SlideShare a Scribd company logo
1 of 21
Download to read offline
SFA Handels GmbH
Neue Aarburgerstrasse 20 Tel. +41 (0)62 785 11 85
CH-4852 Rothrist Fax +41 (0)62 785 11 89
www.sfa-anlagenbau.com info@sfa-anlagenbau.com
VAT No. CHE-113.277.190
Neue Aarburgerstrasse 20, 4852 Rothrist, Switzerland, +41 62 785 11 85, F +41 62 785 11 89, info@sfa-anlagenbau.com, www.sfa-anlagenbau.com
Commercial Court CH 5000 Aarau, Commercial Registration No. CH-400.4.208.140-9, VAT No. CHE-113.277.190
UBS Switzerland AG, IBAN (CHF): CH20 0023 1231 4271 4901 E, IBAN (EUR): CH48 0023 1231 4271 4960 C IBAN (USD): CH15 0023 1231 4271 4961 L, SWIFT CODE UBSWCHZH80A
List of References
SFA Handels GmbH
Revision 07, 2020
______________________________________________________________________________________________________________________
SFA Handels GmbH www.sfa-anlagenbau.com Page 2 of 21
Neue Aarburgerstrasse 20 info@sfa-anlagenbau.com
CH-4852 Rothrist
Engineering
Year Customer Place Scope of supply
Chemical industry
1985 Chemical Factory Uetikon Engineering for steam boiler plant, including infrastructure.
(Switzerland)
1985 Claviag AG Moosleerau Engineering for reconstruction of the heating of spray dryer
(Switzerland) Optima and Magna in accordance with LRV 92.
1985 Sandoz AG Muttenz Engineering for the sanitation of the organically polluted exhaust air
(Switzerland) at Muttenz.
1985 Sandoz AG Muttenz Feasibility study and offer boiler house, heat distribution, process measuring and
(Switzerland) control technology units and equipment.
1986 Sarna AG Sarnen Feasibility study with concept and detail engineering on pentane disposal and
(Switzerland) energy recovery.
1986 Schaerer + Rothrist Feasibility study, risk analysis and detail engineering for the collection and
Schlaepfer AG (Switzerland) disposal of the ethyl oxide-exhaust air.
1986 Rohner AG Pratteln Energy study, energy center and fabrication with
(Switzerland) economy, package of measures, investments.
1987 Bertrams Muttenz Basic- and detail engineering for 1 special steam boiler
Chemianlagen AG (Switzerland) for the saltpetre production. Place of installation Argentina.
1987 Ciba Geigy AG Basel Processing and detail design of a special combustion plant
(Switzerland) for the project AOPRC (China).
______________________________________________________________________________________________________________________
SFA Handels GmbH www.sfa-anlagenbau.com Page 3 of 21
Neue Aarburgerstrasse 20 info@sfa-anlagenbau.com
CH-4852 Rothrist
Engineering
Year Customer Place Scope of supply
Chemical industry
1995 STIA AG Pratteln Engineering for a complete exhaust air cleaning- plant, and registration in
(Switzerland) the production. Engineering for the sanitation of the fuel depot section II. Automation
concept chemistry production building 30.
1999 Gremolith AG Bazenheid Feasibility study and detail engineering on the collection and
(Switzerland) disposal of room- and production exhaust air.
1999 Federal Office for the Bern Feasibility study, engineering and delivery of a separation plant for
Environment FOEN (Switzerland) separating quicksilver after the crematorium, including complete plant installation.
2000 LONZA AG Visp LRV conformal reconstruction of the 70 t/h boilers with replacement of
(Switzerland) the burner and exhaust air disposal, including new installation of the complete
process measuring and control technology automation system and adaptations
to the attendant facilities.
2000 LONZA AG Visp Inspection of the existing exhaust air disposal in the factory,
(Switzerland) in building F17, in Visp.
2005 Hoffmann Basel Feasibility study on waste solvent management
La Roche AG (Switzerland) and utilization in Basel.
2009 Hoffmann Basel Performance and evaluation of the measured results from
La Roche AG (Switzerland) the combustion tests at in a special- high- temperature- combustion
chamber with liquid and gaseous chemical residues.
Flue gas analysis on polychloried dioxins and furanes (PCDD, PCDF).
______________________________________________________________________________________________________________________
SFA Handels GmbH www.sfa-anlagenbau.com Page 4 of 21
Neue Aarburgerstrasse 20 info@sfa-anlagenbau.com
CH-4852 Rothrist
Engineering
Year Customer Place Scope of supply
Municipal waste / Biomass / RDF
1982 Zürcher Regensdorf Economical investigation inspection for power supply.
Furnierwerk (Switzerland)
1983 Hasena AG Laeufelfingen Engineering for hot water generation with distribution system.
(Switzerland)
1987 PRT-Tomar Tomar Basic- and detail engineering for firing equipment
Cork production (Portugal) for solids and 1 steam boiler with a capacity of 25 t/h,
45 bar pressure, including complete plant installation.
2014 Vattenfall Europe Rostock Feasibility study with cost account for a sludge incineration plant in Germany.
(Germany) Adjustment to an existing plant, steam boiler 100 t/h, new fuel specification
with 8 – 12 MJ/kg.
2016 Danpower GmbH Potsdam Feasibility study with cost account for a sludge incineration plant in Germany.
(Germany) Amount of fuel 160’000 t/year.
2019 Top Energy Solution Co., Ltd. Chungcheongnam-do Feasibility study and pre-engineering for a Bio-SRF incineration power plant.
(South Korea) Calculation of the overall cost for the power plant. Pre-engineering for the
fuel feeding system, combustion grate system, combustion air system,
cooling water system, ash removal system, cooling water system,
combustion air system, steam boiler in a special vertical design and
integration in the general layout.
Pre-engineering for the steam boiler in a special vertical design with
60 to/hr, 43 bar, 420°C., including general layout, 3-D model, Bill of Material,
calculation of the water circulation and fluegas temperatures,
calculation and evaluation of solutions for the of SNCR or SCR system.
______________________________________________________________________________________________________________________
SFA Handels GmbH www.sfa-anlagenbau.com Page 5 of 21
Neue Aarburgerstrasse 20 info@sfa-anlagenbau.com
CH-4852 Rothrist
Engineering
Year Customer Place Scope of supply
Municipal waste / Biomass / RDF
2020 GETEC Park Swiss AG Muttenz Feasibility study and pre-engineering for 1 Line of industrial / chemical waste
(Switzerland) incineration power plant.
Calculation of the overall cost for the refurbishment of the fuel feeding system,
combustion grate system, combustion air system and ash removal system.
Pre-engineering for the refurbishment with space requirements, general layout for
planning permissions, etc. Evaluation of solutions for the fuel feeding system,
grate system and ash removal system with cost and performance comparison.
______________________________________________________________________________________________________________________
SFA Handels GmbH www.sfa-anlagenbau.com Page 6 of 21
Neue Aarburgerstrasse 20 info@sfa-anlagenbau.com
CH-4852 Rothrist
Engineering
Year Customer Place Scope of supply
Disposal industry
1994 City Freiburg Freiburg Feasibility study on an animal body incineration plant in Montmollin, canton
(Switzerland) Neuenburg.
1995 Muera Biel Investigation of the condition, wall-thickness measurement of the waste incineration
(Switzerland) boiler.
1999 Bayer Chemie Werk Mannheim Basic- and detail engineering for 1 waste heat boiler in a special combustion
(Germany) plant. Waste heat boiler capacity of 12 t/h, 22 bar pressure.
2002 GZM/GBL Lyss Feasibility-study on CHP generation.
(Switzerland) Animal body incineration plant, generation of current over a gas turbine.
2004 Building authority Basel Feasibility-study on the disposal of human / organically
City of Basel (Switzerland) hospital residues as well as condition analysis of the existing crematory plants.
2005 AWZ Zurich Feasibility-study on the disposal of the waste air of the tankage company
(Switzerland) in occurrence of revision or damage.
Synthetics
1999 Ceta SA Vouvry Feasibility study and detail engineering for the registration and
(Switzerland) disposal of production exhaust air.
______________________________________________________________________________________________________________________
SFA Handels GmbH www.sfa-anlagenbau.com Page 7 of 21
Neue Aarburgerstrasse 20 info@sfa-anlagenbau.com
CH-4852 Rothrist
Engineering
Year Customer Place Scope of supply
Metal industry
1985 Sugar factory Frauenfeld Energy study on the waste heat potential fabrication shavings, drying
(Switzerland) process/boiler house with optimization suggestions.
1987 Apaco AG Grellingen Feasibility study exhaust air disposal of metal pickling plant.
(Switzerland)
1992 Edak AG Dachsen Feasibility study
(Switzerland) exhaust air disposal of metal pickling plant.
2001 Produits Morgia SA Morges Engineering for the building of a power center, one long-distance line channel and
(Switzerland) under stations.
Paper industry
1993 Versoix Versoix Genevea Energy study, power center including distribution system under
(Switzerland) consideration of economy and investments.
Textile industry
1997 Bethge AG Zofingen Energy study, power center with distribution system.
(Switzerland)
1999 VFA AG Thalwil Energy study, power center, including distribution system under
(Switzerland) consideration of economy and investments.
______________________________________________________________________________________________________________________
SFA Handels GmbH www.sfa-anlagenbau.com Page 8 of 21
Neue Aarburgerstrasse 20 info@sfa-anlagenbau.com
CH-4852 Rothrist
Engineering
Year Customer Place Scope of supply
Shipbuilding
1986 Howaldts-Deutsche Kiel Engineering for the building of a marine boiler for a platform ship in Nigeria.
Werft AG (Germany)
1986 Howaldts-Deutsche Kiel Engineering for the building of marine steam boilers
Werft AG (Germany) 30 - 80 t/h for the general marine engineering in Korea and China.
______________________________________________________________________________________________________________________
SFA Handels GmbH www.sfa-anlagenbau.com Page 9 of 21
Neue Aarburgerstrasse 20 info@sfa-anlagenbau.com
