  • - FID Management and Planning - Program Mgmt, Business Mgmt, EVM / Cost Analysis, Scheduling, Risk Mgmt. $1.5 - Safety, Human Factors and Security Assessment - Prelim Hazard Assessment, Program Safety Plan, HCI Spec and Prototyping, Test Planning, $2.2 - Finalize Requirements, Standards, and Specifications - SE Mgmt, Architect. Design, fPR dev., SC-214, Spec Tree, SE Master Plan, Use Case Dev., etc. $1.3 - Implementation Strategy Development - Procurement, Implementation, and Life Cycle Support Strategy for each domain $0.7 - Acquisition Support; Spectrum Planning SIR Development A/G Comm Network - Spectrum Planning, SIR Dev, Spec Dev, IGCE, $3.2 - Detailed Program Planning - WBS Development, Schedule Development, ISR checklist $0.7 - Finalize Exhibit 300 Program Baseline - Cost/Benefits Analysis, Business Case Development, Risk Analysis, ISP, etc. $1.8 - FID Documentation $0.9 - Segment 2 Planning and Analysis - 25% of activities (except for Implementation Strategy and Detailed Planning) $3.7
  • - FID Management and Planning - Program Mgmt, Business Mgmt, EVM / Cost Analysis, Scheduling, Risk Mgmt. $1.5 - Safety, Human Factors and Security Assessment - Prelim Hazard Assessment, Program Safety Plan, HCI Spec and Prototyping, Test Planning, $2.2 - Finalize Requirements, Standards, and Specifications - SE Mgmt, Architect. Design, fPR dev., SC-214, Spec Tree, SE Master Plan, Use Case Dev., etc. $1.3 - Implementation Strategy Development - Procurement, Implementation, and Life Cycle Support Strategy for each domain $0.7 - Acquisition Support; Spectrum Planning SIR Development A/G Comm Network - Spectrum Planning, SIR Dev, Spec Dev, IGCE, $3.2 - Detailed Program Planning - WBS Development, Schedule Development, ISR checklist $0.7 - Finalize Exhibit 300 Program Baseline - Cost/Benefits Analysis, Business Case Development, Risk Analysis, ISP, etc. $1.8 - FID Documentation $0.9 - Segment 2 Planning and Analysis - 25% of activities (except for Implementation Strategy and Detailed Planning) $3.7
  • DCL – Departure Clearance including revisions transmitted to the aircraft on the ground D-ATIS Digital Automatic Terminal Information Service (D-ATIS) up-links of airport weather, hazards, and restrictions to the aircraft. ACL – ATC Clearance Air Traffic Control clearances, instructions, and notifications provided in a textual format (data messaging) between controllers and pilots. Limited ground automation generated messaging for non-trajectory changing messages (e.g., beacon code changes, transfers of voice communications).
  • D-TAXI – Data Link TAXI service provides taxi routes for aircraft to follow from the gate to the runway 4D TRAJ – 4D Trajectory in Performance Based Airspace, providing conflict-free flight with stable aircraft routing FLIPINT – Flight Plan Intent ITP – In-Trail Procedures M&S – Merging and Spacing C&P – Crossing and Passing PAIRAPP – Paired Approaches D-OTIS – Data Link Operational Terminal Information Service D-HIWAS – Data Link Hazardous Weather Service RVR – Data Link Runway Visual Range Service D-FLUP – Data Link Flight Update Information sent to aircraft on known flight delays/constraints, using the Data Link Flight Update Service.
