Lecture NO.3
Muhammad Bilal
Ms. Engineering Management
WHAT IS Work Breakdown
Structure WBS
Work Breakdown structure (WBS):
A hierarchical method that successively
subdivides the work of the project into smaller
detail.
Or
The outcome of this hierarchical process is
called the work breakdown structure (WBS).
Or
The work of the project can be successively
subdivided into smaller and smaller work
elements.
Work Breakdown Structure
WBS
– Complex projects consist of numerous smaller
subprojects, interrelated tasks, and work
elements.
– The procedure for subdividing the overall project
into smaller elements is called the work
breakdown structure or WBS, and its purpose is
to define the total project into “ pieces of work”
called work packages.
– Dividing the project into work packages makes it
easier to prepare project schedules and cost
estimates, and to assign management and task
responsibilities
Work Breakdown Structure
WBS (Cont…)
– The first step in creating a WBS is to divide the
total project into major categories.
– These major categories then are divided into
subcategories that, in turn, are subdivided, and so
on.
– This level-by-level breakdown continues so that
the scope and complexity of work elements is
reduced with each level of breakdown.
– The objective of the procedure is to reduce the
project into work elements that are so clearly
defined that they, individually, can be accurately
budgeted, scheduled, and controlled.
Work Breakdown Structure
WBS (Cont…)
– A typical WBS might consist of the following
four levels (the number of levels varies, as
does the name of the element description at
each level; different project methodologies use
different terms):
Work Breakdown Structure
WBS (Cont…)
– Level 1 represents the total project.
– At Level 2 the project is broken down into several
(usually between 4 and 10) major elements or
subprojects.
– These subprojects should conform to the
deliverables or work areas specified in the scope
statement.
– All of the subprojects when taken together must
make up the total project effort.
– Each subproject, in turn, is broken down into
activities, the sum of which must comprise
everything in the subproject.
Work Breakdown Structure
WBS (Cont…)
– When the process is completed, the tasks at the
lowest levels, whatever the levels might be, are
termed work packages; these work packages
become the basis for further planning steps.
– In the table above, that the term “ work package ”
that appeared
at Level 4 is for illustration only.
– The actual number of levels in the WBS varies, as
does the name of the element description at each
level. In fact, the levels and names are often
prescribed by the project methodology in use.
Work Breakdown Structure
WBS (Cont…)
– Figure shows a typical WBS. Note the
different levels and usage of different names
for each.
Figure: Work Breakdown Structure WBS
Figure: Work Breakdown Structure WBS
Figure: Work Breakdown Structure WBS
Work Packages
– How far down does the breakdown go?
– Simply, as far as needed to completely define all
work necessary for the project.
– Sometimes a Level 2 breakdown will be adequate,
though usually a Level 3 or higher-level breakdown
will be necessary.
– The work in each “ box ” of the WBS must be “ well
defined ” ; if it is not, then the box must be
subdivided into smaller boxes.
Work Packages (Cont…)
– What is necessary for a box to be “ well defined? ” The
box should include the following
1.Clear, comprehensive SOW:
The work task defined well enough so the parties
responsible know exactly what they must do.
2. Resource requirements:
The labor, skills, equipment, facilities, and materials for
the task.
3. Time:
Estimated time necessary to perform the task.
4. Costs:
Estimated costs for the required resources, management,
and related expenses for the task.
5. Responsibility:
The parties, individuals, and job titles responsible for
performing the task and approving it.
Work Packages (Cont…)
6. Outcomes:
The deliverables, end-items, or end-results and
associated requirements and specifications for the task.
7. Inputs:
The preconditions or predecessors necessary to begin the
task.
8. Quality assurance:
The entry, process, and exit conditions to which the task
must conform; these are specified in the quality plan.
9. Risk:
Uncertainty about time, cost, and resources, identified as
high, medium, or low risk, with migration and
contingencies measures for high risks.
10. Other:
Additional information as necessary.
Work Packages (Cont…)
– If any of the properties listed cannot be defined, the
task in the box is too broad and must be broken
down further.
– In most cases, all or most of these properties can be
eventually determined by breaking tasks down into
small-enough pieces.
– A well-defined piece, which by definition includes
the properties summarized in Figure is called a
work package.
Work Packages (Cont…)
– As illustrated in Figure different portions of the
project will require different levels of breakdown to
define work packages, meaning that work packages
in different portions of the project might appear at
different levels.
Organization Breakdown
Structure (OBS)
– What is Organization Breakdown Structure:
Organization Breakdown Structure (OBS) is a
structure used to assign responsibility for work
packages.
• The OBS depicts how the firm has organized to
discharge work responsibility.
• The purposes of the OBS are to provide a framework
to summarize organization unit work performance,
identify organization units responsible for work
packages, and tie the organizational unit to cost
control accounts.
Organization Breakdown
Structure (OBS)
– The OBS defines the organization sub deliverables in a
hierarchical pattern in successively smaller and
smaller units. Frequently, the traditional organization
structure can be used.
– Even if the project is completely performed by a team,
it is necessary to break down the team structure for
assigning responsibility for budgets, time, and
technical performance.
Organization Breakdown
Structure (OBS)
– As in the WBS, the OBS assigns the lowest
organizational unit the responsibility for work
packages within a cost account.
– Herein lies one major strength of using WBS and OBS;
they can be integrated as shown in Figure Below.
Figure: Integration of WBS and OBS
Explanation of the above Figure