CH-4852 Rothrist
General contractor
Year Customer Place Scope of supply
General
1983 Waste incineration plant Buchs Delivery of 1 oil-fired auxiliary steam boiler with a capacity of 30 t/h,
(Switzerland) 35 bar pressure, including complete plant installation.
1987 Oleificio Sabo AG Manno Delivery of 1 oil-fired auxiliary steam boiler with a capacity of 20 t/h,
Cooking oil production (Switzerland) 18 bar pressure, including complete plant installation.
1988 GZM Lyss Installation of a power center including infrastructure,
Extraktionswerk (Switzerland) 1 x steam boiler 16 t/h; 1x steam / steam transformer 5 t/h.
1988 SAIOD Cottendart Colombier Consortium of the companies SFA, Von Roll and K+K
(Switzerland) SFA scope waste incineration boiler including infrastructure.
1995 STEP Lausanne Lausanne Installation of 2 furnace lines for sewage sludge utilization with
(Switzerland) waste heat use incl. integration connection to the consisting infrastructure.
1998 Institute IVI Mittelhäusern Animal body sterilization plant.
(Switzerland)
2004 AWZ Zurich Complete plant installation for the exhaust air disposal for the
(Switzerland) animal flour production.
2008 Colenco Baden Complete plant installation of the hazardous waste incineration plant
(Switzerland) SVA-Hard Winterthur (fluidized bed combustion, sewage sludge).
2008 Colenco Baden Complete plant installation for the plant of Reni in Niedergösgen
(Switzerland) (fluidized bed combustion, wood and rejects).
2008 Crematorium Basel Retrofit of an existing furnace plant for mercury separation.
Hörnli (Switzerland)
______________________________________________________________________________________________________________________
SFA Handels GmbH www.sfa-anlagenbau.com Page 10 of 21
Neue Aarburgerstrasse 20 info@sfa-anlagenbau.com
CH-4852 Rothrist
General contractor
Year Customer Place Scope of supply
Municipal waste / Biomass / RDF
1982 Hasena AG Läufelingen Hot water boiler 5 MW, operating pressure 20 bar.
(Switzerland) Construction pressure 30 bar, HW 190 °C flow, 160 °C return
Combustible: hogged wood class AI
Combustion performance is 6,3 MW
Fuel silo, Hot water boiler, plant infrastructure, process measuring and control
technology.
1983 Swiss Federal Railways Olten Steam boiler 2 x 8 t/h, operating pressure 20 bar.
(Switzerland) Construction pressure 30 bar, 250 °C superheated steam
Combustible: hogged wood class AI – AII
Combustion performance is 2 x 7 MW
Fuel silo, fuel supply, steam boiler
Plant infrastructure, process measuring and control technology.
1985 STEP Lausanne Lausanne Steam boiler 2x8 t/h, to the sewage sludge burn with supporting fire
(Switzerland) and heavily fuel oil.
Operating pressure 30 bar, 360 °C superheated steam
Combustible: 2 x 6’531 kg sewage sludge
Additional fuel: 2 x 217 kg/h heavy fuel oil
Fuel filling, steam boiler, plant infrastructure, process measuring and control
technology.
1988 Angéloz Mode SA Romont Delivery of firing equipment for solids and 1 steam boiler with a capacity of 15 t/h,
Clothing (Switzerland) 12 bar pressure, including complete plant installation.
______________________________________________________________________________________________________________________
SFA Handels GmbH www.sfa-anlagenbau.com Page 11 of 21
Neue Aarburgerstrasse 20 info@sfa-anlagenbau.com
CH-4852 Rothrist
General contractor
Year Customer Place Scope of supply
Municipal waste / Biomass / RDF
1989 SAIOD Cottendart Colombier Steam boiler 14 t/h normal, maximum is 16,5 t/h
(Switzerland) Operating pressure 40 bar, construction pressure 55 bar, 435 °C hot steam
Combustible: municipal and industrial waste
Combustible deliver rate: approximately 4 t/h
Combustion performance is 18 MW
Steam boiler, steel building, process measuring and control technology,
connection to the existing plant infrastructure.
1995 Heraeus Deutschland Pforzheim Complete production waste ashing plant (GPA)
GmbH & Co. KG (Germany) Ashing gear: Production waste materials with precious metal like gold,
Platinum.
Throughput: 300 t/year
Ash charging, burning, waste heat use, flue gas purification, process
measuring and control technology, connection to the existing plant
infrastructure.
2001 Degussa AG Hanau/Frankfurt Complete production waste ashing plant (GPA)
(Germany) Ashing gear: waste materials with precious metal like gold, platinum etcetera
Throughput:
300 t/year production waste materials
500 t/year LM solvent
300 t/year oil of arrears from sump
Ash charging, fuel depot, burning, special combustion chamber, waste heat
use 16 t/h saturated steam16 bar, flue gas purification, process measuring and
control technology, connection to the existing plant infrastructure.
______________________________________________________________________________________________________________________
SFA Handels GmbH www.sfa-anlagenbau.com Page 12 of 21
Neue Aarburgerstrasse 20 info@sfa-anlagenbau.com
CH-4852 Rothrist
General contractor
Year Customer Place Scope of supply
Municipal waste / Biomass / RDF
2002 Harpen EKT Berlin-Neukölln 2 x steam boiler 60 t/h normal, maximum is 66 t/h.
(Germany) Operating pressure is 66 bar, construction pressure 80 bar, 450 °C hot steam
Combustible: Waste wood category A1 – AIV
Combustion performance is 2 x 53 MW thermal
Boiler efficiency: 91 %
Steam boiler, steel building, process measuring and control technology,
connection to the existing plant.
2003 SEC (HHKW) Dresden Steam boiler 30 t/h normal, maximum is 33 t/h.
(Germany) Operating pressure 66 bar, construction pressure 80 bar, 435 °C hot steam
Combustible: Waste wood category AIV, municipal and industrial waste
Fuel throughput: 7 t/h
Combustion performances is 23 MW
Steam boiler, steel building, process measuring and control technology,
connection to the existing plant infrastructure.
2003 Mainova AG Frankfurt am 1 steam boiler 50 t/h normal, maximum is 55 t/h
Main Operating pressure is 66 bar, construction pressure is 80 bar,
(Germany) 450 °C hot steam
Combustible: Waste wood category A1 – AIV
Combustion performance is 43,6 MW
Boiler efficiency: 91 %
Steam boiler, steel building, process measuring and control technology,
connection to the existing plant.
______________________________________________________________________________________________________________________
SFA Handels GmbH www.sfa-anlagenbau.com Page 13 of 21
Neue Aarburgerstrasse 20 info@sfa-anlagenbau.com
CH-4852 Rothrist
General contractor
Year Customer Place Scope of supply
Municipal waste / Biomass / RDF
2005 VYNCKE Several places Steam boiler 55 t/h.
in Thailand Operating pressure is 45 bar, construction pressure is 66 bar, 420 °C hot
steam.
Combustible: Palm stalks
Combustion performance is 50 MW
Production drawings for the Boiler, Strength calculation according to ASME,
Thermal verification, ASME test procedure specification,
Steel construction structural analysis.
2006 Vattenfall Europe Rostock Steam boiler 100 t/h normal, maximum is 105 t/h
(Germany) Operating pressure is 42 bar, construction pressure is 65 bar, 405 °C hot
steam
Combustible: Industrial and municipal waste, refuse derived fuels (RDF).
Combustion performance is 87 MW
Boiler efficiency: 91 %
Combustion grate, 1 lane with 9m width, water-cooled main combustion
zone, air-cooled burnout zone, Fuel feeding system, Steel structure for the
combustion grate, complete cooling system, Air supply, process measuring
and control technology.
2007 Tm.E. Spa Calce Delivery of a bottom ash discharger
Termomeccanica Ecologia (France) Discharge capacity 11-15 t/h of ash and slag.
Weight (empty): 12,8 t
Volume: 8 m³
Transported material: Ash and slag from waste incineration
2008 Holzheizkraftwerk Silbitz Replacement of 2 x Input of fuel.
Silbitz GmbH (Germany) Combustion performance is 27 MW
Fuel throughput is 55’000 t/year
______________________________________________________________________________________________________________________
SFA Handels GmbH www.sfa-anlagenbau.com Page 14 of 21
Neue Aarburgerstrasse 20 info@sfa-anlagenbau.com
CH-4852 Rothrist
General contractor
Year Customer Place Scope of supply
Municipal waste / Biomass / RDF
2010 Unitherm Baruth GmbH Baruth Replacement of the Input of fuel
(Germany) Combustion performance is 45 MW
Fuel throughput is 90’000 t/year
2010 BOFA Rønne Fuel feeding system
(Denmark) Combustion performance is 7 MW
Fuel throughput is 21’000 t/year
2011 Clariant Schweiz AG Muttenz Replacement of the ash removal system
(Switzerland) Combustion performance is 10 MW
Fuel throughput is 30’000 t/year
2011 REFA Nykøbing Fuel feeding system
(Denmark) Combustion performance is 14 MW
Fuel throughput is 44’500 t/year
2012 Danpower GmbH Elsterwerda Replacement of the fuel feeding system
(Germany) Combustion performance is 45 MW
Fuel throughput is 100’000 t/ year
______________________________________________________________________________________________________________________
SFA Handels GmbH www.sfa-anlagenbau.com Page 15 of 21
Neue Aarburgerstrasse 20 info@sfa-anlagenbau.com
CH-4852 Rothrist
General contractor
Year Customer Place Scope of supply
Municipal waste / Biomass / RDF
2014/2015 Vattenfall Europe Rostock Refurbishment and modification of a water-and air-cooled combustion grate system
(Germany) with a width of 9 m for a 100 t/h steam boiler.
Refurbishment and modification of the Input of fuel, feeding pushers, side boxes of
the grate modules with motions compensators, cooling water circuit, 990 pieces of
water-cooled grate plates, air-cooled grate bars, the primary air supply system
and the process measuring and control technology.
2016/2017 Bangkok Industrial Bangkok Engineering and delivery of a water-and air-cooled combustion grate system for a
Boilers Co. Ltd. (Thailand) RDF incineration power plant. Combustion grate with a width of 4,2 m for a 50 t/h
steam boiler, 10 MW electrical power production. Waste throughput 15 t/h.
Water-cooled main combustion zone, air-cooled burnout zone. Fuel feeding system,
complete cooling water system, combustion air system (primary, secondary, and
Fluegas-recirculation), process measuring and control technology.
