PROFILE
Highly motivated and goal-oriented young professional committed to pursuing a long-term career in estimation &
tendering department as a Chief Electrical Estimator with 11+ years’ experience and in projects as a senior
supervisor with 4+ year experience demonstrated within the electro-mechanical contracting company. As a bright
ambitious person, I enjoy working in a fast paced, highly motivating position where I can assist others while
challenging and expanding my knowledge and understanding of the task at hand. I am seeking a position that will
utilize my skills and offer the chance for advancement as well as allow me the opportunity to gain additional skills
and experience.
KEY QUALIFICATIONS & TECHNICAL SKILLS
• Over 11+ years of experience working as a Chief Electrical Estimator.
• Good experience in electrical estimating.
• Advanced knowledge of assigned discipline, estimating techniques, value engineering and cost control.
• Strong knowledge of conducting special studies to establish standard cost data.
• Proficiency in using electrical estimating software and Microsoft Office.
• Ability to review final estimate packages for accuracy and completeness.
• Ability to negotiate internal issues, priorities, and deadlines.
• Ability to perform take-offs and estimates from electrical drawings.
• Proven ability to complete design concept drawings and estimate cost for budget and fixed lump sum pricing.
• In depth knowledge of electrical code and field.
EMPLOYMENT EXPERIENCE
❖ MAGNA MEP Electromechanical LLC. Dubai (UAE)
Chief Electrical Estimator March. 2018 to Present
❖ Drake and Scull International, Abu Dhabi/Dubai (UAE)
Senior Electrical Estimator Dec. 2009 to March 2018
Responsibilities:
❖ Reviewed proposal specifications and drawings to determine scope of work and required contents of estimate.
❖ Analyse blueprints, project documents and specifications to prepare accurate and efficient materials and labour
estimates on all project stages and project related works.
❖ Supervised take-off of material quantities, assembled the estimate data and co-ordinated pricing with estimating
department team members.
❖ Prepares Budget Proposal Estimates and MEP BOQ for tender submission.
❖ Prepares Tender Check Estimates (TCE) for contracts and bill of materials which includes quantities, drawings,
and technical specifications.
❖ Produced final cost estimate summaries and analysed estimate for scope, pricing, and completeness.
❖ Prepared estimation sheet / estimates by calculating complete take off of scope of work.
❖ Ensured maintenance of files and documents as back-up for estimate figures, including current (accurate)
information on prices from suppliers through direct contact, sales brochures, price lists.
❖ Assisted in identifying qualified suppliers and subcontractors and soliciting quotes.
❖ Evaluating technical and commercial offer from the vendor’s and preparing Quotation Comparison statement.
❖ Preparation of list of commercial and technical clarifications.
❖ Assist Engineering Teams in evaluating bids received against the tender for contracts and materials ensuring
avoidance of cost front loading by contractors.
❖ Performs and validates Change/Adjustment Orders (AO) and contractor’s claims.
❖ Contributes huge savings to the company for creating simple, yet highly efficient estimating database acquiring
more than ten (10) profitable public work jobs.
❖ Recommended best solution based on cost (Value Engineering), engineering quality, and availability of
materials.
❖ Compiles, summarizes, updates and maintains estimating/cost database and ensures the accuracy of data
maintained in the section.
❖ Performs overall electrical cost estimates including High voltage & low voltage systems, Lighting, & ELV
Systems like (Data, Network, MATV, CATV, AV System, Public Address, Access Control, Intercom, Nurse call,
Fire Alarm, Intrusion Detection, CCTV, and other systems).
❖ Analyses blueprints and other documentation to prepare time, cost, materials, and labour estimates.
❖ Monitors sub-contractors on progress reports; coordinates with general contractors, subcontractors and