More Related Content

What's hot

WBS presentation
WBS presentationWBS presentation
WBS presentationjpstewar
 
Work breakdown structure
Work breakdown structureWork breakdown structure
Work breakdown structureCOEPD HR
 
Work breakdown structure in project management ppt by kiran j
Work breakdown structure in project management ppt by kiran jWork breakdown structure in project management ppt by kiran j
Work breakdown structure in project management ppt by kiran jIIT delhi
 
Work breakdown structure
Work breakdown structureWork breakdown structure
Work breakdown structureNicola2903
 
Construction planning - Construction Technology and Project Management
Construction planning - Construction Technology and Project ManagementConstruction planning - Construction Technology and Project Management
Construction planning - Construction Technology and Project Managementsrinivas2036
 
Resources allocation and resources scheduling_Construction Management
Resources allocation and resources scheduling_Construction Management Resources allocation and resources scheduling_Construction Management
Resources allocation and resources scheduling_Construction Management A Makwana
 
Procurement in construction
Procurement in constructionProcurement in construction
Procurement in constructionMahSobeh
 
Lec 05 wbs & obs 1
Lec 05 wbs & obs 1Lec 05 wbs & obs 1
Lec 05 wbs & obs 1SAJID ALI RUK
 
Work breakdown structures
Work breakdown structures Work breakdown structures
Work breakdown structures Ian Cammack
 
Primavera presentation
Primavera presentationPrimavera presentation
Primavera presentationNithin Dev
 
Project scheduling and resource levelling_Construction Management
Project scheduling and resource levelling_Construction Management Project scheduling and resource levelling_Construction Management
Project scheduling and resource levelling_Construction Management A Makwana
 
Factors for success of a construction project_Construction Management (218061...
Factors for success of a construction project_Construction Management (218061...Factors for success of a construction project_Construction Management (218061...
Factors for success of a construction project_Construction Management (218061...A Makwana
 
Role of project management in construction industry
Role of project management in construction industryRole of project management in construction industry
Role of project management in construction industryRubnawaz Bhatti
 
03 Construction Project Planning and Scheduling
03 Construction Project Planning and Scheduling03 Construction Project Planning and Scheduling
03 Construction Project Planning and Schedulingakashpadole
 

What's hot (20)

Work Breakdown Structure
Work Breakdown StructureWork Breakdown Structure
Work Breakdown Structure
 
Primavera p6 advanced project planning
Primavera p6 advanced project planningPrimavera p6 advanced project planning
Primavera p6 advanced project planning
 
S Curves Made Easy With Primavera P6
S Curves Made Easy With Primavera P6S Curves Made Easy With Primavera P6
S Curves Made Easy With Primavera P6
 
WBS presentation
WBS presentationWBS presentation
WBS presentation
 
Work breakdown structure
Work breakdown structureWork breakdown structure
Work breakdown structure
 
Work Breakdown Structure
Work Breakdown StructureWork Breakdown Structure
Work Breakdown Structure
 
Work Breakdown Structure
Work Breakdown StructureWork Breakdown Structure
Work Breakdown Structure
 