2018/2019 Super Earth Energy 6 Pichit Engineering and delivery of a water-and air-cooled combustion grate system for a
(Thailand) RDF incineration power plant. Combustion grate with a width of 6 m for a 54 t/h
steam boiler, 11.5 MW gross electrical power production. Fuel throughput 19 t/h.
Water-cooled main combustion zone, air-cooled burnout zone. Fuel feeding system,
complete cooling water system, air supply, process measuring and control
technology and the complete combustion control system.
2019 Chosun Refractories Eng. Taoyuan City Engineering and delivery of a water-and air-cooled combustion grate system for a
(Taiwan) industrial waste incineration power plant. Combustion grate with a width of 3 m and
A length of 6 m after a rotary kiln. Fuel throughput approx. 2 t/h.
Water-cooled main combustion zone, air-cooled burnout zone,
Basic-engineering for cooling water system, air supply, process measuring and
control technology.
______________________________________________________________________________________________________________________
SFA Handels GmbH www.sfa-anlagenbau.com Page 16 of 21
Neue Aarburgerstrasse 20 info@sfa-anlagenbau.com
CH-4852 Rothrist
General contractor
Year Customer Place Scope of supply
Food industry
1979 Landtwing Rütter AG Hünenberg Delivery of a complete waste disposal plant for the distillery.
Distillery (Switzerland) Steam boiler with drum dryer and exhaust gas purification system.
Steam boilers with a capacity of 12 t/h each, 16 bar pressure.
1980 Etter Söhne AG Zug Delivery of a complete waste disposal plant for the distillery.
Distillery (Switzerland) Steam boiler with drum dryer and exhaust gas purification system.
Steam boilers with a capacity of 12 t/h each, 16 bar pressure.
1982 Toni AG Zürich Detail engineering for the power station.
Dairy Farm (Switzerland) Delivery of 2 oil-fired steam boilers with a capacity of 25 t/h each,
16 bar pressure, including complete plant installation.
1983 Nestlé Alabang City of Muntinlupa Delivery of 1 special steam boiler with a capacity of 25 t/h, 16 bar pressure.
Coffee roasters (Philippines) Fired with a special combustion method for coal and biomass together, exhaust
gases from coffee roasters have 500 °C.
Support burner fuel heavy fuel oil.
1984 Coop Bern Bern Delivery of 1 special steam boiler with a capacity of 20 t/h, 16 bar pressure.
(Switzerland) Fired with special combustion grate for waste from the food industry.
Throughput 6 t/h. Support burner fuel light fuel oil.
1985 Louis Ditzler AG Möhlin Delivery of 2 oil--fired steam boilers with a capacity of 18 t/h each, 22 bar
Frozen food products (Switzerland) pressure, including complete plant installation.
1985 Findus Food Békéscsaba Delivery of a power station with a steam production of 25 t/h, 22 bar pressure.
Production (Hungary)
1987 Coop Basel Basel Delivery of 1 oil-fired steam boiler with a capacity of 20 t/h, 18 bar pressure.
Central Bakery (Switzerland)
______________________________________________________________________________________________________________________
SFA Handels GmbH www.sfa-anlagenbau.com Page 17 of 21
Neue Aarburgerstrasse 20 info@sfa-anlagenbau.com
CH-4852 Rothrist
General contractor
Year Customer Place Scope of supply
Food industry
1987 Thomy Nestlé AG Basel Delivery of 2 oil--fired steam boilers with a capacity of 16 t/h each, 16 bar
Food production (Switzerland) pressure, including complete plant installation.
1990 Brauerei St. Gallen Delivery of 1 oil--fired steam boilers with a capacity of 20 t/h each, 25 bar
Schützengarten AG (Switzerland) pressure, including complete plant installation.
Brewery
1990 Migros Volketswil Volketswil Delivery of 2 gas-fired steam boilers with a capacity of 16 t/h each, 18 bar pressure.
Central Backery (Switzerland)
1990 Migros Micarna Courtepin Delivery of 2 oil-/gas-fired steam boilers with a capacity of 15 t/h each,
Central butchery (Switzerland) 16 bar pressure.
.
1992 Migros Münchenstein Münchenstein Delivery of 1 heavy fuel oil-fired steam boiler with a capacity of 20 t/h,
Central warehouse (Switzerland) 20 bar pressure.
______________________________________________________________________________________________________________________
SFA Handels GmbH www.sfa-anlagenbau.com Page 18 of 21
Neue Aarburgerstrasse 20 info@sfa-anlagenbau.com
CH-4852 Rothrist
General contractor
Year Customer Place Scope of supply
Chemical industry
1974
STIA AG Pratteln Delivery of 1 oil fired steam boilers with an output of 20 t/h, 16 bar pressure,
(Switzerland) including infrastructure.
1975 Rohner AG Pratteln Delivery of 2 oil fired steam boilers with an output of 18 t/h, 16 bar pressure,
(Switzerland) including infrastructure.
1985 Schaerer + Rothrist Complete installation and burner equipment for the disposal
Schlaepfer AG (Switzerland) of the ethyl oxide-exhaust air.
1985 SF-Chem AG Pratteln Delivery of 1 heavy fuel oil-fired steam boiler with a capacity of 30 t/h,
(Switzerland) 30 bar pressure, including complete plant installation.
1986 Chemical factory Uetikon Installation of a complete power center with adaptation to the existing
(Switzerland) system. NOx-poor burner with multiple-stage combustion for heavily fuel oil,
in accordance with LRV.
1995 STIA AG Pratteln Thermal exhaust air cleaning plant TAR for the complete
Switzerland) disposal of the loaded exhaust air as well as the liquid residues.
Exhaust air collection starting from emission sources
1998 SANDOZ Basel LRV conformal reconstruction of the boiler plant with replacement of the
(Switzerland) burner plants incl. new installation of the total automation system.
2004 Rohner AG Pratteln Reconstruction and sanitation of the power center.
(Switzerland)
2008 Chemical factories Saar-Lothringen Installation a complete power center, 2 x 10 t/h steam boilers,
Perl (Germany) including infrastructure.
______________________________________________________________________________________________________________________
SFA Handels GmbH www.sfa-anlagenbau.com Page 19 of 21
Neue Aarburgerstrasse 20 info@sfa-anlagenbau.com
CH-4852 Rothrist
General contractor
Year Customer Place Scope of supply
Chemical industry
2008 Heraeus Deutschland Pforzheim Complete sweepings-incineration plant with waste heat utilization,
GmbH & Co. KG (Germany) flue gas cleaning sewage and process measuring and control technology plant.
2009 Degussa Hanau / Frankfurt Complete sweepings-incineration plant with solvent /
(Germany) rhodium oil combustion as well as waste heat use, flue gas cleaning
and process measuring and control technology plant.
2009 Ciba-Geigy Basel Thermal exhaust air cleaning plant TAR K-643 for exhaust air disposal
Factory Klybeck (Switzerland) Farm production K-640.
2012 Hoffmann Basel LRV conformal reconstruction of the boiler plant Nr.8 with replacement of
La Roche AG (Switzerland) the burner plants natural gas/fuel oil/solvent including new installation of
the total automation system and adaptations of the attendant facilities.
2016 Clariant Schweiz AG Muttenz Refurbishment of an existing air-cooled combustion grate system with new grate
(Switzerland) plates.
2017 Clariant Schweiz AG Muttenz Refurbishment of an existing input of fuel. Delivery of a new pusher, pusher table
(Switzerland) and cast parts.
2018 Clariant Schweiz AG Muttenz Replacement of an existing fuel feeding system for the incineration of chemical
(Switzerland) waste. New safety concept with safety related gate system with 2 slide dampers
and a separate hydraulic unit.
______________________________________________________________________________________________________________________
SFA Handels GmbH www.sfa-anlagenbau.com Page 20 of 21
Neue Aarburgerstrasse 20 info@sfa-anlagenbau.com
CH-4852 Rothrist
General contractor
Year Customer Place Scope of supply
Military Enterprises
1991 German Schrobenhausen Detail engineering submission data and execution of the
Aerospace (Germany) licensing procedures for the disposal plant Steinbach.
1991 German Schrobenhausen Investigational procedure and evaluation of the measured results
Aerospace (Germany) in the revolving tube with:
- Explosive Oktogen
- Explosive A-IX-2
- Solid propellant o.l. ammonium perchlorate
- Propellant powder NT-3
- Explosive TNT
- Explosive TO
- Mixture TO/A-/X-2/NT-3
1993 General Atomic Lueppen Partial delivery, mounting, start-up, performance and procedure test
(Germany) including process optimisation of methods of the installed:
- Fluidized-bed combustions
- Rotary drum plant
- Flue gas cleaning plant
- Waste water treatment plant
- Automation system in the plant
1995 UIT Dresden Planning and installation of a mobile mercury return QRG to
(Germany) Valuable material retrieval from primer caps.
2001 Swiss federal one Thun Planning and production of a complete technique line for disposal
Military enterprises (Swiftzerland) of military special- and of residual substances, consisting of:
- Material preparation
- Combustion
- Waste heat utilization
- Flue gas cleaning
- Waste water treatment
______________________________________________________________________________________________________________________
SFA Handels GmbH www.sfa-anlagenbau.com Page 21 of 21
Neue Aarburgerstrasse 20 info@sfa-anlagenbau.com
CH-4852 Rothrist
General contractor
Year Customer Place Scope of supply
Military Enterprises
2001 Federal Military Thun Fuel feeding for solid particle firing incl. complete flue gas cleaning
Department (Switzerland) plant (wet process) and dust-exhaust stage as well as waste water treatment
plants.
Shipbuilding
1986 Vaporama Lake Thun New installation of the complete boiler plant steam ship “Blümlisalp”,
(Switzerland) equipped with integrated superheater and fuel oil EL firing, including
process measuring and control technology-plant and installation.
Paddle steamers from the year 1906.
1 x 8 t/h steam boiler, 12 bar pressure.
Wood industry
1980 Spanplattenwerk Fiederis Delivery of 1 dust/oil-fired steam boiler with a capacity of 20 t/h, 18 bar pressure.
Fiederis AG (Switzerland) Dust from the wooden plate production.
800 – 1’500 kg/h dust from the wooden plate production.

