Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.

Knocking It Out of the Park - Mechanical Systems Installation in Charlotte, North Carolina

79 views

Published on

McKenney’s installed multiple mechanical systems and provided design/assist support at the BB&T Ballpark–Home of the Charlotte Knights. For more information visit http://www.mckenneys.com.

Published in: Business
  • Be the first to comment

  • Be the first to like this

Knocking It Out of the Park - Mechanical Systems Installation in Charlotte, North Carolina

  1. 1. Knocking It Out of the Park PROJECT NAME žž BB&T Ballpark– Home of the Charlotte Knights PROJECT LOCATION žž Charlotte, North Carolina PROJECT TEAM žž Owner: BB&T Knights Baseball, LLC žž General Contractor: Rodgers Builders, Inc., Barton Malow, R.J. Leeper Construction žž Architect: Odell Associates žž Engineer: Smith Seckman Reid, Inc. SPECIALIZATIONS Building Information Modeling LEED Certification MARKETS žž Public Assembly & Places of Worship M cKenney’s installed multiple mechanical systems and ­ rovided design/assist p support at the BB&T Ballpark–Home of the Charlotte Knights. THE CHALLENGE With active city streets on all four sides of the property, the stadium had no on-site storage. Congested ceiling heights also posed issues for McKenney’s and joint venture partner 404-622-5000 info@mckenneys.com 1056 Moreland Industrial Boulevard Atlanta, Georgia 30316 Superior Mechanical Systems. In addition, McKenney’s was tasked with maintaining a tight budget through a design/assist process. THE SOLUTION To overcome storage and access shortfalls, materials were stored at McKenney’s and delivered to the site as needed during nonrush hour times with traffic control assistance. Building Information Modeling (BIM) was used to accommodate ceiling heights and help www.mckenneys.com prevent conflicts with other trades. To reduce costs, the McKenney’s design team recommended unit re-configuration and flexible variable refrigerant flow technology. THE RESULTS The project is on budget and minimal material storage on site has resulted in a clean and safe work environment. Completion is scheduled for 2014. 704-357-1200 info@mckenneys.com 3601 Performance Road Charlotte, North Carolina 28214 © 2014 McKenney’s, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A. McKenney’s, Inc. and the McKenney’s, Inc. logo are registered trademarks of McKenney’s, Inc. All other trademarks are the property of their respective owners. The content of this document is not intended as an endorsement.

×