  • RTCA SC-203

    1. 1. AERONAUTICAL COMMUNICATIONS PANEL (ACP) 15th MEETING OF WORKING GROUP M Montreal, Canada 16 – 18 November 2009 Data Communications Program Status (Presented by: Peter Muraca, FAA) Agenda Item: 1a International Civil Aviation Organization INFORMATION PAPER SUMMARY This information paper is intended to provide status of on going activities within the FAA for the implementation of the Data Communications Program. ACP-WGM15/IP-02 16 - 18 November 2009
    2. 2. Agenda <ul><li>Functional System View </li></ul><ul><li>Program Timeline </li></ul><ul><li>FAA Acquisition Lifecycle </li></ul><ul><li>Near Term Activities </li></ul><ul><li>Milestones & Activities (Leading to FID) </li></ul><ul><li>SC-214/WG-78 Standards Development </li></ul><ul><li>Segment 1 and Segment 2 Services (Summary) </li></ul>
    3. 3. Controller Flight Crew 1.0 Ground User Interface (GUI) 2.0 Ground Data Processing (GDP) 3.0 Ground Message Delivery (GMD) 4.0 Air- Ground Message Delivery (AGMD) 5.0 Airborne Message Delivery (AMD) 6.0 Airborne Data Processing (ADP) 7.0 Airborne User Interface (AUI) FAA System Scope Program Scope User System Scope <ul><li>FAA System Scope </li></ul><ul><ul><li>Program funds enhancements required to perform data communications in: </li></ul></ul><ul><ul><ul><li>Ground User Interface (e.g. ERAM/DSR display software) </li></ul></ul></ul><ul><ul><ul><li>Ground Data Processing (e.g. application software to create clearances) </li></ul></ul></ul><ul><ul><ul><li>Ground Data Delivery (e.g. wide area networking between ground facilities) </li></ul></ul></ul><ul><ul><ul><li>Ground components of A/G Message Delivery (e.g. radio, ground antenna) </li></ul></ul></ul><ul><li>User System Scope </li></ul><ul><ul><li>Users fund enhancements required to perform data communications in: </li></ul></ul><ul><ul><ul><li>Airborne components of A/G Message Delivery (e.g. aircraft radio, antenna) </li></ul></ul></ul><ul><ul><ul><li>Airborne Message Delivery (e.g. aircraft networking) </li></ul></ul></ul><ul><ul><ul><li>Airborne Data Processing (e.g. app s/w in comm & flight management units) </li></ul></ul></ul><ul><ul><ul><li>Airborne User Interface (e.g. cockpit displays & s/w) </li></ul></ul></ul>Functional System View
    4. 4. Program Timeline 2008 10 18 20 12 2022 Initial Investment Decision Final Investment Decision Air Ground Network and Tower Automation Tower Keysite En Route Keysite Final Investment Decision Segment 2 TRACON Keysite  Investment Analysis Readiness Decision 14 16 Identify Automation Contract Release Air Ground Network RFP Final Investment Decision for En Route Automation   Schedule not baselined until Final Investment Decision
    5. 5. Program lifecycle (IID) Initial Investment Decision <ul><li>Complete Service Level Agreements </li></ul><ul><li>Complete Safety Assessments </li></ul><ul><li>Complete Initial Requirement Documents </li></ul><ul><li>Complete Initial Cost Benefit Analysis </li></ul><ul><li>Complete JRC 2A, Initial Investment Decision </li></ul><ul><li>- Develop Specifications </li></ul><ul><li>Develop and Release SIR(s) </li></ul><ul><li>Receive and Evaluate proposals - Mid-term Human Factors and Standards - Finalize Business Case Analyses - Complete JRC Final Investment Decision(s) </li></ul><ul><li>Contract Awards </li></ul>(IARD) Investment Analysis Readiness Decision (FID) Final Investment Decision(s) (FSD) Full Scale Development <ul><li>RFP A/G subnet release 2010 </li></ul><ul><li>A/G subnet and Tower Automation FID 2011 </li></ul><ul><li>En-Route Seg 1 FID 2012 </li></ul><ul><li>Tower automation initial site 2014 </li></ul><ul><li>En-Route initial site 2016 </li></ul><ul><li>Contract Award A/G Subnet </li></ul>2011 Near Term Activities
    6. 6. Near Term Activities <ul><li>Standards Development (RTCA SC-214 / EUROCAE WG-78) </li></ul><ul><ul><li>Safety and Performance Standards </li></ul></ul><ul><ul><li>ATN INTEROP </li></ul></ul><ul><ul><li>FANS INTEROP </li></ul></ul><ul><li>Specifications Development </li></ul><ul><ul><li>Parallel development of DCNS (A/G Subnet) and Automation (Tower / En-Route) Specifications, IRDs.. </li></ul></ul><ul><li>Human Factors </li></ul><ul><ul><li>En Route & Tower human-in-the-loop studies for Segments 1 and 2 services </li></ul></ul><ul><li>DCNS Screening Information Requests (SIR) Development </li></ul><ul><ul><li>Released “Draft” SIR in August 2009 </li></ul></ul><ul><ul><li>Release FINAL SIR in April 2010 </li></ul></ul>
    7. 7. FY09 Primary Activities <ul><li>FID Management and Planning </li></ul><ul><li>Safety, Human Factors and Security Assessment </li></ul><ul><li>Finalize Requirements, Standards, and Specifications </li></ul><ul><li>Implementation Strategy Development </li></ul><ul><li>Spectrum Planning, SIR Development A/G Comm </li></ul><ul><li>Implementation and In Service Development and Planning </li></ul><ul><li>FID Documentation </li></ul><ul><li>Segment 2 Planning and Analysis </li></ul><ul><li>En Route Specification / Statement of Work Development </li></ul><ul><li>Tower Data Link Service Spec and Statement of Work Development </li></ul><ul><li>Operational Capability and Integration </li></ul><ul><li>Human Factors for NextGen CONOPs </li></ul><ul><li>Functional Architecture, System Level Use Cases </li></ul><ul><li>Security Architecture, Characterization, Threat Assessment </li></ul>
    8. 8. FY10 Primary Activities <ul><li>FID Management and Planning </li></ul><ul><li>SIR Release - A/G subnetwork </li></ul><ul><li>Cost / Benefits / Risk Analysis </li></ul><ul><li>System Engineering (Specs, Architecture, Interfaces, Test Planning) </li></ul><ul><li>Standards Validation, Prototype and Demo Support </li></ul><ul><li>Data Comm Lab Development </li></ul><ul><li>En Route Specifications refinement and contract development </li></ul><ul><li>Tower Data Link Service (TDLS) Specifications refinement and contract development </li></ul><ul><li>Terminal Flight Data Manager Requirements/Planning Support </li></ul><ul><li>Validation, Operational Capability and Integration Support </li></ul><ul><li>Human Factors for NextGen ConOps </li></ul>
    9. 9. SC-214/WG-78 Standards Development 2010 2011 2008 2009 WP1 + WP2 WP1 Draft April 09 WP1 & WP2 Dec 09 Standards Publication D-RVR HZWX SC-214/WG78 Scope WP1 WP2 ED-120/DO290 Services D-TAXI D-OTIS FLIPINT D-FLUP 4DTRAD CPDLC for ATSA-ITP CM / CPDLC = Logon, ACM, ACL, DCL, AMC, D-TAXI ADS-C and CPDLC = 4D TRAD, FLIPINT, ITP, M&S, C&P, PAIRAPP FIS = D-OTIS, D-RVR, D-RVR, HZWX, D-ATIS
    10. 10. Segment 1 Services (2014 – 2018) <ul><li>Departure Clearances (DCL) including revisions transmitted to the aircraft on the ground </li></ul><ul><ul><li>Enables full route clearances and revisions </li></ul></ul><ul><ul><li>Exploits Future Air Navigation Systems (FANS) avionics services </li></ul></ul><ul><li>Digital Automatic Terminal Information Service (D-ATIS) up-links of airport weather, hazards, and restrictions to the aircraft </li></ul><ul><li>Air Traffic Control Clearances (ACL) , instructions, and notifications provided in a textual format (data messaging) between controllers and pilots </li></ul><ul><li>Data link logon (DLL) service to provide a unique digital identification of every aircraft </li></ul><ul><li>Initial use of 4-D Trajectory Clearances clearances for continuous descent approaches </li></ul><ul><li>Automatic ATC “hand-off” (ACM) data transmitted to aircraft identifying the radio frequency in use by the next air traffic control sector </li></ul><ul><ul><li>r Traffic Control clearances (ACL) , instructions, and notifications provided in a textual format (data messaging) between controllers and pilots </li></ul></ul>
    11. 11. Segment 2 Services (2018 +) <ul><li>Continue Segment 1 services in Tower and En Route </li></ul><ul><li>Extend Segment 1 services to TRACON </li></ul><ul><li>Plus additional services: </li></ul><ul><ul><li>4-D Trajectory Agreements in Performance Based Airspace, providing conflict-free flight with stable aircraft routing </li></ul></ul><ul><ul><li>Conformance Management to ensure aircraft comply with 4-D agreements </li></ul></ul><ul><ul><li>NAS Airport status, delays and constraints, hazardous weather uplinked to the aircrew </li></ul></ul><ul><ul><li>Taxi-in / Taxi-out service provides taxi routes for aircraft to follow from the gate to the runway </li></ul></ul>
    12. 12. Avionics <ul><li>Leveraging significant existing equipage base (e.g., FANS 1/A+ over VDL-2) </li></ul><ul><ul><li>Supports early services and benefits (e.g., DCL) TOWER </li></ul></ul><ul><ul><li>Working with avionics manufacturers and service providers to determine how far these avionics can carry us into Segment 2 services </li></ul></ul><ul><li>Working with avionics manufacturers to develop SC-214/WG-78 avionics fully NextGen capable avionics </li></ul><ul><ul><li>Draft standard complete in Dec 2009 </li></ul></ul><ul><ul><li>Standards validation work planned for 2010/11 </li></ul></ul>
    13. 13. <ul><li>BACK-UP </li></ul>
    14. 14. Data Comm Capabilities – Globally Harmonized 2010 2015 2020 2025 <ul><li>Original;/Revised Departure Clearances, D-ATIS </li></ul><ul><li>Widespread Delegated Separation = </li></ul><ul><li>Merging & Spacing (M&S), Crossing and Passing (C&P), In-Trail Procedures (ITP), Paired Approaches (PAIRAPP) </li></ul><ul><li>Widespread 4-D Agreements </li></ul>Red = Terminal Function Black = En Route Function Purple = Cross Domain Function Operational Capabilities DC In Tower DC In En Route DC In TRACON <ul><li>Conformance Management </li></ul><ul><li>Initial Trajectory Based Ops </li></ul><ul><ul><li>Operational Terminal Info Service </li></ul></ul><ul><ul><li>NAS Status / Delays / Constraints / Sequencing & Hazardous WX </li></ul></ul><ul><li>TRACON Data Comm Including Routine Clearances, Comm Mgmt, Optimized Descents & Time Based Metering, </li></ul><ul><li>Optimized Descent (TAP/CDA) Validations </li></ul><ul><li>Clearances </li></ul><ul><li>Comm Mgmt </li></ul><ul><li>TFM Reroutes </li></ul><ul><li>Time Based Metering </li></ul>NextGen Equipage Rule Existing Aircraft Capabilities (FANS 1/A+, ATN CPDLC, …) 214/78 Equipage Avionics Available Aircraft Equipage Avionics Standards Segment 1 Segment 2 Segment 3 <ul><li>Conformance Management </li></ul><ul><li>Complex Clearances </li></ul><ul><li>Widespread M&S / C&P / ITP / PAIRAPP </li></ul><ul><li>Widespread 4-D Agreements </li></ul>4DLINK / SESAR A/C Forward Fit Rule A/C Retrofit Rule / All Europe Ground Systems <ul><li>Taxi-Out & In; Terminal Info </li></ul>European Deployment <ul><li>Comm Mgmt </li></ul><ul><li>ATC Microphone Check </li></ul>LINK 2K+ SESAR <ul><li>TAP/CDA’s </li></ul>Implementation Package 1 <ul><li>Initial TAP/CDA’s </li></ul>Implementation Package 3 Implementation Package 2 <ul><li>En Route ATC Clearances </li></ul>Core Europe Ground Systems <ul><li>D-Taxi Out & In </li></ul>

    ×