More Related Content

Similar to SFA-List-of-references.pdf

2015 deep research report on global and china heat meter industry(table of co...
2015 deep research report on global and china heat meter industry(table of co...2015 deep research report on global and china heat meter industry(table of co...
2015 deep research report on global and china heat meter industry(table of co...Janet
 
INDUSTRIAL BOILERS INNERGY FOR HEAT GENERATION AND APPLICATION
INDUSTRIAL BOILERS INNERGY FOR HEAT GENERATION AND APPLICATIONINDUSTRIAL BOILERS INNERGY FOR HEAT GENERATION AND APPLICATION
INDUSTRIAL BOILERS INNERGY FOR HEAT GENERATION AND APPLICATIONINNERGY
 
GaN Systems GS61004B GaN HEMT 2018 teardown reverse costing report published ...
GaN Systems GS61004B GaN HEMT 2018 teardown reverse costing report published ...GaN Systems GS61004B GaN HEMT 2018 teardown reverse costing report published ...
GaN Systems GS61004B GaN HEMT 2018 teardown reverse costing report published ...system_plus
 
B12-2-Wire-Gas-Transmitter.pdf
B12-2-Wire-Gas-Transmitter.pdfB12-2-Wire-Gas-Transmitter.pdf
B12-2-Wire-Gas-Transmitter.pdfENVIMART
 
Fas nz pump_seriestechnology
Fas nz pump_seriestechnologyFas nz pump_seriestechnology
Fas nz pump_seriestechnologyGPLConsulting
 
Presentation Exel Industrial
Presentation Exel IndustrialPresentation Exel Industrial
Presentation Exel IndustrialExel Industrial
 
Sap mm bom
Sap mm bomSap mm bom
Sap mm bomVannak9
 
GEA Tuchenhagen Butterfly Valves T-smart (Catalog 2013)
GEA Tuchenhagen Butterfly Valves T-smart (Catalog 2013)GEA Tuchenhagen Butterfly Valves T-smart (Catalog 2013)
GEA Tuchenhagen Butterfly Valves T-smart (Catalog 2013)Sandro Marques Solidario
 
GAB neumann graphite presentation
GAB neumann graphite presentationGAB neumann graphite presentation
GAB neumann graphite presentationLoic BERNARD
 
Merkel compact seal_simko-300
Merkel compact seal_simko-300Merkel compact seal_simko-300
Merkel compact seal_simko-300walleseals
 
SMR PRE-REFORMER DESIGN: Case Study
SMR PRE-REFORMER DESIGN: Case StudySMR PRE-REFORMER DESIGN: Case Study
SMR PRE-REFORMER DESIGN: Case StudyGerard B. Hawkins
 
Internet connected ICS/SCADA/PLC
Internet connected ICS/SCADA/PLCInternet connected ICS/SCADA/PLC
Internet connected ICS/SCADA/PLCqqlan
 
Mahle Newsletter Edition4 2010
Mahle Newsletter Edition4 2010Mahle Newsletter Edition4 2010
Mahle Newsletter Edition4 2010LeonPuts
 
Mechanical Constraints on Thermal Design of Shell and Tube Exchangers
Mechanical Constraints on Thermal Design of Shell and Tube ExchangersMechanical Constraints on Thermal Design of Shell and Tube Exchangers
Mechanical Constraints on Thermal Design of Shell and Tube ExchangersGerard B. Hawkins
 

Similar to SFA-List-of-references.pdf (20)

2015 deep research report on global and china heat meter industry(table of co...
2015 deep research report on global and china heat meter industry(table of co...2015 deep research report on global and china heat meter industry(table of co...
2015 deep research report on global and china heat meter industry(table of co...
 
