Dynamics AX 2009 MRP training

  1. 1. OAD<br />Dynamics AX 2009 Training:<br />Master Plan<br />
  2. 2. Agenda<br />
  3. 3. Master Plan Overview<br />
  4. 4. Dynamics AX Master Plan Position<br />Materials <br />Requirements <br />Planning<br />(MRP)<br /><ul><li>Materials Planning
  5. 5. Finite Materials
  6. 6. Items Dimensions
  7. 7. Lead Time
  8. 8. BOM structure
  9. 9. ……</li></ul>Microsoft Dynamics AX<br />Master Plan <br /><ul><li>Work Center
  10. 10. Work Capacity
  11. 11. Finite Capacity
  12. 12. Job Scheduling
  13. 13. …….</li></ul>Capacity<br />Requirements <br />Planning<br />(CRP)<br />
  14. 14. Multi-sites Master Plan<br />
  15. 15. Generous Flow in Master Plan<br />Optional<br />Planned<br />Purchase<br />Order<br />Purchase<br />Order<br />Setup<br />Master <br />Plan<br />Item <br />Coverage<br />Item <br />Master<br />Setting<br />Run<br />Master<br />Plan<br />Planned<br />Production Order<br />Production<br />Order<br />Transfer<br />Plan<br />Planned<br />Transfer <br />Order<br />Parameters<br />Setting<br />
  16. 16. ParametersSetting<br />
  17. 17. Master Plan  Setup  Parameters<br />General Tag<br />1<br />3<br />2<br />
  18. 18. 1. 1 Static Master Plan <br />Calculate requirements based on current data.<br />The plan remain unchanged until next static master plan running.<br />It is an operation plan most likely run by purchaser or production planner. <br />
  19. 19. 1.2 Dynamics Master Plan <br />Calculate requirements based on net requirements.<br />It is an sales plan most likely run under the changing of sales order.<br />
  20. 20. 1.3 Dual Plan<br />Single plan (both static and dynamics are the same plan) and Dual plan (use different plan for static and dynamics).<br />Dual plan is used while sales simulation without affecting current results.<br />Single plan is used when the sales simulations is usually firmed to planned order. <br />
  21. 21. 2.1 General Coverage Group <br />It is default item coverage group in running master plan when item has not defined Item coverage group.<br />Priority:<br /> Item Coverage >> General Coverage Group<br />
  22. 22. 2.2 Future Time<br />If receipt time > future time, one day will be added in future day (planned day).<br />E.g. <br />
  23. 23. 3. Today date <br />Running master plan based on this calendar.<br />User can select different calendar and run master plan.<br />
  24. 24. Master Plan  Setup  Parameters<br />Planned Order Tag<br />4<br />
  25. 25. 4.1 Find Trade Agreement <br />Search vendor either in lowest price or shortest lead time when running master scheduling.<br />
  26. 26. 4.2 Receipt Time <br />Automatically assigned to planned production order.<br />If receipt time > future time, future message will be generated.<br />User can choose amend delivery date (receipt date of planned order) as future date.<br />
  27. 27. Master Plan  Setup  Parameters<br />Standard Update tag<br />5<br />
  28. 28. 5.1 Group by Vendor/ buyer / Period <br />Group planned purchase order by vendor / buyer / period.<br />
  29. 29. MasterPlan<br />
  30. 30. Master Plan  Setup  Plans  Master Plan<br />Standard Update tag<br />7<br />6<br />8<br />
  31. 31. 6 Include criteria<br />User can include following criteria in master plan:<br /> - On hand<br /> - Inventory Transaction<br /> - Sales Quotation (include %)<br /> - RFQ<br /> - Forecast Plan<br />
  32. 32. 7.1 Scheduling Method <br />Operation Scheduling<br /> - Production will be scheduled in work center group and date <br />Job Scheduling<br /> - Production will be scheduled in work center and time<br />
  33. 33. 7.2 Time fence (I) <br />Background capacity time fence<br /> - Search for capacity which available <br /> - usually 0 (search to today)<br />Finite capacity<br /> - Time fence for finite production scheduling <br />Bottleneck capacity<br /> - Time fence for bottleneck resources<br />Normally, finite capacity for short-term scheduling and bottleneck capacity for middle term scheduling<br />
