Nacionalna Brownfield konferencija - Saša Drezgić, Ekonomski fakultet u Rijeci

  1. 1. Centar za EU projekte Sveučilišta u Rijeci
  2. 2. • 10 faculties, 4 departments, University Library and Students’ Centre • No. of students: 17,306 • Average yearly admission: abt. 4,000 first-year students • 3rd largest among 7 Croatian state universities • Founded in 1973 – first school of higher education in Rijeka in 1672
  3. 3. RIJEKA • Rector’s Office • Faculty of Medicine • Faculty of Engineering • Faculty of Maritime Studies • Faculty of Economics • Faculty of Civil Engineering • Faculty of Law • Faculty of Philosophy • Academy of Applied Arts • Faculty of Teacher Education •University Departments of Information Science, Mathematics,Physics and Biotechnology • University Library • Students’ Centre OPATIJA • Faculty of Tourism and Hospitality Management
  4. 4. First Croatian University that came up with its Strategy – focus on excellence, quality assurance, LLL, active collaboration with the local community & economy, active inclusion into EHEA & ERA
  5. 5. Aim – to harmonize with EU universities in accordance with Bologna Process requirements and goals Implementation of Bologna Process started in 2005 - 3 cycles (undergraduate/graduate/ doctoral) and ECTS system Transformance from predominately teaching to research university
  6. 6. Recognizible for its excellence in many fields: - engineering - shipbuilding - maritime affairs - biomedicine & basic medical research - social sciences - humanities sciences - natural sciences Objective
  7. 7. University Departments of Mathematics, Physics, Informatics and Biotechnology
  8. 8. Centre for Projects  established in 2007 in accordance with the Strategy Document within the Tempus Project “Capacity Buliding for Research in Croatia”  basic mission - to raise awareness and support researchers in submitting & implementing projects  Main programmes CEUP is involved in: Tempus, Jean Monnet, IPA, Framework Programmes
  9. 9. International Relations Department established in 2001 divided into: • Office for Bilateral and Multilateral Relations • Mobility Office International cooperation • 32 bilateral agreements • 5 agreements in the framework of the Bilateral Mobility Programme
  10. 10. University Campus Construction started in 2007 Phase I completed Phase II.A to be completed by mid 2016 Phase II.B to be completed by 2020 23mEUR from ERDF already obtained The whole 2nd phase
  11. 11. before... ... after
  12. 12. University of Rijeka – Campus Trsat
  13. 13. University of Rijeka – Campus Trsat Changing landscape (2007)
  14. 14. University of Rijeka – Campus Trsat Changing landscape (2008)
  15. 15. Changing landscape (2009) University of Rijeka – Campus Trsat
  16. 16. Changing landscape (2010) University of Rijeka – Campus Trsat
  17. 17. University of Rijeka Campus 18  total area 43.21 ha  University Campus 23.40 ha  Clinical Hospital Centre 8.40 ha  infrastructure 6.83 ha  living 3.49 ha  green 1.09 ha Area of the University Campus within the area of Trsat, the north- east part of the City of Rijeka
  18. 18. Outline of the area 19
  19. 19. Detailed Spatial Plan of the Trsat area 20
  20. 20. Spatial plan - model 21
  21. 21. Long Term Loan Agreement in the amount of 490 million HRK / 64,45 m EUR 22 December 2004 Seated from left: Frano Luković, president of ZABA Daniel Rukavina, rector Dragan Primorac, minister of sciences Petar Radaković, president of ERSTE&S. Bank Božo Prka, president of PBZ Staying from left: Zlatko Komadina, governor of Primorsko- Goranska County Kolinda Grabar Kitarović, minister of European Integration Ivo Sanader, Prime- minister Vojko Obersnel, Mayor of the City of Rijeka mons. Ivan Devčić, archbishop of Rijeka