Sapl Profile New
Sapl Profile NewSapl Profile New
Sapl Profile New
 
INDUSTRIAL BOILERS INNERGY FOR HEAT GENERATION AND APPLICATION
INDUSTRIAL BOILERS INNERGY FOR HEAT GENERATION AND APPLICATIONINDUSTRIAL BOILERS INNERGY FOR HEAT GENERATION AND APPLICATION
INDUSTRIAL BOILERS INNERGY FOR HEAT GENERATION AND APPLICATION
 
GaN Systems GS61004B GaN HEMT 2018 teardown reverse costing report published ...
GaN Systems GS61004B GaN HEMT 2018 teardown reverse costing report published ...GaN Systems GS61004B GaN HEMT 2018 teardown reverse costing report published ...
GaN Systems GS61004B GaN HEMT 2018 teardown reverse costing report published ...
 
B12-2-Wire-Gas-Transmitter.pdf
B12-2-Wire-Gas-Transmitter.pdfB12-2-Wire-Gas-Transmitter.pdf
B12-2-Wire-Gas-Transmitter.pdf
 
Fas nz pump_seriestechnology
Fas nz pump_seriestechnologyFas nz pump_seriestechnology
Fas nz pump_seriestechnology
 
Oil Sensors for Wind Turbines
Oil Sensors for Wind TurbinesOil Sensors for Wind Turbines
Oil Sensors for Wind Turbines
 
Oil sensors for wind turbines
Oil sensors for wind turbinesOil sensors for wind turbines
Oil sensors for wind turbines
 
Presentation Exel Industrial
Presentation Exel IndustrialPresentation Exel Industrial
Presentation Exel Industrial
 
Company presentation by_2017_18_en_final
Company presentation by_2017_18_en_finalCompany presentation by_2017_18_en_final
Company presentation by_2017_18_en_final
 
Sap mm bom
Sap mm bomSap mm bom
Sap mm bom
 
GEA Tuchenhagen Butterfly Valves T-smart (Catalog 2013)
GEA Tuchenhagen Butterfly Valves T-smart (Catalog 2013)GEA Tuchenhagen Butterfly Valves T-smart (Catalog 2013)
GEA Tuchenhagen Butterfly Valves T-smart (Catalog 2013)
 
GAB neumann graphite presentation
GAB neumann graphite presentationGAB neumann graphite presentation
GAB neumann graphite presentation
 
Merkel compact seal_simko-300
Merkel compact seal_simko-300Merkel compact seal_simko-300
Merkel compact seal_simko-300
 
SMR PRE-REFORMER DESIGN: Case Study
SMR PRE-REFORMER DESIGN: Case StudySMR PRE-REFORMER DESIGN: Case Study
SMR PRE-REFORMER DESIGN: Case Study
 
Internet connected ICS/SCADA/PLC
Internet connected ICS/SCADA/PLCInternet connected ICS/SCADA/PLC
Internet connected ICS/SCADA/PLC
 
Professional catalogue 2011_2012_gb-en
Professional catalogue 2011_2012_gb-enProfessional catalogue 2011_2012_gb-en
Professional catalogue 2011_2012_gb-en
 
Mahle Newsletter Edition4 2010
Mahle Newsletter Edition4 2010Mahle Newsletter Edition4 2010
Mahle Newsletter Edition4 2010
 
Mechanical Constraints on Thermal Design of Shell and Tube Exchangers
Mechanical Constraints on Thermal Design of Shell and Tube ExchangersMechanical Constraints on Thermal Design of Shell and Tube Exchangers
Mechanical Constraints on Thermal Design of Shell and Tube Exchangers
 
Embedded For You - Online sample magazine
Embedded For You - Online sample magazineEmbedded For You - Online sample magazine
Embedded For You - Online sample magazine
 

Recently uploaded

Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptMadan Karki
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsSachinPawar510423
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
Piping Basic stress analysis by engineering
Piping Basic stress analysis by engineeringPiping Basic stress analysis by engineering
Piping Basic stress analysis by engineeringJuanCarlosMorales19600
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncssuser2ae721
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
lifi-technology with integration of IOT.pptx
lifi-technology with integration of IOT.pptxlifi-technology with integration of IOT.pptx
lifi-technology with integration of IOT.pptxsomshekarkn64
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgsaravananr517913
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 

Recently uploaded (20)

Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.ppt
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documents
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
Piping Basic stress analysis by engineering
Piping Basic stress analysis by engineeringPiping Basic stress analysis by engineering
Piping Basic stress analysis by engineering
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
lifi-technology with integration of IOT.pptx
lifi-technology with integration of IOT.pptxlifi-technology with integration of IOT.pptx
lifi-technology with integration of IOT.pptx
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 