suppliers.
❖ Compiles checks and verifies specifications, submittals, request for clarifications, change orders, etc.
❖ Purchases highest quality materials at the lowest possible price and in correct amounts.
❖ Research and evaluates suppliers based on price, quality, selection, service, support, availability, reliability,
production and distribution capabilities, and the supplier's reputation and history.
❖ Understand of client requirements and the preparation of the drawings (SLD, Layout, BOQ etc.).
❖ Checking the drawings, scope of work, BOQ, prices, installation cost etc. of the team.
❖ Experience in the preparation of drawings, BOQ, installation cost, AND MANAGEMENT cost and be well versed
with the latest standards.
❖ Established goals and monitored effectiveness of the Estimating Department to achieve their goals.
❖ Assisted project management with preparation of schedules for estimate preparation, review, and publication.
❖ Ensured that projects are completed on time and under budget.
❖ Coordinated with business development to generate leads.
❖ Evaluated and determined appropriate construction methods.
❖ Attending tender pre-bid meeting and following up for clarification.
❖ Evaluates vendors and suppliers from time to time; obtain at least three quotations for presentation and final
evaluation.
❖ Cost sheet preparation.
❖ Preparation MEP related technical documents & submission.
❖ Identification and development of the MEP specialized sub-contractors for the new projects.
❖ Follow up with all new customers and contractors for all enquiries.
❖ Identification of corrective measures needed for overcoming any changes / difficulties that may be faced through
the project and may result in delays
❖ Estimated and prepared bids; participated in bid day activities.
❖ Make sure the quality of work as per code and company standards.
❖ Established goals and monitored effectiveness of the Estimating Department to achieve their goals.
❖ Major Projects Estimated & Awarded:
❖ Presidential Place – Main Building, Wings, Technical Buildings, Road & Infrastructure, Abu Dhabi – UAE
MEP Contract Value – 76.50 Million AED MEP Final Value with Variation Value – 1,110.00 Million AED
❖ Louvre Museum, Abu Dhabi – UAE
MEP Contract Value – 419.00 Million AED MEP Final Value with Variation Value – 700.00 Million AED
❖ Rosewood Hotel, Abu Dhabi – UAE
MEP Contract Value – 187.00 Million AED MEP Final Value with Variation Value – 230.00 Million AED
❖ Al Muneera Residential -Al Raha Beach Development, Abu Dhabi – UAE
MEP Contract Value – 400.00 Million AED MEP Final Value with Variation Value – 511.00 Million AED
❖ Danat Al Emarat Hospital, Abu Dhabi – UAE
MEP Contract Value – 115.00 Million AED MEP Final Value with Variation Value – 122.00 Million AED
❖ King Abdullah University for Science & Technology (KAUST), Jeddah – KSA
MEP Contract Value – 500.0 Million SAR MEP Final Value with Variation Value – 775.00 Million SAR
❖ Fairmount Hotel and Service Apartments, Abu Dhabi – UAE
MEP Contract Value – 232.00 Million AED MEP Final Value with Variation Value – 280.00 Million AED
❖ Warner Brother Thame Park, Abu Dhabi – UAE
MEP Contract Value – 225.00 Million AED MEP Final Value with Variation Value – 280.00 Million AED
❖ Plaza View Mix Development (Residential & Offices), Abu Dhabi – UAE
MEP Contract Value – 224.00 Million AED MEP Final Value with Variation Value – 145.00 Million AED
❖ Reem Mall, Abu Dhabi – UAE
MEP Contract Value – 600.00 Million AED
❖ Company: Drake and Scull International, Abu Dhabi (UAE)
Project: ADNEC (Abu Dhabi National Exhibition Canter) Project Phase II
Position: Senior Electrical Supervisor March 2007 to Dec. 2009
❖ Voltas LTD., Dubai (UAE)
Senior Electrical Supervisor March 2005 to Mar. 2007
Responsibilities:
❖ Execution and General supervision for installation, testing and commissioning of sub stations (Transformers, HV
Panel, and MV Panel) complete in accordance with the drawings and specifications of electrical systems at the
construction sites.
