Instrumentation Construction Pre- CommnEngineer RESUME
1. Sr. P.E. Instrumentation Construction & Pre-Commissioning Engineer
Mohammad yousuf Ahmed N
Objective Carrier : As Project Engineer
Looking forward to work in a prestigious organization, which can provide a constructive an
innovative ambience, where I can solely implement the acquired educational, Eng. Technical
skills, knowledge and can establish myself as an asset to the organization in the field of Process
Instrumentation & process control & Field Instruments Construction On site, Instruments &
Control Loop check Procedure & input channel
Undergone CertifiedTrainingatAdvance TrainingInstitute forElectronicsandProcessInstrumentation,
(ATI-EPI) Govtof India– Ministryof Labor,Hyderabad,A.Pin“ProcessInstrumentationandControl”.
-ALLEN BRADLEY PLC(RS LOGIX 500) Programming :Skill And Strength Pre Commissioning
As a Instrumentation Engineer in petrochemical & Oil/Gas Power sectors – Inspector & Supervision &
Commissioning Engineer & Pre commissioning Instruments & Loop check from the Field Instruments on
site & Fallow All procedure ,Vendor site Documents& Clarify All Test Method, SAES= Saudi Aramco Eng.
Preparation, Execution and Supervision of Installation of field Instruments on Construction site .
Instrumentation construction activities like calibration testing. Installation, loop checking, Pre-commission
and commissioning of equipments.PT.TT. PDT.LS.TS. PG.. FIT. Flow meter Control Valve. MOV & Safety
& Solenoid & Actuator Valves ,Spring& Compensation Butter fly Pilot On/ Off Gate Valve Check valve
JOB DESCRIPTION: Below instrumentation handled on Gas Recycling compressors, Gas Turbines,
Boilers, Rectors, Separators (Test, Production). Heat Exchangers, Heaters, Storage, Tanks Pipe Rack
modules, columns, furnace modules Work Description :
Selection and calibration techniques of various flow meters (liquids and gases)
Calibration of Pressure, flow, level Temperature, Time and Electronic Instruments.
Knowledge & used of International Standards – ISO, ISA, AGA, API, OIML, BS etc.
Model approval of flow meters as per OIML standards.& Aramco Standard
Custody transfer flow measurements, Local Indicating Instrument shall be visible from Where Related
Equipment’s Operated Primary Instruments are Tested & Calibrated Instruments mounted on as close
process connection as Possible ,Pressure Transmitter in gas service may be Mounted On Panels, Test
&Verify the ESD button for Integrity of safe Operation loop drawing & specification sheets Creation of
Field Instruments & setting profiles created Support table for index
Inspection for various Instruments at field and auditing. The Construction Instruments Quality Assurance
& Quality Control, Energized MOV ,Control valve Function Test& Instruments loop check
Quality Control & easily Traceability. The Error from the Installation Instruments Construction site
Use of SCADA, PLC of Yokogawa for various applications. In Oil & Gas, Power Plants & Petrochemical
&Refinery& Control The Fields Instruments through Primary &secondary Cable
2. Work Description For Oil & Gas Construction Pre-Commissioning
Instrumentation: Installation PT.TT.PDT. FIT.& LS.TS.PG.TG.RTD & Thermocouple & Fire & Gas
Detector Flammable Gas detector Compressor Cable Tray, JB location Calibration of Control Valve
Installation of the In-Line on-line instrument like pressure, Level Temperature and flow instrument etc.
Using the instrument index and checking with P&ID.& Hook up drawing &Loop check from DCS
Using hook-up drawings taking the scope of material for material requisitions for tubing and piping and its
accessories.& verify Impulse tubing verify Correctly Install Air Tubing Pneumatic supply air signal Install
Installation of instrument using instrument layouts and location plant with respect to Hazardous area.
classification drawing. P & I D Hook up Drawing Vendor Drawing ,Cable drawing JB drawing cable
schedule Cable List , checking Ash Built drawing Vendor drawing & Reference drawing
Laying of IS/non IS cable as per the cable schedule.& Cable list & cable termination
Termination of cable as per interconnection drawing. for JB Location & Primary & secondary cable
Termination the Field Instruments Construction & Installation is done as per drawing & spot plan
Installation of cable tray as per specification and as per site condition from instrument to JB.