SFA-List-of-references.pdf

  • 1. SFA Handels GmbH Neue Aarburgerstrasse 20 Tel. +41 (0)62 785 11 85 CH-4852 Rothrist Fax +41 (0)62 785 11 89 www.sfa-anlagenbau.com info@sfa-anlagenbau.com VAT No. CHE-113.277.190 Neue Aarburgerstrasse 20, 4852 Rothrist, Switzerland, +41 62 785 11 85, F +41 62 785 11 89, info@sfa-anlagenbau.com, www.sfa-anlagenbau.com Commercial Court CH 5000 Aarau, Commercial Registration No. CH-400.4.208.140-9, VAT No. CHE-113.277.190 UBS Switzerland AG, IBAN (CHF): CH20 0023 1231 4271 4901 E, IBAN (EUR): CH48 0023 1231 4271 4960 C IBAN (USD): CH15 0023 1231 4271 4961 L, SWIFT CODE UBSWCHZH80A List of References SFA Handels GmbH Revision 07, 2020
  • 2. ______________________________________________________________________________________________________________________ SFA Handels GmbH www.sfa-anlagenbau.com Page 2 of 21 Neue Aarburgerstrasse 20 info@sfa-anlagenbau.com CH-4852 Rothrist Engineering Year Customer Place Scope of supply Chemical industry 1985 Chemical Factory Uetikon Engineering for steam boiler plant, including infrastructure. (Switzerland) 1985 Claviag AG Moosleerau Engineering for reconstruction of the heating of spray dryer (Switzerland) Optima and Magna in accordance with LRV 92. 1985 Sandoz AG Muttenz Engineering for the sanitation of the organically polluted exhaust air (Switzerland) at Muttenz. 1985 Sandoz AG Muttenz Feasibility study and offer boiler house, heat distribution, process measuring and (Switzerland) control technology units and equipment. 1986 Sarna AG Sarnen Feasibility study with concept and detail engineering on pentane disposal and (Switzerland) energy recovery. 1986 Schaerer + Rothrist Feasibility study, risk analysis and detail engineering for the collection and Schlaepfer AG (Switzerland) disposal of the ethyl oxide-exhaust air. 1986 Rohner AG Pratteln Energy study, energy center and fabrication with (Switzerland) economy, package of measures, investments. 1987 Bertrams Muttenz Basic- and detail engineering for 1 special steam boiler Chemianlagen AG (Switzerland) for the saltpetre production. Place of installation Argentina. 1987 Ciba Geigy AG Basel Processing and detail design of a special combustion plant (Switzerland) for the project AOPRC (China).
  • 3. ______________________________________________________________________________________________________________________ SFA Handels GmbH www.sfa-anlagenbau.com Page 3 of 21 Neue Aarburgerstrasse 20 info@sfa-anlagenbau.com CH-4852 Rothrist Engineering Year Customer Place Scope of supply Chemical industry 1995 STIA AG Pratteln Engineering for a complete exhaust air cleaning- plant, and registration in (Switzerland) the production. Engineering for the sanitation of the fuel depot section II. Automation concept chemistry production building 30. 1999 Gremolith AG Bazenheid Feasibility study and detail engineering on the collection and (Switzerland) disposal of room- and production exhaust air. 1999 Federal Office for the Bern Feasibility study, engineering and delivery of a separation plant for Environment FOEN (Switzerland) separating quicksilver after the crematorium, including complete plant installation. 2000 LONZA AG Visp LRV conformal reconstruction of the 70 t/h boilers with replacement of (Switzerland) the burner and exhaust air disposal, including new installation of the complete process measuring and control technology automation system and adaptations to the attendant facilities. 2000 LONZA AG Visp Inspection of the existing exhaust air disposal in the factory, (Switzerland) in building F17, in Visp. 2005 Hoffmann Basel Feasibility study on waste solvent management La Roche AG (Switzerland) and utilization in Basel. 2009 Hoffmann Basel Performance and evaluation of the measured results from La Roche AG (Switzerland) the combustion tests at in a special- high- temperature- combustion chamber with liquid and gaseous chemical residues. Flue gas analysis on polychloried dioxins and furanes (PCDD, PCDF).
  • 4. ______________________________________________________________________________________________________________________ SFA Handels GmbH www.sfa-anlagenbau.com Page 4 of 21 Neue Aarburgerstrasse 20 info@sfa-anlagenbau.com CH-4852 Rothrist Engineering Year Customer Place Scope of supply Municipal waste / Biomass / RDF 1982 Zürcher Regensdorf Economical investigation inspection for power supply. Furnierwerk (Switzerland) 1983 Hasena AG Laeufelfingen Engineering for hot water generation with distribution system. (Switzerland) 1987 PRT-Tomar Tomar Basic- and detail engineering for firing equipment Cork production (Portugal) for solids and 1 steam boiler with a capacity of 25 t/h, 45 bar pressure, including complete plant installation. 2014 Vattenfall Europe Rostock Feasibility study with cost account for a sludge incineration plant in Germany. (Germany) Adjustment to an existing plant, steam boiler 100 t/h, new fuel specification with 8 – 12 MJ/kg. 2016 Danpower GmbH Potsdam Feasibility study with cost account for a sludge incineration plant in Germany. (Germany) Amount of fuel 160’000 t/year. 2019 Top Energy Solution Co., Ltd. Chungcheongnam-do Feasibility study and pre-engineering for a Bio-SRF incineration power plant. (South Korea) Calculation of the overall cost for the power plant. Pre-engineering for the fuel feeding system, combustion grate system, combustion air system, cooling water system, ash removal system, cooling water system, combustion air system, steam boiler in a special vertical design and integration in the general layout. Pre-engineering for the steam boiler in a special vertical design with 60 to/hr, 43 bar, 420°C., including general layout, 3-D model, Bill of Material, calculation of the water circulation and fluegas temperatures, calculation and evaluation of solutions for the of SNCR or SCR system.
  • 5. ______________________________________________________________________________________________________________________ SFA Handels GmbH www.sfa-anlagenbau.com Page 5 of 21 Neue Aarburgerstrasse 20 info@sfa-anlagenbau.com CH-4852 Rothrist Engineering Year Customer Place Scope of supply Municipal waste / Biomass / RDF 2020 GETEC Park Swiss AG Muttenz Feasibility study and pre-engineering for 1 Line of industrial / chemical waste (Switzerland) incineration power plant. Calculation of the overall cost for the refurbishment of the fuel feeding system, combustion grate system, combustion air system and ash removal system. Pre-engineering for the refurbishment with space requirements, general layout for planning permissions, etc. Evaluation of solutions for the fuel feeding system, grate system and ash removal system with cost and performance comparison.
  • 6. ______________________________________________________________________________________________________________________ SFA Handels GmbH www.sfa-anlagenbau.com Page 6 of 21 Neue Aarburgerstrasse 20 info@sfa-anlagenbau.com CH-4852 Rothrist Engineering Year Customer Place Scope of supply Disposal industry 1994 City Freiburg Freiburg Feasibility study on an animal body incineration plant in Montmollin, canton (Switzerland) Neuenburg. 1995 Muera Biel Investigation of the condition, wall-thickness measurement of the waste incineration (Switzerland) boiler. 1999 Bayer Chemie Werk Mannheim Basic- and detail engineering for 1 waste heat boiler in a special combustion (Germany) plant. Waste heat boiler capacity of 12 t/h, 22 bar pressure. 2002 GZM/GBL Lyss Feasibility-study on CHP generation. (Switzerland) Animal body incineration plant, generation of current over a gas turbine. 2004 Building authority Basel Feasibility-study on the disposal of human / organically City of Basel (Switzerland) hospital residues as well as condition analysis of the existing crematory plants. 2005 AWZ Zurich Feasibility-study on the disposal of the waste air of the tankage company (Switzerland) in occurrence of revision or damage. Synthetics 1999 Ceta SA Vouvry Feasibility study and detail engineering for the registration and (Switzerland) disposal of production exhaust air.
  • 7. ______________________________________________________________________________________________________________________ SFA Handels GmbH www.sfa-anlagenbau.com Page 7 of 21 Neue Aarburgerstrasse 20 info@sfa-anlagenbau.com CH-4852 Rothrist Engineering Year Customer Place Scope of supply Metal industry 1985 Sugar factory Frauenfeld Energy study on the waste heat potential fabrication shavings, drying (Switzerland) process/boiler house with optimization suggestions. 1987 Apaco AG Grellingen Feasibility study exhaust air disposal of metal pickling plant. (Switzerland) 1992 Edak AG Dachsen Feasibility study (Switzerland) exhaust air disposal of metal pickling plant. 2001 Produits Morgia SA Morges Engineering for the building of a power center, one long-distance line channel and (Switzerland) under stations. Paper industry 1993 Versoix Versoix Genevea Energy study, power center including distribution system under (Switzerland) consideration of economy and investments. Textile industry 1997 Bethge AG Zofingen Energy study, power center with distribution system. (Switzerland) 1999 VFA AG Thalwil Energy study, power center, including distribution system under (Switzerland) consideration of economy and investments.
  • 8. ______________________________________________________________________________________________________________________ SFA Handels GmbH www.sfa-anlagenbau.com Page 8 of 21 Neue Aarburgerstrasse 20 info@sfa-anlagenbau.com CH-4852 Rothrist Engineering Year Customer Place Scope of supply Shipbuilding 1986 Howaldts-Deutsche Kiel Engineering for the building of a marine boiler for a platform ship in Nigeria. Werft AG (Germany) 1986 Howaldts-Deutsche Kiel Engineering for the building of marine steam boilers Werft AG (Germany) 30 - 80 t/h for the general marine engineering in Korea and China.