❖ Execution and General supervision for installation, testing and commissioning, modification of LV switchgears
(LV Main Panel, Capacitor Banks, SMDB, MCC, DB, Feeder Pillars) complete in accordance with the drawings
and specifications of electrical systems at the construction sites.
❖ Erection of Essential electrical equipment such as Diesel Generator, Synchronization Panel Panels, Essential
services (EMDB, ESMDB, EMCC & EDB), UPS & Inverter.
❖ Installation of solid bus duct, termination, making testing and all other activity, which is required to complete the
electrical work.
❖ Erection of life safety services such as Fire Control Panels & lift, elevators power connections.
❖ Installation of Cable Tray, Trunking & Ladders, trench cover (Chequer Plate), Conduit, Runway etc. pulling and
dressing, clipping of cable in its containment.
❖ Erection of all electrical small power and lighting circuits, switches including distribution cabinets, conduits,
unistrut junction box, receptacles, outlets, lighting fittings, pipe rack light, flood light, streetlight with lighting
poles, aviation light, Airfield lighting, 400HZ system, etc.
❖ Execution for Installation of Structure cabling system such as IDF, ODF, ONU & MDF. Installation of telephone
data outlets and wireless, active component network system.
❖ Execution for Installation of low current systems such as CCTV system, Access control system, Lighting Control
system, MATV - CATV system, Intercom System, Fire Alarm & Voice evacuation system, Public Address
System, Nurse Call, Clock Management system, Audio Visual system, Central Emergency Battery System,
Traffic Barrier System, Disabled Refuge System, etc.
❖ Coordination to mechanical services related to electrical system such as BMS Systems, Heating Ventilation
and A/C equipment’s, Chillers Plant, AHUs, FCUs, Roof Extract fans, Chilled Water Pumps, etc.
❖ Laying cables for Medium Voltage, High Voltage, Low Voltage Transformer, Motor, Panel boards, Control
system and Street light, lying of conduit pipe and ducts as per the drawings provided.
❖ Preparation of Daily work schedule, weekly progress reports and maintaining all site related documents.
❖ Take corrective & preventive actions to solve problems, make decisions and follow through on actions in a
timely way with minimum supervision.
❖ Close coordination and follow-up with the concerned authorities to achieve the completion of the job as per the
scheduled.
❖ Receive/action Request for Information (RFI) that apply to electrical works. RFI’s requiring design feedback will
be directed to the Designer for response. Review the responses for adequacy.
❖ Make sure the quality of work as per code and company standards.
❖ Reduce losses due to material shortage, manpower shortages & breakdowns.
❖ Capacity planning, on the job training to the workers (Tool Box Meeting).
❖ Provide technical assistance to the construction team as needed.
❖ Generate/Review material requisitions, submittals, and ensure contract performance measures are met.
❖ Ensure that all Electrical site activities are conducted under controlled conditions as per shop drawings, method
statements, specification and work plan.
❖ Evaluate the project construction to ensure compliance with standards for Electrical systems.
❖ Serve as the Site Representative for all matters related to construction quality assurance of Electrical works.
❖ Preparation of installation method statements in coordination with the QA/QC representatives and check the
prepared documents.
EDUCATION & TRAINING
❖ Executive MBA in Construction Management and
Operation Management.
NIM, Indore (M.P.) India
❖ DBA (Diploma in Business Administration). NIM, Indore (M.P.) India
❖ I T I in Electrical M.P. Board, Jabalpur, India
❖ SSC (PCM) M.P. Board, Bhopal, India
CERTIFICATION
• All India Board of GK and Moral Education, Certificate Course. INDIA
• Cultural Examination Certificate Course. INDIA.
• Indian Examination of NTSC in Three Year certificate Course INDIA.
CORE SKILLS
• IT Skills: MS OFFICE (Excel, Word, Power point, MS Outlook and Explorer).
• Plan SWIFT Estimation Software.
Nageshwar Sharma