Installation of Field junction JBs and fabrication work as required at site.& JB supports
Interaction with project group for site problem and following the contractors for timely complication of
Job
Telecom & Optical Fiber
Installation of Access control system (ACS). PAGA (public address and General Alarm) & Data Network
system (DNS). Optical Fiber cable & Jumper bond Cable Connecting Between two ESD panels Optical
Fiber Jumper Cable to Connect Between two Panels get the signal in the marshaling
Installation of cable tray as per specification and speaker, Beacon, sounders and JB’s. Location
Installation of CCTV in and around the plant for various applications.& Watching Activities
CCTV, ACS, DNS, PAGA panels (Rack) installation, erection and commissioning to meet the
requirement.
Fire & Gas Instruments Construction Pre- Commissioning Supports system
Installation of Small Cable Tray channel, Gas Detectors, Alarm, Panels fire & Gas separation etc
Hand switch (manual call point), ESD, installation with respect to specification. Marshaling cabinet
Inspection of Cable Glanding, Termination and Earthling, grounding & bus bar safety works.
Prior to termination the cable number should be clearly identified, the insulation resistance and the
continuity is checked and values are recorded in approved test formats.& ITP Plan will Implements
It should be ensured that all cables enter and is glanding at the bottom of the junction boxes pane
Description Work :
Project Planning, implementation & project execution which basically includes pre commissioning
checks, interaction with client for modification if any required for onsite execution for any changes in the
design, the installation of all instruments, shut down valves, control valves, shut down panel, telemetry
panel & their internal connections and cable terminations at instruments Finally the Task Achieving
,Documentation for hang over, is maintaining DPR ,material management &work scheduling
Installation, routine calibration, maintenance, servicing, troubleshooting of instruments, control valve
stroke checking, positioned I/P converters, loop checking of instruments as mentioned below.
Transmitters: Pressure, Temperature, Differential Pressure, Flow, Level P/I converters. (FISHER,
ROSEMOUNT, FOXBORO, ABB)
Electronic & Pneumatic Switches : Pressure, Temperature, Level Limit switches (DELTA CONTROLS ,
ASHCROFT).Installation & Commissioning all types of Instruments Level Flow/ Temperature/Pressure &
Level switch Temperature Switch ,like PT,PDT,TT.FIT to know. Flow Rate
Control elements : Control Valves (air to open/air to close), Solenoid Valves, Deluge valves, Shutdown
Valves, Pilot valves Compensation Valve Spring Valve safety valve on/Off Butterfly valve Actuator valve
3. Fire & Gas System : Detectors & Controllers of Smoke, Gas (H2S, HC), UV, Thermal, Fire Familiar with
SAFE CHART & Fire & Gas Panels (FSD&ESD logics), Worked on Shut down Panels, Gas Lift Panel of
various makes like Boosted, Autocon, Petro tech etc. ESD Push Button for Integrity & safe operation
Responsible for Commissioning function Testing and startup DCS, PLC, SCADA Systems.