  • 9. ______________________________________________________________________________________________________________________ SFA Handels GmbH www.sfa-anlagenbau.com Page 9 of 21 Neue Aarburgerstrasse 20 info@sfa-anlagenbau.com CH-4852 Rothrist General contractor Year Customer Place Scope of supply General 1983 Waste incineration plant Buchs Delivery of 1 oil-fired auxiliary steam boiler with a capacity of 30 t/h, (Switzerland) 35 bar pressure, including complete plant installation. 1987 Oleificio Sabo AG Manno Delivery of 1 oil-fired auxiliary steam boiler with a capacity of 20 t/h, Cooking oil production (Switzerland) 18 bar pressure, including complete plant installation. 1988 GZM Lyss Installation of a power center including infrastructure, Extraktionswerk (Switzerland) 1 x steam boiler 16 t/h; 1x steam / steam transformer 5 t/h. 1988 SAIOD Cottendart Colombier Consortium of the companies SFA, Von Roll and K+K (Switzerland) SFA scope waste incineration boiler including infrastructure. 1995 STEP Lausanne Lausanne Installation of 2 furnace lines for sewage sludge utilization with (Switzerland) waste heat use incl. integration connection to the consisting infrastructure. 1998 Institute IVI Mittelhäusern Animal body sterilization plant. (Switzerland) 2004 AWZ Zurich Complete plant installation for the exhaust air disposal for the (Switzerland) animal flour production. 2008 Colenco Baden Complete plant installation of the hazardous waste incineration plant (Switzerland) SVA-Hard Winterthur (fluidized bed combustion, sewage sludge). 2008 Colenco Baden Complete plant installation for the plant of Reni in Niedergösgen (Switzerland) (fluidized bed combustion, wood and rejects). 2008 Crematorium Basel Retrofit of an existing furnace plant for mercury separation. Hörnli (Switzerland)
  • 10. ______________________________________________________________________________________________________________________ SFA Handels GmbH www.sfa-anlagenbau.com Page 10 of 21 Neue Aarburgerstrasse 20 info@sfa-anlagenbau.com CH-4852 Rothrist General contractor Year Customer Place Scope of supply Municipal waste / Biomass / RDF 1982 Hasena AG Läufelingen Hot water boiler 5 MW, operating pressure 20 bar. (Switzerland) Construction pressure 30 bar, HW 190 °C flow, 160 °C return Combustible: hogged wood class AI Combustion performance is 6,3 MW Fuel silo, Hot water boiler, plant infrastructure, process measuring and control technology. 1983 Swiss Federal Railways Olten Steam boiler 2 x 8 t/h, operating pressure 20 bar. (Switzerland) Construction pressure 30 bar, 250 °C superheated steam Combustible: hogged wood class AI – AII Combustion performance is 2 x 7 MW Fuel silo, fuel supply, steam boiler Plant infrastructure, process measuring and control technology. 1985 STEP Lausanne Lausanne Steam boiler 2x8 t/h, to the sewage sludge burn with supporting fire (Switzerland) and heavily fuel oil. Operating pressure 30 bar, 360 °C superheated steam Combustible: 2 x 6’531 kg sewage sludge Additional fuel: 2 x 217 kg/h heavy fuel oil Fuel filling, steam boiler, plant infrastructure, process measuring and control technology. 1988 Angéloz Mode SA Romont Delivery of firing equipment for solids and 1 steam boiler with a capacity of 15 t/h, Clothing (Switzerland) 12 bar pressure, including complete plant installation.
  • 11. ______________________________________________________________________________________________________________________ SFA Handels GmbH www.sfa-anlagenbau.com Page 11 of 21 Neue Aarburgerstrasse 20 info@sfa-anlagenbau.com CH-4852 Rothrist General contractor Year Customer Place Scope of supply Municipal waste / Biomass / RDF 1989 SAIOD Cottendart Colombier Steam boiler 14 t/h normal, maximum is 16,5 t/h (Switzerland) Operating pressure 40 bar, construction pressure 55 bar, 435 °C hot steam Combustible: municipal and industrial waste Combustible deliver rate: approximately 4 t/h Combustion performance is 18 MW Steam boiler, steel building, process measuring and control technology, connection to the existing plant infrastructure. 1995 Heraeus Deutschland Pforzheim Complete production waste ashing plant (GPA) GmbH & Co. KG (Germany) Ashing gear: Production waste materials with precious metal like gold, Platinum. Throughput: 300 t/year Ash charging, burning, waste heat use, flue gas purification, process measuring and control technology, connection to the existing plant infrastructure. 2001 Degussa AG Hanau/Frankfurt Complete production waste ashing plant (GPA) (Germany) Ashing gear: waste materials with precious metal like gold, platinum etcetera Throughput: 300 t/year production waste materials 500 t/year LM solvent 300 t/year oil of arrears from sump Ash charging, fuel depot, burning, special combustion chamber, waste heat use 16 t/h saturated steam16 bar, flue gas purification, process measuring and control technology, connection to the existing plant infrastructure.
  • 12. ______________________________________________________________________________________________________________________ SFA Handels GmbH www.sfa-anlagenbau.com Page 12 of 21 Neue Aarburgerstrasse 20 info@sfa-anlagenbau.com CH-4852 Rothrist General contractor Year Customer Place Scope of supply Municipal waste / Biomass / RDF 2002 Harpen EKT Berlin-Neukölln 2 x steam boiler 60 t/h normal, maximum is 66 t/h. (Germany) Operating pressure is 66 bar, construction pressure 80 bar, 450 °C hot steam Combustible: Waste wood category A1 – AIV Combustion performance is 2 x 53 MW thermal Boiler efficiency: 91 % Steam boiler, steel building, process measuring and control technology, connection to the existing plant. 2003 SEC (HHKW) Dresden Steam boiler 30 t/h normal, maximum is 33 t/h. (Germany) Operating pressure 66 bar, construction pressure 80 bar, 435 °C hot steam Combustible: Waste wood category AIV, municipal and industrial waste Fuel throughput: 7 t/h Combustion performances is 23 MW Steam boiler, steel building, process measuring and control technology, connection to the existing plant infrastructure. 2003 Mainova AG Frankfurt am 1 steam boiler 50 t/h normal, maximum is 55 t/h Main Operating pressure is 66 bar, construction pressure is 80 bar, (Germany) 450 °C hot steam Combustible: Waste wood category A1 – AIV Combustion performance is 43,6 MW Boiler efficiency: 91 % Steam boiler, steel building, process measuring and control technology, connection to the existing plant.
  • 13. ______________________________________________________________________________________________________________________ SFA Handels GmbH www.sfa-anlagenbau.com Page 13 of 21 Neue Aarburgerstrasse 20 info@sfa-anlagenbau.com CH-4852 Rothrist General contractor Year Customer Place Scope of supply Municipal waste / Biomass / RDF 2005 VYNCKE Several places Steam boiler 55 t/h. in Thailand Operating pressure is 45 bar, construction pressure is 66 bar, 420 °C hot steam. Combustible: Palm stalks Combustion performance is 50 MW Production drawings for the Boiler, Strength calculation according to ASME, Thermal verification, ASME test procedure specification, Steel construction structural analysis. 2006 Vattenfall Europe Rostock Steam boiler 100 t/h normal, maximum is 105 t/h (Germany) Operating pressure is 42 bar, construction pressure is 65 bar, 405 °C hot steam Combustible: Industrial and municipal waste, refuse derived fuels (RDF). Combustion performance is 87 MW Boiler efficiency: 91 % Combustion grate, 1 lane with 9m width, water-cooled main combustion zone, air-cooled burnout zone, Fuel feeding system, Steel structure for the combustion grate, complete cooling system, Air supply, process measuring and control technology. 2007 Tm.E. Spa Calce Delivery of a bottom ash discharger Termomeccanica Ecologia (France) Discharge capacity 11-15 t/h of ash and slag. Weight (empty): 12,8 t Volume: 8 m³ Transported material: Ash and slag from waste incineration 2008 Holzheizkraftwerk Silbitz Replacement of 2 x Input of fuel. Silbitz GmbH (Germany) Combustion performance is 27 MW Fuel throughput is 55’000 t/year
  • 14. ______________________________________________________________________________________________________________________ SFA Handels GmbH www.sfa-anlagenbau.com Page 14 of 21 Neue Aarburgerstrasse 20 info@sfa-anlagenbau.com CH-4852 Rothrist General contractor Year Customer Place Scope of supply Municipal waste / Biomass / RDF 2010 Unitherm Baruth GmbH Baruth Replacement of the Input of fuel (Germany) Combustion performance is 45 MW Fuel throughput is 90’000 t/year 2010 BOFA Rønne Fuel feeding system (Denmark) Combustion performance is 7 MW Fuel throughput is 21’000 t/year 2011 Clariant Schweiz AG Muttenz Replacement of the ash removal system (Switzerland) Combustion performance is 10 MW Fuel throughput is 30’000 t/year 2011 REFA Nykøbing Fuel feeding system (Denmark) Combustion performance is 14 MW Fuel throughput is 44’500 t/year 2012 Danpower GmbH Elsterwerda Replacement of the fuel feeding system (Germany) Combustion performance is 45 MW Fuel throughput is 100’000 t/ year
  • 15. ______________________________________________________________________________________________________________________ SFA Handels GmbH www.sfa-anlagenbau.com Page 15 of 21 Neue Aarburgerstrasse 20 info@sfa-anlagenbau.com CH-4852 Rothrist General contractor Year Customer Place Scope of supply Municipal waste / Biomass / RDF 2014/2015 Vattenfall Europe Rostock Refurbishment and modification of a water-and air-cooled combustion grate system (Germany) with a width of 9 m for a 100 t/h steam boiler. Refurbishment and modification of the Input of fuel, feeding pushers, side boxes of the grate modules with motions compensators, cooling water circuit, 990 pieces of water-cooled grate plates, air-cooled grate bars, the primary air supply system and the process measuring and control technology. 2016/2017 Bangkok Industrial Bangkok Engineering and delivery of a water-and air-cooled combustion grate system for a Boilers Co. Ltd. (Thailand) RDF incineration power plant. Combustion grate with a width of 4,2 m for a 50 t/h steam boiler, 10 MW electrical power production. Waste throughput 15 t/h. Water-cooled main combustion zone, air-cooled burnout zone. Fuel feeding system, complete cooling water system, combustion air system (primary, secondary, and Fluegas-recirculation), process measuring and control technology. 2018/2019 Super Earth Energy 6 Pichit Engineering and delivery of a water-and air-cooled combustion grate system for a (Thailand) RDF incineration power plant. Combustion grate with a width of 6 m for a 54 t/h steam boiler, 11.5 MW gross electrical power production. Fuel throughput 19 t/h. Water-cooled main combustion zone, air-cooled burnout zone. Fuel feeding system, complete cooling water system, air supply, process measuring and control technology and the complete combustion control system. 2019 Chosun Refractories Eng. Taoyuan City Engineering and delivery of a water-and air-cooled combustion grate system for a (Taiwan) industrial waste incineration power plant. Combustion grate with a width of 3 m and A length of 6 m after a rotary kiln. Fuel throughput approx. 2 t/h. Water-cooled main combustion zone, air-cooled burnout zone, Basic-engineering for cooling water system, air supply, process measuring and control technology.
