  1. 1. WELCOMES YOU FOR Pre-BID Meeting ON Agricultural Demand Side Management - RFP 22 nd January 2009 BANGALORE ELECTRICITY SUPPLY COMPANY LTD
  2. 2. Agenda <ul><li>BESCOM’s Approach – Elements of the Deal </li></ul><ul><li>Contents of the RFP </li></ul><ul><li>Salient Features of the RFP </li></ul><ul><li>RFP Process </li></ul><ul><ul><li>Application – Submission and Evaluation </li></ul></ul><ul><ul><li>Qualifying Requirements of the Bidders </li></ul></ul><ul><ul><li>RFP Bid Process and Award </li></ul></ul><ul><li>Proposed Calendar for the Initiative </li></ul><ul><li>Questions / Comments / Clarifications </li></ul><ul><li>Nodal Team – Key Personnel </li></ul><ul><ul><li>BESCOM </li></ul></ul><ul><ul><li>WENEXA-II Team </li></ul></ul>BANGALORE ELECTRICITY SUPPLY COMPANY LTD
  3. 3. Contents of the RFP <ul><li>Volume –I </li></ul><ul><li>RFP Document </li></ul><ul><li>Draft Agreement between BESCOM and ESCO </li></ul><ul><li>Draft Agreement between ESCO and Farmer </li></ul><ul><li>Volume-II (on CD) </li></ul><ul><li>Annex. A to H- regarding site study about feeders, land, irrigation, pump etc carried out by various agencies. </li></ul>BANGALORE ELECTRICITY SUPPLY COMPANY LTD
  4. 4. Contents of the RFP – Volume-II (on CD) <ul><li>Annexure A: Concept Note on Agricultural DSM (June, 2007) </li></ul><ul><li>Annexure B: Financing Agricultural DSM Projects. (Aug, 2008) </li></ul><ul><li>Annexure C: Map of Feeders 12 & 13 in Doddaballapura sub-division complied under the India DRUM Project (2006) </li></ul><ul><li>Annexure D: Land use maps for Feeders 12 & 13 in Doddaballapura sub-division (July 2008) </li></ul><ul><li>Annexure E: Pumpset Survey details for Feeders 12 & 13 in Doddaballapura sub-division (Updated 2008) </li></ul><ul><li>Annexure F: Water Balance Study in parts of Doddaballapura Taluk, Bangalore Rural, Karnataka. (October 2008) </li></ul><ul><li>Annexure G: Detailed Project Report: Irrigation Efficiency Improvements in the BESCOM Doddaballapur Subdivision Feeder Lines DF 12 and 13 Service Area. (2006) </li></ul><ul><li>Annexure H: Farmers’ Education in Doddabballapura (2004-2008) </li></ul>BANGALORE ELECTRICITY SUPPLY COMPANY LTD
  5. 5. Salient Features of RFP BANGALORE ELECTRICITY SUPPLY COMPANY LTD
  6. 6. BESCOM’s Approach - Elements of the Deal <ul><li>BESCOM has obtained in principle agreement from KERC & the Government of Karnataka to proceed on a pilot program </li></ul><ul><li>BESCOM intends to enter in agreement with an ESCO </li></ul><ul><ul><li>The preconditions are set at Doddaballapur </li></ul></ul><ul><ul><ul><li>HVDS installed. </li></ul></ul></ul><ul><ul><ul><li>One Transformer for one pump in most cases. </li></ul></ul></ul><ul><ul><ul><li>Metering on transformer is in progress & will be completed by 15 th February 2009 </li></ul></ul></ul><ul><ul><ul><li>NGO working with farmers for four years </li></ul></ul></ul><ul><ul><ul><li>Detailed data available on pumps and pump efficiency </li></ul></ul></ul><ul><li>ESCO implements efficient pumps as part of an Ag DSM program </li></ul><ul><ul><li>ESCO finances the investment required </li></ul></ul><ul><ul><li>Provides ongoing O&M support to farmers and establishes a site office </li></ul></ul><ul><li>ESCO recoups investments through sharing of the energy served </li></ul>BANGALORE ELECTRICITY SUPPLY COMPANY LTD
  7. 7. Key Features of the RFP <ul><li>Default Escrow to be set up and maintained by BESCOM as payment security mechanism </li></ul><ul><li>Carbon Credit – (that the ESCO is required to apply and register) ESCO shall be the sole beneficiary of the revenues </li></ul><ul><li>Joint Measurement and Verification (M&V) protocol to be set up by BESCOM and ESCO </li></ul>BANGALORE ELECTRICITY SUPPLY COMPANY LTD