More Related Content

What's hot (20)

Ahmer salahudin resume
Ahmer salahudin resumeAhmer salahudin resume
Ahmer salahudin resume
 
Cv, electrical engineer, ahmad saqqa
Cv, electrical engineer, ahmad saqqaCv, electrical engineer, ahmad saqqa
Cv, electrical engineer, ahmad saqqa
 
ALAA ABBAS
ALAA ABBASALAA ABBAS
ALAA ABBAS
 
MEP Electrical Engineer
MEP Electrical Engineer MEP Electrical Engineer
MEP Electrical Engineer
 
Mohamed Azaad - Estimation Engineer CV
Mohamed Azaad - Estimation Engineer CVMohamed Azaad - Estimation Engineer CV
Mohamed Azaad - Estimation Engineer CV
 
SK RABANI Electrical engg
SK RABANI  Electrical enggSK RABANI  Electrical engg
SK RABANI Electrical engg
 
JKY CV.
JKY CV.JKY CV.
JKY CV.
 
Govind-CVC5
Govind-CVC5Govind-CVC5
Govind-CVC5
 
Estimation Engineer
Estimation EngineerEstimation Engineer
Estimation Engineer
 
cv electrical engineer
cv electrical engineercv electrical engineer
cv electrical engineer
 
Resume-Estimation
Resume-EstimationResume-Estimation
Resume-Estimation
 
Resume-mohamed-ali
Resume-mohamed-aliResume-mohamed-ali
Resume-mohamed-ali
 
CV -waleed zidan .
CV -waleed zidan .CV -waleed zidan .
CV -waleed zidan .
 
B.tech electrical engineer cv
B.tech electrical engineer cvB.tech electrical engineer cv
B.tech electrical engineer cv
 
JBA_CV_updated
JBA_CV_updatedJBA_CV_updated
JBA_CV_updated
 
Project engineer(cv)
Project engineer(cv)Project engineer(cv)
Project engineer(cv)
 
project electrical engineer
project electrical engineerproject electrical engineer
project electrical engineer
 
Wael Mahmoud Sobeih 11-2014
Wael Mahmoud Sobeih 11-2014Wael Mahmoud Sobeih 11-2014
Wael Mahmoud Sobeih 11-2014
 
CV - mohammed khamis aburuka MBA
CV - mohammed khamis aburuka MBACV - mohammed khamis aburuka MBA
CV - mohammed khamis aburuka MBA
 
CV-Electrical Engineer (1)
CV-Electrical Engineer (1)CV-Electrical Engineer (1)
CV-Electrical Engineer (1)
 

Similar to Cv of nageshwar sharma 2019 (chief estimator)

Similar to Cv of nageshwar sharma 2019 (chief estimator) (20)

Electrical Engineer Sajid Akram N (1)
Electrical Engineer Sajid Akram N (1)Electrical Engineer Sajid Akram N (1)
Electrical Engineer Sajid Akram N (1)
 
CV_SR MEP MANAGER. NT.
CV_SR MEP MANAGER. NT.CV_SR MEP MANAGER. NT.
CV_SR MEP MANAGER. NT.
 
ARNOLD BUSTAMANTE - RESUME
ARNOLD BUSTAMANTE - RESUMEARNOLD BUSTAMANTE - RESUME
ARNOLD BUSTAMANTE - RESUME
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
CV - Waseem Odeh - EE
CV - Waseem Odeh - EECV - Waseem Odeh - EE
CV - Waseem Odeh - EE
 
Hussein Ahmad Salem-CV
Hussein Ahmad Salem-CVHussein Ahmad Salem-CV
Hussein Ahmad Salem-CV
 
YOGESH ELECTRICAL ENGG
YOGESH ELECTRICAL ENGG YOGESH ELECTRICAL ENGG
YOGESH ELECTRICAL ENGG
 
Electrical Engineer Resume
Electrical Engineer ResumeElectrical Engineer Resume
Electrical Engineer Resume
 
MANZAR_CVH
MANZAR_CVHMANZAR_CVH
MANZAR_CVH
 
Hassan mohamed resume 08 06-2016
Hassan mohamed resume 08 06-2016Hassan mohamed resume 08 06-2016
Hassan mohamed resume 08 06-2016
 