  • 16. ______________________________________________________________________________________________________________________ SFA Handels GmbH www.sfa-anlagenbau.com Page 16 of 21 Neue Aarburgerstrasse 20 info@sfa-anlagenbau.com CH-4852 Rothrist General contractor Year Customer Place Scope of supply Food industry 1979 Landtwing Rütter AG Hünenberg Delivery of a complete waste disposal plant for the distillery. Distillery (Switzerland) Steam boiler with drum dryer and exhaust gas purification system. Steam boilers with a capacity of 12 t/h each, 16 bar pressure. 1980 Etter Söhne AG Zug Delivery of a complete waste disposal plant for the distillery. Distillery (Switzerland) Steam boiler with drum dryer and exhaust gas purification system. Steam boilers with a capacity of 12 t/h each, 16 bar pressure. 1982 Toni AG Zürich Detail engineering for the power station. Dairy Farm (Switzerland) Delivery of 2 oil-fired steam boilers with a capacity of 25 t/h each, 16 bar pressure, including complete plant installation. 1983 Nestlé Alabang City of Muntinlupa Delivery of 1 special steam boiler with a capacity of 25 t/h, 16 bar pressure. Coffee roasters (Philippines) Fired with a special combustion method for coal and biomass together, exhaust gases from coffee roasters have 500 °C. Support burner fuel heavy fuel oil. 1984 Coop Bern Bern Delivery of 1 special steam boiler with a capacity of 20 t/h, 16 bar pressure. (Switzerland) Fired with special combustion grate for waste from the food industry. Throughput 6 t/h. Support burner fuel light fuel oil. 1985 Louis Ditzler AG Möhlin Delivery of 2 oil--fired steam boilers with a capacity of 18 t/h each, 22 bar Frozen food products (Switzerland) pressure, including complete plant installation. 1985 Findus Food Békéscsaba Delivery of a power station with a steam production of 25 t/h, 22 bar pressure. Production (Hungary) 1987 Coop Basel Basel Delivery of 1 oil-fired steam boiler with a capacity of 20 t/h, 18 bar pressure. Central Bakery (Switzerland)
  • 17. ______________________________________________________________________________________________________________________ SFA Handels GmbH www.sfa-anlagenbau.com Page 17 of 21 Neue Aarburgerstrasse 20 info@sfa-anlagenbau.com CH-4852 Rothrist General contractor Year Customer Place Scope of supply Food industry 1987 Thomy Nestlé AG Basel Delivery of 2 oil--fired steam boilers with a capacity of 16 t/h each, 16 bar Food production (Switzerland) pressure, including complete plant installation. 1990 Brauerei St. Gallen Delivery of 1 oil--fired steam boilers with a capacity of 20 t/h each, 25 bar Schützengarten AG (Switzerland) pressure, including complete plant installation. Brewery 1990 Migros Volketswil Volketswil Delivery of 2 gas-fired steam boilers with a capacity of 16 t/h each, 18 bar pressure. Central Backery (Switzerland) 1990 Migros Micarna Courtepin Delivery of 2 oil-/gas-fired steam boilers with a capacity of 15 t/h each, Central butchery (Switzerland) 16 bar pressure. . 1992 Migros Münchenstein Münchenstein Delivery of 1 heavy fuel oil-fired steam boiler with a capacity of 20 t/h, Central warehouse (Switzerland) 20 bar pressure.
  • 18. ______________________________________________________________________________________________________________________ SFA Handels GmbH www.sfa-anlagenbau.com Page 18 of 21 Neue Aarburgerstrasse 20 info@sfa-anlagenbau.com CH-4852 Rothrist General contractor Year Customer Place Scope of supply Chemical industry 1974 STIA AG Pratteln Delivery of 1 oil fired steam boilers with an output of 20 t/h, 16 bar pressure, (Switzerland) including infrastructure. 1975 Rohner AG Pratteln Delivery of 2 oil fired steam boilers with an output of 18 t/h, 16 bar pressure, (Switzerland) including infrastructure. 1985 Schaerer + Rothrist Complete installation and burner equipment for the disposal Schlaepfer AG (Switzerland) of the ethyl oxide-exhaust air. 1985 SF-Chem AG Pratteln Delivery of 1 heavy fuel oil-fired steam boiler with a capacity of 30 t/h, (Switzerland) 30 bar pressure, including complete plant installation. 1986 Chemical factory Uetikon Installation of a complete power center with adaptation to the existing (Switzerland) system. NOx-poor burner with multiple-stage combustion for heavily fuel oil, in accordance with LRV. 1995 STIA AG Pratteln Thermal exhaust air cleaning plant TAR for the complete Switzerland) disposal of the loaded exhaust air as well as the liquid residues. Exhaust air collection starting from emission sources 1998 SANDOZ Basel LRV conformal reconstruction of the boiler plant with replacement of the (Switzerland) burner plants incl. new installation of the total automation system. 2004 Rohner AG Pratteln Reconstruction and sanitation of the power center. (Switzerland) 2008 Chemical factories Saar-Lothringen Installation a complete power center, 2 x 10 t/h steam boilers, Perl (Germany) including infrastructure.
  • 19. ______________________________________________________________________________________________________________________ SFA Handels GmbH www.sfa-anlagenbau.com Page 19 of 21 Neue Aarburgerstrasse 20 info@sfa-anlagenbau.com CH-4852 Rothrist General contractor Year Customer Place Scope of supply Chemical industry 2008 Heraeus Deutschland Pforzheim Complete sweepings-incineration plant with waste heat utilization, GmbH & Co. KG (Germany) flue gas cleaning sewage and process measuring and control technology plant. 2009 Degussa Hanau / Frankfurt Complete sweepings-incineration plant with solvent / (Germany) rhodium oil combustion as well as waste heat use, flue gas cleaning and process measuring and control technology plant. 2009 Ciba-Geigy Basel Thermal exhaust air cleaning plant TAR K-643 for exhaust air disposal Factory Klybeck (Switzerland) Farm production K-640. 2012 Hoffmann Basel LRV conformal reconstruction of the boiler plant Nr.8 with replacement of La Roche AG (Switzerland) the burner plants natural gas/fuel oil/solvent including new installation of the total automation system and adaptations of the attendant facilities. 2016 Clariant Schweiz AG Muttenz Refurbishment of an existing air-cooled combustion grate system with new grate (Switzerland) plates. 2017 Clariant Schweiz AG Muttenz Refurbishment of an existing input of fuel. Delivery of a new pusher, pusher table (Switzerland) and cast parts. 2018 Clariant Schweiz AG Muttenz Replacement of an existing fuel feeding system for the incineration of chemical (Switzerland) waste. New safety concept with safety related gate system with 2 slide dampers and a separate hydraulic unit.
  • 20. ______________________________________________________________________________________________________________________ SFA Handels GmbH www.sfa-anlagenbau.com Page 20 of 21 Neue Aarburgerstrasse 20 info@sfa-anlagenbau.com CH-4852 Rothrist General contractor Year Customer Place Scope of supply Military Enterprises 1991 German Schrobenhausen Detail engineering submission data and execution of the Aerospace (Germany) licensing procedures for the disposal plant Steinbach. 1991 German Schrobenhausen Investigational procedure and evaluation of the measured results Aerospace (Germany) in the revolving tube with: - Explosive Oktogen - Explosive A-IX-2 - Solid propellant o.l. ammonium perchlorate - Propellant powder NT-3 - Explosive TNT - Explosive TO - Mixture TO/A-/X-2/NT-3 1993 General Atomic Lueppen Partial delivery, mounting, start-up, performance and procedure test (Germany) including process optimisation of methods of the installed: - Fluidized-bed combustions - Rotary drum plant - Flue gas cleaning plant - Waste water treatment plant - Automation system in the plant 1995 UIT Dresden Planning and installation of a mobile mercury return QRG to (Germany) Valuable material retrieval from primer caps. 2001 Swiss federal one Thun Planning and production of a complete technique line for disposal Military enterprises (Swiftzerland) of military special- and of residual substances, consisting of: - Material preparation - Combustion - Waste heat utilization - Flue gas cleaning - Waste water treatment
  • 21. ______________________________________________________________________________________________________________________ SFA Handels GmbH www.sfa-anlagenbau.com Page 21 of 21 Neue Aarburgerstrasse 20 info@sfa-anlagenbau.com CH-4852 Rothrist General contractor Year Customer Place Scope of supply Military Enterprises 2001 Federal Military Thun Fuel feeding for solid particle firing incl. complete flue gas cleaning Department (Switzerland) plant (wet process) and dust-exhaust stage as well as waste water treatment plants. Shipbuilding 1986 Vaporama Lake Thun New installation of the complete boiler plant steam ship “Blümlisalp”, (Switzerland) equipped with integrated superheater and fuel oil EL firing, including process measuring and control technology-plant and installation. Paddle steamers from the year 1906. 1 x 8 t/h steam boiler, 12 bar pressure. Wood industry 1980 Spanplattenwerk Fiederis Delivery of 1 dust/oil-fired steam boiler with a capacity of 20 t/h, 18 bar pressure. Fiederis AG (Switzerland) Dust from the wooden plate production. 800 – 1’500 kg/h dust from the wooden plate production.