Installation, F&G Panel, Analyzer, DCS, UPS, FT, PT, TT, LT, thermocouple, control valve, solenoid
valve, Actuator Valve for Reducing Gas, installation catholic protection. for Oil Gas Power Plants &
petrochemical &loop check Cold/Hot Commissioning process such as oil train metering Skid GT ,Pumps
export Oil Pumps ,Commissioning of Utility System such as Desalination Plants Nitrogen Skid
Instruments air Compressor Skid. Creating Instruments data Sheet For Various Field Instruments &
Customizing various Sheets Creation of field Instruments setting the profiles Create the support Table for
Index
Responsibilities: For Construction Pre- Commissioning
Seniorinstrumentation&control Engineering & operation & technical Planningdrivingtestingroutes
processing andpast controllingandoperationandmaintenance of automation,productioncapacity
control systemInstrumentation designed system , regulating and monitoring & Instruments
Installation & Commissioning, glanding ,Termination of Primary & Secondary cable in the
conduit to JB box & from JB to secondary cable termination with loop checking from DCS
Controls of Equipment’s, plant maintenance analysis of technical data support system, orifice
nozzle, venture meter flow meter, galvanic meter, optical instruments working measurements,
commissioning, erection & installation of ESD panels &Marshaling Cabinet for Instruments
Instrumentation method & process controlling method by Automation & Apply PLC DCS SCADA
To Monitor the Rate of Flow & P& ID diagram the Pre Loop Check & Function test Variable , the
CTMS Custody method transfer system check by DCS Control Room Measurements the Supply
& Return flow Properly the Test drive for Planning & Co-ordination the PLC & DCS SCADA
Automation the Trouble Shooting Instrumentation & Control System Selecting the Best
Equipment’s Control Automation Technique technical Support System For all the Controlling &
Regulating Flow Indicator Meter as Per Technical Method The most cost Effective Instruments
for Application that Are Sensitive Challenging in the fields of Measurements of Control &
Recording & Calibrations Fire & gas detector , Flame Gas detector in Compressor Area &
Ultrasonic flow Meter On Skid
Addition Information: Commissioning
1- Control and Maintenance of the PlantInstrumentation&Control.
2-Provide Technical SupportandTrainingatthe sites.
3- Programming,configuring&Implementationof PLC/SCADA.
4- Configuration,Faultdiagnostics,preparingconnectiontoa PLC,Locate PLC faults,Monitor& Modify
valuesandTroubleshootingof PLC. MarshalingCabinetPanel systemtoDCSControl,FieldInstruments
5-Knowledgeof motors,Drives,star/deltastarters,PNP& NPN sensorsandtheirinterfacingrelaylogic,
ladderlogic,electrical schematics,proximityswitches,Timersandcounters. Sensor&TransducerSystem
6-Reviewof P&ID,Hookupdrawings,Instrumentlocation&wiringlayout,airFlow Diagrams.
4. 7- Able toread InstrumentDataSheetsforvariousFieldInstruments,Preparationof InstrumentsList
Piping&TubingInstallation VisualInspection&cable GlandInstallation
8- Control Loop CheckingandTesting. ForCompressorAreainFire &Gas detector
9- Calibrationof variousProcessControl Instruments,ControlValves&Switches.
10- FieldEngineering,AssistinginModificationof systemdesignInternalpanel modification.addition
11-modulesinPanel asperClientrequirementThe Glandsize asper Cable Core size RequiredinHole
12-Holesize forCable &Its Cable Glandsonthe sheetof panel forAdjustinginthe Hole byusingreducer
13-precommssioningco-ordinate withVendorscope of FieldInstrumentswhichisConnectedwith
14yokogawa Cs-300/Allan Bradleyatcustomsite as per Petroleum industry standard & safetycodes
15-Cable betweenskidmountedinstruments&JBshall be RoutedinConduitthe conduitInstallationin