  22. 22. Campus 1st phase overview 23 PHASE I Academy of Applied Arts (reconstruction and equipping) Science and Technology Park (reconstruction) Faculty of Humanities and Social Sciences and Faculty of Teacher Education (construction) Student Centre and student restaurant (construction and equipping) Faculty of Civil Engineering (construction) University Departments (construction) Equipping of Faculty of Humanities and Social Sciences, Faculty of Teacher Education, Faculty of Civil Engineering and University Departments Supporting infrastructure
  23. 23. Academy of Applied Arts 24
  24. 24. Academy of Applied Arts 25  total area of 8,140 m2  the facility was built in 1928  reconstruction started in November 2005, and completed in September 2006  in function since academic year 2006/2007  cost of facility reconstruction: 3,926,031 €  35 teaching rooms  1 computer room  33 cabinets
  25. 25. Science and Technology Park 26
  26. 26. Science and Technology Park 27  facility was built in 1962.  total area of 3,600 m2  reconstruction started in August 2008 and completed in March 2009  cost of remodeling the existing building: 1,614,382 €  In function since April 2009
  27. 27. Faculty of Humanities and Social Sciences and Faculty of Teacher Education 28
  28. 28. Faculty of Humanities and Social Sciences and Faculty of Teacher Education 29  total area of 21,050 m2  200 parking spots in the underground garage  construction started in October 2007  construction contract price: 23,151,263 €  in function since January 2011  20 teaching rooms  4 computer rooms  25 lecture halls  18 seminar rooms  138 cabinets
  29. 29. Student Restaurant 30
  30. 30. Student Restaurant 31  total area of 7,240 m2  100 parking spots in the underground garage  construction started in October 2007  construction contract price: 9,157,806 €  in function since April 2011
  31. 31. Faculty of Civil Engineering 32
  32. 32. Faculty of Civil Engineering 33  total area of 14,252 m2  200 parking spots in the underground garage  the University Centre for Studies is located in the building  construction started in March 2008  construction contract price: 16,213,570 €  in function since November 2011  takeover delayed due to minor defects in construction  83 offices  15 practicums  9 laboratories  8 lecture rooms
  33. 33. University Departments of Mathematics, Physics, Informatics and Biotechnology 34
  34. 34. University Departments of Mathematics, Physics, Informatics and Biotechnology 35  total area of 16,350 m2  construction started in October 2007  construction contract price: 15,392,096 €  in function since July 2012  takeover delayed due to problems with the building facade  15 teaching rooms  4 lecture halls  10 seminar rooms  32 laboratories  92 cabinets
  35. 35. 36 University of Rijeka Campus - 1st phase (2012)
  36. 36. University of Rijeka, Phase II.A facilities (2014-2016) 37 Investment Total value CAMPUS PHASE II Student accommodation, phase I 20.485.000 € Socio-cultural Centre 7.227.500 € Sports Hall and Outdoor sports facilities phase I 10.000.000 € Supporting infrastructure 3.643.750 € International Centre for Tourism and Sustainable Development - Opatija 7.059.038 €
  37. 37. University of Rijeka Campus, Phase II.A facilities 38 Sports Hall and Outdoor sports facilities-phase I Student accomodation facilities Supporting infrastructur e Socio-cultural centre
  38. 38. University of Rijeka Campus, Phase II.A facilities Student Accommodation Facilities, phase I – Pavilions 1 and 2 39 Student accomodation facilities (Pavilions 1 and 2)
  39. 39. Student Accommodation Facilities, Phase II.A – Pavilions 1 and 2 © 2013 University of Rijeka 40  total area of 13,800 m2  total of 598 beds  estimated (engineering) value of investment: 9 m EUR  construction permit obtained
  40. 40. University of Rijeka Campus, Phase II.A facilities © 2013 University of Rijeka 41 Student accomodation facilities (Pavilion 4)
  41. 41. Student Accommodation Facilities, Phase II.A – Pavilion 4 with the Student Centre, Technical Machinery and Laundromat © 2013 University of Rijeka 42  total area of 5,050 m2  total of 160 beds  estimated (engineering) value of investment: 4 m EUR  construction permit obtained