Work breakdown structure in project management ppt by kiran j
Work breakdown structure in project management ppt by kiran jWork breakdown structure in project management ppt by kiran j
Work breakdown structure in project management ppt by kiran j
 
Work breakdown structure
Work breakdown structureWork breakdown structure
Work breakdown structure
 
Construction planning - Construction Technology and Project Management
Construction planning - Construction Technology and Project ManagementConstruction planning - Construction Technology and Project Management
Construction planning - Construction Technology and Project Management
 
Resources allocation and resources scheduling_Construction Management
Resources allocation and resources scheduling_Construction Management Resources allocation and resources scheduling_Construction Management
Resources allocation and resources scheduling_Construction Management
 
Procurement in construction
Procurement in constructionProcurement in construction
Procurement in construction
 
Lec 05 wbs & obs 1
Lec 05 wbs & obs 1Lec 05 wbs & obs 1
Lec 05 wbs & obs 1
 
Work breakdown structures
Work breakdown structures Work breakdown structures
Work breakdown structures
 
Primavera presentation
Primavera presentationPrimavera presentation
Primavera presentation
 
Project scheduling and resource levelling_Construction Management
Project scheduling and resource levelling_Construction Management Project scheduling and resource levelling_Construction Management
Project scheduling and resource levelling_Construction Management
 
Earned Value Management
Earned Value ManagementEarned Value Management
Earned Value Management
 
Factors for success of a construction project_Construction Management (218061...
Factors for success of a construction project_Construction Management (218061...Factors for success of a construction project_Construction Management (218061...
Factors for success of a construction project_Construction Management (218061...
 
Role of project management in construction industry
Role of project management in construction industryRole of project management in construction industry
Role of project management in construction industry
 
03 Construction Project Planning and Scheduling
03 Construction Project Planning and Scheduling03 Construction Project Planning and Scheduling
03 Construction Project Planning and Scheduling
 

Similar to Lect 3 wbs&obs

WBS-final-1.Project Management and Ethics.pptx
WBS-final-1.Project Management and Ethics.pptxWBS-final-1.Project Management and Ethics.pptx
WBS-final-1.Project Management and Ethics.pptxFillHackjack
 
Untitled document (24).pdf
Untitled document (24).pdfUntitled document (24).pdf
Untitled document (24).pdfAsadUllah174251
 
Work breakdown structure (WBS) PRESENTATION.pptx
Work breakdown structure (WBS) PRESENTATION.pptxWork breakdown structure (WBS) PRESENTATION.pptx
Work breakdown structure (WBS) PRESENTATION.pptxErzaScarlet64
 
Work Break Down Structure
Work Break Down StructureWork Break Down Structure
Work Break Down StructureSomtel
 
Control account, work and planning package - PMP/CAPM from PMI
Control account, work and planning package - PMP/CAPM from PMIControl account, work and planning package - PMP/CAPM from PMI
Control account, work and planning package - PMP/CAPM from PMIMudassir Iqbal
 
Work breakdown Structure
Work breakdown StructureWork breakdown Structure
Work breakdown StructureNicola2903
 
workbreakdownstructureppt-130410021152-phpapp02 (1).pdf
workbreakdownstructureppt-130410021152-phpapp02 (1).pdfworkbreakdownstructureppt-130410021152-phpapp02 (1).pdf
workbreakdownstructureppt-130410021152-phpapp02 (1).pdfDipakBorse6
 
Workbreakdownstructureppt 130410021152-phpapp02
Workbreakdownstructureppt 130410021152-phpapp02Workbreakdownstructureppt 130410021152-phpapp02
Workbreakdownstructureppt 130410021152-phpapp02sayyed sabir
 
PositioningPositioning of Product or ServiceParis based weig.docx
PositioningPositioning of Product or ServiceParis based weig.docxPositioningPositioning of Product or ServiceParis based weig.docx
PositioningPositioning of Product or ServiceParis based weig.docxChantellPantoja184
 
6 Work Breakdown Structure and SchedulingCavan ImagesSto.docx
6 Work Breakdown Structure  and SchedulingCavan ImagesSto.docx6 Work Breakdown Structure  and SchedulingCavan ImagesSto.docx
6 Work Breakdown Structure and SchedulingCavan ImagesSto.docxevonnehoggarth79783
 
