Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.

0

Share

Download to read offline

Nguyen Xuan Nam - EVN and Cooperation Potential

Download to read offline

OECD-ADB High-level Roundtable on Green Finance Opportunities in ASEAN, 31 October 2019, OECD, Paris, France

Related Books

Free with a 30 day trial from Scribd

See all

Related Audiobooks

Free with a 30 day trial from Scribd

See all
  • Be the first to like this

Nguyen Xuan Nam - EVN and Cooperation Potential

  1. 1. 1 EVN AND COOPERATION POTENTIAL Hanoi, Oct-2019
  2. 2. 2 COOPERATION POTENTIAL Revised PDP VII generation Resource (MW) Year 2020 Year 2025 Year 2030 Hydro 18,060 20,362 21,886 Coal 25,620 47,575 55,167 Gas 8,940 15,054 23,699 RE (wind, solar, small hydro, biomas) 5,940 12,063 27,195 Solar: 12,000 Wind: 6,000 Other: ~10,000 Imports 1,440 1,448 1,554 Sum 60,000 96,500 129,500
  3. 3. 3  SWITCHING TO LNG - For Phu My, O Mon, Tan Phuoc Power Plant Complex  CAPEX – INVESTMENT STRATEGY From 2020 - 2030, EVN needs a total of about 15 billion USD of capex of power plants, the electricity industry needs about 90 billion USD for the overall development of the electricity industry (power, transmission, distribution, retail, electricity market, ...)  EVN’s credit rating BB+, positive outlook, equal to Vietnam sovereign rating. COOPERATION OPPORTUNITIES Strategic shareholders – Capital investment
  4. 4. 4 OMON COMPLEX  LOCATION: CAN THO PROVINCE BAC AI PSPP  LOCATION: NINH THUAN PROVINCE IALY HPP EXTENSION  LOCATION: KONTUM PROVINCE TAN PHUOC COMPLEX  LOCAITON: TIEN GIANG PROVINCE TRI AN HPP EXTENSION  LOCATION: DONG NAI PROVINCE RENEWABLE ENERGY PROJECTS (SOLAR) 1. On-site SESAN 4 HPP (Gia Lai & Kon Tum Province) 2. PHUOC THAI (Ninh Phuoc Disctrict, Ninh Thuan Province) HOA BINH HPP EXTENSION  LOCATION: HOA BINH PROVINCE POWER DEVELOPMENT PROJECTS
  5. 5. 4. EVN NEW POWER PROJECT 5 HOA BINH HPP EXTENSION  EXISTING CAPACITY: 8x240MW (COD: 1988 - 1994)  EXTENSION CAPACITY: 2x240MW (planned COD: 2021 - 2022)  CURRENT STATUS: FS approved  PRE COST ESTIMATION : $318M TRI AN HPP EXTENSION  EXISTING CAPACITY: 4x100MW (COD: 1988 - 1989)  EXTENSION CAPACITY: 2x100MW (planned COD: 2025, EVN proposal COD: 2021 - 2022)  CURRENT STATUS: PRE-PROJECT STAGE  PRE COST ESTIMATION: $137M IALY HPP EXTENSION  EXISTING CAPACITY: 4x180MW (COD: 2000 - 2002)  EXTENSION CAPACITY: 2x180MW (planned COD: 2020)  CURRENT STATUS: FS approved  PRE COST ESTIMATION : $252M TRI AN HPP IALY HPP HOA BINH HPP POWER DEVELOPMENT PROJECTS HPP EXTENSION PROJECTS
  6. 6. 6 BAC AI PSPP  INSTALLED CAPACITY: 4x300MW  CURRENT STATUS: TECHINICAL DESIGN STAGE  ESTIMATED COST: $980M  COD (planned):  Bac Ai #1, 2: 2023  Bac Ai #3, 4: 2025 BAC AI PSPP POWER DEVELOPMENT PROJECTS PUMP STORAGE PROJECTS
