Presentacion del proyecto para la rehabilitacion parcial del alcantarillado pluvial en Rincon de Guayabitos, Nayarit, Mexico.

Published in: Design, Technology
  • Be the first to like this

Rehabilitación eng1 02

  1. 1. Jacarandas Avenue Storm Drain Rehabilitation 5 de Octubre 2011 Author: Arq. Octaviano Figueroa Salazar
  2. 2. Rincón de Guayabitos <ul><li>“ Rincón de Guayabitos is the perfect for those who want to experience the &quot;real&quot; Mexico –friendly people, dusty narrow cobblestone streets, and cement block houses in various states of repair – unspoiled and unchanged. </li></ul><ul><li>The people who live here are kind, hard-working, generous, and proud. The majority are fisherman, farmers, waiters, cooks, maids, and construction workers. Their lives are filled with long-standing traditions and strong family values.” JaltembaBayLife.com </li></ul>
  3. 3. Rincón de Guayabitos <ul><li>“ Rincon de Guayabitos, a small town with a great beach that's laid back and perfect for relaxing and taking it easy. Soft golden sand and tranquil waves make this an ideal spot for families with young children. Mexican families come here on weekends and holidays” </li></ul><ul><li>About.Com Mexico Travel </li></ul>
  4. 4. Rincón de Guayabitos <ul><li>Locals depend on Tourist Industry </li></ul><ul><li>March - November only Mexican Tourism </li></ul><ul><li>Summer Flooding causes economic hardship and Health Hazard </li></ul>
  5. 5. Issue and Challenge <ul><li>Objective </li></ul><ul><ul><li>Summer Rains cause extensive flooding in downtown Guayabitos which infrastructure can’t support. </li></ul></ul><ul><ul><li>Solve the public health emergency crisis in Rincon de Guayabitos from sewage discharges into the sea during flooding season. </li></ul></ul><ul><li>Solution </li></ul><ul><ul><li>Construction of two new storm drains and rehabilitation of two existing ones at the intersection of Jacaranda and Nuevo Sol. </li></ul></ul><ul><ul><li>Rehabilitation of retaining walls at the discharge of the Jacarandas walkway. </li></ul></ul>
  6. 6. Objective: Avoid Flooding August 7, 2011 5th Flood of the Season
  7. 7. August 7, 2011 5th Flood of the Season
  8. 8. August 7, 2011 5th Flood of the Season
  9. 9. August 7, 2011 5th Flood of the Season August 7, 2011 5th Flood of the Season
  10. 10. August 19, 2011 8th Flood of the Season
  11. 11. August 19, 2011 8th Flood of the Season August 19, 2011 8th Flood of the Season
  12. 12. Objective: Avoid Flooding <ul><li>Close of business </li></ul><ul><li>Contamination of cisterns </li></ul><ul><li>Cancellation of reservations </li></ul><ul><li>Spread of diseases </li></ul>
  13. 13. Proposal <ul><li>Description </li></ul><ul><ul><li>Largely resolve the health emergency caused by sewage discharge </li></ul></ul><ul><ul><li>Benefits over 8,000 residents and hundreds of thousands of visitors </li></ul></ul><ul><ul><li>Must be conducted this year or early 2012 prior to the rainy season </li></ul></ul><ul><ul><li>Part of a major State renovation project of 1.4 million pesos ($105,000 US) </li></ul></ul><ul><li>Project status </li></ul><ul><li>Flood area has been surveyed </li></ul><ul><li>Detailed architectural drawings and hydraulic calculations of the hotel zone </li></ul><ul><li>A preliminary budget estimate and resource availability </li></ul><ul><li>The support of the College of Civil Engineers & Architects for technical validation. </li></ul>
  14. 14. Hidrologic Area Guayabitos <ul><li>The plan is to drain the collecting rain water from a 3'867 m2 hydrologic area. </li></ul><ul><li>The area has an annual average rainfall of 968.5 mm. </li></ul>
  15. 15. Hidrologic Area Guayabitos POLÍGONO DE LA INUNDACIÓN VIERNES 19 DE AGOSTO Flood Zone in Guayabitos
  16. 16. Storm Drain Discharges in Need of Repair
  17. 17. Hydrologic Zone in Guayabitos WATER MAIN OUTPUT SECOND WATER DUMP
  18. 18. (SECOND)Rehabilitation Area
  19. 19. Storm Drain Discharge to Ocean
  20. 20. Rehabilitate 4 Storm Drains
  21. 21. Proposed Storm Drain Solution
  22. 22. Detail of Storm Drain Grating
  23. 23. Detail of Storm Drain discharge
  24. 24. Budget 206,000 16,000 46,000 42,000 76,000 14,000 12,000 Total Pesos CONCEPT QUANTITY UNIT Cost Pesos USD 1 PRELIMINARIES 1 LOT 12,000 $ 892 2 EXCAVATIONS 1 LOT 14,000 $ 1,041 3 MASONRY DS 2 LOT 38,000 $ 5,650 4 MASONRY DESC 1 LOT 42,000 $ 3,123 5 BLACKSMITHING 2 LOT 23,000 $ 3,420 6 COBBLESTONE 1 LOT 16,000 $ 1,890 TOTAL: $16,016
  25. 25. Matching Grant <ul><li>Club Rotario Jaltemba Bay $ 4,994 </li></ul><ul><ul><li>Guayabitos Hotel Association </li></ul></ul><ul><ul><li>Municipality of Compostela </li></ul></ul><ul><ul><li>Festival of Brotherhood Club $ 2,250 </li></ul></ul><ul><ul><li>District 5130 $ 2,575 </li></ul></ul><ul><ul><li>The Rotary Foundation $ 6,197 </li></ul></ul><ul><ul><li>Total $16,016 </li></ul></ul><ul><ul><li>* U.S. Dollars </li></ul></ul>
  26. 26. MAIN PROJECT <ul><li>The main project will be executed by the State of Nayarit. </li></ul><ul><li>With support from the National Water Commission </li></ul><ul><li>Government investment in the main work 1´365,960.18 PMX </li></ul><ul><ul><li>Total USD $106,218.00 </li></ul></ul><ul><ul><li>* U.S. Dollars </li></ul></ul>

×