  42. 42. University of Rijeka Campus, Phase II.A facilities © 2013 University of Rijeka 43 Socio-cultural centre
  43. 43. Socio-cultural Centre © 2013 University of Rijeka 44  total area of 4,452 m2  University ceremony hall (Auditorium Maximum), polyvalent premises for various cultural and social events, cultural and art organizations and student clubs.  these same premises can be used for the organization of symposiums and congresses.  premises for an Internet café, restaurant, three establishments, bookstore, student radio, television, newspapers, etc.  estimated (engineering) value of investment: 7,23 m EUR  construction permit obtained  activities for the amendment of the project related to new and planned study programs
  44. 44. University of Rijeka Campus, Phase II.A facilities © 2013 University of Rijeka 45 Sports Hall and Outdoor sports facilities phase
  45. 45. Sports Hall and Outdoor Sports Facilities part I © 2013 University of Rijeka 46  estimated area of 5,500 m2 of above- ground floors and 3,900 m2 underground floors (two floors of underground garages)  min 300 parking spots in underground garage  other facilities which are in the function of the basic purpose or are compatible with it, such as outdoor sports facilities phase I, and athletic track, catering and service facilities, shops, business premises, etc.  estimated value of investment: 10 m EUR  location permit obtained
  46. 46. University of Rijeka Campus, Phase II.A facilities © 2013 University of Rijeka 47 Supporting infrastructur e
  47. 47. Supporting infrastructure © 2013 University of Rijeka 48  estimated value of investment: 3,64 m EUR  construction permit obtained
  48. 48. University of Rijeka Campus, Phase II.B facilities (2014-2020) © 2013 University of Rijeka 49 Facility Value PHASE II.B facilities Student accommodation, phase II 56,4 m EUR University Library 19,8 m EUR Translational medicine 5,4 m EUR Faculty of Medicine and Faculty of Health Sciences 22 m EUR Faculty of Engineering 21,4 m EUR Faculty of Economics 14,4 m EUR Outdoor sports facilities, phase II 0,24 m EUR Heating and Power Plant 10,0 m EUR
  49. 49. University Library © 2013 University of Rijeka 50  total area of 20,300 m2  library complex - premises for users as well as a depository and protection of library holdings (approximately 600,000 books)  out-of-library complex – bookshop and computer equipment shop, café, smaller exclusive restaurant, club premises, exhibition area, sales gallery, multifunctional hall  estimated investment value: 19,8 m EUR
  50. 50. Translational Medicine Centre © 2013 University of Rijeka 51  total area of 5,366 m2  Research centre for four main areas : imunology, tumors, regenerative medicine and functional neuroresearch  University core facilities: Biobank, Unit for clinical drug research, laboratories for genomic analyses, bioinformatics laboratory, etc.  estimated investment value: 5,4 m EUR  location permit obtained
  51. 51. Faculty of Medicine, Engineering and Economics © 2013 University of Rijeka 52 Faculty of Economics  25 study programmes  15 departments  estimated investment value: 14,4 m EUR Faculty of Engineering  17 study programmes  11 departments  estimated investment value: 21,4 m EUR Faculty of Medicine and Faculty of Health Sciences  17 study programmes  43 departments  estimated investment value: 22 m EUR
  52. 52. Outdoor sports facilities, part II © 2013 University of Rijeka 53  total area of 2,530 m2  a handball and basketball court and athletic track with associated bleachers  estimated (engineering) value of investment: 240,000 EUR  location permit obtained
  53. 53. Heating and Power Plant © 2013 University of Rijeka 54 The heating/power plant is drafted as a joint energy unit of the University Campus on Trsat and the Clinical Hospital Centre (construction in phases) 1st phase - needed thermal power of approximately 17 MW; while in the final state 41MW estimated (engineering) value of investment: 10 m EUR Location permit has been obtained
  54. 54. Sveučilišna bolnica

×