  34. 34. 8. Forecast Plan <br />Forecast Plan: link to forecast plan<br />Reduction Key: used to reduce forecast amount in future<br />Alternative: set reduction principle in master plan<br />
  35. 35. Master Plan  Setup  Plans  Master Plan<br />Time Fence tag<br />9<br />
  36. 36. 9. Time fence (II)<br />Coverage: time fence for master plan cover<br />Freeze: will not create planned orders in this period<br />Firming: will automatically generate purchase / production order<br />Explosion: will explore BOM item in this period<br />
  37. 37. Con’t <br />Forecast Plan: Consider forecast in this time period.<br /> Capacity: Consider working capacity for this period<br />Action Message: Time fence to consider action date<br />Future Message: Time fence to consider possible future date. <br />
  38. 38. Master Plan  Setup  Plans  Master Plan<br />Future Message tag / Action Message tag<br />10<br />11<br />
  39. 39. 10. Future Message <br />Update planned production / purchase / transfer order<br /> - Update delivery date to possible future date<br /> - e.g. <br />
  40. 40. 11. Action Message <br />Update delivery date to date which nearest requirement date<br />e.g. <br />
  41. 41. Master Plan  Setup  Plans  Master Plan<br />Safety Margin tag<br />12<br />
  42. 42. 12. Safety Margin<br />Receipt Margin<br /> - Additional time for purchase receipt<br />Issue Margin<br /> - Deduce issue requirements (Sales Order) from master scheduling <br />Reorder Margin<br />- Additional lead time for purchase in master scheduling<br />
  43. 43. Forecast Scheduling<br />
  44. 44. Forecast plan overview<br />Forecast Scheduling<br />Forecast <br />Plan<br />Forecast <br />Model 1 <br />Forecast<br />Model 2<br />Forecast <br />Model n<br />………<br />ITEMs<br />
  45. 45. Inventory Management  Setup  Forecast  Forecast Model<br />Forecast Model<br />
  46. 46. 13<br />
  47. 47. 13. Forecast Model<br />Arrange sub-model for the forecast model<br />Run forecast plan using upper forecast model<br />
  48. 48. Master Plan  Setup  Forecast Plans<br />Forecast Plan<br />14<br />
  49. 49. 14. Define the forecast plan<br />User can select whether forecast plan include sales/purchase forecast<br />Select forecast model the forecast plan apply to.<br />
  50. 50. Inventory Management  Periodic  Forecast  Item  Entry<br />Item<br />15<br />
  51. 51. 15. Define forecast<br />Model: Define which forecast model to be run<br />Customer Account / Group: Create customer-based forecast<br />Item Allocation Key: allocate item ratio to item group<br />Sales Quantity: forecast Qty for 1 unit per forecast<br />Allocation: Set length of forecast period <br />
  52. 52. Item Coverage<br />
  53. 53. Inventory Management  Periodic  Forecast  Item  Entry<br />Item<br />15<br />14<br />16<br />
  54. 54. 14. Coverage <br />Coverage plan: Days coverage in this group<br /> Coverage code: <br /> - Period<br />- Requirements<br /> - Min.Max<br />
  55. 55. Con’t <br />Period: consolidate requirements by period<br />Requirements: Driven by sales order / forecast <br />Min/ Max: Safety stock<br />
  56. 56. 15. Positive & Negative Days<br />Positive days: Days of period not issue PO under positive requirements<br />Negative days: Days of period not issue PO under negative requirements<br />
  57. 57. 16. Others<br />BOM version requirements: Requirements by BOM version.<br />Route Version requirements: Different route will be taken consideration in coverage planning<br />
  58. 58. Planned Order<br />
  59. 59. Master Plan  Periodic  Forecast Plan / Master Plan<br />17<br />
  60. 60. 17. Planned Order<br />Select master plan / forecast plan to run<br />Planned order will be generated<br />Release planned purchase order / production order / transfer order in<br /> “ Master Plan  Place  Planned”<br />
  61. 61. Lab<br />Please follow the instruction sheet.<br />
  62. 62. Q & A<br />