CSCI 714 Software Project Planning and EstimationLec.docx
CSCI 714 Software Project Planning and EstimationLec.docxCSCI 714 Software Project Planning and EstimationLec.docx
CSCI 714 Software Project Planning and EstimationLec.docxmydrynan
 
Work Breakdown Structure Aritrya Kumar.pptx
Work Breakdown Structure Aritrya Kumar.pptxWork Breakdown Structure Aritrya Kumar.pptx
Work Breakdown Structure Aritrya Kumar.pptxARITRYAKUMAR
 
Work breakdown structure ppt
Work breakdown structure pptWork breakdown structure ppt
Work breakdown structure pptnazi2020
 
Engineering Economics|Work Breakdown Structure
Engineering Economics|Work Breakdown StructureEngineering Economics|Work Breakdown Structure
Engineering Economics|Work Breakdown Structureumair khan
 
SEQ CHAPTER h r 3work breakdown structure A Work Breakdown St.docx
 SEQ CHAPTER h r 3work breakdown structure A Work Breakdown St.docx SEQ CHAPTER h r 3work breakdown structure A Work Breakdown St.docx
SEQ CHAPTER h r 3work breakdown structure A Work Breakdown St.docxaryan532920
 
The Work Breakdown StructureAwork breakdown structure (WBS) brea.docx
The Work Breakdown StructureAwork breakdown structure (WBS) brea.docxThe Work Breakdown StructureAwork breakdown structure (WBS) brea.docx
The Work Breakdown StructureAwork breakdown structure (WBS) brea.docxssusera34210
 

Similar to Lect 3 wbs&obs (20)

WBS-final-1.Project Management and Ethics.pptx
WBS-final-1.Project Management and Ethics.pptxWBS-final-1.Project Management and Ethics.pptx
WBS-final-1.Project Management and Ethics.pptx
 
Untitled document (24).pdf
Untitled document (24).pdfUntitled document (24).pdf
Untitled document (24).pdf
 
Work breakdown structure (WBS) PRESENTATION.pptx
Work breakdown structure (WBS) PRESENTATION.pptxWork breakdown structure (WBS) PRESENTATION.pptx
Work breakdown structure (WBS) PRESENTATION.pptx
 
Work Break Down Structure
Work Break Down StructureWork Break Down Structure
Work Break Down Structure
 
Control account, work and planning package - PMP/CAPM from PMI
Control account, work and planning package - PMP/CAPM from PMIControl account, work and planning package - PMP/CAPM from PMI
Control account, work and planning package - PMP/CAPM from PMI
 
Work breakdown Structure
Work breakdown StructureWork breakdown Structure
Work breakdown Structure
 
workbreakdownstructureppt-130410021152-phpapp02 (1).pdf
workbreakdownstructureppt-130410021152-phpapp02 (1).pdfworkbreakdownstructureppt-130410021152-phpapp02 (1).pdf
workbreakdownstructureppt-130410021152-phpapp02 (1).pdf
 
Workbreakdownstructureppt 130410021152-phpapp02
Workbreakdownstructureppt 130410021152-phpapp02Workbreakdownstructureppt 130410021152-phpapp02
Workbreakdownstructureppt 130410021152-phpapp02
 
PositioningPositioning of Product or ServiceParis based weig.docx
PositioningPositioning of Product or ServiceParis based weig.docxPositioningPositioning of Product or ServiceParis based weig.docx
PositioningPositioning of Product or ServiceParis based weig.docx
 
Babu 143
Babu 143Babu 143
Babu 143
 
6 Work Breakdown Structure and SchedulingCavan ImagesSto.docx
6 Work Breakdown Structure  and SchedulingCavan ImagesSto.docx6 Work Breakdown Structure  and SchedulingCavan ImagesSto.docx
6 Work Breakdown Structure and SchedulingCavan ImagesSto.docx
 
CSCI 714 Software Project Planning and EstimationLec.docx
CSCI 714 Software Project Planning and EstimationLec.docxCSCI 714 Software Project Planning and EstimationLec.docx
CSCI 714 Software Project Planning and EstimationLec.docx
 
Work Breakdown Structure Aritrya Kumar.pptx
Work Breakdown Structure Aritrya Kumar.pptxWork Breakdown Structure Aritrya Kumar.pptx
Work Breakdown Structure Aritrya Kumar.pptx
 