Hassan mohamed resume 08 06-2016
Hassan mohamed resume 08 06-2016Hassan mohamed resume 08 06-2016
Hassan mohamed resume 08 06-2016
 
Hassan mohamed resume 08 06-2016
Hassan mohamed resume 08 06-2016Hassan mohamed resume 08 06-2016
Hassan mohamed resume 08 06-2016
 
cv new
cv newcv new
cv new
 
G_123
G_123G_123
G_123
 
Resume
ResumeResume
Resume
 
F. CV
F. CVF. CV
F. CV
 
HASSAN CV
HASSAN CVHASSAN CV
HASSAN CV
 
ilyas_MEP new
ilyas_MEP newilyas_MEP new
ilyas_MEP new
 
saif.resume dxb
saif.resume dxbsaif.resume dxb
saif.resume dxb
 

Recently uploaded

"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...Erbil Polytechnic University
 
Levelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument methodLevelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument methodManicka Mamallan Andavar
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm Systemirfanmechengr
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdfCaalaaAbdulkerim
 
List of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfList of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfisabel213075
 
Artificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewArtificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewsandhya757531
 
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmComputer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmDeepika Walanjkar
 
GSK & SEAMANSHIP-IV LIFE SAVING APPLIANCES .pptx
GSK & SEAMANSHIP-IV LIFE SAVING APPLIANCES .pptxGSK & SEAMANSHIP-IV LIFE SAVING APPLIANCES .pptx
GSK & SEAMANSHIP-IV LIFE SAVING APPLIANCES .pptxshuklamittt0077
 
chpater16.pptxMMMMMMMMMMMMMMMMMMMMMMMMMMM
chpater16.pptxMMMMMMMMMMMMMMMMMMMMMMMMMMMchpater16.pptxMMMMMMMMMMMMMMMMMMMMMMMMMMM
chpater16.pptxMMMMMMMMMMMMMMMMMMMMMMMMMMMNanaAgyeman13
 
Crushers to screens in aggregate production
Crushers to screens in aggregate productionCrushers to screens in aggregate production
Crushers to screens in aggregate productionChinnuNinan
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating SystemRashmi Bhat
 
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Erbil Polytechnic University
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
Cooling Tower SERD pH drop issue (11 April 2024) .pptx
Cooling Tower SERD pH drop issue (11 April 2024) .pptxCooling Tower SERD pH drop issue (11 April 2024) .pptx
Cooling Tower SERD pH drop issue (11 April 2024) .pptxmamansuratman0253
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating SystemRashmi Bhat
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating SystemRashmi Bhat
 
National Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfNational Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfRajuKanojiya4
 

Recently uploaded (20)

"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...
 
Levelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument methodLevelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument method
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm System
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdf
 
List of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfList of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdf
 
Artificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewArtificial Intelligence in Power System overview
Artificial Intelligence in Power System overview
 
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmComputer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
 
GSK & SEAMANSHIP-IV LIFE SAVING APPLIANCES .pptx
GSK & SEAMANSHIP-IV LIFE SAVING APPLIANCES .pptxGSK & SEAMANSHIP-IV LIFE SAVING APPLIANCES .pptx
GSK & SEAMANSHIP-IV LIFE SAVING APPLIANCES .pptx
 
chpater16.pptxMMMMMMMMMMMMMMMMMMMMMMMMMMM
chpater16.pptxMMMMMMMMMMMMMMMMMMMMMMMMMMMchpater16.pptxMMMMMMMMMMMMMMMMMMMMMMMMMMM
chpater16.pptxMMMMMMMMMMMMMMMMMMMMMMMMMMM
 
Crushers to screens in aggregate production
Crushers to screens in aggregate productionCrushers to screens in aggregate production
Crushers to screens in aggregate production
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating System
 
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
Cooling Tower SERD pH drop issue (11 April 2024) .pptx
Cooling Tower SERD pH drop issue (11 April 2024) .pptxCooling Tower SERD pH drop issue (11 April 2024) .pptx
Cooling Tower SERD pH drop issue (11 April 2024) .pptx
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating System
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating System
 
National Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfNational Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdf
 

Cv of nageshwar sharma 2019 (chief estimator)

  • 1. NAGESHWAR SHARMA Drake and Scull Engineering (PJSC) Abu Dhabi, (UAE) PO. Box 44325 +971-55-7451092 Email: - s.nagesh7@gmail.com; s.nagesh7@hotmail.com PROFILE Highly motivated and goal-oriented young professional committed to pursuing a long-term career in estimation & tendering department as a Chief Electrical Estimator with 11+ years’ experience and in projects as a senior supervisor with 4+ year experience demonstrated within the electro-mechanical contracting company. As a bright ambitious person, I enjoy working in a fast paced, highly motivating position where I can assist others while challenging and expanding my knowledge and understanding of the task at hand. I am seeking a position that will utilize my skills and offer the chance for advancement as well as allow me the opportunity to gain additional skills and experience. KEY QUALIFICATIONS & TECHNICAL SKILLS • Over 11+ years of experience working as a Chief Electrical Estimator. • Good experience in electrical estimating. • Advanced knowledge of assigned discipline, estimating techniques, value engineering and cost control. • Strong knowledge of conducting special studies to establish standard cost data. • Proficiency in using electrical estimating software and Microsoft Office. • Ability to review final estimate packages for accuracy and completeness. • Ability to negotiate internal issues, priorities, and deadlines. • Ability to perform take-offs and estimates from electrical drawings. • Proven ability to complete design concept drawings and estimate cost for budget and fixed lump sum pricing. • In depth knowledge of electrical code and field. EMPLOYMENT EXPERIENCE ❖ MAGNA MEP Electromechanical LLC. Dubai (UAE) Chief Electrical Estimator March. 2018 to Present ❖ Drake and Scull International, Abu Dhabi/Dubai (UAE) Senior Electrical Estimator Dec. 2009 to March 2018 Responsibilities: ❖ Reviewed proposal specifications and drawings to determine scope of work and required contents of estimate. ❖ Analyse blueprints, project documents and specifications to prepare accurate and efficient materials and labour estimates on all project stages and project related works. ❖ Supervised take-off of material quantities, assembled the estimate data and co-ordinated pricing with estimating department team members. ❖ Prepares Budget Proposal Estimates and MEP BOQ for tender submission. ❖ Prepares Tender Check Estimates (TCE) for contracts and bill of materials which includes quantities, drawings, and technical specifications. ❖ Produced final cost estimate summaries and analysed estimate for scope, pricing, and completeness.
  • 2. ❖ Prepared estimation sheet / estimates by calculating complete take off of scope of work. ❖ Ensured maintenance of files and documents as back-up for estimate figures, including current (accurate) information on prices from suppliers through direct contact, sales brochures, price lists. ❖ Assisted in identifying qualified suppliers and subcontractors and soliciting quotes. ❖ Evaluating technical and commercial offer from the vendor’s and preparing Quotation Comparison statement. ❖ Preparation of list of commercial and technical clarifications. ❖ Assist Engineering Teams in evaluating bids received against the tender for contracts and materials ensuring avoidance of cost front loading by contractors. ❖ Performs and validates Change/Adjustment Orders (AO) and contractor’s claims. ❖ Contributes huge savings to the company for creating simple, yet highly efficient estimating database acquiring more than ten (10) profitable public work jobs. ❖ Recommended best solution based on cost (Value Engineering), engineering quality, and availability of materials. ❖ Compiles, summarizes, updates and maintains estimating/cost database and ensures the accuracy of data maintained in the section. ❖ Performs overall electrical cost estimates including High voltage & low voltage systems, Lighting, & ELV Systems like (Data, Network, MATV, CATV, AV System, Public Address, Access Control, Intercom, Nurse call, Fire