  8. 8. Obligations of BESCOM <ul><li>BESCOM shall be responsible for operation, maintenance and repair/replacement of power supply system to New High Efficiency Pump (NHEP). </li></ul><ul><li>BESCOM had implemented HVDS with generally one transformer for one pump. </li></ul><ul><li>Each pump to have a separate meter physically located on the Distribution Transformer (DT). </li></ul><ul><li>BESCOM has installed switch capacitors on 11 KV systems. </li></ul><ul><li>BESCOM will make payments on a monthly basis to the ESCO based on the share of energy savings derived from the competitive bidding process. </li></ul><ul><li>Seek GOK support for implementation of proposed project; keep KERC informed and seek necessary KERC approvals, if any. </li></ul><ul><li>BESCOM will be obliged to provide the necessary hours of supply to the Feeders as per policy of GOK. </li></ul>BANGALORE ELECTRICITY SUPPLY COMPANY LTD
  9. 9. Obligations of ESCO <ul><li>ESCO shall also be responsible for financing, implementing and operating the project. </li></ul><ul><li>ESCO will be responsible for planning the New High Efficiency Pump (NHEP) procurement, installation, maintenance and repair/replacement during the contract. </li></ul><ul><li>The ESCO will be responsible for dismantling the old pumps and ensuring its disposal in a manner that it can not be used as irrigation pumpset anywhere in India. </li></ul><ul><li>The ESCO will be required to maintain a log of easily visible serial numbers and markings in the casting on the products. (For purposes of record and scrutiny against tampering of the IP set.) </li></ul>BANGALORE ELECTRICITY SUPPLY COMPANY LTD
  10. 10. Joint Obligations of BESCOM & ESCO <ul><li>Agreements to be signed between ESCO & BESCOM. </li></ul><ul><li>BESCOM to facilitate signing of agreement between ESCO & farmers. </li></ul><ul><li>ESCO, jointly with BESCOM, to implement a monitoring and verification (M&V) protocol for meter reading. </li></ul>BANGALORE ELECTRICITY SUPPLY COMPANY LTD
  11. 11. RFP Process BANGALORE ELECTRICITY SUPPLY COMPANY LTD
  12. 12. Application – Submission and Evaluation BANGALORE ELECTRICITY SUPPLY COMPANY LTD
  13. 13. Submission of Application <ul><li>PART – I </li></ul><ul><ul><li>Part (A) -- “Technical Bid” (includes Statement of Qualification detailing applicant’s technical competence) </li></ul></ul><ul><ul><ul><li>One original and two copies in hardcopy format (plus one electronic copy (DVD/CD) in Portable Document Format (PDF) format, in a separate, sealed package), organized in a manner as specified in the formats </li></ul></ul></ul><ul><ul><li>Processing Fee (of INR 500 as receipt of purchase from BESCOM to be attached with the submission Or in the event of downloading the document from the website submit a demand draft/pay order drawn on a scheduled bank, in favor of the “Bangalore Electricity Supply Company Limited”, payable at Bangalore. ) </li></ul></ul><ul><ul><ul><li>Placed in a separate envelope clearly marked as “Processing Fee” on it, along with the Technical Bid. </li></ul></ul></ul>BANGALORE ELECTRICITY SUPPLY COMPANY LTD
  14. 14. (Cont.) Submission of Application <ul><li>PART –II </li></ul><ul><ul><li>Part (B) -- “Financial Bid” (includes: (a) Energy saving from the project; (b) The proportion in which saved energy at shall be shared with BESCOM </li></ul></ul><ul><ul><ul><li>One original and two copies in the formats should be delivered in a sealed envelope </li></ul></ul></ul>BANGALORE ELECTRICITY SUPPLY COMPANY LTD