  7. 7. 7 SESAN 4 HPP SITE  INSTALLED CAPACITY: 47MW (Photovoltaic)  CURRENT STATUS: PRE-PROJECT STAGE  COD (planned): 2020 PHUOC THAI SITE  INSTALLED CAPACITY:  PHUOC THAI 1 (50MW)  PHUOC THAI 2( 100MW)  PHUOC THAI 3 (50MW)  TECHNOLOGY: Photovoltaic  CURRENT STATUS: on-going  COD (planned): 2020 PHUOC THAI SITE SESAN 4 HPP SITE POWER DEVELOPMENT PROJECTS SOLAR ENERGY PROJECTS
  8. 8. 8 O MON CAN THO OMON I POWER PLANT  CAPACITY: 2x330 (CONVENTIONAL TPP)  FUEL: CURRENT: FO; TO BE CONVERTED TO NARTURAL GAS  COD: UNIT 1: 2009, UNIT 2: 2015 OMON IV POWER PLANT  CAPACITY: >750MW (CCGT)  FUEL: NARTURAL GAS SUPPLIED FROM LOT B (SOUTH-WEST AREA )  CURRENT STATUS: PRE-PROJECT STAGE; PLANNED COD: 2024  SOURCE OF FUNDING: COMMERCIAL LOAN AND ECA OMON III POWER PLANT  CAPACITY: >750MW (CCGT)  FUEL: NARTURAL GAS SUPPLIED FROM LOT B (SOUTH-WEST AREA )  CURRENT STATUS: PRE-PROJECT STAGE; PLANNED COD: 2024  SOURCE OF FUNDING: JAPAN INTERNATIONAL COOPERATION AGENCY OMON IOMON IIIOMON IV 500kV SWITCHYARD POWER DEVELOPMENT PROJECTS OMON CCGT POWER PLANT PROJECTS
  9. 9. 9 PLANNED IN THE REVISED PDP 7 o CAPACITY: 4x600MW o FUEL: IMPORTED COAL o OWNER: EVN o COD:  TAN PHUOC 1 #1: 2027  TAN PHUOC 1 #2: 2028  TAN PHUOC 2 #1: 2028  TAN PHUOC 2 #2: 2029 EVN PROPOSAL o CAPACITY: CCGT PLANTS: 4X1000MW o FUEL: IMPORTED LNG o OWNER: EVN o SOURCE OF FUNDING: TO BE DEFINED. ESTIMATED: COMMERCIAL LOANS AND/OR ECA o COD (intended):  TAN PHUOC 1: 2023 - 2024  TAN PHUOC 2: 2024 - 2025  TAN PHUOC 3: 2025 - 2026  TAN PHUOC 4: 2026 - 2027 TAN PHUOC 1 TAN PHUOC LNG TAN PHUOC 4 TAN PHUOC 3 TAN PHUOC 2 TAN PHUOC TIỀN GIANG POWER DEVELOPMENT PROJECTS TAN PHUOC CCGT POWER PLANT PROJECTS
  10. 10. 10 PLANNED IN THE REVISED PDP 7 o CAPACITY: 2x750MW o FUEL: NATURE GAS FROM BLUE WHALE o OWNER: SEMBCORP o COD:  DUNG QUAT 1: 2023  DUNG QUAT 2: 2024 CURRENT SITUATION o CAPACITY: CCGT PLANTS: 2X750MW o FUEL: NATURE GAS FROM BLUE WHALE o OWNER: EVN, SEMBCORP o SOURCE OF FUNDING: TO BE DEFINED. ESTIMATED: COMMERCIAL LOANS AND/OR ECA o COD (intended):  DUNG QUAT 1: 2023  DUNG QUAT 2: 2024  DUNG QUAT 3: 2025 DUNG QUAT 3 DUNG QUAT 2 DUNG QUAT QUANG NGAI DUNG QUAT 1 POWER DEVELOPMENT PROJECTS DUNG QUAT CCGT POWER PLANT PROJECTS
  11. 11. 11 THANK YOU! VIETNAM ELECTRICITY Address: 11 Cua Bac St., Ba Dinh Dist., Hanoi, Vietnam Tel: (84-4) 6.6946789 - Fax: (84-4)6.6946666

OECD-ADB High-level Roundtable on Green Finance Opportunities in ASEAN, 31 October 2019, OECD, Paris, France

Views

Total views

322

On Slideshare

0

From embeds

0

Number of embeds

0

Actions

Downloads

6

Shares

0

Comments

0

Likes

0

×