  1. 1. BASHKIA TIRANË Municipality Tirana STRATEGIC PROJECTS APRIL 2015
  2. 2. Strategic Projects 1. Tirana Northen Boulevard and River Project 2. Multimodal Terminal 3. Light Rail System (LRS )Tram 4. Tirana Techno - Park 5. Tirana Public Lighting Project 6. Energy Efficency Project
  3. 3. TIRANA NORTHEN BOULEVARD AND RIVER PROJECT Description 885 Ha
  4. 4. TIRANA NORTHEN BOULEVARD AND RIVER PROJECT Phase I The Southen section of the boulevard 885 Ha
  5. 5. TIRANA NORTHEN BOULEVARD AND RIVER PROJECT Description River Project 885 Ha
  6. 6. TIRANA NORTHEN BOULEVARD AND RIVER PROJECT Description 885 Ha The northen section of boulevard
  7. 7. TIRANA NORTHEN BOULEVARD AND RIVER PROJECT Goals 2000 jobs directly 21.000 employees 43.000 habitants
  8. 8. TIRANA NORTHEN BOULEVARD AND RIVER PROJECT Extension of the Boulevard
  9. 9. TIRANA NORTHEN BOULEVARD AND RIVER PROJECT 6 Squares 2 4 6 3 5 1 6 squares
  10. 10. TIRANA NORTHEN BOULEVARD AND RIVER PROJECT Squareconnector
  11. 11. TIRANA NORTHEN BOULEVARD AND RIVER PROJECT Merchant Square
  12. 12. TIRANA NORTHEN BOULEVARD AND RIVER PROJECT Square ofJustice
  13. 13. TIRANA NORTHEN BOULEVARD AND RIVER PROJECT Cultural Square
  14. 14. TIRANA NORTHEN BOULEVARD AND RIVER PROJECT Youth Square
  15. 15. TIRANA NORTHEN BOULEVARD AND RIVER PROJECT Square connector with the river
  16. 16. TIRANA NORTHEN BOULEVARD AND RIVER PROJECT Square connector with the river
  17. 17. TIRANA NORTHEN BOULEVARD AND RIVER PROJECT Current status Phaze I On september 6, 2013 with a value of 26 mln Euro Phaze II On January 17, 2014 with a value of 12,8 mln Euro Blocked by central Goverment
  18. 18. MULTIMODAL TERMINAL Description
  19. 19. MULTIMODAL TERMINAL Location
  20. 20. MULTIMODAL TERMINAL Functional Organization 1. Railway station (tram-train) 2. Bus Terminal 3. Passenger Terminal 4. Support services center
  21. 21. MULTIMODAL TERMINAL GOALS
  22. 22. MULTIMODAL TERMINAL GOALS Integration of the public transport lines Coverage of 75% of inter-urban traffic Coverage of 75% of inter-urban traffic Increasing of the public transport commodities Road safety Employment Opportunities
  23. 23. MULTIMODAL TERMINAL Benefits
  24. 24. Benefits MULTIMODAL TERMINAL 6 tone CO2 less / day Reduction of noise pollution 3,1 km occupied space 2.500 litra/ less oil / day psychological stress reduction
  25. 25. MULTIMODAL TERMINAL Current status May 2014 Concession procedure Diagram PPP Value 40 milion euro Blocked by central Goverment
  26. 26. TRAM Description
  27. 27. TRAMI 2 Lines Line 2 “East- West (Kinostudio-Kombinat) Line1 “North- South” (Square i Nënë Tereza- city-multimodal Terminal -length 7.2 km -about 70,000 passenger/day. -length 8,4 km -about 90,000 passenger/day
  28. 28. TRAM Goals Increase the number of passengers who use publik transport Reliable public transport Rapid Transportation Bloced by central goverment
  29. 29. TRAM Benefits Reduce air noise level and improvement of the level of CO2 in the city To reduce operating cots and reduce the number of road accidents Reduce travel time and increase comfort in travel Construction of the line Kinostudio-Kombinat, length 9.5 km Provides thait in the first phase of transportone 90.000 passanger/ day
  30. 30. Description Tirana LRT The feasibility study and project desing dor line 2 Value 155,5 milion EUR 68,6 milion passenger / year Blocked by central goverment
  31. 31. TIRANA TECHNO - PARK Description 30.000 m2
  32. 32. TIRANA TECHNO - PARK GOALS Absorption of labor and intellectual The improvement of research resources and other services Management of large tracts of land Large investments crash Strenthning the local economy and international
  33. 33. TIRANA TECHNO - PARK Statusi Aktual January 2014 Feasibility study Land for construction of techno park
  34. 34. Energy Efficency Project Benefits 45% of the road network
  35. 35. Energy Efficency Project Benefits Menaging digital lighting The improvement of the quality of lighting Reducing energy consumption in public lighting in measure 45% Energy cost reduction Lowering the cost of maintenance Title to the CO2 reduction
  36. 36. Energy Efficency Project Benefits
  37. 37. Energy Efficency Project Benefits
  38. 38. Thank you ! BELGRADE, 23 April 2015

×