NAIP and TNRIS

1,715 views

Published on

A Creative NAIP Buy UP:The Texas Experience

Published in: Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
1,715
On SlideShare
0
From Embeds
0
Number of Embeds
3
Actions
Shares
0
Downloads
4
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

NAIP and TNRIS

  1. 1. A Creative NAIP Buy UP:<br />The Texas Experience<br />James Scott III<br />Texas Natural Resources Information System<br />Tim Crago<br />North West Geomatics Ltd.<br />
  2. 2. Program Summary<br /><ul><li> State of Texas wide coverage (275K sq miles, 254 Counties)
  3. 3. 1 meter NAIP deliverable
  4. 4. 0.5 meter TNRIS deliverable
  5. 5. Single acquisition at 0.75 meter resolution using ADS40 ‘highres’ mode.
  6. 6. Multiple product deliveries
  7. 7. Summer 2008, winter 2009 seasons</li></li></ul><li>Program Chronology<br /><ul><li> North West awarded NAIP contract for Texas in March 2008
  8. 8. TNRIS began the process of consolidating partners in June 07 and close involvement with FSA
  9. 9. 4 State agencies involved
  10. 10. 2008 Acquisition – April 28 – Oct 28
  11. 11. 2009 Acquisition – Jan 15 – Feb 28</li></li></ul><li>Texas Partners<br />Commission on State Emergency Communications (24 regional centers)<br />Texas Commission on Environmental Quality (air quality and facilities)<br />Texas General Land Office (Coastal Programs)<br />Texas Water Development Board (Texas Natural Resources Information System – Strategic Mapping Program and National Flood Insurance Mapping)<br />USDA Natural Resources Conservation Service<br />U.S. Geological Survey <br />
  12. 12. Contract Vehicle - Then<br /><ul><li> TXMAS (Texas Multiple Award Schedule) used by TNRIS to issue buy up contract to North West
  13. 13. TXMAS uses the Federal GSA contract obtained by competitive tender as the underlying contract to award a schedule of 50 products and services
  14. 14. Buy up award must happen quickly before NAIP acquisition begins</li></li></ul><li>Contract Vehicle – Now & Future<br /><ul><li> High Priority Imagery and Data Sets (HPIDS)
  15. 15. Authority given to TNRIS to manage statewide GIS data procurement
  16. 16. Pool of 21 Pre-qualified data and service providers</li></li></ul><li>Project Area Map<br />Flight Blocks<br />Summer 2008<br />Winter 2009<br />
  17. 17. The Leica ADS Sensor<br />Leica ADS Sensor<br />ADS Band Configuration<br />
  18. 18. Program Design<br /><ul><li> Original NAIP design was for 1m. resolution imagery; with the State of Texas wanting 50cm.
  19. 19. Original 1m. design involved 61,000 line miles of collection.
  20. 20. Re-designed for 75cm collection with 83,000 line miles; 36% increase.
  21. 21. Altitude change from 30,000’ to 23,000’</li></li></ul><li>Technical Approach<br /><ul><li>Leica ADS40-SH52
  22. 22. 23,000’ altitude
  23. 23. High-res mode acquisition resulting in 0.75m x 0.33m multispectral pixel</li></ul> 0.375m x 0.165m pan pixel<br /><ul><li> Re-sampled to 1m x 1m for NAIP
  24. 24. Re-sampled to 0.5m x 0.5m for TNRIS
  25. 25. All products to NAIP specs (with some exceptions)</li></li></ul><li>Acquisition Approach<br /><ul><li> With our partners
  26. 26. Fugro Horizons – FugroEarthdata
  27. 27. Up to 5 Cessna Conquests
  28. 28. Equipped with Leica ADS40-SH52</li></li></ul><li>Project Quantities<br />* - includes overlap between areas<br />
  29. 29. Deliverables Discussion<br />
  30. 30. Ortho Comparison – 1m<br />
  31. 31. Ortho Comparison – 50cm<br />
  32. 32. Lessons - General<br /><ul><li> Very short time frame between the NAIP award and the NAIP flying season to negotiate buy-up
  33. 33. Essential that State partners/funding in place prior to NAIP award
  34. 34. A single strong State entity leader
  35. 35. Contract vehicle/mechanism needs to be clear/expeditious; sole sourcing or others </li></li></ul><li>Lessons - State<br /><ul><li> State benefits from strong contribution ability (1/3)
  36. 36. Importance of strong FSA state office /State Mapping Center relationships
  37. 37. Value of positive history of data collaboration across state agencies</li></li></ul><li>Summary<br /><ul><li> USDA NAIP deliverables and time lines met
  38. 38. TNRIS and the State received 50cm state wide coverage
  39. 39. NAIP program funding augmented by State agencies to enhance deliverables to meet the State requirements</li>

×