2. 2 ТЕN-Т corridors
5Infrastructure bottlenecks
8 Ecology
1 Compliance to priorities
of the NTSU 2030
4 Improving transportation
to the EU
7 Safety
3 Stage of the project
preparation
6 Financials
9 Regional development
KEY CRITERIA FOR INFRASTRUCTURE
PROJECT PRIORITIZATION
3. 16295
14500
819 361 617
Total Roads Railway Avia Other
Requested amount for submitted
applications/projects, mln euro
FINANCING REGIONAL AND MUNICIPAL
INFRASTRUCTURE PROJECTS
395 potential infrastructure projects: 83% (331
projects on road modernization)
100 road projects are situated on TEN-T or
aimed at improving connection with the EU
361 mln euro allocated for airport
modernization will boost the development of
multimodal transportation and passenger
aviation transportation
Total amount to be financed is 16.3 bln
395
331
29 10 25
Total Roads Railway Avia Other
Number of submitted applications/projects
4. PROGRAM OF REGIONAL AIRPORT DEVELOPMENT (1/3)
Virtually all Ukrainian airports need modernization/reconstruction
361 mln euro can boost modernization of 9 Ukrainian airports
5. PROGRAM OF REGIONAL AIRPORT DEVELOPMENT (2/3)
Passenger flow in Ukraine grew +21% (+2.2mln) up to 12.9 mln passengers in 2016 (2015 -
10.7 mln passengers)
15 Polish airports provided transportation of 30.4 mln passengers in 2016: 49% of air
transportation is provided by the regional airports
30.4 mln passengers12.7 mln passengers
6. PILOT PROJECT ON MULTIMODAL INFRASTRUCTURE
DEVELOPMENT: BILA TSERKVA AIRPORT (3/3)
52 mln euro budget
Increasing cargo transportation through modernization
of multimodal infrastructure: а) aviation; b) railway; c)
road
Expand cargo service, currently one cargo flight per
day, existing customs facility
Potential passenger service: а) local population of
211,000, comparable to many regional centers (Ivano-
Frankivsk 227,000, Ternopil 217,000, Lutsk 216,000,
Uzhgorod 116,000); b) 126 km to Uman – potential for
attracting existing passenger traffic from other airports.
Pre-feasibility:
Raising loans
Concession
Population: 211 the
126 km Uman
91 km Kyiv
2.5 km runway
46 airport ramps for
planes
7. GO HIGHWAY WILL CONNECT ODESSA PORTS TO EU MARKETS
11 projects in the framework of GO
highway (539 mln euro in total) will
facilitate further improvement of
connection between Baltic and Black
seas as well as: а) road safety; b) port
infrastructure and logistics; b) regional
development;
Implementation of GO highway project
will decrease transit time between
Gdansk/Gdynia and Black Sea ports
(Odesa, Yuzhny, Chornomorsk,
Mykolaiv) from 23 hours up to 15 hours.
8. IMPROVING TRANSPORTATION TO THE EU
Financing (180 mln euro) will allow to
reconstruct 20 projects in 4 regions on the
roads Р-14, М-08, М-24, М-25, М-26, Н-22, Р-
14, Р-53, Т-07-14, Т-14-01, Т-26-01, Т-26-04,
Т-26-08
Improving road connections with Poland,
Slovakia, Hungary, Romania will facilitate: а)
growth of cargo/passenger transportation; b)
increase of transit potential; c) unification of
Ukrainian and European infrastructure
standards
9. TEN-T: IMPROVING CONNECTIVITY WITH EU
Development of TEN-T program
in Ukraine facilitates improving
cooperation with EU and
eliminating bottlenecks inside
the country
69 projects (8893 mln euro)
facilitate growth of transit
potential in 16 regions of
Ukraine through: а)
reconstruction of road sections
on М-01, М-03, М-19, М-06, М-
14, Н-01, М-13, М-11, М-07; b)
construction of 3 interchanges,
3 railway over-passes; c)
reconstruction/construction of 2
river bridges
10. RESULTS OF THE REGIONAL AND MUNICIPAL
INFRASTRUCTURE PROJECTS PRIORITIZATION
№ TITLE
Amount, mln
euro
І
AVIATION TRANSPORT
361 Modernization of multimodal infrastructure on the basis of Bila Tserkva Airport (pilot project 52 mln euro)
Regional airport development program (9 projects including Vinnytsia, Rivne, Uzhgorod, Kherson)
ІІ
ТЕN-Т (unites 69 projects in 16 regions of Ukraine)
8 893
Reconstruction of the road section on the roads М-01, М-03, М-19, М-06, М-14, Н-01, М-13, М-11, М-07 (70
projects)
Construction of 3 interchanges, 3 railway over-crossings, reconstruction/construction of 2 bridges
ІІІ
IMPROVING TRANSPORTATION TO THE EU (20 projects in 4 regions)
180 Reconstruction of portions of roads Р-14, М-08, М-24, М-25, М-26, Н-22, Р-14, Р-53, Т-07-14, Т-14-01, Т-26-
01, Т-26-04, Т-26-08
ІV GO HIGHWAY: 11 projects to improve transportation to the EU and to the Black Sea coast 539
Financing (~10 bln euro) will facilitate solving main priority issues and stimulate the development of
innovative projects in Ukraine
За результатами проведеної пріоритезації проект розвитку аеропорту Біла Церква як ми бачимо набрав більше всього балів а саме 530 балів. Заявлена аеропортом сума необхідна для розвитку аеропорту складає 53 млн доларів
Розвиток даного аеропорту передбачає розвиток мультимодальних перевезень
Аеродром Білої Церкви має статус міжнародного, що в свою чергу дозволяє приймати міжнародні грузи та пасажирів
Може розглядатися як додаткова площадка для лоу костів
Міністерством економічного розвитку зареєстровано в Білій Церкві індустріальний парк
З огляду на те, що аеродромом Білої Церкви отримано найвищий бал згідно методології пріоритезації єС ми вбачаємо за доцільне проведення додаткових досліджень, а саме проведення попереднього техніко – економічного дослідження, яке включатиме дослідження стосовно пасажирського терміналу, якості злітно – посадкової смуги, питань управління
Висновки