  15. 15. Technical Bid <ul><li>Statement of Qualifications : </li></ul><ul><ul><li>Company Qualifications – corporate bona fides of ESCOs and their capability including - Registration Statement; description of its line(s) of business including a profile of the financial and operating highlights of each, and the years of operation in India. </li></ul></ul><ul><ul><li>Proposed Approach – ESCO’s proposed approach; including its proposed project organization structure and team; use of innovative concepts, methodologies and/or technologies. </li></ul></ul><ul><ul><ul><li>It is preferred that the NHEP be the star-rated by Bureau of Energy Efficiency (BEE) or similar organization. </li></ul></ul></ul><ul><ul><li>Relevant Prior Experience – with other projects with characteristics that have a bearing on the proposed Ag DSM pilot project </li></ul></ul><ul><ul><li>Proposed Changes – any additions or changes that the ESCO would like to forward. </li></ul></ul>BANGALORE ELECTRICITY SUPPLY COMPANY LTD
  16. 16. Technical Bid - Evaluation <ul><li>Applicant with a score of 70 or more shall be declared as technically qualified. </li></ul>BANGALORE ELECTRICITY SUPPLY COMPANY LTD Criteria for the ESCO Points Objective Understanding of the Problem & Technical Approach 30 To assess the understanding of the problem, the effectiveness of the planned approach and relevance of prior work. Proposed Organization, Staffing and prior experience related to the project 50 To evaluate the strengths of the proposed team, including key project management members and technical specialists and the time and other resources that will be devoted to the project. Innovation & other factors 15 To judge the value of proposed innovations in improving the probability of achieving desired results from the Ag DSM project and to make allowance for other factors not previously contemplated that will have a bearing on project results Usage of (BEE) Star-rated pumpsets 05 Award of 5(five) points for proposed usage of five-star rated pump sets; 3 (three) for four-star rated pumpsets; and 1( one) for three-star rated pump sets. Pump sets below three-star rated no points shall be awarded.
  17. 17. Financial Bid - Evaluation <ul><li>Applicant proposing the highest value of bidding parameter shall be the finalist ESCO </li></ul><ul><li>Conditional Financial bids may be liable for rejection </li></ul>BANGALORE ELECTRICITY SUPPLY COMPANY LTD NAME OF ESCO Energy Saving in the project with reference to the base line (in %) X (say) Proportion of Energy saving proposed to be shared with BESCOM (in %) Y (say) Bidding Parameter (in %) X*Y
  18. 18. Establishing “Responsiveness” of Applications <ul><li>Bid “Non-Responsive” if it is not -- </li></ul><ul><ul><li>Received by the due date and time specified in the RFP </li></ul></ul><ul><ul><li>Includes insufficient information for it to be evaluated and/ or it does not comply with the specified formats </li></ul></ul><ul><ul><li>Is not signed and / or sealed in the manner and to the extent indicated in this RFP </li></ul></ul><ul><ul><li>Is not accompanied by the required processing fee. </li></ul></ul><ul><ul><li>In case of being a response by a ‘Consortium’, the submission does not include a Memorandum of Understanding (MoU) / Agreement prepared on a stamp paper of requisite value with the other members of the Consortium clearly indicating the relationship with the Prime Bidder </li></ul></ul>BANGALORE ELECTRICITY SUPPLY COMPANY LTD
  19. 19. Qualifying Requirements of the Bidders BANGALORE ELECTRICITY SUPPLY COMPANY LTD
  20. 20. Qualifying Requirement of Bidders <ul><li>Leading Irrigation Pump-set (IP Set) manufacturers/ suppliers, leading consultancy agencies, Energy Service Companies (ESCOs) and other similar businesses and entrepreneurs or consortium of ESCOS are invited to bid. </li></ul><ul><li>Qualify criterion are in next slides </li></ul>BANGALORE ELECTRICITY SUPPLY COMPANY LTD
  21. 21. Qualifying Requirement of Bidders <ul><li>Criteria for ESCOs / Consortium of ESCOs include the following: </li></ul><ul><ul><li>Demonstrated project management experience </li></ul></ul><ul><ul><li>Relevant experience in the electricity sector and/or in Ag DSM </li></ul></ul><ul><ul><li>Relevant experience in energy auditing, DSM or performance contracting </li></ul></ul><ul><ul><li>Recent representative experience on projects with similar technical and management characteristics </li></ul></ul><ul><li>Annual turnover criterion : </li></ul><ul><ul><li>For Pure-ESCO (Those companies who or their subsidiary/sister/group companies have no other business except energy services) – Rs. 50 Lakhs in each of the last three financial years. </li></ul></ul><ul><ul><li>For Companies other than the Pure ESCO – Rs. 3 Crores in each of the last three financial years. </li></ul></ul><ul><ul><li>In the event of bid by a consortium, this criterion is applicable for the Prime bidder only. </li></ul></ul>BANGALORE ELECTRICITY SUPPLY COMPANY LTD
  22. 22. (Cont.) Qualifying Requirement of Bidders <ul><li>Criteria for ESCOs / Consortium of ESCOs include the following: </li></ul><ul><ul><li>Full time employees on permanent payroll : </li></ul></ul><ul><ul><ul><li>For Pure-ESCO (Those companies who or their subsidiary/ sister/group companies have no other business except ESCO services) - 10 employees. </li></ul></ul></ul><ul><ul><ul><li>For Companies other than the Pure ESCO - 25 employees </li></ul></ul></ul><ul><ul><ul><li>In the event of bid by a consortium, this criterion is applicable for the Prime bidder only . </li></ul></ul></ul><ul><ul><li>Profitable results for the last three (3) financial years. For a bid by a consortium, this criterion is applicable for the Prime bidder only. </li></ul></ul>BANGALORE ELECTRICITY SUPPLY COMPANY LTD
  23. 23. RFP Bid Process and Award BANGALORE ELECTRICITY SUPPLY COMPANY LTD
  24. 24. RFP: Bid Process and Award of Contract <ul><li>Bidder to pay a non-refundable Processing Fee of Rs. 500. </li></ul><ul><ul><li>As receipt of purchase from BESCOM to be attached with the submission </li></ul></ul><ul><ul><li>Or in the event of downloading the document from the website submit a demand draft/pay order drawn on a scheduled bank, in favor of the “Bangalore Electricity Supply Company Limited”, payable at Bangalore. </li></ul></ul>BANGALORE ELECTRICITY SUPPLY COMPANY LTD Issuance of RFP Documents to the Bidders Technical & Financial Bid Submission with Processing Fee Evaluation of Technical Bids Finalist Orals/Presentation for Qualifying Bidders Evaluation of Financial Bids for Technically Qualified Bidders Bid Evaluation and Notification of Top Ranked Bidder Contract Award
  25. 25. Proposed Calendar for the initiative BANGALORE ELECTRICITY SUPPLY COMPANY LTD
  26. 26. Proposed Calendar BANGALORE ELECTRICITY SUPPLY COMPANY LTD Milestone Events Date Commencement of sale (/posting on website) of bid document January 13, 2009 Written Submission of questions to BESCOM on RFP January 20, 2009 Pre-bid conference January 22,2009 (15:00 hrs) Site Visit January 23, 2009 Last date for sale (/availability on website) of the bid document February 20, 2009 Last date of submission of bids February 21, 2009 (13:00 hrs) Opening of Technical Bids February 21, 2009 (15:00 hrs) Call (select) Bidders for Presentations February 25 – 28, 2009 Completion of Technical Bid Evaluation March 5, 2009 Opening of Financial Bid March 12, 2009 (13:00 hrs) Award of Contract March 16,2009 Milestone Events Date Pre-NIT meeting December 17, 2008 Farmers’ Meeting with BESCOM January 05, 2009
  27. 27. You all are invited tomorrow for site visit at DODDABALLAPUR AEE Office, IB Circle near D-Cross S/s at 10:30 AM BANGALORE ELECTRICITY SUPPLY COMPANY LTD
  28. 28. <ul><li>Nodal Team – Key Personnel </li></ul>BANGALORE ELECTRICITY SUPPLY COMPANY LTD
  29. 29. Bangalore Electricity Supply Company (BESCOM) BANGALORE ELECTRICITY SUPPLY COMPANY LTD Key Personnel Contact Mr. G.V. Balaram General Manager (Projects) K. R. Circle, Bangalore 560 001 Tel: + 91 (0) 80 2237 4852 Fax: + 91 (0) 80 2237 4852 Email: [email_address] Mr. B.N. Sathyaprema Kumar General Manager (HRD) K. R. Circle, Bangalore 560 001 Tel: + 91 (0) 80 2225 8938 Fax: + 91 (0) 80 2235 2484 Email: [email_address]
  30. 30. WENEXA Team BANGALORE ELECTRICITY SUPPLY COMPANY LTD Key Personnel Contact Dr. Gaurav Bhatiani Principal Energy Specialist & Mission Environment Officer U S Embassy, Chanakyapuri New Delhi - 110001 Tel: + 91 (11) 2419 8000; Fax: + 91 (11) 2418 8454 Mr. Rakesh Kumar Goyal Chief Of Party, WENEXA-II A-6 Qutab Hotel and Apartments Shaheed Jeet Singh Marg, New Delhi - 110016 Tel: +91 (11) 416 88773; Fax: +91 (11) 416 89087 [email_address] Ms. Ekta Bhardwaj Consultant, WENEXA-II A-6 Qutab Hotel and Apartments Shaheed Jeet Singh Marg, New Delhi - 110016 Tel: +91 (11) 416 88773; Fax: +91 (11) 416 89087 [email_address] Mr. Vasuki Field consultant, WENEXA-II No. 2285, 7th Main, 21st Cross Banashankari 2nd stage Bangalore - 560 070 Tel: + 91 (80) 2676 0436 [email_address] Mr. Shamsuddeen Field consultant, WENEXA-II #97, 17th 'B' Main, 5th Block Koramangala, Bangalore - 560 0 95 Tel: +91 (80) 2553 0597
  31. 31. Queries from Bidders BANGALORE ELECTRICITY SUPPLY COMPANY LTD Query Response Area and size of Pilot Each Feeder length ~ 18 km (2 feeders are under consideration), covers ~ 29 villages Efficiency of pumpsets in use Currently not measured . Pilot Study shows that new high efficiency pumpsets can save energy upto 40% – 60% providing similar quantity of water Pumpwise energy consumption, no of hours run, annual usuage Currently not metered. KERC assumes ~ 7300 units/ per installation/ annum. Internally, Bescom for energy audit purposes assumes 117 units/ hp/ month. Currently Bescom supplies 10 hrs of 3 phase supply Annual usage depends on various parameters and could be between 200 to 240 days in a year Pooled Power Purchase Price (“PPPP”) for costing the unit of energy saved. Will the price be same/ fixed for the entire contract period Assumed as per applicable KERC’s orders. For 07-08 it is Rs 2.65/ kWh. Should KERC revise the PPPP, the revised rate would be applicable How energy savings is measured Based on the Distribution Transformer Metering
  32. 32. Queries from Bidders BANGALORE ELECTRICITY SUPPLY COMPANY LTD Query Response How the efficiency of pumpsets to be assumed for the contract period To be based on the type of pumpset used and the manufacturer's specification Compensation for increased consumption on account of tampering, theft etc This is a HVDS feeder and the connections are through distribution transformer only. No hooking possible. Quality of input supply This is through HVDS along with attendant capacitor banks ensuring high quality of supply. Further as the state is part of Inter state ABT, frequency excursions are low Pumps meeting international requirements but doesn’t have ISI or BEE ratings RFP states that pumps should have ISI ratings (however, if international ratings are approved by BIS, then the same can be considered) Methodology for baseline RFP states that the baseline would be on the basis of kWh consumed and metered. This would provide objective measurement that can be verified by both the parties
  33. 33. Queries from Bidders BANGALORE ELECTRICITY SUPPLY COMPANY LTD Query Response Modifications to the qualifying criteria mentioned in RFP – can the criteria be met by anyone of the consortium members RFP requires that the qualifying criteria to be met by the Prime bidder .
  34. 34. Questions / Comments / Clarifications BANGALORE ELECTRICITY SUPPLY COMPANY LTD
  35. 35. <ul><li>Thank You </li></ul>BANGALORE ELECTRICITY SUPPLY COMPANY LTD

×