Alarm, Intrusion Detection, CCTV, and other systems). ❖ Analyses blueprints and other documentation to prepare time, cost, materials, and labour estimates. ❖ Monitors sub-contractors on progress reports; coordinates with general contractors, subcontractors and suppliers. ❖ Compiles checks and verifies specifications, submittals, request for clarifications, change orders, etc. ❖ Purchases highest quality materials at the lowest possible price and in correct amounts. ❖ Research and evaluates suppliers based on price, quality, selection, service, support, availability, reliability, production and distribution capabilities, and the supplier's reputation and history. ❖ Understand of client requirements and the preparation of the drawings (SLD, Layout, BOQ etc.). ❖ Checking the drawings, scope of work, BOQ, prices, installation cost etc. of the team. ❖ Experience in the preparation of drawings, BOQ, installation cost, AND MANAGEMENT cost and be well versed with the latest standards. ❖ Established goals and monitored effectiveness of the Estimating Department to achieve their goals. ❖ Assisted project management with preparation of schedules for estimate preparation, review, and publication. ❖ Ensured that projects are completed on time and under budget. ❖ Coordinated with business development to generate leads. ❖ Evaluated and determined appropriate construction methods. ❖ Attending tender pre-bid meeting and following up for clarification. ❖ Evaluates vendors and suppliers from time to time; obtain at least three quotations for presentation and final evaluation. ❖ Cost sheet preparation. ❖ Preparation MEP related technical documents & submission. ❖ Identification and development of the MEP specialized sub-contractors for the new projects. ❖ Follow up with all new customers and contractors for all enquiries. ❖ Identification of corrective measures needed for overcoming any changes / difficulties that may be faced through the project and may result in delays
  • 3. ❖ Estimated and prepared bids; participated in bid day activities. ❖ Make sure the quality of work as per code and company standards. ❖ Established goals and monitored effectiveness of the Estimating Department to achieve their goals. ❖ Major Projects Estimated & Awarded: ❖ Presidential Place – Main Building, Wings, Technical Buildings, Road & Infrastructure, Abu Dhabi – UAE MEP Contract Value – 76.50 Million AED MEP Final Value with Variation Value – 1,110.00 Million AED ❖ Louvre Museum, Abu Dhabi – UAE MEP Contract Value – 419.00 Million AED MEP Final Value with Variation Value – 700.00 Million AED ❖ Rosewood Hotel, Abu Dhabi – UAE MEP Contract Value – 187.00 Million AED MEP Final Value with Variation Value – 230.00 Million AED ❖ Al Muneera Residential -Al Raha Beach Development, Abu Dhabi – UAE MEP Contract Value – 400.00 Million AED MEP Final Value with Variation Value – 511.00 Million AED ❖ Danat Al Emarat Hospital, Abu Dhabi – UAE MEP Contract Value – 115.00 Million AED MEP Final Value with Variation Value – 122.00 Million AED ❖ King Abdullah University for Science & Technology (KAUST), Jeddah – KSA MEP Contract Value – 500.0 Million SAR MEP Final Value with Variation Value – 775.00 Million SAR ❖ Fairmount Hotel and Service Apartments, Abu Dhabi – UAE MEP Contract Value – 232.00 Million AED MEP Final Value with Variation Value – 280.00 Million AED ❖ Warner Brother Thame Park, Abu Dhabi – UAE MEP Contract Value – 225.00 Million AED MEP Final Value with Variation Value – 280.00 Million AED ❖ Plaza View Mix Development (Residential & Offices), Abu Dhabi – UAE MEP Contract Value – 224.00 Million AED MEP Final Value with Variation Value – 145.00 Million AED ❖ Reem Mall, Abu Dhabi – UAE MEP Contract Value – 600.00 Million AED ❖ Company: Drake and Scull International, Abu Dhabi (UAE) Project: ADNEC (Abu Dhabi National Exhibition Canter) Project Phase II Position: Senior Electrical Supervisor March 2007 to Dec. 2009 ❖ Voltas LTD., Dubai (UAE) Senior Electrical Supervisor March 2005 to Mar. 2007 Responsibilities: ❖ Execution and General supervision for installation, testing and commissioning of sub stations (Transformers, HV Panel, and MV Panel) complete in accordance with the drawings