Accordance on the skidMounted.The Instrumentsshall be mountedasclose asProcessConnection
JOB DESCRIPTION
Plantmaintenance &operation
: Installation,of Instrumentation&control
: Commissioning&MonitoringInstruments
: ProcessInstrumentation&processcontrol
: Trouble shootingInstrumentation&Control System
: Instruments testing Plan ITP Plan
: ProcessInstrumentationDiagram(P&ID)
: SelectingbestEquipment’s Control &AutomationTechnique
: ProcessControl Technique work
: Operation&Maintenance of Automation
: ProductioncapacityControl System
: Instrumentation&designedSystem
: Regulating&Monitoring& Control of Equipment's
: PlantMaintenance needsEngineering &Technical Data
: supportSystem& Technical.AutomatonPLCDCSSCADA
Job Profile: Construction & Pre-Commissioning
- Instrumentationdesign,Specificationsof Processinstruments.& ProcessControl Preparationof blockdiagrams,
wiringandcontrol logicschematics.- Preparationof wiringdiagrams,loopdiagrams,instrumentindex,cable
schedule,etc.- Preparationof instrumentlocationlayoutsandJBLayoutsbyreferringP& I D & Hook up-
Preparationof JBschedule.FromJBto Secondary cable to Instrumentscable terminationwithLoop -Familiar
withSteamflow,Condensate,Lube oil &Governingscheme P&ID’s. Vendordatadrawingchecking,AshBuilt
Drawing& cable listcable schedule DrawingReviewsof P&I D Hook upDrawingInstrumentsLocation& wiring
diagram& fallowwiringlayout Cable drawingforcable laying&cable ConduitroutesdrawingforFields
InstrumentsconstructionCable LayinginTrenchAreawithCable tagNumbers& cable Lay up to JB BOXfrom JB to
InstrumentsVerifyall Instrumentstermination&loopcheckhave beencorrectly&GroundedinAccordance with
projectSpecification.Ultrasonic FlowmeteronSkid&Impulse tubing&valve s& PT TT PDT TS LS
5. Work experience:
Bezel Arabia Co. LTD for Oil & Gas petrochemical Refinery power Projects
“Man Power Supplying Company LTD AL – JUBAIL KSA”
1)Present TASNEE Petrochemical PMT .client side “ Project Engineer Area site Construction
Instrumentation “Project Supports Services Dept. April-2015 To Running job at Tasnee
petrochemical Aramco Fence Area Filter Foundation Sales gas Metering skid SAAC/BUCCO
2) Sr. Instrumentation Construction Engineer & pre- Commissioning Engineer
Monitor for Instrument PIT TIT PDT FIT Ultrasonic Flow meter Co2 Compressor Cooling tower
Co2 Capture &Chemical Injection Facilities & NGL recovery Oil & gas Plant, LIT
May .2012 to April 2015 worked Job at Saudi Aramco Co2 project, Hawiayah Uthemaniyya
3) Job Samsung Engineering Groups. On supply bases Through bezel Arabia Company-
May 2008 TO May 2012 Custody transfer method System Skid sales gas metering skid
4) Job at E-Tech Oil & Energy , Gas Plants at SABIC & SADARA On supply basis through
Bezel Arabia Company Ltd April 2005 TO April 2008
5) Sr. Instrumentation Construction & pre-commissioning Engineer
Jeddah Saudi Arabia
Saline WaterConversionCorp & PowerPlants
March 2000 – March 2005
6) Instrumentation Construction & Pre-Commissioning Engineer
Mysore Petrochemical PvtLTD.
KarnatakaIndia
July1996 – February2000
AcademicProfile :
1: B.E. INSTRUMENTATION TECHNOLOGY
2: M.E. BIOMEDICAL INSTRUMENTATION
3: M.B.A.MANAGEMENTS & TECHNOLOGY
PERSONAL PROFILE:
Name: MOHAMMED YOUSUF AHMED NILANGAKAR. Date of Birth : 02-01-1972
Nationality: India Iqamma No: 2326520521. Pass Port No :L: 3845316 Date of Issue: 5-01-2014
Date of Expiry 04-01-2024. Place of Issue: Riyadh Indian Embassy KSA
Marital Status: married
: Language Known : English Hindi Urdu Arabic
Iqamma Status: Transferable with KSA Driving license
Residency: Jubail Kingdom of Saudi Arabia
Zamsa555@yahoo.com&companyId :moha.ahmed@tasnee.comMobileno +966 0542832350