today actually useful? – 10 mins of feedback in return for £100’s of support • Our board use this to decide what we do with our grant. If we don’t get positive feedback we are unlikely to continue
  • 84. Recent & forthcoming PAS activity • PAS Autumn Conference • Planning Decisions • Pre-Application Discussions
  • 85. Three things to do before 10am tomorrow: Sign up for the PAS Bulletin Follow us on Twitter Sign up to the Khub 1 3 2
  • 86. Please leave your badges The support doesn’t end now: