5.
5 YEAR REVIEW 2006
• NO INTENTION OF DOING AN
AGGREGATE STUDY
• STUDY OR ELSE!
6.
• TERMS OF REFERENCE
• USED DOCUMENT PREPARED BY THE
COUNTY OF GREY
• OVER $300,000
7.
• SCALED DOWN VERSION
• $150,00 WAS SET ASIDE OVER A 3
YEAR PERIOD ($50K/YEAR)
• TERMS OF REFERENCE WERE
REVIEWED BY MMAH
8.
• TENDER DOCUMENTS WERE
READY IN THE SPRING OF 2008
• FIVE FIRMS WERE INVITED TO
BID, ONLY ONE DID
9.
• CONTRACT WAS AWARDED TO
JACQUES WITHFORD IN
SEPTEMBER 2008
• TARGETED COMPLETION DATE:
FALL 2009
10.
• FINAL DRAFT WAS COMPLETED
IN NOVEMBER 2011
• STILL NOT COMPLETED YET
11.
• ORIGINAL PLAN WAS TO
CONDUCT PUBLIC MEETINGS
AND INCORPORATE THE
FINDINGS THROUGH AN OPA
• WILL BE INCORPORATED AS PART
OF OUR CURRENT 5 YEAR
REVIEW