Work breakdown structure ppt
Work breakdown structure pptWork breakdown structure ppt
Work breakdown structure ppt
 
Engineering Economics|Work Breakdown Structure
Engineering Economics|Work Breakdown StructureEngineering Economics|Work Breakdown Structure
Engineering Economics|Work Breakdown Structure
 
SEQ CHAPTER h r 3work breakdown structure A Work Breakdown St.docx
 SEQ CHAPTER h r 3work breakdown structure A Work Breakdown St.docx SEQ CHAPTER h r 3work breakdown structure A Work Breakdown St.docx
SEQ CHAPTER h r 3work breakdown structure A Work Breakdown St.docx
 
SEN-22413 - UNIT - V.pptx
SEN-22413 -  UNIT - V.pptxSEN-22413 -  UNIT - V.pptx
SEN-22413 - UNIT - V.pptx
 
Final_Module_2.ppt
Final_Module_2.pptFinal_Module_2.ppt
Final_Module_2.ppt
 
The Work Breakdown StructureAwork breakdown structure (WBS) brea.docx
The Work Breakdown StructureAwork breakdown structure (WBS) brea.docxThe Work Breakdown StructureAwork breakdown structure (WBS) brea.docx
The Work Breakdown StructureAwork breakdown structure (WBS) brea.docx
 
Wbs, gant charts
Wbs, gant chartsWbs, gant charts
Wbs, gant charts
 

Recently uploaded

How-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionHow-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionCIToolkit
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insightWayne Abrahams
 
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchRashtriya Kisan Manch
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsCIToolkit
 
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsFrom Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsCIToolkit
 
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic TraitsDigital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic TraitsHannah Smith
 
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)jennyeacort
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingCIToolkit
 
From Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light AssessmentFrom Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light AssessmentCIToolkit
 
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证jdkhjh
 
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024Giuseppe De Simone
 
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...CIToolkit
 
Shaping Organizational Culture Beyond Wishful Thinking
Shaping Organizational Culture Beyond Wishful ThinkingShaping Organizational Culture Beyond Wishful Thinking
Shaping Organizational Culture Beyond Wishful ThinkingGiuseppe De Simone
 
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramBeyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramCIToolkit
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixCIToolkit
 
The Final Activity in Project Management
The Final Activity in Project ManagementThe Final Activity in Project Management
The Final Activity in Project ManagementCIToolkit
 

Recently uploaded (16)

How-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionHow-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem Resolution
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insight
 
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield Metrics
 
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsFrom Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
 
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic TraitsDigital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
 
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
 
From Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light AssessmentFrom Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light Assessment
 
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
 
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
 
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
 
Shaping Organizational Culture Beyond Wishful Thinking
Shaping Organizational Culture Beyond Wishful ThinkingShaping Organizational Culture Beyond Wishful Thinking
Shaping Organizational Culture Beyond Wishful Thinking
 
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramBeyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
 
The Final Activity in Project Management
The Final Activity in Project ManagementThe Final Activity in Project Management
The Final Activity in Project Management
 

