Gen...
McKenney’s made significant upgrades to the mechanical systems
infrastructure—including chillers, piping and pumps—without...
The Challenge
Critical equipment in the facility had to remain active, with optimal
redundancy at all times. The engineer ...
The Results
The complicated process was completed without any interruption to data
center operations while adhering to fac...
Atlanta Office: 1056 Moreland Industrial Boulevard
Atlanta, Georgia 30316
P: 404-622-5000
Charlotte Office: 3601 Performan...
Atlanta Office: 1056 Moreland Industrial Boulevard
Atlanta, Georgia 30316
P: 404-622-5000
Charlotte Office: 3601 Performan...
Seamless Data Center Operations - Norcross, Georgia
Upcoming SlideShare
Loading in …5
×

Seamless Data Center Operations - Norcross, Georgia

2,578 views

Published on

McKenney’s made significant upgrades to the mechanical systems infrastructure—including chillers, piping and pumps—without interrupting data center operations.

Published in: Business, Technology
  • Be the first to comment

  • Be the first to like this

Seamless Data Center Operations - Norcross, Georgia

  1. 1. Project Name Large Data Center Project Location Norcross, Georgia Project Team Owner: Communications Services Provider General Contractor: Westin Construction Engineer: Black & Veatch Specializations Plumbing Shop Prefab Energy Management Pipe Shop Prefab Sheet Metal Shop Prefab Markets Mission Critical Central Plants
  2. 2. McKenney’s made significant upgrades to the mechanical systems infrastructure—including chillers, piping and pumps—without interrupting data center operations.
  3. 3. The Challenge Critical equipment in the facility had to remain active, with optimal redundancy at all times. The engineer and McKenney’s had to develop a detailed sequence of construction procedures. The Solution McKenney’s built a large steel platform in sections above the existing chillers. Each chiller was individually lifted to its section on the platform where it was reconnected quickly using prefabricated piping connections. Once startup and commissioning was completed on the relocated chiller, the team began to work on the next chiller. The content of this document is not intended as an endorsement.
  4. 4. The Results The complicated process was completed without any interruption to data center operations while adhering to facility security procedures. The customer expressed satisfaction with the quality and expediency of the work.
  5. 5. Atlanta Office: 1056 Moreland Industrial Boulevard Atlanta, Georgia 30316 P: 404-622-5000 Charlotte Office: 3601 Performance Road Charlotte, North Carolina 28214 P: 704-357-1200 sales@mckenneys.com www.mckenneys.com
  6. 6. Atlanta Office: 1056 Moreland Industrial Boulevard Atlanta, Georgia 30316 P: 404-622-5000 Charlotte Office: 3601 Performance Road Charlotte, North Carolina 28214 P: 704-357-1200 sales@mckenneys.com www.mckenneys.com

×