and specifications of electrical systems at the construction sites. ❖ Execution and General supervision for installation, testing and commissioning, modification of LV switchgears (LV Main Panel, Capacitor Banks, SMDB, MCC, DB, Feeder Pillars) complete in accordance with the drawings and specifications of electrical systems at the construction sites. ❖ Erection of Essential electrical equipment such as Diesel Generator, Synchronization Panel Panels, Essential services (EMDB, ESMDB, EMCC & EDB), UPS & Inverter. ❖ Installation of solid bus duct, termination, making testing and all other activity, which is required to complete the electrical work.
  • 4. ❖ Erection of life safety services such as Fire Control Panels & lift, elevators power connections. ❖ Installation of Cable Tray, Trunking & Ladders, trench cover (Chequer Plate), Conduit, Runway etc. pulling and dressing, clipping of cable in its containment. ❖ Erection of all electrical small power and lighting circuits, switches including distribution cabinets, conduits, unistrut junction box, receptacles, outlets, lighting fittings, pipe rack light, flood light, streetlight with lighting poles, aviation light, Airfield lighting, 400HZ system, etc. ❖ Execution for Installation of Structure cabling system such as IDF, ODF, ONU & MDF. Installation of telephone data outlets and wireless, active component network system. ❖ Execution for Installation of low current systems such as CCTV system, Access control system, Lighting Control system, MATV - CATV system, Intercom System, Fire Alarm & Voice evacuation system, Public Address System, Nurse Call, Clock Management system, Audio Visual system, Central Emergency Battery System, Traffic Barrier System, Disabled Refuge System, etc. ❖ Coordination to mechanical services related to electrical system such as BMS Systems, Heating Ventilation and A/C equipment’s, Chillers Plant, AHUs, FCUs, Roof Extract fans, Chilled Water Pumps, etc. ❖ Laying cables for Medium Voltage, High Voltage, Low Voltage Transformer, Motor, Panel boards, Control system and Street light, lying of conduit pipe and ducts as per the drawings provided. ❖ Preparation of Daily work schedule, weekly progress reports and maintaining all site related documents. ❖ Take corrective & preventive actions to solve problems, make decisions and follow through on actions in a timely way with minimum supervision. ❖ Close coordination and follow-up with the concerned authorities to achieve the completion of the job as per the scheduled. ❖ Receive/action Request for Information (RFI) that apply to electrical works. RFI’s requiring design feedback will be directed to the Designer for response. Review the responses for adequacy. ❖ Make sure the quality of work as per code and company standards. ❖ Reduce losses due to material shortage, manpower shortages & breakdowns. ❖ Capacity planning, on the job training to the workers (Tool Box Meeting). ❖ Provide technical assistance to the construction team as needed. ❖ Generate/Review material requisitions, submittals, and ensure contract performance measures are met. ❖ Ensure that all Electrical site activities are conducted under controlled conditions as per shop drawings, method statements, specification and work plan. ❖ Evaluate the project construction to ensure compliance with standards for Electrical systems. ❖ Serve as the Site Representative for all matters related to construction quality assurance of Electrical works. ❖ Preparation of installation method statements in coordination with the QA/QC representatives and check the prepared documents. EDUCATION & TRAINING ❖ Executive MBA in Construction Management and Operation Management. NIM, Indore (M.P.) India ❖ DBA (Diploma in Business Administration). NIM, Indore (M.P.) India ❖ I T I in Electrical M.P. Board, Jabalpur, India ❖ SSC (PCM) M.P. Board, Bhopal, India
  • 5. CERTIFICATION • All India Board of GK and Moral Education, Certificate Course. INDIA • Cultural Examination Certificate Course. INDIA. • Indian Examination of NTSC in Three Year certificate Course INDIA. CORE SKILLS • IT Skills: MS OFFICE (Excel, Word, Power point, MS Outlook and Explorer). • Plan SWIFT Estimation Software. Nageshwar Sharma