Lect 3 wbs&obs

  • 1. Lecture NO.3 Muhammad Bilal Ms. Engineering Management
  • 2. WHAT IS Work Breakdown Structure WBS Work Breakdown structure (WBS): A hierarchical method that successively subdivides the work of the project into smaller detail. Or The outcome of this hierarchical process is called the work breakdown structure (WBS). Or The work of the project can be successively subdivided into smaller and smaller work elements.
  • 3. Work Breakdown Structure WBS – Complex projects consist of numerous smaller subprojects, interrelated tasks, and work elements. – The procedure for subdividing the overall project into smaller elements is called the work breakdown structure or WBS, and its purpose is to define the total project into “ pieces of work” called work packages. – Dividing the project into work packages makes it easier to prepare project schedules and cost estimates, and to assign management and task responsibilities
  • 4. Work Breakdown Structure WBS (Cont…) – The first step in creating a WBS is to divide the total project into major categories. – These major categories then are divided into subcategories that, in turn, are subdivided, and so on. – This level-by-level breakdown continues so that the scope and complexity of work elements is reduced with each level of breakdown. – The objective of the procedure is to reduce the project into work elements that are so clearly defined that they, individually, can be accurately budgeted, scheduled, and controlled.
  • 5. Work Breakdown Structure WBS (Cont…) – A typical WBS might consist of the following four levels (the number of levels varies, as does the name of the element description at each level; different project methodologies use different terms):
  • 6. Work Breakdown Structure WBS (Cont…) – Level 1 represents the total project. – At Level 2 the project is broken down into several (usually between 4 and 10) major elements or subprojects. – These subprojects should conform to the deliverables or work areas specified in the scope statement. – All of the subprojects when taken together must make up the total project effort. – Each subproject, in turn, is broken down into activities, the sum of which must comprise everything in the subproject.
  • 7. Work Breakdown Structure WBS (Cont…) – When the process is completed, the tasks at the lowest levels, whatever the levels might be, are termed work packages; these work packages become the basis for further planning steps. – In the table above, that the term “ work package ” that appeared at Level 4 is for illustration only. – The actual number of levels in the WBS varies, as does the name of the element description at each level. In fact, the levels and names are often prescribed by the project methodology in use.
  • 8. Work Breakdown Structure WBS (Cont…) – Figure shows a typical WBS. Note the different levels and usage of different names for each.
  • 9. Figure: Work Breakdown Structure WBS
  • 10. Figure: Work Breakdown Structure WBS
  • 11. Figure: Work Breakdown Structure WBS
  • 12. Work Packages – How far down does the breakdown go? – Simply, as far as needed to completely define all work necessary for the project. – Sometimes a Level 2 breakdown will be adequate, though usually a Level 3 or higher-level breakdown will be necessary. – The work in each “ box ” of the WBS must be “ well defined ” ; if it is not, then the box must be subdivided into smaller boxes.
  • 13. Work Packages (Cont…) – What is necessary for a box to be “ well defined? ” The box should include the following 1.Clear, comprehensive SOW: The work task defined well enough so the parties responsible know exactly what they must do. 2. Resource requirements: The labor, skills, equipment, facilities, and materials for the task. 3. Time: Estimated time necessary to perform the task. 4. Costs: Estimated costs for the required resources, management, and related expenses for the task. 5. Responsibility: The parties, individuals, and job titles responsible for performing the task and approving it.
  • 14. Work Packages (Cont…) 6. Outcomes: The deliverables, end-items, or end-results and associated requirements and specifications for the task. 7. Inputs: The preconditions or predecessors necessary to begin the task. 8. Quality assurance: The entry, process, and exit conditions to which the task must conform; these are specified in the quality plan. 9. Risk: Uncertainty about time, cost, and resources, identified as high, medium, or low risk, with migration and contingencies measures for high risks. 10. Other: Additional information as necessary.
  • 15. Work Packages (Cont…) – If any of the properties listed cannot be defined, the task in the box is too broad and must be broken down further. – In most cases, all or most of these properties can be eventually determined by breaking tasks down into small-enough pieces. – A well-defined piece, which by definition includes the properties summarized in Figure is called a work package.
  • 16. Work Packages (Cont…) – As illustrated in Figure different portions of the project will require different levels of breakdown to define work packages, meaning that work packages in different portions of the project might appear at different levels.
  • 17. Organization Breakdown Structure (OBS) – What is Organization Breakdown Structure: Organization Breakdown Structure (OBS) is a structure used to assign responsibility for work packages. • The OBS depicts how the firm has organized to discharge work responsibility. • The purposes of the OBS are to provide a framework to summarize organization unit work performance, identify organization units responsible for work packages, and tie the organizational unit to cost control accounts.
  • 18. Organization Breakdown Structure (OBS) – The OBS defines the organization sub deliverables in a hierarchical pattern in successively smaller and smaller units. Frequently, the traditional organization structure can be used. – Even if the project is completely performed by a team, it is necessary to break down the team structure for assigning responsibility for budgets, time, and technical performance.
  • 19. Organization Breakdown Structure (OBS) – As in the WBS, the OBS assigns the lowest organizational unit the responsibility for work packages within a cost account. – Herein lies one major strength of using WBS and OBS; they can be integrated as shown in Figure Below.
  • 20. Figure: Integration of WBS and OBS
  • 21. Explanation of the above Figure